CN103357771A - Steel tube flaring device and method - Google Patents
Steel tube flaring device and method Download PDFInfo
- Publication number
- CN103357771A CN103357771A CN2013102667566A CN201310266756A CN103357771A CN 103357771 A CN103357771 A CN 103357771A CN 2013102667566 A CN2013102667566 A CN 2013102667566A CN 201310266756 A CN201310266756 A CN 201310266756A CN 103357771 A CN103357771 A CN 103357771A
- Authority
- CN
- China
- Prior art keywords
- steel tube
- enlarging
- flaring
- steel pipe
- core gold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention relates to the technical field of production equipment of tubular products and aims to solve the technical problem of providing a steel tube flaring device capable of reducing labor intensity and improving production efficiency. The steel tube flaring device comprises a clamp component and a flaring component, wherein the clamp component comprises a clamp, the clamp clamps a steel tube, the flaring component comprises a hydraulic pressure station, a hydrocylinder and a flaring core gold, the hydraulic pressure station drives the hydrocylinder, the hydrocylinder is connected with the flaring core gold, and the flaring core gold is used for flaring of the steel tube. According to the steel tube flaring device, the hydraulic pressure station controls flexibility of the hydrocylinder so as to enable the flaring core gold to automatically perform flaring on the steel tube, the steel tube can be simply replaced by manual work, other operations are completed by the steel tube flaring device, operations difficult for manual work can be completed, the degree of automation is high, the labor intensity is reduced, time and labor are saved, the labor cost is reduced, the production safety is ensured, the operation is easy and simple, and the production efficiency is improved. The invention further provides a steel tube flaring method.
Description
Technical field
The present invention relates to tubing production equipment technical field, more specifically, relate to a kind of steel tube flaring Apparatus and method for.
Background technology
In the prior art, enlarging is that hollow object or tube-like piece are opened wide a kind of stamping procedure that the place expands outwardly.At present, steel tube flaring equipment is difficult to automatically finish enlarging, and a lot of operations need manually-operated, and operation easier is large, increases labour intensity, consuming time taking a lot of work, and production efficiency is low.
Summary of the invention
The present invention is intended to solve the problems of the technologies described above at least to a certain extent.
The purpose of this invention is to provide a kind of reduction labour intensity, the steel tube flaring equipment of enhancing productivity.
Further purpose of the present invention provides a kind of reduction labour intensity, the steel tube flaring method of enhancing productivity.
The technical solution adopted for the present invention to solve the technical problems is: a kind of steel tube flaring equipment, comprise clamp assembly and enlarging assembly, described clamp assembly comprises anchor clamps, described clamp steel pipe, described enlarging assembly comprises Hydraulic Station, hydraulic jack and enlarging core gold, described Hydraulic Station drives hydraulic jack, and described hydraulic jack is connected with enlarging core gold, and described enlarging core gold carries out enlarging to steel pipe.
Steel tube flaring equipment of the present invention can allow enlarging core gold that steel pipe is carried out enlarging by the flexible of Hydraulic Station control hydraulic jack automatically, only need manually to exchange for simply steel pipe, other operations are finished by equipment, can finish manually to be difficult to the operation finished, and automaticity is high, reduce labour intensity, time saving and energy saving, the labor savings cost ensures production safety simultaneously, easy and simple to handle, enhance productivity.
In one embodiment, described clamp assembly also comprises clamping cylinder, and steel pipe is put into anchor clamps, is clamped by clamping cylinder.Clamping cylinder can avoid steel pipe to be subjected to displacement in the enlarging process automatically with steel tube clamping, affects product quality.
The present invention also provides a kind of steel tube flaring method simultaneously, and it uses above-mentioned steel tube flaring equipment, clamps steel pipe by clamp assembly, then by the enlarging assembly steel pipe is carried out enlarging.
In one embodiment, may further comprise the steps successively:
A, steel pipe is put into anchor clamps, clamped by clamping cylinder;
B, Hydraulic Station drive hydraulic jack and stretch out, and automatically steel pipe are carried out enlarging thereby drive enlarging core gold;
C, after enlarging is finished, hydraulic jack shrinks, and returns thereby drive enlarging core gold;
D, unclamp anchor clamps, take out steel pipe, carry out next action.
The invention has the beneficial effects as follows: steel tube flaring equipment of the present invention can allow enlarging core gold that steel pipe is carried out enlarging by the flexible of Hydraulic Station control hydraulic jack automatically, only need manually to exchange for simply steel pipe, other operations are finished by equipment, can finish manually to be difficult to the operation finished, and automaticity is high, reduce labour intensity, time saving and energy saving, the labor savings cost ensures production safety simultaneously, easy and simple to handle, enhance productivity.
Description of drawings
Fig. 1 is the structural representation of one embodiment of the invention.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the partial structurtes schematic diagram of clamp assembly in the one embodiment of the invention.
Fig. 4 is the partial structurtes schematic diagram of enlarging assembly in the one embodiment of the invention.
Accompanying drawing only is used for exemplary illustration, can not be interpreted as limitation of the present invention; For better explanation embodiment, some parts of accompanying drawing have omission, zoom in or out, and do not represent the size of actual product; To those skilled in the art, in the accompanying drawing some known configurations and explanation thereof may to omit be understandable.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in further details.
As shown in Figures 1 to 4, a kind of steel tube flaring equipment of the present invention comprises clamp assembly and enlarging assembly.Wherein said clamp assembly comprises anchor clamps 1 and clamping cylinder 2, manually steel pipe A is put into anchor clamps, automatically steel pipe A is clamped by clamping cylinder 2, avoids steel pipe A to be subjected to displacement in the enlarging process, affects product quality.Described enlarging assembly comprises Hydraulic Station 3, hydraulic jack 4 and enlarging core gold 5, and described Hydraulic Station 3 drives hydraulic jack 4, and described hydraulic jack 4 is connected with enlarging core gold 5, and 5 couples of steel pipe A of described enlarging core gold carry out enlarging.
The present invention also provides a kind of steel tube flaring method simultaneously, and it uses above-mentioned steel tube flaring equipment, clamps steel pipe A by clamp assembly, then by the enlarging assembly steel pipe A is carried out enlarging.
Specific operation process of the present invention may further comprise the steps successively:
A, steel pipe is put into anchor clamps, clamped by clamping cylinder;
B, Hydraulic Station drive hydraulic jack and stretch out, and automatically steel pipe are carried out enlarging thereby drive enlarging core gold;
C, after enlarging is finished, hydraulic jack shrinks, and returns thereby drive enlarging core gold;
D, unclamp anchor clamps, take out steel pipe, carry out next action.
Therefore, steel tube flaring equipment of the present invention can allow enlarging core gold that steel pipe is carried out enlarging by the flexible of Hydraulic Station control hydraulic jack automatically, only needs manually to exchange simply steel pipe for, and other operations are finished by equipment, can finish and manually be difficult to the operation finished, automaticity is high, reduces labour intensity, and is time saving and energy saving, the labor savings cost, ensure simultaneously production safety, easy and simple to handle, enhance productivity.
Obviously, the above embodiment of the present invention only is for example of the present invention clearly is described, and is not to be restriction to embodiments of the present invention.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here need not also can't give all embodiments exhaustive.All any modifications of doing within the spirit and principles in the present invention, be equal to and replace and improvement etc., all should be included within the protection domain of claim of the present invention.
Claims (4)
1. steel tube flaring equipment, it is characterized in that, comprise clamp assembly and enlarging assembly, described clamp assembly comprises anchor clamps, described clamp steel pipe, described enlarging assembly comprise Hydraulic Station, hydraulic jack and enlarging core gold, and described Hydraulic Station drives hydraulic jack, described hydraulic jack is connected with enlarging core gold, and described enlarging core gold carries out enlarging to steel pipe.
2. steel tube flaring equipment according to claim 1 is characterized in that, described clamp assembly also comprises clamping cylinder, and steel pipe is put into anchor clamps, is clamped by clamping cylinder.
3. a steel tube flaring method is characterized in that, right to use requires 1 to 2 each described steel tube flaring equipment, clamps steel pipe by clamp assembly, then by the enlarging assembly steel pipe is carried out enlarging.
4. steel tube flaring method according to claim 3 is characterized in that, may further comprise the steps successively:
A, steel pipe is put into anchor clamps, clamped by clamping cylinder;
B, Hydraulic Station drive hydraulic jack and stretch out, and automatically steel pipe are carried out enlarging thereby drive enlarging core gold;
C, after enlarging is finished, hydraulic jack shrinks, and returns thereby drive enlarging core gold;
D, unclamp anchor clamps, take out steel pipe, carry out next action.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102667566A CN103357771A (en) | 2013-06-29 | 2013-06-29 | Steel tube flaring device and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102667566A CN103357771A (en) | 2013-06-29 | 2013-06-29 | Steel tube flaring device and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103357771A true CN103357771A (en) | 2013-10-23 |
Family
ID=49360510
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013102667566A Pending CN103357771A (en) | 2013-06-29 | 2013-06-29 | Steel tube flaring device and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103357771A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105903826A (en) * | 2016-05-20 | 2016-08-31 | 浙江工业大学 | Thin-wall metal pipe expanding machine with automatic feeding device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200960539Y (en) * | 2006-10-27 | 2007-10-17 | 张海勇 | Pipe-expanding mechanism |
CN101209480A (en) * | 2006-12-30 | 2008-07-02 | 同方人工环境有限公司 | Method for manufacturing copper pipe bulged ring and tube gripper for implementing the method |
US20120217674A1 (en) * | 2011-02-28 | 2012-08-30 | Rothenberger Ag | Device and procedure for expanding the end of a plastic pipe |
JP2012179670A (en) * | 2011-02-28 | 2012-09-20 | Shiga Kogyo Kk | Roller-biasing leaf spring mounting device and method for mounting roller-biasing leaf spring |
DE102011106605B3 (en) * | 2011-06-16 | 2012-09-20 | Sms Meer Gmbh | Mechanical tensile expander |
CN102825152A (en) * | 2011-06-13 | 2012-12-19 | 大连船舶重工集团有限公司 | Automatic flaring machine for stainless steel pipe joint |
CN102989912A (en) * | 2013-01-04 | 2013-03-27 | 青岛豪德博尔实业有限公司 | Steel tube flaring and punching device |
CN203390089U (en) * | 2013-06-29 | 2014-01-15 | 广东联塑科技实业有限公司 | Steel pipe-flaring machine |
-
2013
- 2013-06-29 CN CN2013102667566A patent/CN103357771A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200960539Y (en) * | 2006-10-27 | 2007-10-17 | 张海勇 | Pipe-expanding mechanism |
CN101209480A (en) * | 2006-12-30 | 2008-07-02 | 同方人工环境有限公司 | Method for manufacturing copper pipe bulged ring and tube gripper for implementing the method |
US20120217674A1 (en) * | 2011-02-28 | 2012-08-30 | Rothenberger Ag | Device and procedure for expanding the end of a plastic pipe |
JP2012179670A (en) * | 2011-02-28 | 2012-09-20 | Shiga Kogyo Kk | Roller-biasing leaf spring mounting device and method for mounting roller-biasing leaf spring |
CN102825152A (en) * | 2011-06-13 | 2012-12-19 | 大连船舶重工集团有限公司 | Automatic flaring machine for stainless steel pipe joint |
DE102011106605B3 (en) * | 2011-06-16 | 2012-09-20 | Sms Meer Gmbh | Mechanical tensile expander |
CN102989912A (en) * | 2013-01-04 | 2013-03-27 | 青岛豪德博尔实业有限公司 | Steel tube flaring and punching device |
CN203390089U (en) * | 2013-06-29 | 2014-01-15 | 广东联塑科技实业有限公司 | Steel pipe-flaring machine |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105903826A (en) * | 2016-05-20 | 2016-08-31 | 浙江工业大学 | Thin-wall metal pipe expanding machine with automatic feeding device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203062153U (en) | Fast fixture switching device | |
CN204504580U (en) | A kind of tower structure part welding positioning tool | |
CN203390089U (en) | Steel pipe-flaring machine | |
CN203495044U (en) | Steel pipe cutting ferrule pre-tightening device and steel pipe cutting ferrule flaring device thereof | |
CN103357771A (en) | Steel tube flaring device and method | |
CN202185708U (en) | Work fixture for frame structure | |
CN103660358B (en) | A kind of rapid mould clamping device automatically | |
CN202185707U (en) | Tooling fixture for framework structure | |
CN102615828B (en) | Assembly device for plastic pipe clamp | |
CN203973252U (en) | A kind of valve body four axle machining tool fixtures | |
CN202684416U (en) | Auxiliary frame welding fixture | |
CN202725688U (en) | Lifting type steel pipe straightening machine | |
CN203002810U (en) | Intelligent pipe inner diameter reducing system | |
CN203578811U (en) | Annular clamp for machining center | |
CN203030695U (en) | Pipe part flanging device | |
CN103792987A (en) | Pipe bender improved device | |
CN204108068U (en) | A kind of skinning surface clamping mould device | |
CN205147139U (en) | Pipe end expands, undergauge device | |
CN104226770B (en) | Skin pulling stretch forming mould clamping device and process method thereof | |
CN204672739U (en) | Copper-aluminium coalignment | |
CN102172657B (en) | Semitrailer axle tube thickening apparatus and axle tube thickening method | |
CN203565522U (en) | Tube pulling device | |
CN204346971U (en) | The special fluorescent magnetic particle inspection machine of a kind of stabilizer bar | |
CN204565075U (en) | The chuck swelling device of the centrifugal drawbench of ductile iron pipe | |
CN203711736U (en) | Clamping mechanism of pier head machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C05 | Deemed withdrawal (patent law before 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20131023 |