CN103362062A - 衔口梁 - Google Patents

衔口梁 Download PDF

Info

Publication number
CN103362062A
CN103362062A CN2013100049831A CN201310004983A CN103362062A CN 103362062 A CN103362062 A CN 103362062A CN 2013100049831 A CN2013100049831 A CN 2013100049831A CN 201310004983 A CN201310004983 A CN 201310004983A CN 103362062 A CN103362062 A CN 103362062A
Authority
CN
China
Prior art keywords
bridge
weight
mouthful
rank
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100049831A
Other languages
English (en)
Inventor
韩志群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2013100049831A priority Critical patent/CN103362062A/zh
Publication of CN103362062A publication Critical patent/CN103362062A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

应用衔口梁与衔口卡梁技术使单柱桥墩双通道高架公路桥不发生桥梁单侧承重平衡问题,铰接链式桥梁提高了双通道单柱桥墩公路高架桥梁单侧承重力与侧向冲击力的平衡稳定性。

Description

衔口梁
技术领域:桥梁建筑
背景技术:中国古建筑“魚衔梁”
杠杆
发明内容:铰链式桥梁衔接使“魚衔梁”古建筑技术应用于现代双通道单柱桥墩公路高架桥,衔口梁技术使双通道公路高架桥积木桥梁的独立桥面梁组合构成铰接链式桥体。“魚衔梁”技术觧决的是房梁的长短问题。
【衔口梁】技术觧决的是桥梁的侧翻问题。
附图说明:图1公路高架桥单柱桥墩积木桥梁正剖视墩台双杠杆支点结构几何分析图
图2公路高架桥单柱桥墩积木桥梁衔口梁结构俯视剖示图
图3公路高架桥单柱桥墩积木桥梁衔口梁结构侧视剖示图
图4公路高架桥单柱桥墩积木桥梁衔口卡梁结构正剖示图
图5公路高架桥单柱桥墩积木桥梁衔口卡梁结构侧视示图
具体实施方式:
杠杆支点两端质量(重量)相等,杠杆平衡。
杠杆支点两端质量(重量)不相等,质量(重量)大的一端下垂。
杠杆支点两端“力臂质量”(重量)相等,“附加质量”(重量)相同杠杆平衡。
杠杆支点两端“力臂质量”(重量)相等,“附加质量”(重量)大的一端下垂。
图1公路高架桥单柱桥墩积木桥梁正剖视墩台双杠杆支点结构几何分析图:
独立桥面梁1    单柱桥墩2
左杠杆支点W左侧桥梁边线A左杠杆支点线B
右杠杆支点V右杠杆支点线C右侧桥梁边线D
汽车左行“附加质量”(重量)作用于左杠杆支点W左端:
左杠杆支点线B到左侧桥梁边线A的“力臂质量”(重量)与左杠杆支点线B到右杠杆支点线C的“力臂质量”(重量)相同,汽车的“附加质量”(重量)作用于左杠杆支点线B与左侧桥梁边线A之间,汽车的“附加质量”(重量)等于或小于右杠杆支点线C到右侧桥梁边线D的“力臂质量”(重量)桥面梁稳定。汽车的“附加质量”(重量)大于右杠杆支点线C到右侧桥梁边线D的“力臂质量”(重量)积木桥梁的独立桥面梁1向桥梁左侧倾翻。
汽车右行“附加质量”(重量)作用于右杠杆支点V右端:
右杠杆支点线C到右侧桥梁边线D的“力臂质量”(重量)与右杠杆支点线C到左杠杆支点线B的“力臂质量”(重量)相同,汽车的“附加质量”(重量)作用于右杠杆支点线C与右侧桥梁边线D之间,汽车的“附加质量”(重量)等于或小于左杠杆支点线B到左侧桥梁边线A的“力臂质量”(重量)桥面梁稳定。汽车的“附加质量”(重量)大于左杠杆支点线B到左侧桥梁边线A的“力臂质量”(重量)积木桥梁的独立桥面梁1向桥梁右侧倾翻。
图2公路高架桥单柱桥墩积木桥梁衔口梁结构俯视剖示图:
独立桥面梁1  独立桥面梁衔口3  衔口梁4
图3公路高架桥单柱桥墩积木桥梁衔口梁结构侧视剖示图:
独立桥面梁1  单柱桥墩2  独立桥面梁衔口3  衔口梁4
图4公路高架桥单柱桥墩积木桥梁衔口卡梁结构正剖示图:
独立桥面梁1  单柱桥墩2  衔口卡梁5
图5公路高架桥单柱桥墩积木桥梁衔口卡梁结构侧视示图:
独立桥面梁1  单柱桥墩2衔  口卡梁5
衔口梁与衔口卡梁作用:
铰接链式技术使单柱桥墩双通道高架公路桥梁不发生桥梁单侧承重平衡问题,提高了双通道单柱桥墩公路高架桥梁单侧承重力与侧向冲击力的平衡稳定性。

Claims (2)

1.衔口梁技术:其特征是由独立桥面梁(1)单柱桥墩(2)独立桥面梁衔口(3)衔口梁(4)组合构成铰接链式桥体。 
2.根据权力要求1所述衔口梁技术内容,衔口卡梁的技术方案:其特征是由独立桥面梁(1)单柱桥墩(2)衔口卡梁(5)组合构成铰接链式桥体。 
CN2013100049831A 2013-01-08 2013-01-08 衔口梁 Pending CN103362062A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100049831A CN103362062A (zh) 2013-01-08 2013-01-08 衔口梁

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100049831A CN103362062A (zh) 2013-01-08 2013-01-08 衔口梁

Publications (1)

Publication Number Publication Date
CN103362062A true CN103362062A (zh) 2013-10-23

Family

ID=49364268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100049831A Pending CN103362062A (zh) 2013-01-08 2013-01-08 衔口梁

Country Status (1)

Country Link
CN (1) CN103362062A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111676802A (zh) * 2018-12-11 2020-09-18 郑琼华 预制桥的桥板桥墩连接结构

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06146219A (ja) * 1992-11-09 1994-05-27 Ishikawajima Constr Materials Co Ltd コンクリート製プレキャスト床版の継手構造
JPH08333723A (ja) * 1995-06-06 1996-12-17 Yokogawa Koji Kk プレキャスト床版の製作方法およびプレキャスト床版の連結方法
JP2005090124A (ja) * 2003-09-18 2005-04-07 Oriental Construction Co Ltd プレキャスト床版の連結構造
CN1637215A (zh) * 2003-12-23 2005-07-13 东洋综合建业株式会社 采用钢支架将预应力混凝土工字梁连接起来的结构和方法
JP2011144513A (ja) * 2010-01-12 2011-07-28 Sho-Bond Corp 橋梁に於けるプレキャスト床版の継手

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06146219A (ja) * 1992-11-09 1994-05-27 Ishikawajima Constr Materials Co Ltd コンクリート製プレキャスト床版の継手構造
JPH08333723A (ja) * 1995-06-06 1996-12-17 Yokogawa Koji Kk プレキャスト床版の製作方法およびプレキャスト床版の連結方法
JP2005090124A (ja) * 2003-09-18 2005-04-07 Oriental Construction Co Ltd プレキャスト床版の連結構造
CN1637215A (zh) * 2003-12-23 2005-07-13 东洋综合建业株式会社 采用钢支架将预应力混凝土工字梁连接起来的结构和方法
JP2011144513A (ja) * 2010-01-12 2011-07-28 Sho-Bond Corp 橋梁に於けるプレキャスト床版の継手

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111676802A (zh) * 2018-12-11 2020-09-18 郑琼华 预制桥的桥板桥墩连接结构
CN111676802B (zh) * 2018-12-11 2021-09-14 江山市发发科技有限公司 预制桥的桥板桥墩连接结构

Similar Documents

Publication Publication Date Title
EP1396582A3 (en) Reinforcement structure of truss bridge or arch bridge
CN203741713U (zh) 预应力混凝土桥面板
CN107747275B (zh) 一种铁路桥梁用组合式抗风屏障
BR112012024769A2 (pt) dispositivo de estrutura de elevação
WO2007055823A3 (en) Gpcr expressing cell lines and antibodies
CN105934549B (zh) 桥接装置
CN208440981U (zh) 一种简支桥梁的新型桥面连续结构
CN103362062A (zh) 衔口梁
CN103161122A (zh) 混凝土梁-波形钢腹板混凝土梁的纵向混合连续梁体系
CN208039456U (zh) 一种装配式建筑梁柱节点连接机构
CN102677582A (zh) 拱梁间为部分刚性连接形式的中承式系杆拱桥
CN204163276U (zh) 施加预应力的大跨度热网管道用钢桁架
CN204825614U (zh) 混凝土梁-波形钢腹板梁组合连续梁桥
CN204590639U (zh) 一种新型竹、木连续梁预应力施加系统
ARAVINTHAN 3113 Flexural Behavior of Externally Prestressed Beams with Large Eccentricities
CN211300148U (zh) 一种骨科韧带重建用的门型钉预弯器
Hossain et al. Force transfer mechanism in positive moment continuity details for prestressed concrete girder bridges
HUE028249T2 (hu) Hajtószerkezet C és O típusú kapcsolási képességû szakaszolóhoz
CN204325892U (zh) 城际铁路单箱双室简支箱梁结构型式
CN206399728U (zh) 高强度金属材料的剪切试件
RU2005114036A (ru) Способ определения модуля упругости юнга материалов
CN203256589U (zh) 一种新型钢桁架栈桥结构
ATE438013T1 (de) Ein verbindungsglied mit einem geschwächten bereich aufweisenden gestängemechanismus
Savaliya et al. The Influence Of Cable Sag On The Dynamic Behaviour Of Cable-Stayed Suspension Bridge With Variable Suspension To Main Span Ratio
CN103225366A (zh) 新型平衡弦张弦梁

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131023