CN103336809A - Method for updating data in comprehensive pipeline area - Google Patents

Method for updating data in comprehensive pipeline area Download PDF

Info

Publication number
CN103336809A
CN103336809A CN2013102580384A CN201310258038A CN103336809A CN 103336809 A CN103336809 A CN 103336809A CN 2013102580384 A CN2013102580384 A CN 2013102580384A CN 201310258038 A CN201310258038 A CN 201310258038A CN 103336809 A CN103336809 A CN 103336809A
Authority
CN
China
Prior art keywords
data
pipeline
original
renewal
original pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102580384A
Other languages
Chinese (zh)
Other versions
CN103336809B (en
Inventor
郑丰收
陶为翔
潘良波
刘旭
党磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengyuan Geographic Information Group Co., Ltd.
Original Assignee
SHANDONG ZHENGYUAN GEOGRAPHICAL INFORMATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG ZHENGYUAN GEOGRAPHICAL INFORMATION ENGINEERING Co Ltd filed Critical SHANDONG ZHENGYUAN GEOGRAPHICAL INFORMATION ENGINEERING Co Ltd
Priority to CN201310258038.4A priority Critical patent/CN103336809B/en
Publication of CN103336809A publication Critical patent/CN103336809A/en
Application granted granted Critical
Publication of CN103336809B publication Critical patent/CN103336809B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention relates to the management field of city pipe network data, in particular to a method for updating data in a comprehensive pipeline area. According to the method, original pipeline data and updated pipeline data are firstly mapped and displayed, and the steps of pipeline map superimposition, in-area element marking, searching on topology of bordering elements, key word matching, property judgment, manual auxiliary assignment and data update are sequentially carried out. According to the method, the step of key word information judgment is added on the basis of space information topology judgment, the accuracy on bordering data update is ensured, meanwhile corresponding update operation is implemented according to different meanings of operation markings, the uniformity of updated data is guaranteed, by combining the automatic assigned operation marking and the manual assigned operation marking, bordering data is prevented from being omitted, and the quality of data updating is improved.

Description

A kind of comprehensive pipeline area data method for updating
Technical field
The present invention relates to the urban pipe network data management field, relate in particular to a kind of comprehensive pipeline area data method for updating.
Background technology
At present, during for comprehensive pipeline area update, often the disposal route that adopts is that intra-zone carries out data and replaces, and considers just when edge fit position key element is upgraded that spatial information handles, and causes the inconsistent of data when upgrading so easily.
Summary of the invention
For addressing the above problem, the invention provides a kind of easy to operate and can be accurately the comprehensive pipeline area data method for updating of new data more.
The technical solution used in the present invention is as follows:
A kind of comprehensive pipeline area data method for updating becomes figure to show behind the renewal pipeline The data distinct symbols mark with original pipeline data and new detection, comprises the steps:
Step 1, conduit line map stack: stack shows with the renewal conduit line map with original conduit line map, and draws the renewal regional extent with closed line; Be convenient original pipeline data and the renewal pipeline data distinguished, can in window, just can show original pipeline data after the conduit line map stack simultaneously and upgrade the pipeline data with the distinct symbols demonstration when data become figure again.
Key element mark in step 2, the zone: will all fall into the original pipeline deletion of upgrading in the regional extent, and write the temporary library updating form with upgrading the original pipeline data in the zone and upgrading after the pipeline data increase operational label 1 and 2 respectively;
Step 3, edge fit place key element topology are searched element: find out and intersect with the regional extent line and an end points is positioned at the original pipeline in zone, and the original pipe point data that will be positioned at the end points correspondence in zone is designated as Pt, centered by Pt, upgrade the pipe point data by specifying manifold to search plain range search, if to search plain key element number be 0, then directly enter step 6, otherwise by distance from the close-by examples to those far off successively the renewal pipe point data that searches out of mark be Pt1, Pt2 ..., Ptn;
Step 4, key word coupling: relatively manage successively point data Pt and Pt1, Pt2 ..., Ptn keyword message, if certain renewal pipe point data Ptk(1=<k<=n) consistent with the Pt keyword message, then Pt (k+1) ..., Ptn no longer carries out key word coupling, carry out next step, otherwise directly enter step 6;
Step 5, property determine: relatively whether the pipe point attribute information of Ptk and Pt consistent, as if the attribute information unanimity then operational label be designated as 3, otherwise operational label is designated as 4, writes the temporary library updating form behind the original pipeline data increase operational label with correspondence;
Step 6, artificial auxiliary appointment the: check the original pipeline data in edge fit place, write the temporary library updating form for the manual assigned operation mark of unlabelled data; After step 3 and 4 operations, can holiday the edge fit data, search the plain assigned operation mark that all needs manually to assist when the key word coupling is all inconsistent when not finding corresponding more new data or in the step 4 such as topology in the step 3.Also other situations may be arranged in addition, the operation that needs the user to carry out according to concrete needs comes the assigned operation mark, can both accurately upgrade to guarantee all data, does not omit.
Step 7, Data Update: read the data in the temporary library updating form, carry out deletion, interpolation, attribute modification operation according to operational label, finish comprehensive pipeline area data and upgrade operation, wherein operational label 1,2,3,4 represents original pipeline deletion respectively, upgrades that pipeline adds, original pipeline does not change, original pipeline information is revised.
Keyword message mentioned above can be self-defined as required for judging whether consistent differentiation field of original pipeline and renewal pipeline, and described keyword message can be feature, adjunct, material.
The basis that the present invention judges in the spatial information topology increases the step that keyword message is judged, guaranteed the accuracy of edge fit Data Update, carry out corresponding renewal operation according to the different implication of operational label simultaneously, guarantee the more consistance of new data, and combine by automatic appointment and the artificial operational label of specifying, prevent from omitting the edge fit data, improved the quality of Data Update.
Description of drawings
Fig. 1 is process flow diagram of the present invention.
Embodiment
A kind of comprehensive pipeline area data method for updating becomes figure to show that this method specifically comprises the steps: behind the renewal pipeline The data distinct symbols mark with original pipeline data and new detection earlier
Step 1, conduit line map stack: stack shows with the renewal conduit line map with original conduit line map, and draws the renewal regional extent with closed line;
Key element mark in step 2, the zone: will all fall into the original pipeline deletion of upgrading in the regional extent, and write the temporary library updating form with upgrading the original pipeline data in the zone and upgrading after the pipeline data increase operational label 1 and 2 respectively;
Step 3, edge fit place key element topology are searched element: find out and intersect with the regional extent line and an end points is positioned at the original pipeline in zone, and the original pipe point data that will be positioned at the end points correspondence in zone is designated as Pt, centered by Pt, upgrade the pipe point data by specifying manifold to search plain range search, if to search plain key element number be 0, then directly enter step 6, otherwise by distance from the close-by examples to those far off successively the renewal pipe point data that searches out of mark be Pt1, Pt2 ..., Ptn;
Step 4, key word coupling: relatively manage successively point data Pt and Pt1, Pt2 ..., Ptn keyword message, if certain renewal pipe point data Ptk(1=<k<=n) consistent with the Pt keyword message, then Pt (k+1) ..., Ptn no longer carries out key word coupling, carry out next step, otherwise directly enter step 6; Keyword message can be self-defined as required for judging whether consistent differentiation field of original pipeline and renewal pipeline, and described keyword message can be feature, adjunct, material.
Step 5, property determine: relatively whether the pipe point attribute information of Ptk and Pt consistent, as if the attribute information unanimity then operational label be designated as 3, otherwise operational label is designated as 4, writes the temporary library updating form behind the original pipeline data increase operational label with correspondence;
Step 6, artificial auxiliary appointment the: check the original pipeline data in edge fit place, write the temporary library updating form for the manual assigned operation mark of unlabelled data;
Step 7, Data Update: read the data in the temporary library updating form, carry out deletion, interpolation, attribute modification operation according to operational label, finish comprehensive pipeline area data and upgrade operation, wherein operational label 1,2,3,4 represents original pipeline deletion respectively, upgrades that pipeline adds, original pipeline does not change, original pipeline information is revised.

Claims (2)

1. a comprehensive pipeline area data method for updating becomes figure to show behind the renewal pipeline The data distinct symbols mark with original pipeline data and new detection, it is characterized in that comprising the steps:
Step 1, conduit line map stack: stack shows with the renewal conduit line map with original conduit line map, and draws the renewal regional extent with closed line;
Key element mark in step 2, the zone: will all fall into the original pipeline deletion of upgrading in the regional extent, and write the temporary library updating form with upgrading the original pipeline data in the zone and upgrading after the pipeline data increase operational label 1 and 2 respectively;
Step 3, edge fit place key element topology are searched element: find out and intersect with the regional extent line and an end points is positioned at the original pipeline in zone, and the original pipe point data that will be positioned at the end points correspondence in zone is designated as Pt, centered by Pt, upgrade the pipe point data by specifying manifold to search plain range search, if to search plain key element number be 0, then directly enter step 6, otherwise by distance from the close-by examples to those far off successively the renewal pipe point data that searches out of mark be Pt1, Pt2 ..., Ptn;
Step 4, key word coupling: relatively manage successively point data Pt and Pt1, Pt2 ..., Ptn keyword message, if certain renewal pipe point data Ptk(1=<k<=n) consistent with the Pt keyword message, then Pt (k+1) ..., Ptn no longer carries out key word coupling, carry out next step, otherwise directly enter step 6;
Step 5, property determine: relatively whether the pipe point attribute information of Ptk and Pt consistent, as if the attribute information unanimity then operational label be designated as 3, otherwise operational label is designated as 4, writes the temporary library updating form behind the original pipeline data increase operational label with correspondence;
Step 6, artificial auxiliary appointment the: check the original pipeline data in edge fit place, write the temporary library updating form for the manual assigned operation mark of unlabelled data;
Step 7, Data Update: read the data in the temporary library updating form, carry out deletion, interpolation, attribute modification operation according to operational label, finish comprehensive pipeline area data and upgrade operation, wherein operational label 1,2,3,4 represents original pipeline deletion respectively, upgrades that pipeline adds, original pipeline does not change, original pipeline information is revised.
2. comprehensive pipeline area data method for updating according to claim 1, it is characterized in that: described keyword message is feature, adjunct, material.
CN201310258038.4A 2013-06-26 2013-06-26 A kind of method that data in comprehensive pipeline area updates Active CN103336809B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310258038.4A CN103336809B (en) 2013-06-26 2013-06-26 A kind of method that data in comprehensive pipeline area updates

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310258038.4A CN103336809B (en) 2013-06-26 2013-06-26 A kind of method that data in comprehensive pipeline area updates

Publications (2)

Publication Number Publication Date
CN103336809A true CN103336809A (en) 2013-10-02
CN103336809B CN103336809B (en) 2016-06-29

Family

ID=49244974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310258038.4A Active CN103336809B (en) 2013-06-26 2013-06-26 A kind of method that data in comprehensive pipeline area updates

Country Status (1)

Country Link
CN (1) CN103336809B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107145575A (en) * 2017-05-05 2017-09-08 国家测绘地理信息局四川测绘产品质量监督检验站 Attribute consistency inspection method and device based on location matches
CN107818535A (en) * 2017-11-17 2018-03-20 湖南优图信息技术有限公司 A kind of Underground Pipeline Data management method, apparatus and system
CN107832378A (en) * 2017-10-30 2018-03-23 泰华智慧产业集团股份有限公司 The determination method, apparatus and computer-readable medium in pipeline data region to be updated
CN108280137A (en) * 2017-12-27 2018-07-13 武汉众智鸿图科技有限公司 A kind of edit methods and device of the pipe network data of task based access control
CN110110019A (en) * 2018-01-31 2019-08-09 北京四维图新科技股份有限公司 A kind of method and device that road network topological data updates

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101788299A (en) * 2009-12-29 2010-07-28 北京世纪高通科技有限公司 Updating method and device of RTIC (Real-Time Information of China) matching table based on navigation electronic map
CN102128628A (en) * 2010-01-19 2011-07-20 北京四维图新科技股份有限公司 Difference analysis method and difference analysis device for electronic maps

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101788299A (en) * 2009-12-29 2010-07-28 北京世纪高通科技有限公司 Updating method and device of RTIC (Real-Time Information of China) matching table based on navigation electronic map
CN102128628A (en) * 2010-01-19 2011-07-20 北京四维图新科技股份有限公司 Difference analysis method and difference analysis device for electronic maps

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梁庆发等: "地下管网数据的动态更新技术研究", 《地理信息世界》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107145575A (en) * 2017-05-05 2017-09-08 国家测绘地理信息局四川测绘产品质量监督检验站 Attribute consistency inspection method and device based on location matches
CN107832378A (en) * 2017-10-30 2018-03-23 泰华智慧产业集团股份有限公司 The determination method, apparatus and computer-readable medium in pipeline data region to be updated
CN107818535A (en) * 2017-11-17 2018-03-20 湖南优图信息技术有限公司 A kind of Underground Pipeline Data management method, apparatus and system
CN108280137A (en) * 2017-12-27 2018-07-13 武汉众智鸿图科技有限公司 A kind of edit methods and device of the pipe network data of task based access control
CN108280137B (en) * 2017-12-27 2020-07-28 武汉众智鸿图科技有限公司 Task-based pipe network data editing method and device
CN110110019A (en) * 2018-01-31 2019-08-09 北京四维图新科技股份有限公司 A kind of method and device that road network topological data updates

Also Published As

Publication number Publication date
CN103336809B (en) 2016-06-29

Similar Documents

Publication Publication Date Title
CN103336809A (en) Method for updating data in comprehensive pipeline area
US8799246B2 (en) Apparatus and method of producing map differential data
CN101501452B (en) Map update data supplying apparatus, version table, map data updating system and map update data supplying method
US20200379142A1 (en) System and method for pipeline management
CN102446177B (en) Collecting method, equipment, disposal route, system and base map processing method
US20100274469A1 (en) Navigation device and data update system
US20130076766A1 (en) Map data distribution apparatus, electronic apparatus, and map update system
JP4466683B2 (en) Map update system and map update method
CN102968373B (en) A kind of maintaining method of test macro and device
CN103718000A (en) Real-time map data updating system and method
JP2011158339A (en) Map update data supply device and map update data supply program
CN101646921A (en) Map update data supply apparatus, map data update system, and map update data supply method
CN102968327B (en) A kind of embedded POI data increment updating method supporting incremental update
WO2011013177A1 (en) Facility search device
CN104102677A (en) Method and device for updating data of electronic map and server
CN101882135B (en) Data processing method and device
CN101593201A (en) The extracting method of geospatial data increment information
CN105808578A (en) Method and device for incremental updating of electronic map
EP2690405B1 (en) Navigation device and method of outputting an electronic map
CN109344214A (en) Management map method and robot
US20170307383A1 (en) In-vehicle apparatus and map data management system
WO2006046342A1 (en) Management system and program of long object
CN114627645B (en) Method, device, equipment and storage medium for determining real-time running line of vehicle
CN102859497B (en) Data access method and data access device
Xi et al. Improved dynamic time warping algorithm for bus route trajectory curve fitting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 101300 2 Airport East Road, Shunyi District business district, Beijing

Patentee after: CHINA ZHENGYUAN GEOMATICS CO., LTD.

Address before: 250101 3366 Yingxiu Road, Ji'nan new and high tech Zone, Shandong

Patentee before: Shandong Zhengyuan Geographical Information Engineering Co., Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 101300 2 Airport East Road, Shunyi District business district, Beijing

Patentee after: Zhengyuan Geographic Information Group Co., Ltd.

Address before: 101300 2 Airport East Road, Shunyi District business district, Beijing

Patentee before: CHINA ZHENGYUAN GEOMATICS CO., LTD.