CN103337301A - One-to-three rubber continuous vulcanization production line - Google Patents
One-to-three rubber continuous vulcanization production line Download PDFInfo
- Publication number
- CN103337301A CN103337301A CN2013102293638A CN201310229363A CN103337301A CN 103337301 A CN103337301 A CN 103337301A CN 2013102293638 A CN2013102293638 A CN 2013102293638A CN 201310229363 A CN201310229363 A CN 201310229363A CN 103337301 A CN103337301 A CN 103337301A
- Authority
- CN
- China
- Prior art keywords
- rubber
- machine
- main body
- core rod
- sealing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention relates to a one-to-three rubber continuous vulcanization production line. The number of pay-off racks is three; three magnetic powder tensioners are arranged behind the three pay-off racks; a powder box, a rubber extruding machine , an upper sealing device, a vulcanizing pipe, a lower sealing device, a cooling water groove and a dragger are arranged behind the three magnetic powder tensioners together correspondingly in sequence; three wire storing racks are arranged behind the dragger; a spark machine, an oil machine and a wire taking row machine are correspondingly arranged behind each wire storing rack respectively; an extruding machine head of the rubber extruding machine is a one-to-three rubber extruding insulating machine head. The production line can realize the rubber insulation/sheath production in single production line and double wire and cable; the production efficiency is greatly improved; the equipment investment cost is saved.
Description
Technical field
The invention belongs to electric wire manufacturing installation field, particularly a kind of one goes out three rubber continuous vulcanization production lines.
Background technology
At present, the electric wire machining production line mainly is made of following equipment: pay off rack, magnetic tensioner, mistake powder case, Rubber Extruder, upper sealing device, curing tube, lower sealing device, band formula hauling machine, bosh, vertical storage line device, power frequency spark machine, take-up etc.Existing electric wire rubber continuous vulcanization production line is generally the processing that the wall scroll production line can only be finished wall scroll electric wire or cable, there is the low outstanding problem of production efficiency, if will produce two or many electric wires simultaneously, then must use many production lines, it causes the significantly raising of equipment cost again, and the taking in a large number of factory building.
Summary of the invention
The objective of the invention is to overcome the deficiencies in the prior art, provide a kind of one to go out three rubber continuous vulcanization production lines, production and processing when it adopts the wall scroll production line can realize three electric wire/cables has the production efficiency height, the outstanding advantage that equipment cost is low.
The present invention solves its technical problem and is achieved through the following technical solutions:
A kind of one goes out three rubber continuous vulcanization production lines, by the pay off rack of arranging successively and installing, the magnetic tensioner, cross the powder case, Rubber Extruder, upper sealing device, curing tube, lower sealing device, bosh, hauling machine, storage rack, spark machine, Machine for adding oil on material, take-up row mechanism becomes, Rubber Extruder is equipped with extruder head, it is characterized in that: described pay off rack is three, these three pay off rack postorders are three magnetic tensioners of corresponding placement respectively, three magnetic tensioners correspond to the mistake powder case that postorder is placed successively jointly, a Rubber Extruder, a upper sealing device,, a curing tube, a lower sealing device, a bosh, a hauling machine, place three storage racks at the hauling machine postorder, these three storage rack postorders difference are a corresponding spark machine separately, Machine for adding oil on material and take-up row machine, and the extruder head of described Rubber Extruder is one to go out three rubber and extrude the insulation head.
And, be sent to the magnetic tensioner through a cable-through hole behind described three pay off racks.
And, described one goes out three rubber extrudes the insulation head by handpiece body, main body, divide fluid, the core rod cover, coupling sleeve, regulating sleeve, die sleeve, the die sleeve seat, core rod constitutes, install handpiece body on main body top, divide fluid and core rod cover at the inner coaxial package of main body, front end at main body is installed coupling sleeve, regulating sleeve is installed in rear end at main body, core rod cover front end in main body installs core rod, front end inside at main body installs die sleeve by the die sleeve seat, described die sleeve is three outlet die sleeves, be shaped on side by side three extrusion cavities at this three outlets die sleeve, described core rod is three outlet core rods, and this three outlets core rod is shaped on three cables corresponding with described three outlet die sleeves and portals.
Advantage of the present invention and beneficial effect are:
Basis one goes out three rubber continuous vulcanization production lines and adopts improved one to go out three rubber extruder heads, can extrude three cable rubber-covereds or sheath simultaneously, Rubber Extruder, upper sealing device, curing tube, lower sealing device, hauling machine, bosh are the wall scroll tinuous production on the whole production line thus, thereby can realize the production of rubber-covered/sheath of three electric wires of wall scroll production line, significantly enhance productivity, save equipment investment cost, improve business economic benefit and competitive strength.
Description of drawings
Fig. 1 is the structural representation (first half) of production line of the present invention;
Fig. 2 is the structural representation (latter half) of production line of the present invention;
Fig. 3 is the structural representation (cutaway view) of rubber extruder head of the present invention;
Fig. 4 is that the A-A of Fig. 3 is to cutaway view;
Fig. 5 is the B portion enlarged drawing of Fig. 4.
The 1-pay off rack, 2-magnetic tensioner, 3-crosses the powder case, the 4-Rubber Extruder, the 5-extruder head, the 6-upper sealing device, the 7-curing tube, the 8-lower sealing device, the 9-bosh, the 10-caliper, the 11-hauling machine, the 12-storage rack, the 13-spark machine, the 14-Machine for adding oil on material, 15-take-up row machine, the 16-coupling sleeve, 17-die sleeve seat, 18-three outlet die sleeves, 19-three outlet core rods, 20-core rod cover, 21-divides fluid, 22-master's body, the 23-regulating sleeve, the 24-gland, the 25-handpiece body, 26-tuningout bolt, the 27-extrusion cavities, the 28-cable portals.
Embodiment
The invention will be further described below by specific embodiment, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
A kind of one goes out three rubber continuous vulcanization production lines, the pay off rack of installing by arranging successively 1, magnetic tensioner 2, mistake powder case 3, Rubber Extruder 4, upper sealing device 6, curing tube 7, lower sealing device 8, bosh 9, hauling machine 11, storage rack 12, spark machine 13, Machine for adding oil on material 14, take-up row machine 15 constitute, and Rubber Extruder is equipped with extruder head 5.Be placed with a caliper 10 between tank and the hauling machine.
The innovation part of this production line is: pay off rack is three, and these three pay off rack postorders are three magnetic tensioners of corresponding placement respectively, are sent to the magnetic tensioner through a cable-through hole behind three pay off racks.Three magnetic tensioners correspond to a mistake powder case, a Rubber Extruder, a upper sealing device, a curing tube, a lower sealing device, a bosh, hauling machine that postorder is placed successively jointly, place three storage racks at the hauling machine postorder, these three storage rack postorders are a corresponding spark machine, Machine for adding oil on material and take-up row machine separately respectively, and the extruder head of described Rubber Extruder is one to go out three rubber and extrude the insulation head.
Above-mentioned one go out three rubber extrude the insulation head by handpiece body 25, main body 22, divide fluid 21, core rod cover 20, coupling sleeve 16, regulating sleeve 23, die sleeve, die sleeve seat 17, core rod to constitute.Install handpiece body on main body top, divide fluid and core rod cover at the inner coaxial package of main body, at the front end of main body coupling sleeve is installed, by gland 24 regulating sleeve is installed in the rear end of main body.Be symmetrically arranged with the tuningout bolt 26 of top dress die sleeve seat at main body.
Originally the innovation part of extruding the insulation head is: die sleeve is three outlet die sleeves 18, be shaped on side by side three extrusion cavities 27 at this three outlets die sleeve, described core rod is three outlet core rods 19, and this three outlets core rod is shaped on three cables corresponding with described three outlet die sleeves and portals 28.Core rod cover front end in main body installs described three outlet core rods, installs three outlet die sleeves in the front end inside of main body by the die sleeve seat.
Pay off rack, magnetic tensioner are three on the whole production line, vertical storage line device, power frequency spark machine and take-up are that all the other are crossed powder case, Rubber Extruder, upper sealing device, curing tube, lower sealing device, band formula hauling machine, bosh, are the wall scroll tinuous production outside side by side three.On pay off rack, draw three electric wire/cables, pass through power frequency spark machine and take-up respectively.Thus, the processing of the rubber-covered/sheath of three electric wires of realization wall scroll production line.Production efficiency can be increased to original three times.
Although disclose embodiments of the invention and accompanying drawing for the purpose of illustration, but it will be appreciated by those skilled in the art that: in the spirit and scope that do not break away from the present invention and claims, various replacements, variation and modification all are possible, therefore, scope of the present invention is not limited to embodiment and the disclosed content of accompanying drawing.
Claims (3)
1. one kind one goes out three rubber continuous vulcanization production lines, by the pay off rack of arranging successively and installing, the magnetic tensioner, cross the powder case, Rubber Extruder, upper sealing device, curing tube, lower sealing device, bosh, hauling machine, storage rack, spark machine, Machine for adding oil on material, take-up row mechanism becomes, Rubber Extruder is equipped with extruder head, it is characterized in that: described pay off rack is three, these three pay off rack postorders are three magnetic tensioners of corresponding placement respectively, three magnetic tensioners correspond to the mistake powder case that postorder is placed successively jointly, a Rubber Extruder, a upper sealing device,, a curing tube, a lower sealing device, a bosh, a hauling machine, place three storage racks at the hauling machine postorder, these three storage rack postorders difference are a corresponding spark machine separately, Machine for adding oil on material and take-up row machine, and the extruder head of described Rubber Extruder is one to go out three rubber and extrude the insulation head.
2. according to claim 1 one goes out three rubber continuous vulcanization production lines, it is characterized in that: be sent to the magnetic tensioner through a cable-through hole behind described three pay off racks.
3. according to claim 1 one goes out three rubber continuous vulcanization production lines, it is characterized in that: described one goes out three rubber extrudes the insulation head by handpiece body, main body, divide fluid, the core rod cover, coupling sleeve, regulating sleeve, die sleeve, the die sleeve seat, core rod constitutes, install handpiece body on main body top, divide fluid and core rod cover at the inner coaxial package of main body, front end at main body is installed coupling sleeve, regulating sleeve is installed in rear end at main body, core rod cover front end in main body installs core rod, front end inside at main body installs die sleeve by the die sleeve seat, described die sleeve is three outlet die sleeves, be shaped on side by side three extrusion cavities at this three outlets die sleeve, described core rod is three outlet core rods, and this three outlets core rod is shaped on three cables corresponding with described three outlet die sleeves and portals.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102293638A CN103337301A (en) | 2013-06-08 | 2013-06-08 | One-to-three rubber continuous vulcanization production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102293638A CN103337301A (en) | 2013-06-08 | 2013-06-08 | One-to-three rubber continuous vulcanization production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103337301A true CN103337301A (en) | 2013-10-02 |
Family
ID=49245440
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013102293638A Pending CN103337301A (en) | 2013-06-08 | 2013-06-08 | One-to-three rubber continuous vulcanization production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103337301A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104240811A (en) * | 2014-09-02 | 2014-12-24 | 山东中泰阳光电气科技有限公司 | Tubular busbar and special processing device and method for tubular busbar |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2081323A (en) * | 1980-07-17 | 1982-02-17 | Kabel Metallwerke Ghh | Multi-core electrical power cable or line, and process for its manufacture |
JPH07141944A (en) * | 1994-05-09 | 1995-06-02 | Mitsuba Seisakusho:Kk | Manufacturing device for rubber-covered electric wire |
CN202093891U (en) * | 2011-05-30 | 2011-12-28 | 天津市天缆电工机械有限公司 | Rubber continuous vulcanization production line of one production line producing two cables |
CN203325575U (en) * | 2013-06-08 | 2013-12-04 | 天津市天缆电工机械有限公司 | One-for-three rubber continuous vulcanization production line |
-
2013
- 2013-06-08 CN CN2013102293638A patent/CN103337301A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2081323A (en) * | 1980-07-17 | 1982-02-17 | Kabel Metallwerke Ghh | Multi-core electrical power cable or line, and process for its manufacture |
JPH07141944A (en) * | 1994-05-09 | 1995-06-02 | Mitsuba Seisakusho:Kk | Manufacturing device for rubber-covered electric wire |
CN202093891U (en) * | 2011-05-30 | 2011-12-28 | 天津市天缆电工机械有限公司 | Rubber continuous vulcanization production line of one production line producing two cables |
CN203325575U (en) * | 2013-06-08 | 2013-12-04 | 天津市天缆电工机械有限公司 | One-for-three rubber continuous vulcanization production line |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104240811A (en) * | 2014-09-02 | 2014-12-24 | 山东中泰阳光电气科技有限公司 | Tubular busbar and special processing device and method for tubular busbar |
CN104240811B (en) * | 2014-09-02 | 2016-08-24 | 山东中泰阳光电气科技有限公司 | Tube type bus and special apparatus for working thereof and processing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202093891U (en) | Rubber continuous vulcanization production line of one production line producing two cables | |
CN202093894U (en) | Rubber extruding machine head for extruding two insulated cables at one time | |
CN102280216B (en) | Cable mold | |
CN203325575U (en) | One-for-three rubber continuous vulcanization production line | |
CN103337301A (en) | One-to-three rubber continuous vulcanization production line | |
CN211566881U (en) | Pipe extrusion type combined die for cable extrusion layer | |
CN205564376U (en) | Anti winding course surpasses six types of non - shadow data cables | |
CN102814963B (en) | A kind of foaming tube extrusion die of adjustable feed rate | |
CN202134288U (en) | Cable mould | |
WO2016074112A1 (en) | Pvc in-conduit arc-partitioned flame-retardant and insulated electrical conduit | |
CN203317724U (en) | Rubber extruding insulating machine head capable of extruding three cables simultaneously | |
CN103692634B (en) | Tube extrusion die and utilize tubing and the flexible pipe of this Making mold | |
CN204303446U (en) | A kind of power cable of anti-extrusion stretch-proof | |
CN210182135U (en) | High-voltage cable heating pipeline and high-voltage cable production line | |
CN203317723U (en) | Cable sheath plastic extruding machine | |
CN102368407B (en) | Long distance transmission digit instrument cable and manufacturing method thereof | |
CN204997972U (en) | Novel PVC wire channel mould utensil | |
CN203592662U (en) | Pipe extrusion die, pipe manufactured through the same and flexible pipe | |
CN102280212B (en) | Water-cooled stranding device used in cable-conductive-core strand production | |
CN201154540Y (en) | Forming die of plastic magnetic stripe extruding machine | |
CN104409147A (en) | Plastic flexible foam filler | |
CN202710817U (en) | Imporous optical cable production device | |
CN203267164U (en) | Inner mold structure for cable extruder | |
CN202332400U (en) | Digital instrument cable for long-distance transmission | |
CN203102943U (en) | Corrosion-resistant and cold-resistant control cable |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20131002 |