CN103335059A - 风力发电机叶片分组配重系统 - Google Patents
风力发电机叶片分组配重系统 Download PDFInfo
- Publication number
- CN103335059A CN103335059A CN2013102291647A CN201310229164A CN103335059A CN 103335059 A CN103335059 A CN 103335059A CN 2013102291647 A CN2013102291647 A CN 2013102291647A CN 201310229164 A CN201310229164 A CN 201310229164A CN 103335059 A CN103335059 A CN 103335059A
- Authority
- CN
- China
- Prior art keywords
- counterweight
- blade
- grouping
- scheme
- weight
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Complex Calculations (AREA)
Abstract
一种风力发电机叶片分组配重系统,包括电子吊称、计算机和数据采集设备,电子吊称对叶片进行称重,计算机通过数据采集设备采集一批次叶片的重量,处理后显示最佳分组方案及配重方案;计算机具有:数据采集模块用于实时采集来自数据采集设备的重量数据;参数设置模块用于设置对叶片进行分组和配重的参数;存储模块用于存储叶片数据,配重参数,配重方案;配重计算模块用于计算该批次每个叶片的重量、静力矩、经过配重后所有可能的重量和静力矩范围,计算任意三片叶片是否可以配重,如果可配,选择最佳的配重方案;叶片分组模块用于对叶片进行智能分组,选择最佳的分组方案,使分组方案满足尽可能多的叶片能分组,配重最优组数最多等条件;显示输出模块用于显示输出分组配重方案。
Description
技术领域
本发明涉及风力发电机叶片,具体说,涉及该叶片分组配重系统。
背景技术
风力发电机叶片的尺寸很大,为了保证发电机组运行时各叶片的力矩平衡,风轮各个叶片的形状,重量、重心应当一致。但是在叶片加工过程中,不可避免地存在误差,导致叶片的重量、重心不一致。因此,厂家在叶片出厂前,需要对叶片进行分组及配重,使每一组(三只)叶片重量和重心一致。
目前,风力发电机叶片分组配重的方法,是将一组叶片进行称重后,人工进行计算配重,计算对叶片配重的重量和位置,如果配重不成功,还需要另外选择三只叶片,重新分组,重新计算。其缺点是:计算繁琐,需要人工进行分组,分组方案不能保证最大可能地分组所有叶片,不能保证配重的重量最小,分组效率低,难以保证分组方案最优。
发明内容
本发明的目的在于提供一种风力发电机叶片自动分组配重系统。该系统通过数据采集装置采集一批(不小于3片)叶片的重量和静力矩数据;无需操作员手工计算、分组、判断,系统智能计算出分组和配重方案。
本发明的技术解决方案是:
一种风力发电机叶片分组配重系统,包括顺序链接的称重装置、数据采集装置、数据处理装置,其特征在于所述称重装置是两点式电子吊称,所述数据采集装置是数据采集设备,所述数据处理装置是计算机,所述两点式电子吊称对叶片进行称重,所述数据采集设备将数据送入计算机处理,计算机显示叶片分组及配重方案。
上述方案的计算机包括:
- 数据采集模块:用于实时采集来自数据采集设备的重量数据;
- 参数设置模块:用于设置对叶片进行分组和配重的参数;
- 存储模块:用于存储叶片数据,配重参数,配重方案;
- 配重计算模块:用于计算该批次每个叶片的重量、静力矩、经过配重后所有可能的重量和静力矩范围,计算任意三片叶片是否可以配重,如果可配,选择最佳的配重方案;
- 叶片分组模块:用于对叶片进行智能分组,选择最佳的分组方案, 使分组方案满足尽可能多的叶片能分组,配重最优组数最多等条件;
- 显示输出模块:用于显示输出分组配重方案;分组配重方案包括输入叶片数量、重量、静力矩;已分组配重组数及片数,每组叶片的编号、平均重量、平均静力矩、重量误差、静力矩误差;已分组配重叶片的配重位置及重量、配重后重量、配重后静力矩。
本发明的有益技术效果是:
无需操作员手工计算、分组、判断,系统智能计算出分组和配重方案,该分组配重方案是所有叶片所有分组组合中的最优分组组合。
附图说明
图1是本系统的结构框图
图2是叶片称重原理示意图
图3是本系统称重工作流程图
图4是本系统配重计算模块工作流程图
图5是本系统叶片分组模块工作流程图
图6是本系统显示输出模块界面图
具体实施方式
参见图1:本风力发电机叶片分组配重系统主要包括三部分,一是称重装置,二是数据采集装置,三是数据处理装置。
称重装置由两套电子吊秤1构成,该电子吊秤1选用OCS-10Hg-XS型无线数传电子吊秤,按照图2所示进行两点式称重,将叶片的重量信号转换成重量数字信息后,通过无线发送装置发送给数据采集装置。称重原理参见图3。
图2中:R,H为根部电子吊秤起吊位置和尖部电子吊秤起吊位置,LR、LH分别为R、H到连接法兰的距离,WR、WH为根部、尖部电子吊秤测得的重量,可计算配重前叶片重量和静力矩
叶片重量: Win = WR+WH
叶片静力矩: Min = WR×LR+WH×LH
数据采集设备2包括接收仪表、仪表与计算机的连接线缆,数据采集装置接收电子吊秤发送的重量数字信息,传输给数据处理装置。
数据处理装置是一台计算机3,具有如下功能模块:
数据采集模块4,用于实时采集来自数据采集设备的重量数据;
参数设置模块5,用于设置对叶片进行分组和配重的参数;
存储模块6,用于存储叶片数据,配重参数,配重方案;
配重计算模块7,用于计算该批次每个叶片的重量、静力矩、经过配重后所有可能的重量和静力矩范围,计算任意三片叶片是否可以配重,如果可配,选择最佳的配重方案;
叶片分组模块8,用于对叶片进行智能分组,选择最佳的分组方案, 使分组方案满足尽可能多的叶片能分组,配重最优组数最多等条件;
显示输出模块9,用于显示输出分组配重方案;分组配重方案包括输入叶片数量、重量、静力矩;已分组配重组数及片数,每组叶片的编号、平均重量、平均静力矩、重量误差、静力矩误差;已分组配重叶片的配重位置及重量、配重后重量、配重后静力矩。
本系统的工作过程,包括五大步骤:
一、参数设置步骤
操作人员根据风力发电机叶片的工艺要求,通过参数设置模块5设置系统参数。参数主要包括配重后的总重量范围,配重后的静力矩范围,同一组三个叶片的总重量、静力矩最大误差,同一组三个叶片的总重量、静力矩最优误差,可以进行配重的多个位置范围及相应的重量范围。误差为百分比,正实数,最优误差应不大于最大误差。在叶片工艺不变的情况下,参数只需要设置一次。
二、叶片称重步骤,请见图3
启动计算机后,数据采集设备2传输重量数字信号到数据采集模块4,待数据稳定后,数据采集模块4采集叶片重量,连同叶片编号和测量的距离参数一起送入存储模块6。将同型号一个批次叶片称重,叶片数n应大于等于3,叶片编号不应重复。
三、计算最佳配重方案步骤,请见图4
称重完毕后,配重计算模块7计算任意三片叶片的配重方案,叶片数为n时,需要计算Cn 3组,即从n个元素中取出3个元素的组合数。方案包括该三片叶片是否可以配重;如果可配,是否有最优解,在方案是最优解的情况下,选择配重位置最少的最优解,在配重位置相同的情况下,选择配重总重量最小的最优解;在有近似解但没有最优解的情况下,选择配重位置最少的近似解,在配重位置相同的情况下,选择配重总重量最小的近似解。
四、查找最佳分组方案步骤,请见图5
计算任意三片叶片的配重方案结束后,叶片分组模块8查找所有分组组合中的最佳分组方案,智能跳过不是最佳的方案,减少比较计算的数量,提高查找效率。最佳分组的条件可以设置为但不限于下列条件示例:
能配重的组数最多;
最优解组数最多;
配重的总位置数最少;
配重的总重量数最少。
最佳分组方案依次满足上述条件。
五、显示输出方案步骤,请见图6
显示输出模块9显示输出分组配重方案,包括输入叶片数量、重量、静力矩;已分组配重组数及片数,每组叶片的编号、平均重量、平均静力矩、重量误差、静力矩误差;已分组配重叶片的配重位置及重量、配重后重量、配重后静力矩。
Claims (2)
1.一种风力发电机叶片分组配重系统,包括顺序链接的称重装置、数据采集装置、数据处理装置,其特征在于所述称重装置是两点式电子吊称,所述数据采集装置是数据采集设备,所述数据处理装置是计算机,所述两点式电子吊称对叶片进行称重,所述数据采集设备将数据送入计算机处理,计算机显示叶片分组及配重方案。
2.根据权利要求1所述的风力发电机叶片分组配重系统,其特征在于所述计算机包括:
数据采集模块:用于实时采集来自数据采集设备的重量数据;
参数设置模块:用于设置对叶片进行分组和配重的参数;
存储模块:用于存储叶片数据,配重参数,配重方案;
配重计算模块:用于计算该批次每个叶片的重量、静力矩、经过配重后所有可能的重量和静力矩范围,计算任意三片叶片是否可以配重,如果可配,选择最佳的配重方案;
叶片分组模块:用于对叶片进行智能分组,选择最佳的分组方案, 使分组方案满足尽可能多的叶片能分组,配重最优组数最多等条件;
显示输出模块:用于显示输出分组配重方案;分组配重方案包括输入叶片数量、重量、静力矩;已分组配重组数及片数,每组叶片的编号、平均重量、平均静力矩、重量误差、静力矩误差;已分组配重叶片的配重位置及重量、配重后重量、配重后静力矩。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102291647A CN103335059A (zh) | 2013-06-09 | 2013-06-09 | 风力发电机叶片分组配重系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102291647A CN103335059A (zh) | 2013-06-09 | 2013-06-09 | 风力发电机叶片分组配重系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103335059A true CN103335059A (zh) | 2013-10-02 |
Family
ID=49243266
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013102291647A Pending CN103335059A (zh) | 2013-06-09 | 2013-06-09 | 风力发电机叶片分组配重系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103335059A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104504282A (zh) * | 2014-12-31 | 2015-04-08 | 上海致远绿色能源股份有限公司 | 一种基于最小聚合的叶片分组算法 |
EP3034861A1 (en) * | 2014-12-18 | 2016-06-22 | Acciona Windpower S.a. | Balancing method of wind turbine rotors |
WO2017089194A1 (de) * | 2015-11-26 | 2017-06-01 | Senvion Gmbh | Rotorblatt einer windenergieanlage |
CN107977733A (zh) * | 2017-11-10 | 2018-05-01 | 南京汽轮电机(集团)有限责任公司 | 一种透平动叶片排序方法 |
WO2018188820A1 (en) * | 2017-04-12 | 2018-10-18 | Siemens Wind Power A/S | Weighing device for a wind turbine rotor blade |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101344422A (zh) * | 2008-07-24 | 2009-01-14 | 东方电气集团东方汽轮机有限公司 | 风力发电机叶片配重测试系统 |
EP2233904A1 (en) * | 2009-03-25 | 2010-09-29 | Siemens Aktiengesellschaft | Arrangement to determine a static moment of a blade |
-
2013
- 2013-06-09 CN CN2013102291647A patent/CN103335059A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101344422A (zh) * | 2008-07-24 | 2009-01-14 | 东方电气集团东方汽轮机有限公司 | 风力发电机叶片配重测试系统 |
EP2233904A1 (en) * | 2009-03-25 | 2010-09-29 | Siemens Aktiengesellschaft | Arrangement to determine a static moment of a blade |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3034861A1 (en) * | 2014-12-18 | 2016-06-22 | Acciona Windpower S.a. | Balancing method of wind turbine rotors |
CN104504282A (zh) * | 2014-12-31 | 2015-04-08 | 上海致远绿色能源股份有限公司 | 一种基于最小聚合的叶片分组算法 |
CN104504282B (zh) * | 2014-12-31 | 2017-09-12 | 上海致远绿色能源股份有限公司 | 一种基于最小聚合的叶片分组算法 |
WO2017089194A1 (de) * | 2015-11-26 | 2017-06-01 | Senvion Gmbh | Rotorblatt einer windenergieanlage |
WO2018188820A1 (en) * | 2017-04-12 | 2018-10-18 | Siemens Wind Power A/S | Weighing device for a wind turbine rotor blade |
CN110720029A (zh) * | 2017-04-12 | 2020-01-21 | 西门子歌美飒可再生能源公司 | 用于风力涡轮机转子叶片的称重装置 |
EP3593100B1 (en) | 2017-04-12 | 2022-02-02 | Siemens Gamesa Renewable Energy A/S | Weighing device for a wind turbine rotor blade |
US11333129B2 (en) | 2017-04-12 | 2022-05-17 | Siemens Gamesa Renewable Energy A/S | Weighing device for a wind turbine rotor blade |
CN107977733A (zh) * | 2017-11-10 | 2018-05-01 | 南京汽轮电机(集团)有限责任公司 | 一种透平动叶片排序方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103335059A (zh) | 风力发电机叶片分组配重系统 | |
CN101344422B (zh) | 风力发电机叶片配重测试系统 | |
CN203773584U (zh) | 手持式物流快递货物数据采集装置 | |
CN110928324B (zh) | 无人机飞行参数采集设备及其校准方法 | |
CN105352632A (zh) | 一种数字压力传感器和获取数字压力信号的方法 | |
CN113945632A (zh) | 一种钢结构网架的健康监测装置和方法 | |
CN207095613U (zh) | 一种产品自动称重读码及尺寸体积测量系统 | |
Marsillac | Management of the photovoltaic supply chain | |
CN102944184B (zh) | 起重机械主梁或起重臂塑性变形机器视觉检测装置及方法 | |
CN204710735U (zh) | 一种用于25公斤标准砝码自动检定分类的称重机器人 | |
CN207051961U (zh) | 太阳能光伏发电量预测系统 | |
CN102346029B (zh) | 架空线弧垂观测角检测装置及其控制方法 | |
CN102510285B (zh) | 一种数据采集传输仪模拟信号采集方法 | |
CN111858521A (zh) | 配网工程设计数据共享云平台及应用方法 | |
CN110517778A (zh) | 一种智能体重秤的体重管理方法 | |
CN115683304A (zh) | 称重方法、装置、系统及作业机械 | |
CN102831317A (zh) | 一种风力发电机组载荷计算的方法和装置 | |
CN103499951B (zh) | 一种基于Web架构的抽油机动态调平衡系统 | |
CN107748115A (zh) | 岩土工程土样盒自动称重和编号自动识别的系统及方法 | |
CN202869806U (zh) | 一种测量风力发电机组振动与载荷对应关系的装置 | |
CN202889651U (zh) | 一种用于面向工矿企业的安全生产云服务平台的无线传感器数据采集装置 | |
JP2008059446A (ja) | 生産管理装置、生産管理方法およびそのコンピュータ・プログラム | |
CN201149517Y (zh) | 溶解乙炔充装计量设备 | |
CN105425194A (zh) | 一种电力仪表的脉冲常数的设置方法 | |
CN101762312A (zh) | 电子秤电子天平称量自定义通讯协议的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20131002 |