CN103362214A CN2012101047608A CN201210104760A CN103362214A CN 103362214 A CN103362214 A CN 103362214A CN 2012101047608 A CN2012101047608 A CN 2012101047608A CN 201210104760 A CN201210104760 A CN 201210104760A CN 103362214 A CN103362214 A CN 103362214A
Authority
CN
China
Prior art keywords
floor structure
structure body
unit
floor
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101047608A
Other languages
Chinese (zh)
Other versions
CN103362214B (en
Inventor
孙善骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinhu comprehensive inspection and Testing Center
Original Assignee
孙善骏
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 孙善骏 filed Critical 孙善骏
Priority to CN201210104760.8A priority Critical patent/CN103362214B/en
Publication of CN103362214A publication Critical patent/CN103362214A/en
Application granted granted Critical
Publication of CN103362214B publication Critical patent/CN103362214B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Floor Finish (AREA)

Abstract

The invention discloses an open structure packaging combined type building which is characterized in that K structure unit assemblies mainly comprise unit cylinders 1, unit chapiter connecting plates 2, unit support head connecting plates 6, positioning bodies 3, supporting pieces 4, connecting plates 5, cylinder holes 7 and chapiter connecting plate mounting holes 8, and are adopted in floor structure body unit assemblies and maintenance bodies, and supported on a floor structure body column unit body 9 arranged in each floor structure body unit assembly; two floor structure bodies and the K structure unit assemblies are mated and mounted to form a floor structure space; then combination force templates or/and other wallboard materials 14 are mounted; and the open structure packaging combined type building is formed. Construction modules are manufactured in a factory and by moulds, and used materials of all components are subjected to optimization selection, so that building materials are saved to the greatest extent, and a steel structure building can be built quickly by adopting bolted connection preferentially.

Description

The packaging combined building of opening structure
Technical field
The present invention relates to building field, is the packaging combined building of a kind of modular opening structure, is called again the packaging combined building of K structure, is mainly used in steel construction civilian, industrial, agriculture usefulness, the steel construction that is applicable to build up fast.
Background technology
At present, the packaging combined building of opening structure that does not also have this pattern, along with the building variation frequent and that require with the room of upgrade removing, building up fast steel construction more and more becomes the demand in market, along with popularizing of the steel construction of civilian, industrial, agriculture usefulness, adopts packaging combined form of structure, range site assembly Fast Installation, the body plan building more and more becomes the problem that needs solution scientifically and rationally.In order to solve modular packaging combined building, packaging combined angle support steel structure building, packaging combined building with cable-supported steel structure, various combination shaping plate, the various relevant building system and the relevant Patent projects such as parts, tough Combined concrete corrosion protection steel construction piece and other combined member that utilizes wind and solar energy of this problem and supporting inventor's invention, save to greatest extent building materials, the building that fast Development is civilian, commercial, industrial is necessary to invent a kind of applicable, advanced packaging combined building of opening structure.
Summary of the invention
The objective of the invention is to provide a kind of modular opening structure packaging combined building, be applicable to build up fast steel construction, save to greatest extent building materials.
The basic mode of the packaging combined building of opening structure of the present invention mainly is: adopt the mode oneself selected as required permutation and combination floor structure body unit assembly become the floor structure body, on the floor structure scapus uncle (mother's brother) cell cube 9 that adopts a plurality of K element of construction assemblys to be supported in to be equipped with in each floor structure body unit assembly, just consisted of the floor face if be furnished with floor plates at each floor structure body unit assembly, become the floor structure space after mounted two floor faces and the supporting installation of a plurality of K element of construction assembly, K element of construction assembly is called again opening structure unit combination body, be exposed at the floor structure body beam 11 of outside, floor structure space or/and on the floor structure body letter beam 10 external wall waterproof folding piece 13 is installed, the exterior wall combination shaping plate is installed or/and other wallboard material 14 in waterproof folding piece 13, floor structure body beam 11 in the floor structure interior volume is directly installed the interior wall combination shaping plate or/and other wallboard material 14 or/and can not want waterproof folding piece 13 on the floor structure body letter beam 10, interior wall, the exterior wall combination shaping plate is or/and other wallboard material 14 is the sheet material of not doing restriction, the material that can adopt other to need, can make two-sided or other maintenance mode that needs, the separation mode, so just consisted of the packaging combined building of opening structure, its annex, water power, ventilate, air-conditioning, communication, coal gas, TVs etc. arrange and reserve auxiliary equipment as required, do not do being particularly limited.To sum up, principal character of the present invention is for to become the floor structure body by a plurality of floor structure body unit assembly permutation and combination, between two floor structure bodies or adopt a plurality of K element of construction assemblys to be connected on the floor structure scapus uncle (mother's brother) cell cube 9 that is equipped with in each floor structure body unit assembly of floor structure body up and down between floor structure body and the constructure ground basis to constitute the floor structure space; Mainly by unit cylinder 1 two ends linkage unit column cap junction plate 2, in the middle of unit cylinder 1, connect support member 4 and consist of K element of construction assembly; Form floor structure body unit assembly by floor structure body letter beam 10, floor structure body beam 11, the floor structure body secondary beam 12 of not fixing a number, floor structure body unit assembly is combined into the floor structure body; Floor structure body beam 11 on the floor structure space is or/and be equipped with combination shaping plate or/and other wallboard material 14 on the floor structure body letter beam 10; Single attached column K element of construction combination physical efficiency and floor structure scapus uncle (mother's brother) cell cube 9 connections that Half Beam is arranged, two attached column K element of construction assemblys form back-to-back has full post also can be connected with floor structure scapus uncle (mother's brother) cell cube connection.K element of construction assembly is to adopt unit cylinder 1 two ends linkage unit column cap junction plate 2, column cap junction plate installing hole 8 is arranged on the unit column cap junction plate 2, in the middle of unit cylinder 1, connect support member 4 with junction plate 5, on support member 4 terminations, generally done unit fastener junction plate 6, become K font structure spare after general employing said modules forms, also just consisted of K element of construction assembly; For being installed at unit cylinder 1, purlin, support, connector etc. can make porose or screw on it, all be called cylinder hole 7, cylinder hole 7 is to select the not limiting hole or the screw that adopt, unit cylinder 1 can adopt the making such as each shape steel tube, channel-section steel, C steel, weldment, shaped steel, and the multiple patent steel member of inventor's invention, combination steel member also can be made into unit cylinder 1 and parts thereof; Form floor structure body unit assembly by floor structure body letter beam 10, floor structure body beam 11, the floor structure body secondary beam 12 of not fixing a number, different floor structure body unit assemblys are combined into the floor structure body, the floor structure body becomes the floor face after spreading floor plates, generally in each floor structure body unit assembly, be equipped with floor structure scapus uncle (mother's brother) cell cube 9, floor structure scapus uncle (mother's brother) cell cube 9 can with K element of construction assembly on 8 pairs of column cap junction plate installing holes logical and can use the bolt connection; In order successfully to make 8 pairs of column cap junction plate installing holes on floor structure scapus uncle (mother's brother) cell cube 9 and the K element of construction assembly logical, the parts of mold production use the positioning body 3 that is reserved on the unit column cap junction plate 2 to be positioned the locating hole of floor structure scapus uncle (mother's brother) cell cube 9 when mounted, screw or hole that connecting bolt is installed can be arranged on the floor structure scapus uncle (mother's brother) cell cube 9, also can dispose in addition hold-doun nut or double end screwed pipe within it, the auxiliary hand hole of installation check can also be done in its side, and positioning body 3 main bodys can also can be other cylinder, tube shell for cone.Floor structure body unit assembly has single Half Beam, two Half Beam floor structure body unit assemblys etc., for can and various forms of floor structure body unit assembly distinguish supporting, K element of construction assembly is manufactured with full post K element of construction assembly and attached column K element of construction assembly, two attached column K element of construction assembly backrests are installed to form full post, just can be connected with floor structure scapus uncle (mother's brother) cell cube connection; There is the floor structure body unit assembly of two limit floor structure body beams 11 to be called general floor structure body unit assembly, there is the floor structure body unit assembly of three limit floor structure body beams 11 to be called three beam floor structure body unit assemblys, there is the floor structure body unit assembly of four limit floor structure body beams 11 to be called four beam floor structure body unit assemblys, floor structure body beam 11 can be the Half Beam that is divided into two, mainly be to cooperate attached column K element of construction assembly to install, Half Beam floor structure body unit assembly has monolateral Half Beam and bilateral Half Beam floor structure body unit assembly; General floor structure body unit assembly, three side bar floor structure body unit assemblys, four side bar floor structure body unit assemblys, single Half Beam and two Half Beam floor structure body unit assembly can make up in shape configuration as required, the mode permutation and combination that employing can be selected becomes the floor structure body, if having floor plates just to consist of the floor face on each floor structure body unit assembly; Between two floor faces or floor face and ground with becoming the floor structure space after the supporting installation of a plurality of K element of construction assembly, at the floor structure body beam 11 of the floor structure body unit assembly of outside, floor structure space or/and on the floor structure body letter beam 10 external wall waterproof folding piece 13 can be installed, on waterproof folding piece 13, the exterior wall combination shaping plate can be installed or/and other wallboard material 14, if being arranged, specific (special) requirements or exterior wall watt plate self can waterproof also can exempt waterproof folding piece 13, floor structure body beam 11 at the floor structure body unit assembly of floor structure interior volume is directly installed the interior wall combination shaping plate or/and other wallboard material 14 or/and can not fill waterproof folding piece 13 on the floor structure body letter beam 10, interior wall, the exterior wall combination shaping plate is or/and other wallboard material 14 can be made maintenance and the separation mode of two-sided or other special requirement, and other maintenance materials and door and window etc. dispose as required and are not construed as limiting; The preferential selection of the various patent combination shaping plates of inventor's invention supports the use; Various relevant building system, the parts isopreference of wind energy, solar energy of utilizing of inventor's invention selected to support the use; The patent tough Combined concrete corrosion protection steel construction piece that floor structure body letter beam 10, floor structure body beam 11, floor structure body secondary beam 12, K element of construction assembly etc. can be selected to adopt the inventor to invent or other combined member etc.; Staircase, escalator can be arranged in one or several floor structure body unit assembly, the floor structure body unit assembly that is furnished with stair will have corresponding suitability with the stair parts, position mode, the method for its layout are not done and are particularly limited, and the contrast such as the elevator shaft structure of escalator producer requires to arrange.Each component, such as floor structure body unit assembly, K element of construction assembly etc., all be called the unit combination body with a lifting elements body, so the unit combination body can be four side bars, four post uncle (mother's brother) floor structure bodies, four side bars, six post uncle (mother's brother) floor structure bodies etc., K element of construction assembly can be that full post also can be attached column K element of construction assembly.The building form of each ingredient of the packaging combined building of composition opening structure, shape, quantity, annex etc. are not done restriction.Can quote other many frame modes cooperation in the implementation makes, installs.Owing to adopted modularization making, the packaging combined building of opening structure be installed, all preferentially with bolts between a plurality of structures, unit combination body, just can Fast Installation, build up building fast.
The packaging combined building of opening structure provided by the invention, on the floor structure scapus uncle (mother's brother) cell cube 9 that has adopted a plurality of K element of construction assemblys to be supported in to be equipped with in each floor structure body unit assembly, adopt a plurality of floor structure body unit assemblys as required permutation and combination become the floor structure body, by between the floor face of two floor structure bodies or between floor face and ground with becoming the floor structure space after the supporting installation of a plurality of K element of construction assembly, be exposed at and combination shaping plate be installed or/and other wallboard material 14 on the floor structure body beam 11 of outside, floor structure space, floor structure body beam 11 in the floor structure interior volume is installed the interior wall combination shaping plate or/and other wallboard material 14, so just consisted of fast the packaging combined building of opening structure, because the packaging combined building components of modular making opening structure, the all parts batch production is produced, select through optimizing with material, building materials have been saved to greatest extent, the building block that batch production is produced preferentially connects with bolt, make up quick and easy for installationly, just can build up fast steel construction.
Description of drawings: the accompanying drawing 1 of the packaging combined building of opening structure of the present invention is a kind of schematic diagram of full post K element of construction assembly; Fig. 2 is a kind of schematic diagram of attached column K element of construction assembly; Fig. 3 is the schematic diagram of general six post uncle (mother's brother) floor structure body unit assemblys; Fig. 4 is a kind of schematic diagram of three side bars, six post uncle (mother's brother) floor structure body unit assemblys; Fig. 5 is a kind of schematic diagram of four side bars, six post uncle (mother's brother) floor structure body unit assemblys; Fig. 6 is a kind of schematic diagram of the two Half Beams of six attached column uncle (mother's brother)s and the single Half Beam floor structure of 3 half 3 post uncle (mother's brother)s body unit assembly; Fig. 7 is wallboard and external wall waterproof folding piece schematic diagram; Fig. 8 is a kind of schematic diagram of a kind of floor structure body unit assembly and the combination of a kind of K element of construction assembly; Fig. 9 is a kind of schematic diagram of unit column cap junction plate and unit fastener junction plate; Figure 10 is wallboard and external wall waterproof folding piece mounting means schematic diagram; Figure 11 is a kind of schematic diagram of four side bars, four post uncle (mother's brother) floor structure body unit assemblys; Figure 12 is that staircase floor structure body unit assembly stair are arranged schematic diagram.Each accompanying drawing shows all only be a special case.The packaging combined building of opening structure mainly by unit cylinder 1, unit column cap junction plate 2, unit fastener junction plate 6, positioning body 3, support member 4, junction plate 5, cylinder hole 7, column cap junction plate installing hole 8, floor structure scapus uncle (mother's brother) cell cube 9, floor structure body letter beam 10, floor structure body beam 11, floor structure body secondary beam 12, external wall waterproof folding piece 13, combination shaping plate or/and other wallboard material 14 etc. form.
The specific embodiment: with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, Figure 10, Figure 11, Figure 12, on prefabricated K element of construction assembly basis, ground or the floor structure scapus uncle (mother's brother) cell cube 9 that in floor structure body unit assembly, is equipped with adopt a plurality of K element of construction assemblys to install to be supported on the floor structure scapus uncle (mother's brother) cell cube 9 that is equipped with in each synthetic floor structure body unit assembly of upper layer group, the floor structure body adopts preselected mode to be arranged in a combination as required, if have floor plates just to consist of the floor face on each floor structure body unit assembly, between two floor faces or between floor face and ground with becoming the floor structure space after the supporting installation of a plurality of K element of construction assembly, at the floor structure body beam 11 of the outside, floor structure space that exposes or/and floor structure body letter beam 10 is installed external wall waterproof folding pieces 13, combination shaping plate is or/and other wallboard material 14 outside waterproof folding piece 13 is installed, floor structure body beam 11 in the floor structure interior volume is directly installed the interior wall combination shaping plate or/and other wallboard material 14 or/and can not want waterproof folding piece 13 on the floor structure body letter beam 10, interior wall, the exterior wall combination shaping plate is or/and other wallboard material 14 is the sheet material of not doing restriction, can adopt other material that needs or/and combined material, can make two-sided or other maintenance mode that needs, the separation mode, so just consisted of the packaging combined building of opening structure, its annex, water power, ventilate, air-conditioning, communication, coal gas, TVs etc. arrange and reserve auxiliary equipment as required, all do not do being particularly limited.K element of construction assembly is to adopt unit cylinder 1 two ends linkage unit column cap junction plate 2, column cap junction plate installing hole 8 is arranged on the unit column cap junction plate 2, in the middle of unit cylinder 1, connect support member 4 with junction plate 5, junction plate 5 is selected as required or need not do not done restriction, on support member 4 terminations, generally done unit fastener junction plate 6, at unit cylinder 1 purlin is installed, support, connectors etc. can the porose or screw of supporting making on it, all be called cylinder hole 7, cylinder hole 7 is to select the not limiting hole or the screw that adopt, has just consisted of K element of construction assembly after mainly adopting said modules to form; By the floor structure body letter beam 10 of not fixing a number, floor structure body beam 11, floor structure body secondary beam 12 forms floor structure body unit assembly, different floor structure body unit assemblys are combined into the floor structure body, the floor structure body becomes the floor face after spreading floor plates, floor structure body letter beam 10, floor structure body beam 11, floor structure body secondary beam 12 can adopt difformity, the material of form is made, frame mode, method, form, shape is not done and is particularly limited, generally in each floor structure body unit assembly, be equipped with floor structure scapus uncle (mother's brother) cell cube 9, floor structure scapus uncle (mother's brother) cell cube 9 can with K element of construction assembly on 8 pairs of general bolt connections of column cap junction plate installing hole; Being reserved with positioning body 3 on the unit column cap junction plate 2 is positioned in the locating hole of floor structure scapus uncle (mother's brother) cell cube 9 when floor structure scapus uncle (mother's brother) cell cube 9 is connected with K element of construction assembly, screw or hole that connecting bolt is installed can be arranged on the floor structure scapus uncle (mother's brother) cell cube 9, also can dispose in addition hold-doun nut or double end screwed pipe within it.For can and various forms of floor structure body unit assembly distinguish supporting, K element of construction assembly is manufactured with full post K element of construction assembly and attached column K element of construction assembly, two attached column K element of construction assembly backrests are installed to form full post, just can be connected with floor structure scapus uncle (mother's brother) cell cube connection, the floor structure scapus uncle (mother's brother) cell cube 9 that attached column K element of construction assembly also can be connected with Half Beam connects; There is the floor structure body unit assembly of two limit floor structure body beams 11 to be called general floor structure body unit assembly, there is the floor structure body unit assembly of three limit floor structure body beams 11 to be called three beam floor structure body unit assemblys, there is the floor structure body unit assembly of four limit floor structure body beams 11 to be called four beam floor structure body unit assemblys, floor structure body beam 11 can be the Half Beam that is divided into two, mainly be to cooperate attached column K element of construction assembly to install, Half Beam floor structure body unit assembly has monolateral Half Beam and bilateral Half Beam floor structure body unit assembly; General floor structure body unit assembly, three side bar floor structure body unit assemblys, four side bar floor structure body unit assemblys, single Half Beam and two Half Beam floor structure body unit assembly can be made assembly as required, adopt the mode permutation and combination of selecting to become the floor structure body, if having floor plates just to consist of the floor face on each floor structure body unit assembly, floor plates can adopt suitable material, sheet material, cast-in-place, prefabricated all can, the construction and the mounting means method do not do restriction; Two floor faces become the floor structure space after with the supporting installation of a plurality of K element of construction assembly, at the floor structure body beam 11 of the floor structure body unit assembly of outside, floor structure space or/and floor structure body letter beam 10 is installed external wall waterproof folding pieces 13, combination shaping plate is or/and other wallboard material 14 outside waterproof folding piece 13 is installed, floor structure body beam 11 at the floor structure body unit assembly of floor structure interior volume is directly installed the interior wall combination shaping plate or/and other wallboard material 14 or/and can not want waterproof folding piece 13 on the floor structure body letter beam 10, interior wall, the exterior wall combination shaping plate is or/and other wallboard material 14 can be made the maintenance of two-sided or other special requirement, the separation mode, waterproof folding piece 13, combination shaping plate is not or/and the component that the maintenances such as other wallboard material 14 need are done is particularly limited; Each component, such as floor structure body unit assembly, K element of construction assembly etc., all be called the unit combination body with a lifting elements body, so the unit combination body can be four side bars, four post uncle (mother's brother) floor structure bodies, four side bars, six post uncle (mother's brother) floor structure bodies etc., K element of construction assembly can be that full post also can be attached column K element of construction assembly.The building form of each ingredient of the packaging combined building of composition opening structure, shape, quantity etc. are not done restriction.Can adopt other many frame modes cooperation to make, install in the implementation.Since adopted modularization making that the packaging combined building of opening structure is installed, all preferentially with bolts between a plurality of structures, unit combination body, just can fast install, build up fast building.Other annex that need to dispose, auxiliary material etc. dispose as required and do not do restriction.

Claims (5)

1. packaging combined building of opening structure, mainly by unit cylinder (1), unit column cap junction plate (2), unit fastener junction plate (6), positioning body (3), support member (4), junction plate (5), cylinder hole (7), column cap junction plate installing hole (8), floor structure scapus uncle (mother's brother) cell cube (9), floor structure body letter beam (10), floor structure body beam (11), floor structure body secondary beam (12), external wall waterproof folding piece (13), combination shaping plate is or/and other wallboard material (14) composition, it is characterized in that: become the floor structure body by a plurality of floor structure body unit assembly permutation and combination, adopt a plurality of K element of construction assemblys to be connected on the floor structure scapus uncle (mother's brother) cell cube (9) that is equipped with in each floor structure body unit assembly of floor structure body up and down between two floor structure bodies or between floor structure body and the constructure ground basis and constitute the floor structure space.
2. the packaging combined building of opening structure according to claim 1 is characterized in that: mainly by unit cylinder (1) two ends linkage unit column cap junction plates (2), connect support member (4) and consist of K element of construction assembly in the middle of unit cylinder (1).
3. the packaging combined building of opening structure according to claim 1, it is characterized in that: form floor structure body unit assembly by floor structure body letter beam (10), floor structure body beam (11), the floor structure body secondary beam (12) of not fixing a number, floor structure body unit assembly is combined into the floor structure body.
4. the packaging combined building of opening structure according to claim 1 is characterized in that: the floor structure body beam (11) on the floor structure space is or/and be equipped with combination shaping plate or/and other wallboard material (14) on the floor structure body letter beam (10).
5. the packaging combined building of opening structure according to claim 1, it is characterized in that: single attached column K element of construction combination physical efficiency connects with the floor structure scapus uncle (mother's brother) cell cube (9) that Half Beam is arranged, and two attached column K element of construction assemblys form back-to-back has full post also can be connected 9 with floor structure scapus uncle (mother's brother) cell cube) connect.
CN201210104760.8A 2012-04-11 2012-04-11 The packaging combined building of opening structure Active CN103362214B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210104760.8A CN103362214B (en) 2012-04-11 2012-04-11 The packaging combined building of opening structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210104760.8A CN103362214B (en) 2012-04-11 2012-04-11 The packaging combined building of opening structure

Publications (2)

Publication Number Publication Date
CN103362214A true CN103362214A (en) 2013-10-23
CN103362214B CN103362214B (en) 2016-09-14

Family

ID=49364410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210104760.8A Active CN103362214B (en) 2012-04-11 2012-04-11 The packaging combined building of opening structure

Country Status (1)

Country Link
CN (1) CN103362214B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994001630A1 (en) * 1992-07-07 1994-01-20 Tuomo Juola Framework of a building and method for its construction
CN101024974A (en) * 2007-03-16 2007-08-29 北京城建设计研究总院有限责任公司 Shaped-steel concrete frame-steel supporting structure type steel column preconstraint node
CN202117164U (en) * 2011-03-08 2012-01-18 孙善骏 Assembled and combined type building with angular support steel structure
CN202148599U (en) * 2011-03-04 2012-02-22 孙善骏 Container combined steel-structure building
CN202787485U (en) * 2012-04-11 2013-03-13 孙善骏 Open structure packaging combined type building

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994001630A1 (en) * 1992-07-07 1994-01-20 Tuomo Juola Framework of a building and method for its construction
CN101024974A (en) * 2007-03-16 2007-08-29 北京城建设计研究总院有限责任公司 Shaped-steel concrete frame-steel supporting structure type steel column preconstraint node
CN202148599U (en) * 2011-03-04 2012-02-22 孙善骏 Container combined steel-structure building
CN202117164U (en) * 2011-03-08 2012-01-18 孙善骏 Assembled and combined type building with angular support steel structure
CN202787485U (en) * 2012-04-11 2013-03-13 孙善骏 Open structure packaging combined type building

Also Published As

Publication number Publication date
CN103362214B (en) 2016-09-14

Similar Documents

Publication Publication Date Title
CN208618567U (en) It is easy to assembled movable plank house
CN103669574A (en) Building frame system and assembly method thereof
CN102561723B (en) Modular photovoltaic power generation building
CN202787485U (en) Open structure packaging combined type building
CN206562827U (en) A kind of modularization steel-frame structure for tower equipment
CN109555222B (en) Building structure system
CN201865195U (en) Novel movable board house
CN201332353Y (en) Support and connection structure of high-voltage DC converter valve
CN202658714U (en) Open-meter steel structure containerized combined multi-high-rise building
CN103362214A (en) Open structure packaging combined type building
CN102966186A (en) Node structure of rigid single-layered latticed-shell structure
CN202431019U (en) Modular photovoltaic power generation building
CN203008233U (en) K-structure unit assembly
CN102864746A (en) Bearing frame for bridge construction
CN105275120A (en) Prefabricated light steel concrete plate column structure and construction method thereof
CN106451169B (en) A kind of box module prefabricated substation and its installation method
KR101186979B1 (en) A corridor module construction method for assembly type building
CN204551731U (en) A kind of full steel structure building
KR101661207B1 (en) Truss Structure system and a method of construction
CN103374975A (en) Containerized and assembled multi-high-rise building with 'kai'(shaped like a Chinese character 'kai')-*-shaped steel structure
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN203225074U (en) Advertising board of net rack structure
CN202658717U (en) Modular containerized combined steel structure building
CN103594936A (en) Modularized installation framework for distribution box and assembly method
CN203594160U (en) Notch plate, folding angle plate and jointed plate coordinated with cylinder-shaped packaging assembling unit assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201228

Address after: 211600 No. 47, Jianshe Road, Jinhu County, Jiangsu, Huaian

Patentee after: Jinhu comprehensive inspection and Testing Center

Address before: 230011 no.1-303, huaxiuyuan, Dangshan Road, North 2nd Ring Road, Hefei City, Anhui Province

Patentee before: Sun Shanjun

TR01 Transfer of patent right