CN103335543A - 固定管板换热器管束与筒体的装配工艺 - Google Patents

固定管板换热器管束与筒体的装配工艺 Download PDF

Info

Publication number
CN103335543A
CN103335543A CN2013102173301A CN201310217330A CN103335543A CN 103335543 A CN103335543 A CN 103335543A CN 2013102173301 A CN2013102173301 A CN 2013102173301A CN 201310217330 A CN201310217330 A CN 201310217330A CN 103335543 A CN103335543 A CN 103335543A
Authority
CN
China
Prior art keywords
tube
tube sheet
sheet
heat exchanger
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102173301A
Other languages
English (en)
Inventor
胡沛德
刘鹏
周金秀
孟静
刘志胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG MEILING CHEMICAL EQUIPMENT CO Ltd
Original Assignee
SHANDONG MEILING CHEMICAL EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG MEILING CHEMICAL EQUIPMENT CO Ltd filed Critical SHANDONG MEILING CHEMICAL EQUIPMENT CO Ltd
Priority to CN2013102173301A priority Critical patent/CN103335543A/zh
Publication of CN103335543A publication Critical patent/CN103335543A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明属于管壳式换热器的制造领域,具体涉及一种固定管板换热器管束与筒体的装配工艺,管板I与拉杆通过螺纹连接;通过定距管控制折流板间距,将折流板固定;拧紧拉杆螺母;将换热管依次穿过折流板和管板I;管板I与筒体组对;之后,先不焊接,先将换热管一端(即前端)与管板I焊接,再将管板I中心位置换热管的另一端(即末端)与管板II焊接,然后顺次焊接管板I、管板II与筒体之间连接的焊缝,之后将其余换热管的末端与管板II焊接,最后再进行一次整体消除应力退火处理,消除换热管所受的拉应力。利用换热管对管板I、管板II的约束力,控制管板I、管板II与筒体连接焊缝的焊接变形量,确保管板与管箱隔板连接处的密封性能。

Description

固定管板换热器管束与筒体的装配工艺
技术领域
本发明涉及一种固定管板换热器管束与筒体的装配工艺,属于管壳式换热器的制造领域。
背景技术
换热器是化工、炼油、动力、食品、轻工、原子能、制药、机械及其他许多工业部门广泛使用的一种通用设备。在化工厂中,换热器的投资约占总投资的10%-20%,在炼油厂中,约占总投资的35%-40%。
在各种换热器中,由于管壳式换热器单位体积内能够提供较大的传热面积,且传热效果比较好,适用性比较强,所以是工业生产中应用最广泛的换热器。
在管壳式换热器中,相同直径的情况下,固定管板式换热器能排的换热管数量最多,换热面积最大,而且结构简单,密封性较好,不会发生内漏。所以,在工业生产中固定管板式管壳换热器被大量的采用。
固定管板式管壳换热器结构如图1所示,在制造过程中,目前所使用的固定管板换热器筒体与管束的装配工艺为:管板I1与拉杆5通过螺纹连接→按图纸要求,通过定距管4控制折流板间距,将折流板3固定→拧紧拉杆螺母6→将换热管7依次穿过折流板3和管板I1→管板I1与筒体2组对→管板II8与筒体2组对→管板I1与筒体2焊接→管板II8与筒体2焊接→按图纸要求调整换热管7伸出管板I1端面的长度→换热管7与管板I1焊接→换热管7与管板II8焊接→换热管7与管板I1胀接→换热管7与管板II8胀接。由于固定管板换热器的管板都比较薄,按照以上装配工艺,焊接之后管板的变形量非常大,特别是大直径的换热器,焊接之后管板II8的端面会鼓成一个球面,这样会导致管板中间位置的换热管长度不够,管板与管箱隔板连接处的密封性能不好。
发明内容
根据以上现有技术中的不足,本发明要解决的技术问题是:提供一种固定管板换热器管束与筒体的装配工艺,能够控制管板与筒体焊接时的变形,确保管板与管箱隔板连接处的密封性能。
本发明所述的固定管板换热器管束与筒体的装配工艺,包括以下步骤:
①管板I与拉杆通过螺纹连接;
②通过定距管控制折流板间距,将折流板固定;
③拧紧拉杆螺母;
④将换热管依次穿过折流板和管板I;
⑤管板I与筒体组对;
⑥按实际要求调整换热管伸出管板I端面的长度;
⑦换热管与管板I焊接;
⑧将管板I中心位置的换热管的末端与管板II焊接;
⑨管板I与筒体焊接;
⑩管板II与筒体焊接;
Figure BDA00003297021300021
管板I中心位置以外部位的换热管的末端与管板II焊接;
Figure BDA00003297021300022
换热管与管板I胀接;
Figure BDA00003297021300023
换热管与管板II胀接;
Figure BDA00003297021300024
进行整体消除应力退火处理,消除换热管所受的拉应力。
本装配工艺中,管板I与筒体组对结束之后,先不焊接,而是先将换热管一端(即前端)与管板I焊接,再将管板I中心位置换热管的另一端(即末端)与管板II焊接,然后顺次焊接管板I、管板II与筒体之间连接的焊缝,之后将其余换热管的末端与管板II焊接,从而利用换热管对管板I、管板II的约束力,控制管板I、管板II与筒体连接焊缝的焊接变形量,最后再进行一次整体消除应力退火处理,就可以消除换热管所受的拉应力。
本发明与现有技术相比所具有的有益效果是:
本固定管板换热器管束与筒体的装配工艺较传统工艺更为合理,将管板与筒体组对后,先将换热管与管板I焊接,再将管板I中心部位的少量换热管与管板II焊接,之后再焊接管板与筒体连接处的焊缝,利用换热管对管板的约束力控制管板I、管板II与筒体连接焊缝的焊接变形量,克服了传统工艺中管板变形量大的问题,确保了管板与管箱隔板连接处的密封性能,保证固定管板换热器的质量并延长其使用寿命。
附图说明
图1是固定管板式管壳换热器的结构示意图。
图中:1、管板I;2、筒体;3、折流板;4、定距管;5、拉杆;6、拉杆螺母;7、换热管;8、管板II。
具体实施方式
下面结合附图对本发明的实施例做进一步描述:
固定管板式管壳换热器结构如图1所示,固定管板换热器管束与筒体的装配工艺为:固定管板换热器管束与筒体的装配工艺为:管板I1与拉杆5通过螺纹连接→通过定距管4控制折流板3间距,将折流板3固定→拧紧拉杆螺母6→将换热管7依次穿过折流板3和管板I1→管板I1与筒体2组对→按实际要求调整换热管7伸出管板I1端面的长度→换热管7与管板I1焊接→将管板I1中心位置的换热管7的末端与管板II8焊接→管板I1与筒体2焊接→管板II8与筒体2焊接→管板I1中心位置以外部位的换热管7的末端与管板II8焊接→换热管7与管板I1胀接→换热管7与管板II8胀接→整体进行消除应力退火处理,消除换热管所受的拉应力。
本装配工艺中,管板I1与筒体2组对结束之后,先不焊接,而是先将换热管7一端(即前端)与管板I1焊接,再将管板I1中心位置换热管7的另一端(即末端)与管板II8焊接,然后顺次焊接管板I1、管板II8与筒体2之间连接的焊缝,之后将其余换热管7的末端与管板II8焊接,从而利用换热管7对管板I1、管板II8的约束力,控制管板I1、管板II8与筒体2连接焊缝的焊接变形量,最后再进行一次整体消除应力退火处理,就可以消除换热管所受的拉应力。
以柴油加氢装置所需的固定管板式换热器为例,其直径都在1600mm以上,管板厚度在60mm-80mm之间,换热管数量都在1900根以上,以下是采用传统装配工艺与本发明所述工艺所得固定管板换热器的数据对比:
采用传统工艺,管板中间的变形量都在5mm以上,而管板上隔板槽深度为5mm,结果使得管箱隔板跟管板连接的部位没法密封;
而采用本发明所述工艺,管板中间的变形量都控制在了1mm之内,有的甚至达到了零变形,从而确保了管板与管箱隔板的密封性能,保证了换热器的质量。
由上述数据可知,通过本装配工艺得到的固定管板换热器能够克服传统工艺中出现的管板变形量大(如:管板的端面鼓成球面)的问题,从而确保管板与管箱隔板连接处的密封性能,保证固定管板换热器的质量并延长其使用寿命。

Claims (1)

1.一种固定管板换热器管束与筒体的装配工艺,其特征在于:包括以下步骤:
①管板I(1)与拉杆(5)通过螺纹连接;
②通过定距管(4)控制折流板间距,将折流板(3)固定;
③拧紧拉杆螺母(6);
④将换热管(7)依次穿过折流板(3)和管板I(1);
⑤管板I(1)与筒体(2)组对;
⑥按实际要求调整换热管(7)伸出管板I(1)端面的长度;
⑦换热管(7)与管板I(1)焊接;
⑧将管板I(1)中心位置的换热管(7)的末端与管板II(8)焊接;
⑨管板I(1)与筒体(2)焊接;
⑩管板II(8)与筒体(2)焊接;
管板I(1)中心位置以外部位的换热管(7)的末端与管板II(8)焊接;
换热管(7)与管板I(1)胀接;
Figure FDA00003297021200013
换热管(7)与管板II(8)胀接;
整体进行消除应力退火处理,消除换热管所受的拉应力。
CN2013102173301A 2013-06-04 2013-06-04 固定管板换热器管束与筒体的装配工艺 Pending CN103335543A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102173301A CN103335543A (zh) 2013-06-04 2013-06-04 固定管板换热器管束与筒体的装配工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102173301A CN103335543A (zh) 2013-06-04 2013-06-04 固定管板换热器管束与筒体的装配工艺

Publications (1)

Publication Number Publication Date
CN103335543A true CN103335543A (zh) 2013-10-02

Family

ID=49243753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102173301A Pending CN103335543A (zh) 2013-06-04 2013-06-04 固定管板换热器管束与筒体的装配工艺

Country Status (1)

Country Link
CN (1) CN103335543A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108106466A (zh) * 2017-02-22 2018-06-01 东海县凯凯石英制品有限公司 一种耐腐蚀耐高温无泄露式石英换热装置及制备方法
CN112247537A (zh) * 2020-10-16 2021-01-22 叶小英 一种管壳换热器装配用管束组件辅助翻转机构
CN113804043A (zh) * 2021-09-30 2021-12-17 抚顺化工机械设备制造有限公司 一种固定管板式热交换器中段的焊接方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4202086A (en) * 1977-08-17 1980-05-13 B.V. Neratoom Method of assembling the parts of a heat exchanger, and a heat exchanger thus assembled
CN102937385A (zh) * 2012-10-22 2013-02-20 周祥 一种固定管板式换热器及其制造方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4202086A (en) * 1977-08-17 1980-05-13 B.V. Neratoom Method of assembling the parts of a heat exchanger, and a heat exchanger thus assembled
CN102937385A (zh) * 2012-10-22 2013-02-20 周祥 一种固定管板式换热器及其制造方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
庄晓和: "换热器的组装工艺", 《黑龙江冶金》, vol. 32, no. 4, 31 December 2012 (2012-12-31), pages 37 - 41 *
王再丽: "固定管板式换热器制造工艺", 《科技视界》, no. 13, 31 May 2012 (2012-05-31), pages 187 - 188 *
邹华: "高效节能固定式双管板换热器制造", 《中国化工装备》, no. 5, 18 September 2012 (2012-09-18) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108106466A (zh) * 2017-02-22 2018-06-01 东海县凯凯石英制品有限公司 一种耐腐蚀耐高温无泄露式石英换热装置及制备方法
CN112247537A (zh) * 2020-10-16 2021-01-22 叶小英 一种管壳换热器装配用管束组件辅助翻转机构
CN113804043A (zh) * 2021-09-30 2021-12-17 抚顺化工机械设备制造有限公司 一种固定管板式热交换器中段的焊接方法

Similar Documents

Publication Publication Date Title
CN101614494B (zh) 带外导流筒的固定管板式预应力换热器及其处理方法
CN103557514B (zh) 集箱式高压加热器
CN202037426U (zh) 一种用于蒸汽发生器管束的抗震条装配辅助工装
CN1719187A (zh) 一种连续螺旋折流板管壳式换热器
CN103335543A (zh) 固定管板换热器管束与筒体的装配工艺
CN204313679U (zh) 一种管壳式换热器
CN102213560A (zh) 一种波纹螺旋板换热器
CN104191182A (zh) 一种全包覆金属复合管的生产方法
CN203495494U (zh) 一种筒体组装工装
CN108728623B (zh) 组合式双管板螺纹锁紧环换热器热处理防变形装置及其使用方法
CN202382617U (zh) 可拆卸管壳式换热器
CN205781452U (zh) 一种六角形无缝钛管
CN204545779U (zh) 筒节用板焊接工装
CN201449190U (zh) 带外导流筒的固定管板式预应力换热器
CN202109788U (zh) 应用螺旋椭圆形换热管的热交换设备
CN203837536U (zh) 一种钛换热器
CN202109787U (zh) 应用扁平形螺旋换热管的热交换设备
CN202109789U (zh) 应用椭圆形螺旋换热管的热交换设备
CN201522213U (zh) 带补偿装置的管板式换热器筒体
CN102095327A (zh) 应用异形换热管的热交换设备
CN202008315U (zh) 一种管壳式换热器用分段可拆式拉杆
CN202599195U (zh) 换热器上管板保护装置
CN202133307U (zh) 一种管壳式换热器管板集成结构
CN207622944U (zh) 一种用于电力蒸发式凝汽器单管试漏装置
CN202109804U (zh) 椭圆形换热管

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20131002