CN103352431A - Finished steel strand harness propulsion device - Google Patents
Finished steel strand harness propulsion device Download PDFInfo
- Publication number
- CN103352431A CN103352431A CN2013103407496A CN201310340749A CN103352431A CN 103352431 A CN103352431 A CN 103352431A CN 2013103407496 A CN2013103407496 A CN 2013103407496A CN 201310340749 A CN201310340749 A CN 201310340749A CN 103352431 A CN103352431 A CN 103352431A
- Authority
- CN
- China
- Prior art keywords
- steel wire
- head
- wire bundle
- banding ring
- finished product
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses a finished steel strand harness propulsion device. The propulsion device comprises a hoop and a propulsion head; one end of the hoop is connected with one end of the propulsion head; a finished steel strand harness is sleeved in the inner hole in the other end of the hoop and then is fastened by the hoop; the other end of the propulsion head is a cone; the outline dimensions of the hoop and the propulsion head are smaller than the internal diameter of a construction aperture passage in which the follow-up finished steel strand harness is pushed. The propulsion device has the benefits that the hoop and the propulsion head are fastened and connected into a whole, so that the processing and mounting are convenient and the construction efficiency is high; the front end of the propulsion head is conic, so that the pushing process is more smooth when propulsion equipment is used for pushing; the propulsion device has the advantages of simplicity in processing, convenience in replacement, low cost and the like. The hoop is fastened at the end part of the finished steel strand harness before leaving a factory; so long as the corresponding propulsion head is screwed onto the hoop on a construction site, the propulsion device can be used to push the finished steel strand harness to penetrate through the construction aperture passage corrugated pipe.
Description
Technical field
What the present invention relates to is the propulsion plant that the finished product steel wire bundle is used.
Background technology
In to building, road and bridge building operations, need many prestress steel twist wire arranging bunchys, penetrate in the prestressed pore passage that has prepared, namely in the corrugated conduit.Finished product steel wire bundle (claiming again " comb is compiled bundle ") is worn when sending in corrugated conduit, need to a special tractor be set at finished product steel wire bundle front end, pass the draw ring of tractor one end with haulage cable, thereby it is mobile in prestressed pore passage to spur whole finished product steel wire bundle.
Chinese utility model patent 200820035829.5 discloses a kind of prestress wire drawing head, and above-mentioned patent comprises: drawing head and prestress steel twist thread fixing plate, described drawing head contain front end circular cone and rear end hollow cylinder, and the hollow cylinder inwall has internal thread; Described prestress steel twist thread fixing plate outer ring is threaded on the drawing head internal thread.
There is following defective in above-mentioned No. 200820035829.5 patents: the prestress steel twist thread fixing plate is too thin, when bearing tension is larger, easily gets loose; Drawing head does not have the draw ring of fixed traction wire rope, is not easy to the dilatory of haulage cable; Device does not have unified specification, uses chaotic.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of banding ring simple in structure is provided, this banding ring can firmly be locked finished product steel wire bundle end fast, and can conveniently connect the propulsion plant that a kind of finished product steel wire bundle of propulsion plant is used.
The technical scheme that solves the problems of the technologies described above is: the propulsion plant that a kind of finished product steel wire bundle is used, and described propulsion plant comprises: banding ring, propelling head; Described banding ring one end connects an end that advances head, the inner hole sleeve of the banding ring other end dress up behind the product steel wire bundle and banding on finished product steel wire bundle one end; The other end of described propelling head is cone; The outer profile size of banding ring and propelling head is less than the pushed construction duct internal diameter of follow-up finished product steel wire bundle.
Preferred version is: described banding ring comprises with the syndeton that advances head: the banding ring with advance head with being threaded, its screw connection structure comprises: the external screw thread cylinder of the banding ring internal thread of banding ring one end and the first end of propelling screws.
The invention has the beneficial effects as follows: the present invention overcomes the shortcoming of prior art, and advantage of the present invention is as follows:
1) banding ring of the present invention is fastenedly connected with the propelling head and is integrated, and has processing, characteristics easy for installation, and efficiency of construction is high; It is coniform advancing the front end of head, when adopting puopulsion equipment to push, makes the propelling movement process more smooth and easy; It is simple that the present invention has processing, changes the advantages such as convenient, with low cost.
2) the banding ring just has been fastened on finished product steel wire bundle end when dispatching from the factory, and is fitted on the banding ring as long as therefore will advance accordingly at the construction field (site) head to screw, and just can begin to push the finished product steel wire bundle and pass construction duct bellows.
3) the banding ring is fixed on dedicated extruded equipment and the tool construction of finished product steel wire bundle end simple, cost is low, and banding is effective, and banding ring and finished product steel wire bundle can firmly be integrated.
Description of drawings
Fig. 1 is that the present invention is assemblied in structural representation on the finished product steel wire bundle;
Fig. 2 is partial sectional view among Fig. 1;
Fig. 3 is the P section enlarged drawing among Fig. 2.
" sequence number explanation in the accompanying drawing "
1: the finished product steel wire bundle; 1a: single steel strand; 2: the banding ring; 2a: technique impression; 2b: banding ring internal thread; 3: advance head.
The specific embodiment
Below in conjunction with accompanying drawing embodiments of the invention are described in further detail.
Fig. 1 is that the present invention is assemblied in structural representation on the finished product steel wire bundle; Fig. 2 is partial sectional view among Fig. 1; Fig. 3 is the P section enlarged drawing among Fig. 2.
As shown in the figure, the invention provides the propulsion plant that a kind of finished product steel wire bundle is used, described propulsion plant comprises: banding ring 2, advance 3; Described banding ring 2 one ends connect advance an end of 3, the inner hole sleeve of banding ring 2 other ends dress up behind the product steel wire bundle 1 and banding on finished product steel wire bundle 1 one ends; The other end of described propelling 3 is cone; Banding ring 2 with advance an outer profile size of 3 less than the pushed construction duct internal diameter of follow-up finished product steel wire bundle 1.
Described banding ring 2 comprises with a syndeton that advances 3: banding ring 2 is threaded with advancing 3 usefulness, and its screw connection structure comprises: the external screw thread cylinder of the banding ring internal thread 2b of banding ring 2 one ends and propelling 3 one end screws.
In particular, the propulsion plant that a kind of finished product steel wire bundle of construction duct bellows is used is passed in a kind of propelling movement provided by the invention, and this propulsion plant comprises banding ring 2 and advances 3; Described banding ring 2 is that an end is with the hollow ring of internal thread, one end of banding ring 2 is threaded connection and advances an end of 3, the other end of banding ring 2, with dedicated extruded equipment extruding banding ring 2 other ends are squeezed on finished product steel wire bundle 1 one ends, namely, the inwall of banding ring 2 other ends is pressed on finished product steel wire bundle 1 one ends and with finished product steel wire bundle 1 and is integrated, and leaves over technique impression 2a at banding ring 2 other end external diameters after the extruding.
The size of the internal diameter of described banding ring 2 determines that according to the radical of single steel strand 1a in the equipped finished product steel wire bundle 1 internal diameter of banding ring 2 generally changes in 30~200mm scope; Banding ring 2 and advance an outer profile size of 3 less than inside diameter of bel is convenient to the smoothly pushed bellows duct of passing of follow-up finished product steel wire bundle 1.
Described propelling 3 comprises an end with externally threaded cylinder, and advancing 3 other end is cone.Advance an end external screw thread of 3 to be connected with the internal thread of banding ring 2 one ends; Advance the cone of 3 other end as advancing finished product steel wire bundle 1 to pass the front end of construction duct bellows, the shape of cone reduces resistance in the time of making finished product steel wire bundle 1 in bellows is passed in propelling movement.
The course of work of the present invention is as follows:
At first, be inserted in banding ring 2 other end endoporus in the end of finished product steel wire bundle 1, but do not touch the banding ring internal thread 2b of banding ring 2 one ends, extrusion equipment with special use pushes at banding ring 2 other ends, banding ring 2 other ends and finished product steel wire bundle 1 extruding banding is integrated, and namely finished product steel wire bundle 1 is close on the inwall of banding ring 2 and is reinforced;
Secondly, the banding ring internal thread 2b of banding ring 2 one ends screwed with an end cylinder external screw thread that advances 3 connect as one, make like this finished product steel wire bundle 1, banding ring 2 and advance 3 to form integrative-structures;
At last, with confinement ring 2, advance 3 to put into the prestressed pore passage bellows together with finished product steel wire bundle 1, keep correct orientation, promote whole steel wire bundle at an end of putting into propulsion plant with special-purpose puopulsion equipment and move forward at prestressed pore passage, finished product steel wire bundle 1 can be advanced smoothly and pass the bellows duct.
Above one embodiment of the present of invention are had been described in detail, described content only is preferred embodiment of the present invention, can not be considered to be used to limiting the scope that practices of the present invention.All equalizations of doing according to the present invention change or improve, and do not have substantial novelty to change, and all should belong in the covering scope of the present invention.
Claims (2)
1. the propulsion plant that the finished product steel wire bundle is used is characterized in that, described propulsion plant comprises: banding ring (2), propelling head (3); Described banding ring (2) one ends connect an end that advances head (3), the inner hole sleeve of banding ring (2) other end dress up behind the product steel wire bundle (1) and banding on finished product steel wire bundle (1) one end; The other end of described propelling head (3) is cone; The outer profile size of banding ring (2) and propelling head (3) is less than the pushed construction duct internal diameter of follow-up finished product steel wire bundle (1).
2. the propulsion plant used of a kind of finished product steel wire bundle described in according to claim 1, it is characterized in that, described banding ring (2) comprises with the syndeton that advances head (3): banding ring (2) with advance head (3) with being threaded, its screw connection structure comprises: the banding ring internal thread (2b) of banding ring (2) one ends screws with the external screw thread cylinder of propelling (3) one end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013103407496A CN103352431A (en) | 2013-08-06 | 2013-08-06 | Finished steel strand harness propulsion device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013103407496A CN103352431A (en) | 2013-08-06 | 2013-08-06 | Finished steel strand harness propulsion device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103352431A true CN103352431A (en) | 2013-10-16 |
Family
ID=49308839
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013103407496A Pending CN103352431A (en) | 2013-08-06 | 2013-08-06 | Finished steel strand harness propulsion device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103352431A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105040906A (en) * | 2015-07-03 | 2015-11-11 | 天津鑫坤泰预应力专业技术有限公司 | Pushable finished steel strand beam with external hooping ring |
CN105040908A (en) * | 2015-07-03 | 2015-11-11 | 天津鑫坤泰预应力专业技术有限公司 | Pushable finished steel stranded wire harness |
CN105625191A (en) * | 2016-02-02 | 2016-06-01 | 中交一公局第二工程有限公司 | Construction method of segment girder prestressed pipeline |
CN108103943A (en) * | 2017-12-20 | 2018-06-01 | 中交第二航务工程局有限公司 | The device and its application method reeved in HDPE casings |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02153167A (en) * | 1988-12-01 | 1990-06-12 | Masayoshi Fukai | Built-up pc twist steel wire tenser, tension work thereof, retension work thereof, and jack chair |
JP2006077572A (en) * | 2005-11-30 | 2006-03-23 | Sumitomo Denko Steel Wire Kk | Pc steel material fixing method |
CN101173546A (en) * | 2007-11-22 | 2008-05-07 | 广西壮族自治区公路桥梁工程总公司 | Cable reeving device and its reeving method |
CN201232165Y (en) * | 2008-07-25 | 2009-05-06 | 中铁十局集团有限公司 | Steel strand beam reeve machine |
CN103184797A (en) * | 2013-03-20 | 2013-07-03 | 中国核工业华兴建设有限公司 | Prestressed steel strand penetrating guide device and penetrating usage method |
CN203487462U (en) * | 2013-08-06 | 2014-03-19 | 天津鑫坤泰预应力专业技术有限公司 | Finished steel strand bundle pushing device |
-
2013
- 2013-08-06 CN CN2013103407496A patent/CN103352431A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02153167A (en) * | 1988-12-01 | 1990-06-12 | Masayoshi Fukai | Built-up pc twist steel wire tenser, tension work thereof, retension work thereof, and jack chair |
JP2006077572A (en) * | 2005-11-30 | 2006-03-23 | Sumitomo Denko Steel Wire Kk | Pc steel material fixing method |
CN101173546A (en) * | 2007-11-22 | 2008-05-07 | 广西壮族自治区公路桥梁工程总公司 | Cable reeving device and its reeving method |
CN201232165Y (en) * | 2008-07-25 | 2009-05-06 | 中铁十局集团有限公司 | Steel strand beam reeve machine |
CN103184797A (en) * | 2013-03-20 | 2013-07-03 | 中国核工业华兴建设有限公司 | Prestressed steel strand penetrating guide device and penetrating usage method |
CN203487462U (en) * | 2013-08-06 | 2014-03-19 | 天津鑫坤泰预应力专业技术有限公司 | Finished steel strand bundle pushing device |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105040906A (en) * | 2015-07-03 | 2015-11-11 | 天津鑫坤泰预应力专业技术有限公司 | Pushable finished steel strand beam with external hooping ring |
CN105040908A (en) * | 2015-07-03 | 2015-11-11 | 天津鑫坤泰预应力专业技术有限公司 | Pushable finished steel stranded wire harness |
CN105625191A (en) * | 2016-02-02 | 2016-06-01 | 中交一公局第二工程有限公司 | Construction method of segment girder prestressed pipeline |
CN105625191B (en) * | 2016-02-02 | 2017-07-21 | 中交一公局第二工程有限公司 | Beam sections prestressed pipe pipeline construction method |
CN108103943A (en) * | 2017-12-20 | 2018-06-01 | 中交第二航务工程局有限公司 | The device and its application method reeved in HDPE casings |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103352431A (en) | Finished steel strand harness propulsion device | |
CN203367893U (en) | Cable traction head | |
CN103352432A (en) | Finished steel strand harness tractor with threaded connection sleeve | |
CN203487462U (en) | Finished steel strand bundle pushing device | |
CN103362311B (en) | A kind of traction apparatus of finished steel strand bundle band anchorage | |
CN103362310A (en) | Tractor for finished steel strand and threading method of finished steel strand | |
CN202197061U (en) | Threading tool for corrugated pipe | |
CN203381355U (en) | Code spraying device for plastic pipelines | |
CN203487460U (en) | Finished steel strand bundle tractor with threaded connection sleeve | |
CN203546593U (en) | Propulsion device for finished steel strand harness | |
CN203301083U (en) | Conduit for protecting cable | |
CN103388309B (en) | Propelling device for finished steel strand bundle, and method for integrally propelling and passing | |
CN203547153U (en) | Mandrel traction device for finished steel strand bundles | |
CN203547152U (en) | Threading conveyor for finished steel stranded wire harnesses | |
CN103362072B (en) | A kind of tractor of finished steel strand bundle | |
CN103452324A (en) | Threader for finished steel strand bundle | |
CN203487461U (en) | Finished steel strand bundle tractor | |
CN203487792U (en) | Finished steel strand bundle tractor with core rod | |
CN103452244B (en) | A kind of finished steel strand bundle | |
CN104453245A (en) | Novel extrusion sleeve for finished prestress steel strand bundle | |
CN204547017U (en) | The wire harness guiding device of nylon extruder | |
CN204095097U (en) | Three-layer co-extruded rubber extruding machine | |
CN204103375U (en) | Novel wire pipe lining device | |
CN204103376U (en) | Roller type walks wire conductor | |
CN203487459U (en) | Confining ring for finished steel strand |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20131016 |