CN103362442A - 钻井多点连通循环采集地热法 - Google Patents
钻井多点连通循环采集地热法 Download PDFInfo
- Publication number
- CN103362442A CN103362442A CN2012100897889A CN201210089788A CN103362442A CN 103362442 A CN103362442 A CN 103362442A CN 2012100897889 A CN2012100897889 A CN 2012100897889A CN 201210089788 A CN201210089788 A CN 201210089788A CN 103362442 A CN103362442 A CN 103362442A
- Authority
- CN
- China
- Prior art keywords
- well
- wells
- multiple spot
- communicated
- connected system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24T—GEOTHERMAL COLLECTORS; GEOTHERMAL SYSTEMS
- F24T10/00—Geothermal collectors
- F24T10/10—Geothermal collectors with circulation of working fluids through underground channels, the working fluids not coming into direct contact with the ground
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/10—Geothermal energy
Abstract
钻井多点连通循环采集地热法:是运用钻井技术在两井之间形成多点连通系统;通过工质在多点连通系统中进行循环获取热量。1.两井之间进行多点连通的方法:①先由一井(A)下部向另一井(B)方位侧钻,再以与主井一定间距作平行钻进,并超过主井井深。②封隔分支井上部与主井的连通。③在主井底部与分支井下部进行连通。④由另一井(B)下部向分支井段以一定间距作多条平行连通。2.技术延伸:对多点连通系统进行压裂作业获得贯穿连通系统的裂缝,进而增加工质与热源体的接触面积。由一口井分别向不同方位的多口井进行多点连通构成群组连通系统。即一口注井托两口出井、三口出井、四口出井等以提高效率。
Description
1技术领域
本发明是地热能开发技术的一种方法。它涉及到地热能学、地质构造学和石油钻井工艺技术等领域相关科学与技术。
2背景技术
目前,地热能开采方法主要三种。
第一种钻直井穿过地热储层的含水沙层。下筛管渗水,上部用套管封固。再下潜水泵将高温热水抽至地面进行利用。这种方法一是受资源条件限制,二是消耗地下水资源,不能持续利用。
第二种方法是在一定距离范围内,钻两口直井。一口作为注水井,另一口作抽水井。
这种方法虽然避免了消耗地下水资源。但是,前提条件是储热岩石透水性要好。遇到低渗透地层注水难度加大,成本增加,无法进行商业开发。
第三种是增强型地热系统。针对高温干热岩体采集地热的一种方法。先钻透高温结晶岩石并向其中注入高压水从而形成垂直裂缝,然后在直井旁边一定距离内,再钻一井与直井来抽取热水。通俗的讲就是用工程方法制造一个封闭系统,在向一口井中注入冷水的同时能从另一口井中抽出热水。这种方法由于施工难度较大、投资风险大并且关键技术掌握在国外公司手中,所以目前在国内还没有推行。
为了更好开发利用地热能这一清洁能源,使它能够长久为人类社会服务。在确保环境、资源安全的前提下,广泛商业开发是实现这一目标的唯一途径。
地热能商业开发必须满足两个条件,第一对资源条件的普遍适应性。第二投入与产出要成正比。目前地热能开发大都是通过钻开储热岩层,然后用水作介质直接或间接循环来完成热量交换。高额钻井成本短期内不会有明显的变化。热交换效率低是阻碍商业开发的主要技术瓶颈。同样条件下增加循环介质与热源岩石体的接触面积可以提高热交换效率。现行的地热能开采方法没能在这方面有所突破。使地热能开发实现商业化这一愿景步履艰难。本发明正是利用现有工程技术手段完成这一突破。与现行地热能开采方法相比,能够成倍增加循环介质与热源体的接触面积。从而大幅度提高热交换效率。
3发明内容
首先在一定距离的两点上分别钻A、B两直井(也可以是两斜井)。两井钻达目的层后分别下技术套管封固。然后在A井下部向B井方位开窗侧钻,经增斜、稳斜、降斜至0度,位移30-40米,与主井平行钻至超过主井井深40米,分支井完成。在分支井上部造斜或稳斜段下封隔器或注水泥封堵;再由主井底部出套管脚与分支井作连通,这样形成鱼钩状井眼。在B井下部多处向A井分支井直井段开窗侧钻作多条等分、平行连通井眼,并分别下筛管。这样A、B两井之间就形成一个闭合多点连通系统。由A井注常温水流经A井分支井、多条连通井段,完成热量交换再由B井返出热水。如图所示:四点连通示意图。
以上所述两直井之间的多点连通方法同样也适应两斜井之间的多点连通。它的特点是工质在系统内能够全覆盖循环,即不会出现短路循环。对于低渗透热岩层和干热岩层的地热能开发是一种新的尝试。
实际操作中可以根据具体储热层地质情况选择几点连通和间距。在此连通系统上进行压裂作业,可以获得贯穿连通井眼之间的裂缝,增加工质与热源岩石体的接触面积从而提高热交换效率。在A井以多点连通方法向多井进行连通作业(两组、三组、四组等),形成群组连通系统。以提高投资效率。
4附图说明
如图所示,常温水由A井井口注入井底(进入热量采集区),然后上返流经A井分支井和四条连通井段,然后汇入B井完成热量交换;热水由B井返出地面进入热量释放区完成热量交换后常温水进入蓄水池待注。就这样完成一个循环过程,不间断地重复这个循环过程就是把地下热能输送到地面的过程。
常温水——注入多点连通采热系统吸收热量——热水返出地面至用户释放热量
通过测定注水排量与返出热水温度数值变化,找出当返出热水温度恒定时注水排量的最大值,此排量值即为这个多点连通采热系统的合理注水排量值。
5具体实施方式
一、根据地质资料和目的层(即地热储层)地层压力梯度确定两开或三开井。
二、A、B两井之间的距离以定向井安全施工的最大极限以内为宜。
三、A、B两井分别钻达目的层并下技术套管封固。
四、在A井下部(接近储热层)下斜向器,用定向钻具和MWD仪器向B井方向开窗侧钻。位移30-40米井斜降至0度。与A井平行钻进至超过主井井深40米。起钻在造斜或稳斜处下封隔器或注水泥封固。下钻钻碎斜向器出套管脚,应用MWD和地质导向技术大角度(50-70度)与分支井连通。
五、在B井下部由下至上分别下人斜向器,向A井分支井直井段应用MWD和地质导向技术作多条连通井眼,并分别下人筛管。这样钻井多点连通采热系统完成。
Claims (8)
1.一种采用钻井工艺技术在两井之间形成多点连通的方法。其特征在于采用以下步骤:①先由一井(A)下部向另一井(B)方位侧钻,再以与主井一定间距作平行钻进,并超过主井井深。②封隔分支井上部与主井的连通。③在主井底部与分支井下部进行连通。④由另一井(B)下部向分支井段以一定间距作多条平行连通。
2.一种采用两井间多点连通系统进行地热能源开采的方法。其特征在于:对多点连通系统进行压裂作业从而获得贯穿连通系统的裂缝,增加工质与热源体的接触面积;由一口井分别向不同方位的多口井进行多点连通构成群组连通系统,即一口注井托两口出井、三口出井、四口出井等采热群组系统。
3.根据权利要求1所述:一种采用钻井工艺技术在两井之间形成多点连通的方法。其特征在于:两井之间通过其中一井的分支井作为桥梁进行多点连通。
4.根据权利要求1所述:一种采用钻井工艺技术在两井之间形成多点连通的方法。其特征在于:主井(A)通过对分支井上部封隔、下部连通,形成封闭逆向通道。
5.据权利根要求1所述:一种采用钻井工艺技术在两井之间形成多点连通的方法。其特征在于:多条平行连通井眼是从与分支井连通点的低位向主井侧钻点的相对高位的走向。
6.据权利根要求1所述:一种采用钻井工艺技术在两井之间形成多点连通的方法。其特征在于:此多点连通系统满足了工质在循环过程中由低位到高位全覆盖整个系统的充分条件。
7.据权利根要求2所述:一种采用两井间多点连通系统进行地热能源开采的方法。其特征在于:在使用多点连通系统开采地热能源时在系统中进行压裂作业,获得裂缝以增加工质与热源体的接触面积。
8.据权利根要求2所述:一种采用两井间多点连通系统进行地热能源开采的方法。其特征在于:在开采地热能源时运用两井间多点连通技术方法进行群组连通,即一口注水井以多点连通方法同时连通多口(二、三、四等)出水井。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210089788.9A CN103362442B (zh) | 2012-03-30 | 2012-03-30 | 钻井多点连通循环采集地热法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210089788.9A CN103362442B (zh) | 2012-03-30 | 2012-03-30 | 钻井多点连通循环采集地热法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103362442A true CN103362442A (zh) | 2013-10-23 |
CN103362442B CN103362442B (zh) | 2016-01-13 |
Family
ID=49364623
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210089788.9A Active CN103362442B (zh) | 2012-03-30 | 2012-03-30 | 钻井多点连通循环采集地热法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103362442B (zh) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104154668A (zh) * | 2014-08-28 | 2014-11-19 | 上海天合石油工程股份有限公司 | 封闭式深井地热能采集系统 |
CN104695926A (zh) * | 2014-12-30 | 2015-06-10 | 王作韬 | 一种低温地热能开采技术方法 |
CN105625993A (zh) * | 2014-11-28 | 2016-06-01 | 吉林大学 | 干热岩多循环加热系统及其生产方法 |
WO2016082188A1 (zh) * | 2014-11-28 | 2016-06-02 | 吉林大学 | 干热岩多循环加热系统及其生产方法 |
CN105696996A (zh) * | 2016-01-29 | 2016-06-22 | 太原理工大学 | 一种干热岩地热人工热储的建造方法 |
CN106196233A (zh) * | 2016-07-15 | 2016-12-07 | 西安交通大学 | 一种中深部地热能供暖系统 |
CN106285475A (zh) * | 2016-08-30 | 2017-01-04 | 中国石油集团川庆钻探工程有限公司工程技术研究院 | 一种地热井热循环方法 |
CN106948795A (zh) * | 2017-03-30 | 2017-07-14 | 中国石油大学(北京) | 一种多分支水平井闭式循环开发水热型地热的方法 |
CN107178344A (zh) * | 2017-07-14 | 2017-09-19 | 中国石油大学(华东) | 一种注入co2动用地热能开发天然气水合物藏的方法 |
CN107269254A (zh) * | 2017-07-14 | 2017-10-20 | 中国石油大学(华东) | 一种利用地压型地热能开采海底水合物的井组结构和方法 |
CN108222831A (zh) * | 2018-01-03 | 2018-06-29 | 西南石油大学 | 多向地热井及高效开采干热岩方法 |
CN115163003A (zh) * | 2018-07-04 | 2022-10-11 | 埃沃尔技术股份有限公司 | 形成高效率地热井筒的方法 |
WO2023147670A1 (en) * | 2022-02-04 | 2023-08-10 | Novus Earth Energy Operations Inc. | Balanced geothermal energy transfer loop |
WO2023247768A1 (fr) * | 2022-06-24 | 2023-12-28 | Dynasteer | Architecture de forage ménagée dans un sous-sol pour une installation géothermique, installation et procédé associé |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3863709A (en) * | 1973-12-20 | 1975-02-04 | Mobil Oil Corp | Method of recovering geothermal energy |
WO1998022760A1 (en) * | 1996-11-22 | 1998-05-28 | Moe Per H | A plant for exploiting geothermal energy |
CN1252851A (zh) * | 1997-04-28 | 2000-05-10 | 国际壳牌研究有限公司 | 在井系统中使用的设备 |
WO2003095795A1 (en) * | 2002-05-08 | 2003-11-20 | Cdx Gas, L.L.C. | Method and system for underground treatment of materials |
US20060048946A1 (en) * | 2004-09-07 | 2006-03-09 | Al-Muraikhi Ahmed J | Wellbore system for producing fluid |
CN101629485A (zh) * | 2009-06-17 | 2010-01-20 | 中国地质科学院勘探技术研究所 | 地下热能源钻井连通井开采方法 |
WO2010074980A1 (en) * | 2008-12-10 | 2010-07-01 | Carter Ernest E Jr | Method and apparatus for increasing well productivity |
US20100170672A1 (en) * | 2008-07-14 | 2010-07-08 | Schwoebel Jeffrey J | Method of and system for hydrocarbon recovery |
CN102116140A (zh) * | 2011-01-25 | 2011-07-06 | 煤炭科学研究总院西安研究院 | 一种提高地面煤层气抽采效果的施工方法 |
-
2012
- 2012-03-30 CN CN201210089788.9A patent/CN103362442B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3863709A (en) * | 1973-12-20 | 1975-02-04 | Mobil Oil Corp | Method of recovering geothermal energy |
WO1998022760A1 (en) * | 1996-11-22 | 1998-05-28 | Moe Per H | A plant for exploiting geothermal energy |
CN1252851A (zh) * | 1997-04-28 | 2000-05-10 | 国际壳牌研究有限公司 | 在井系统中使用的设备 |
WO2003095795A1 (en) * | 2002-05-08 | 2003-11-20 | Cdx Gas, L.L.C. | Method and system for underground treatment of materials |
US20060048946A1 (en) * | 2004-09-07 | 2006-03-09 | Al-Muraikhi Ahmed J | Wellbore system for producing fluid |
US20100170672A1 (en) * | 2008-07-14 | 2010-07-08 | Schwoebel Jeffrey J | Method of and system for hydrocarbon recovery |
WO2010074980A1 (en) * | 2008-12-10 | 2010-07-01 | Carter Ernest E Jr | Method and apparatus for increasing well productivity |
CN101629485A (zh) * | 2009-06-17 | 2010-01-20 | 中国地质科学院勘探技术研究所 | 地下热能源钻井连通井开采方法 |
CN102116140A (zh) * | 2011-01-25 | 2011-07-06 | 煤炭科学研究总院西安研究院 | 一种提高地面煤层气抽采效果的施工方法 |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104154668A (zh) * | 2014-08-28 | 2014-11-19 | 上海天合石油工程股份有限公司 | 封闭式深井地热能采集系统 |
CN105625993B (zh) * | 2014-11-28 | 2018-06-26 | 吉林大学 | 干热岩多循环加热系统及其生产方法 |
CN105625993A (zh) * | 2014-11-28 | 2016-06-01 | 吉林大学 | 干热岩多循环加热系统及其生产方法 |
WO2016082188A1 (zh) * | 2014-11-28 | 2016-06-02 | 吉林大学 | 干热岩多循环加热系统及其生产方法 |
CN104695926A (zh) * | 2014-12-30 | 2015-06-10 | 王作韬 | 一种低温地热能开采技术方法 |
CN105696996A (zh) * | 2016-01-29 | 2016-06-22 | 太原理工大学 | 一种干热岩地热人工热储的建造方法 |
CN106196233A (zh) * | 2016-07-15 | 2016-12-07 | 西安交通大学 | 一种中深部地热能供暖系统 |
CN106285475B (zh) * | 2016-08-30 | 2018-07-17 | 中国石油集团川庆钻探工程有限公司工程技术研究院 | 一种地热井热循环方法 |
CN106285475A (zh) * | 2016-08-30 | 2017-01-04 | 中国石油集团川庆钻探工程有限公司工程技术研究院 | 一种地热井热循环方法 |
CN106948795A (zh) * | 2017-03-30 | 2017-07-14 | 中国石油大学(北京) | 一种多分支水平井闭式循环开发水热型地热的方法 |
US10401056B2 (en) | 2017-03-30 | 2019-09-03 | China University Of Petroleum-Beijing | Hydrothermal geothermal development method of multilateral well closed circulation |
CN107178344A (zh) * | 2017-07-14 | 2017-09-19 | 中国石油大学(华东) | 一种注入co2动用地热能开发天然气水合物藏的方法 |
CN107269254A (zh) * | 2017-07-14 | 2017-10-20 | 中国石油大学(华东) | 一种利用地压型地热能开采海底水合物的井组结构和方法 |
CN108222831A (zh) * | 2018-01-03 | 2018-06-29 | 西南石油大学 | 多向地热井及高效开采干热岩方法 |
CN115163003A (zh) * | 2018-07-04 | 2022-10-11 | 埃沃尔技术股份有限公司 | 形成高效率地热井筒的方法 |
US11959356B2 (en) | 2018-07-04 | 2024-04-16 | Eavor Technologies Inc. | Method for forming high efficiency geothermal wellbores |
WO2023147670A1 (en) * | 2022-02-04 | 2023-08-10 | Novus Earth Energy Operations Inc. | Balanced geothermal energy transfer loop |
WO2023247768A1 (fr) * | 2022-06-24 | 2023-12-28 | Dynasteer | Architecture de forage ménagée dans un sous-sol pour une installation géothermique, installation et procédé associé |
Also Published As
Publication number | Publication date |
---|---|
CN103362442B (zh) | 2016-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103362442B (zh) | 钻井多点连通循环采集地热法 | |
CN101629485B (zh) | 地下热能源钻井连通井开采方法 | |
CN105840146A (zh) | 一种分支井体积压裂自循环开采干热岩地热方法 | |
CN105863568A (zh) | 一种利用地下热虹吸自循环开采干热岩地热方法 | |
CN105625993B (zh) | 干热岩多循环加热系统及其生产方法 | |
CN107100605B (zh) | 一种双水平井循环超临界二氧化碳开发干热岩的方法 | |
US20070245729A1 (en) | Directional geothermal energy system and method | |
CN105909214A (zh) | 一种利用长水平井自循环开采致密干热岩地热能的方法 | |
CN106968601B (zh) | 开采干热岩地热资源的井身结构及方法 | |
CN204252967U (zh) | 干热岩多循环加热系统 | |
CN107882535B (zh) | 一种采用水平井开发干热岩热能的工艺方法 | |
WO2016082188A1 (zh) | 干热岩多循环加热系统及其生产方法 | |
CN106640028A (zh) | 一种两井连通循环增强型地热系统完井方法 | |
CN208901664U (zh) | 基于同井注采开发地热能的地热井系统 | |
CN106894804A (zh) | 一种单井循环增强型地热系统完井方法 | |
CN109505577B (zh) | 干热岩开采方法 | |
US20240110731A1 (en) | Method for Configuring Wellbores in a Geologic Formation | |
CN104695926A (zh) | 一种低温地热能开采技术方法 | |
CN114198016B (zh) | 地热闭环工质循环开采方法 | |
CN104533372A (zh) | 利用定向压裂技术开采地热能的方法 | |
CN109958418A (zh) | 一种提高换热面积和采热流量的伞型egs系统 | |
CN108489124A (zh) | 一种地热井下多回路换热方法 | |
KR101237723B1 (ko) | 심부지열발전을 위한 심정 시스템 및 그 시추방법 | |
CN111520924A (zh) | 一种地下人工热储构造 | |
CN207063968U (zh) | 一种两井连通循环增强型地热完井系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220613 Address after: 105, 1f, building 5, Third District, changshengyuan, Chengnan street, Changping District, Beijing Patentee after: Beijing Zhonghe Lvjian Energy Technology Co.,Ltd. Address before: Wan Zhuang oil base in Hebei province Guangyang District of Langfang District 14 12-1-14 Patentee before: Liu Hongbin |
|
TR01 | Transfer of patent right |