一种利用实时功率自动累计电厂超欠电量的方法 Download PDFInfo
- Publication number
- CN103366229B CN103366229B CN201210083086.XA CN201210083086A CN103366229B CN 103366229 B CN103366229 B CN 103366229B CN 201210083086 A CN201210083086 A CN 201210083086A CN 103366229 B CN103366229 B CN 103366229B
- Authority
- CN
- China
- Prior art keywords
- power
- electric weight
- electric
- owing
- super
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 17
- 230000005540 biological transmission Effects 0.000 claims abstract description 11
- 230000005611 electricity Effects 0.000 claims abstract description 10
- 238000007726 management method Methods 0.000 claims abstract description 6
- 230000010354 integration Effects 0.000 claims description 10
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 claims description 6
- 238000009792 diffusion process Methods 0.000 claims 1
- 238000009825 accumulation Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000013480 data collection Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
- Y02P90/82—Energy audits or management systems therefor
Abstract
一种利用实时功率自动累计电厂超欠电量的方法,它涉及电力系统超欠电量累计的方法。它解决了电度表不能存储计划值,无法累计出实时超欠电量的问题。本发明的方法为:通过EMS能量管理系统采集符合精度要求的实时被考核数据;在满足二次系统安全防护的前提下,实现了应用安全分区四区到实时安全分区一区的计划值信息单向传输,利用FTP服务和EXCEL开发专用管理传输程序;对功率计划曲线按要求进行上下浮动计算形成上下计划曲线;利用电量=瞬时电力按时间积分的原理计算电度量,实时比较实时功率电力与计划考核上下限之间的差异,并对超出和欠缺部分电力进行积分计算电度量。本发明量化了考核指标,对电厂的监管方便。
Description
技术领域
本发明涉及电力系统超欠电量累计的方法,尤其涉及一种利用实时功率自动累计电厂超欠电量的方法。
背景技术
目前,全国大部分地区电源建设严重超前电网建设,造成省内大机组停机或不能满发,运行极不经济。同时各地方电厂因供热等原因,不断上网发电,对地方电厂的考核手段相对落后,造成全网运行不经济,调峰能力下降。对各发电厂从电量考核上,不能从电度表上准确反映出每日机组按发电计划超发和欠发的电度量,给调度运行提供准确的实时依据及考核带来了不便的问题。
发明内容
本发明为了解决现有电度表不能存储计划值,无法累计出实时超欠电量的问题,提供了一种利用实时功率自动累计电厂超欠电量的方法,解决该问题的具体技术方案如下:
本发明的的步骤如下:
步骤一、通过EMS能量管理系统采集符合精度要求的电厂发电及上网实时功率数据,数据精度为±0.5%;
步骤二、在满足二次系统安全防护的前提下,实现了应用安全分区四区到实时安全分区一区的计划值信息单向传输,利用FTP服务和EXCEL开发专用管理传输程序;
步骤三、对功率计划曲线按要求进行上下浮动计算(一般为±2%),形成上、下计划曲线,要求电厂实时发电功率或上网功率曲线在计划上、下限曲线内运行,不超也不欠,既不大于上限也不小于下限;
步骤四、利用电量=瞬时电力按时间积分的原理计算电度量,实时比较实时功率电力与计划考核上下限之间的差异,如果大于计划上限,则通过运算,自动累计超过上限部分功率电力的积分,计算超出计划部分的电量,并对超过部分进行累加,形成时、日、月、年超出电量的数据,如果小于计划下限,则通过运算,自动累计欠缺下限部分功率电力的积分,计算欠缺计划部分的电量并存储,并对欠缺部分电量进行累加,形成时、日、月、年超出电量的数据并存储;
步骤五、采用应用程序通过对超欠电力的积分,统计出电厂的超欠电度量,并能统计出电厂的小时、日、月、季、年的超欠电量数据值,实现电厂超欠电量的自动累计。
本发明一种利用实时功率自动累计电厂超欠电量的方法具有以下优点:一、利用电量=瞬时电力按时间积分的原理计算电度量;二、参与实时考核的实时信息采集精度高,所有遥测量的采集精度均在±0.5%以内,大部分能满足±0.2%精度。为电量积分奠定良好的数据基础;三、通过应用软件开发实现计划值自动计算计划考核上下限,并与实时电力一同显示,同时实时值与计划值比较计算超欠电力,形成曲线非常直观,可以保存历史数据;四、通过软件开发实现各电厂功率考核点超欠电力的累计积分,超欠分别统计并实现历史存储和统计;五、在满足二次系统安全防护的前提下,实现了应用四区到实时一区的计划值信息单向传输;六、利用FTP服务和EXCEL开发专用管理传输程序,成倍地提高了工作效率,手工输入数据需1个工作日,现在只要执行一个程序即可完成;七、因有准确的依据,量化了考核指标和考核结果,对地方电厂的考核具有可操作性。
附图说明
图1是考核数据采集与计划值传输工作原理图,图2某电厂发电总加计划考核曲线与实时曲线运行图,图3是超欠及积分电量累计程序流程图。
具体实施方式
具体实施方式一:结合图1描述本实施方式。本实施方式的方法的步骤如下:
步骤一、通过EMS能量管理系统采集符合精度要求的电厂发电及上网实时功率数据,数据精度要达到±0.5%以内;
步骤二、在满足二次系统安全防护的前提下,实现了应用安全分区四区到实时安全分区一区的计划值信息单向传输,利用FTP服务和EXCEL开发专用管理传输程序,手工输入数据需1个工作日,现在只要执行一个程序即可完成;
步骤三、对功率计划曲线按要求进行上下浮动计算(一般为±2%),形成计划上、下限曲线,理想情况要求电厂实时发电功率或上网功率曲线在计划上、下限曲线内运行,不超也不欠,既不大于上限也不小于下限;
步骤四、利用电量=瞬时电力按时间积分的原理计算电度量,实时比较实时功率电力与考核上下限之间的差异,如果大于计划上限,则通过运算,自动累计超过上限部分功率电力的积分,计算超出计划部分的电量,并对超过部分进行累加,形成时、日、月、年超出电量的数据,如果小于计划下限,则通过运算,自动累计欠缺下限部分功率电力的积分,计算欠缺计划部分的电量并存储,并对欠缺部分电量进行累加,形成时、日、月、年超出电量的数据并存储;
步骤五、采用应用程序通过对超欠电力的积分,统计出电厂的超欠电度量,并能统计出电厂的小时、日、月、季、年的超欠电量数据值,实现电厂超欠电量的自动累计,形成报表便于考核。
Claims (1)
1.一种利用实时功率自动累计电厂超欠电量的方法,其特征在于该方法的步骤如下:
步骤一、通过EMS能量管理系统采集符合精度要求的电厂发电及上网实时功率数据,数据精度要达到±0.5%以内;
步骤二、在满足二次系统安全防护的前提下,实现了应用安全分区四区到实时安全分区一区的计划值信息单向传输,利用FTP服务和EXCEL开发专用管理传输程序;
步骤三、对功率计划曲线按要求进行上下浮动计算,形成计划曲线上、下限,在计划曲线上、下限内运行,不超也不欠,既不大于上限也不小于下限;
功率计划曲线是计划值信息按时间微分后的数值的图形化集合;
步骤四、利用电量=瞬时电力按时间积分的原理计算电度量,实时比较实时功率电力与其对应的计划曲线上、下限上的数值之间的差异,如果大于计划曲线上限上的数值,则通过运算,自动累计超过上限部分功率电力的积分,计算超出计划部分的电量,并对超过部分进行累加,形成时、日、月、年超出电量的数据,如果小于计划曲线下限上的数值,则通过运算,自动累计欠缺下限部分功率电力的积分,计算欠缺计划部分的电量并存储,并对欠缺部分电量进行累加,形成时、日、月、年欠缺电量的数据并存储;
步骤五、应用程序通过对超欠电力的积分,统计出电厂的超欠电度量,并能统计出电厂的小时、日、月、季、年的超欠电量数据值,实现电厂超欠电量的自动累计。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210083086.XA CN103366229B (zh) | 2012-03-27 | 2012-03-27 | 一种利用实时功率自动累计电厂超欠电量的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210083086.XA CN103366229B (zh) | 2012-03-27 | 2012-03-27 | 一种利用实时功率自动累计电厂超欠电量的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103366229A CN103366229A (zh) | 2013-10-23 |
CN103366229B true CN103366229B (zh) | 2016-05-11 |
Family
ID=49367522
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210083086.XA Active CN103366229B (zh) | 2012-03-27 | 2012-03-27 | 一种利用实时功率自动累计电厂超欠电量的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103366229B (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201017443Y (zh) * | 2007-03-19 | 2008-02-06 | 节能技术有限公司 | 用电量智能监测仪表 |
CN201251814Y (zh) * | 2008-09-12 | 2009-06-03 | 北京博纳电气有限公司 | 阶梯预付费电能表 |
CN201503468U (zh) * | 2009-09-28 | 2010-06-09 | 威胜集团有限公司 | 电压质量电能表 |
CN101752903A (zh) * | 2009-11-27 | 2010-06-23 | 清华大学 | 一种时序递进式电力调度方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8381021B2 (en) * | 2010-08-25 | 2013-02-19 | Itron, Inc. | System and method for automated unattended recovery for remotely deployed intelligent communication devices |
-
2012
- 2012-03-27 CN CN201210083086.XA patent/CN103366229B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201017443Y (zh) * | 2007-03-19 | 2008-02-06 | 节能技术有限公司 | 用电量智能监测仪表 |
CN201251814Y (zh) * | 2008-09-12 | 2009-06-03 | 北京博纳电气有限公司 | 阶梯预付费电能表 |
CN201503468U (zh) * | 2009-09-28 | 2010-06-09 | 威胜集团有限公司 | 电压质量电能表 |
CN101752903A (zh) * | 2009-11-27 | 2010-06-23 | 清华大学 | 一种时序递进式电力调度方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103366229A (zh) | 2013-10-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103268570B (zh) | 一种电网经济调度预评估系统及方法 | |
CN104283234A (zh) | 基于大时间尺度机组检修的风电接纳能力评估方法 | |
Sahbani et al. | Development prospect of smart grid in Morocco | |
Morrison | Global demand projections for renewable energy resources | |
CN103366229B (zh) | 一种利用实时功率自动累计电厂超欠电量的方法 | |
Krishnan et al. | Building foresight in long-term infrastructure planning using end-effect mitigation models | |
Shi et al. | The capacity joint optimization of energy storage and renewable generation based on simulation | |
Gudimetla et al. | Application of energy storage and STATCOM for grid quality issues | |
Hawkins et al. | Evolving role of wind forecasting in market operation at the CAISO | |
Hadley et al. | Impacts of demand-side resources on electric transmission planning | |
Krad et al. | Quantifying the operational benefits of conventional and advanced pumped storage hydro on reliability and efficiency | |
Phadke | Empirical analysis of the variability of wind generation in India: implications for grid integration | |
CN105005936A (zh) | 利用实时功率自动累计电厂超欠电量的方法 | |
Arseneaux | 20 MW Flywheel frequency regulation plant | |
Lu et al. | The wide-area energy storage and management system phase II Final Report-Flywheel Field Tests | |
van Tonder et al. | Investigating demand response potential in a mining group | |
Lee | Exploring frequency regulation market transformation | |
Aburub et al. | Optimal generation planning to improve storage cost and system conditions | |
Abdel-Karim | Effects of integrating wind power for representative load scenarios in a us electric power system: Operational costs and environmental impacts | |
Faeth et al. | A clash of competing necessities | |
Zhang et al. | Wind power availability and increased capacity credit for multiple wind farms | |
Flynn et al. | Renewables integration, flexibility measures and operational tools for the Ireland and N. Ireland power system | |
Jones et al. | The value of distributed solar electric generation to san antonio | |
Elombo et al. | Impacts of grid integration of wind energy in the Namibian power network | |
Tran et al. | Sensitivity analysis of probabilistic reliability evaluation of KEPCO system using TRELSS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |