CN103353047B - The fixing frame of subway radio receiver casing - Google Patents

The fixing frame of subway radio receiver casing Download PDF

Info

Publication number
CN103353047B
CN103353047B CN201310254195.8A CN201310254195A CN103353047B CN 103353047 B CN103353047 B CN 103353047B CN 201310254195 A CN201310254195 A CN 201310254195A CN 103353047 B CN103353047 B CN 103353047B
Authority
CN
China
Prior art keywords
rectangle frame
link press
press span
angle
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310254195.8A
Other languages
Chinese (zh)
Other versions
CN103353047A (en
Inventor
陈权威
王进忠
王洋
王亚军
白斌
李伟
都丽娟
张秀琴
张沐凌
侯林琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Railway Signal Co Ltd
Original Assignee
Shenyang Railway Signal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Railway Signal Co Ltd filed Critical Shenyang Railway Signal Co Ltd
Priority to CN201310254195.8A priority Critical patent/CN103353047B/en
Publication of CN103353047A publication Critical patent/CN103353047A/en
Application granted granted Critical
Publication of CN103353047B publication Critical patent/CN103353047B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Support Of Aerials (AREA)

Abstract

The invention provides a kind of fixing frame of subway radio receiver casing, problem to be solved is: current fixing frame is installed loaded down with trivial details.Main points of the present invention are: main body is cuboid framework, the link press span that cuboid framework comprises former and later two rectangle frames and coupled together by former and later two rectangle frames, said link press span refers to that the link press span one_to_one corresponding of forward and backward rectangle frame overlaps, connect with erection bolt afterwards again, wherein after rectangle frame each link press span on have several erection bolt holes, by Z-direction arrangement, the erection bolt hole of each upper link press span of front rectangle frame is all in Y-direction bar hole; At each angle of rear rectangle frame, a fixing bolt is set; At each angle of front rectangle frame, a construction bolt is set; Said supporting base is made up of the angle steel of a pair symmetry, is fixed on the base angle, two, left and right of front rectangle frame.Good effect of the present invention is: structure is simple and easy to dress, according to erecting bed, can arbitrarily regulate the angle of casing.

Description

The fixing frame of subway radio receiver casing
Technical field
The present invention relates to the device of fixing subway radio receiver (WAB) casing.
Background technique
Subway radio receiver casing and antenna with the use of, casing is arranged on fixing and mounting bracket, then is fixed on the metope in tunnel by fixing frame.Said fixing frame comprises box main body, and upper and lower before main body arranges fence and two supporting bases protruded forward respectively, to be placed in by casing in fence and to be placed on two supporting bases.The defect of this fixing frame is, installs loaded down with trivial details, and in-site installation needs many people to coordinate.
Summary of the invention
For solving the problems of the technologies described above, the object of this invention is to provide a kind of fixing frame of subway radio receiver casing.
The object of the present invention is achieved like this: it comprises main body and supporting base, it is characterized in that: main body is cuboid framework, the link press span that cuboid framework comprises former and later two rectangle frames and coupled together by former and later two rectangle frames, said link press span refers to that the link press span one_to_one corresponding of forward and backward rectangle frame overlaps, connect with erection bolt afterwards again, wherein after rectangle frame each link press span on have several erection bolt holes, by Z-direction (referring to the direction perpendicular to paper) arrangement, the erection bolt hole of each upper link press span of front rectangle frame is all in Y-direction bar hole; A fixing bolt is set at each angle of rear rectangle frame, for the present invention is fixed on tunnel metope; A construction bolt is set at each angle of front rectangle frame, for casing is fixed on front rectangle frame; Said supporting base is made up of the angle steel of a pair symmetry, is fixed on the base angle, two, left and right of front rectangle frame, for placing casing.During assembling main body, erection bolt uses different erection bolt holes, can regulate the forward leaning angle of front rectangle frame, and then regulates the forward leaning angle of casing, to adapt to the different amount of tunnel, erecting bed metope, ensures that casing is parallel all the time with ground.
Compared with prior art, good effect of the present invention is: structure is simple and easy to dress, according to erecting bed, can arbitrarily regulate the angle of casing, to ensure that casing and ground are parallel all the time.
Accompanying drawing explanation
The present invention is further illustrated below in conjunction with accompanying drawing.
Fig. 1 is schematic diagram of the present invention.
Embodiment
Main body is cuboid framework, the link press span that cuboid framework comprises front rectangle frame 1, rear rectangle frame 2 and coupled together by former and later two rectangle frames, said link press span refers to that the link press span 11 of front rectangle frame and link press span 21 one_to_one corresponding of rear rectangle frame overlap, connect with erection bolt 3 afterwards again, wherein after rectangle frame each link press span on have several erection bolt holes 22, by Z-direction arrangement, the erection bolt hole of each upper link press span of front rectangle frame is all in Y-direction bar hole 12; A fixing bolt 4 is set at each angle of rear rectangle frame, for the present invention is fixed on tunnel metope; A construction bolt 5 is set at each angle of front rectangle frame, for casing is fixed on front rectangle frame; Said supporting base 6 is made up of the angle steel of a pair symmetry, is fixed on the base angle, two, left and right of front rectangle frame, for placing casing.During assembling main body, erection bolt uses different erection bolt holes, can regulate the forward leaning angle of front rectangle frame, and then regulates the forward leaning angle of casing, to adapt to the different amount of tunnel, erecting bed metope, ensures that casing is parallel all the time with ground.

Claims (1)

1. the fixing frame of a subway radio receiver casing, it comprises main body and supporting base, it is characterized in that: main body is cuboid framework, the link press span that cuboid framework comprises former and later two rectangle frames and coupled together by former and later two rectangle frames, said link press span refers to that the link press span one_to_one corresponding of forward and backward rectangle frame overlaps, connect with erection bolt afterwards again, wherein after rectangle frame each link press span on have several erection bolt holes, by Z-direction arrangement, the erection bolt hole of each upper link press span of front rectangle frame is all in Y-direction bar hole; At each angle of rear rectangle frame, the fixing bolt that main body is fixed on tunnel metope by is set; At each angle of front rectangle frame, a construction bolt is set; Said supporting base is made up of the angle steel of a pair symmetry, is fixed on the base angle, two, left and right of front rectangle frame, for placing casing.
CN201310254195.8A 2013-06-25 2013-06-25 The fixing frame of subway radio receiver casing Active CN103353047B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310254195.8A CN103353047B (en) 2013-06-25 2013-06-25 The fixing frame of subway radio receiver casing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310254195.8A CN103353047B (en) 2013-06-25 2013-06-25 The fixing frame of subway radio receiver casing

Publications (2)

Publication Number Publication Date
CN103353047A CN103353047A (en) 2013-10-16
CN103353047B true CN103353047B (en) 2015-08-19

Family

ID=49309444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310254195.8A Active CN103353047B (en) 2013-06-25 2013-06-25 The fixing frame of subway radio receiver casing

Country Status (1)

Country Link
CN (1) CN103353047B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107859534B (en) * 2017-12-25 2024-09-13 南京迈拓园区管理服务有限公司 Subway box structure that resistance to compression is effectual

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2123727U (en) * 1992-04-20 1992-12-02 江苏外贸泰州地毯总厂 Adjustable air-conditioner support
CN1389658A (en) * 2001-06-05 2003-01-08 Lg电子有限公司 Apparatus for regulating display device angle, and its connection support
CN2582462Y (en) * 2002-09-25 2003-10-29 易力行 Built-up combined machine cabinet frame
RU2005129515A (en) * 2003-03-25 2006-02-27 Репак Бехеер Б.В. (Nl) MULTIFUNCTIONAL CONSTRUCTION MODULAR ELEMENT FOR MACHINES OF ENGINEERING AND STRUCTURE OF THE FRAME BACK OF THE PACKING MECHANISM
CN102041946A (en) * 2009-10-13 2011-05-04 徐一鸣 Method for installing door/window cover, matched tool, fitting and door/window cover
CN203309484U (en) * 2013-06-25 2013-11-27 沈阳铁路信号有限责任公司 Fixing frame of metro wireless receiving equipment box

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0791734A (en) * 1993-09-20 1995-04-04 Fujitsu General Ltd Indoor unit of air conditioner

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2123727U (en) * 1992-04-20 1992-12-02 江苏外贸泰州地毯总厂 Adjustable air-conditioner support
CN1389658A (en) * 2001-06-05 2003-01-08 Lg电子有限公司 Apparatus for regulating display device angle, and its connection support
CN2582462Y (en) * 2002-09-25 2003-10-29 易力行 Built-up combined machine cabinet frame
RU2005129515A (en) * 2003-03-25 2006-02-27 Репак Бехеер Б.В. (Nl) MULTIFUNCTIONAL CONSTRUCTION MODULAR ELEMENT FOR MACHINES OF ENGINEERING AND STRUCTURE OF THE FRAME BACK OF THE PACKING MECHANISM
CN102041946A (en) * 2009-10-13 2011-05-04 徐一鸣 Method for installing door/window cover, matched tool, fitting and door/window cover
CN203309484U (en) * 2013-06-25 2013-11-27 沈阳铁路信号有限责任公司 Fixing frame of metro wireless receiving equipment box

Also Published As

Publication number Publication date
CN103353047A (en) 2013-10-16

Similar Documents

Publication Publication Date Title
DK2143149T3 (en) Support frame for an electrically active panel such as a photovoltaic panel
CN203309484U (en) Fixing frame of metro wireless receiving equipment box
CN103353047B (en) The fixing frame of subway radio receiver casing
MX341007B (en) Self-launching falsework for platforms in ports.
CN204702110U (en) Collapsible belt feeder
CN205132971U (en) Pre -buried section structure in tower machine
CN204288714U (en) Spherical LED display
CN103376220B (en) Composite material C-type beam deflection and distortion detection and prestress application experiment table
CN204040556U (en) A telescopic graduation two electronic box protection canopy
CN202914985U (en) Connecting and fixing device for box bodies and support frame of display screen
CN205179583U (en) Mounting panel is assembled to wiring system
CN204416133U (en) The adjustable frit frame that keeps out the wind
CN203995981U (en) Rigid connection structure between a kind of aux. fascia panel and armrest box
CN203626239U (en) Vertical column formwork
CN207279942U (en) Air conditioner mounting bracket
CN205365815U (en) Car seat installation simulation mechanism
CN202240307U (en) Assembly welding tool for cross plate of power transmission iron tower
CN203211241U (en) Adjustable automobile rear protection device
CN203729579U (en) Device for fixing formworks
CN203386777U (en) Portable folding type cell panel support
CN204011670U (en) Communication base station bracing frame
CN203099245U (en) Four-paw support
CN203094594U (en) Multi-specification bar code adhesion fixing device
CN202108367U (en) Easy-to-mount combined-type door frame
CN203193156U (en) Installation platform for assembling outdoor box transformer station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant