CN103334725A - Method and device for evaluating low permeability reservoir displacement effectiveness - Google Patents

Method and device for evaluating low permeability reservoir displacement effectiveness Download PDF

Info

Publication number
CN103334725A
CN103334725A CN2013102618080A CN201310261808A CN103334725A CN 103334725 A CN103334725 A CN 103334725A CN 2013102618080 A CN2013102618080 A CN 2013102618080A CN 201310261808 A CN201310261808 A CN 201310261808A CN 103334725 A CN103334725 A CN 103334725A
Authority
CN
China
Prior art keywords
displacement
rock core
pressure
energy
validity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102618080A
Other languages
Chinese (zh)
Other versions
CN103334725B (en
Inventor
高建
马德胜
刘庆杰
杨司玉
吕静
康浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201310261808.0A priority Critical patent/CN103334725B/en
Publication of CN103334725A publication Critical patent/CN103334725A/en
Application granted granted Critical
Publication of CN103334725B publication Critical patent/CN103334725B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to the field of the development of oil reservoir, and in particular to a method and a device for evaluating low permeability reservoir displacement effectiveness. The method comprises the following steps of selecting a core to carry out the displacement, and acquiring an energy curve of the core reflecting the variation of an energy retention coefficient along the time, wherein the energy retention coefficient is the pressure retention state of the core in the displacement process; and evaluating the displacement effectiveness through the variation of the energy curve. By measuring the pressure on different points of the core, the temperature and pressure condition of the low permeability reservoir can be simulated, and the low permeability reservoir energy retention coefficient test method is obtained. Whether an effective displacement system can be established or not can be evaluated by utilizing the energy retention coefficient. Important significance in the low permeability reservoir recovery field can be achieved.

Description

Estimate method and the device of low-permeability oil deposit displacement validity
Technical field
The present invention relates to the oil reservoir development field, relate in particular to a kind of method and device of estimating low-permeability oil deposit displacement validity.
Background technology
Low-permeability oil deposit has become the important component part of producing in the China's oil increasing the storage, at present still insufficient to the level of understanding of low-permeability oil deposit, its seepage flow mechanism, movement disciplinarian of oil and water etc. all have a great difference with the saturating sandstone reservoir of general middle and high infiltration, the passage that the permeability of low-permeability oil deposit is very low, oil gas water is depended on for existence is very trickle, filtrational resistance is very big, the interaction force of liquid-solid boundary and liquid-liquid interface is remarkable, and cause percolation law to depart from Darcy's law, at present how low-permeability oil deposit is set up also ripe evaluation method without comparison of effective displacement system.
Summary of the invention
The embodiment of the invention provides a kind of method and device of estimating low-permeability oil deposit displacement validity, be used for to solve existing low-permeability oil deposit and how to set up also ripe evaluation method without comparison of effective displacement system.
A kind of method of estimating low-permeability oil deposit displacement validity is provided in the embodiment of the invention, comprises:
Choose rock core and carry out displacement, and obtain the energy retention coefficient of described rock core with the energy curve of displacement time variation; Described energy retention coefficient is the pressure hold mode of described rock core in displacement process;
By the variation of described energy curve, estimate the validity of this displacement.
Above-mentioned a kind of method of estimating low-permeability oil deposit displacement validity, wherein, described method also comprises:
When described energy curve increases progressively, then the energy of described displacement keeps high;
When described energy curve successively decreases, then the energy of described displacement keeps low.
Above-mentioned a kind of method of estimating low-permeability oil deposit displacement validity, wherein, the energy retention coefficient that obtains described rock core comprises:
Choose a plurality of pressure spots and real-time force value of gathering each pressure spot on the rock core;
Calculate the first integral area of each force value and length, calculate the second integral area of force value and the length of described rock core oil phase under the irreducible water condition simultaneously; Described length is that described pressure spot is to the distance of the injection end of described displacing medium;
Calculate the ratio of described first integral area and second integral area, obtain the energy retention coefficient of described rock core.
Above-mentioned a kind of method of estimating low-permeability oil deposit displacement validity, wherein, a plurality of described pressure spots evenly distribute along the seepage direction of described rock core.
Above-mentioned a kind of method of estimating low-permeability oil deposit displacement validity, wherein, described displacement comprises: miscible-phase displacement and immiscible displacement.
Above-mentioned a kind of method of estimating low-permeability oil deposit displacement validity, wherein, after adopting multiple displacing medium that described rock core is carried out displacement respectively, the displacement time to every kind of displacing medium is carried out normalized, obtains the time dependent energy curve of energy retention coefficient under every kind of displacing medium.
Above-mentioned a kind of method of estimating low-permeability oil deposit displacement validity, wherein, described rock core is the whole rock core of length 0.8m-1.5m.
The present invention also provides a kind of device of estimating low-permeability oil deposit displacement validity, and corresponding device comprises:
Acquiring unit is used for choosing rock core and carries out displacement, and obtains the energy retention coefficient of described rock core with the energy curve of displacement time variation; Described energy retention coefficient is the pressure hold mode of described rock core in displacement process;
Analytic unit is used for the variation by described energy curve, estimates the validity of this displacement.
Above-mentioned a kind of device of estimating low-permeability oil deposit displacement validity, wherein, described acquiring unit also comprises:
Acquisition module is used for choosing a plurality of pressure spots and real-time force value of gathering each pressure spot on the rock core;
Computing module for the first integral area that calculates each force value and length, calculates the second integral area of force value and the length of described rock core oil phase under the irreducible water condition simultaneously; Described length is that described pressure spot is to the distance of the injection end of described displacing medium;
Described computing unit also is used for calculating the ratio of described first integral area and second integral area, obtains the energy retention coefficient of described rock core.
Above-mentioned a kind of device of estimating low-permeability oil deposit displacement validity, wherein, described device also comprises: processing unit, be used for after adopting multiple displacing medium that described rock core is carried out displacement respectively, the displacement time to every kind of displacing medium is carried out normalized, by the time dependent energy curve of energy retention coefficient under every kind of displacing medium of described acquiring unit acquisition.
The embodiment of the invention provides, and by whole rock core is carried out the multiple spot pressure measurement, temperature, the pressure condition of simulation low-permeability oil deposit obtain low-permeability oil deposit energy retention coefficient method of testing.Utilize the energy retention coefficient to estimate to set up effective displacement system.Be significant in low-permeability oil deposit exploitation field.
Description of drawings
Accompanying drawing described herein is used to provide further understanding of the present invention, constitutes the application's a part, does not constitute limitation of the invention.In the accompanying drawings:
Fig. 1 is a kind of method flow diagram of estimating low-permeability oil deposit displacement validity in the embodiment of the invention;
Fig. 2 is a kind of device schematic diagram of estimating low-permeability oil deposit displacement validity in the embodiment of the invention;
Fig. 3 is that energy retention coefficient of the present invention calculates schematic diagram;
Fig. 4 is the energy curve schematic diagram of the different displacing mediums of the present invention correspondence in displacement process.
The specific embodiment
For making the purpose, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing the embodiment of the invention is described in further detail.At this, illustrative examples of the present invention and explanation thereof are used for explanation the present invention, but not as a limitation of the invention.
The embodiment of the invention provides a kind of method and device of estimating low-permeability oil deposit displacement validity, be used for to solve existing low-permeability oil deposit and how to set up also ripe evaluation method without comparison of effective displacement system.
A kind of method of estimating low-permeability oil deposit displacement validity is provided in the embodiment of the invention, and as shown in Figure 1, described method comprises:
Step 101 is chosen rock core and is carried out displacement, and obtains the energy retention coefficient of described rock core with the energy curve of displacement time variation; Described energy retention coefficient is the pressure hold mode of described rock core in displacement process; Preferable, described rock core is chosen whole rock core, and chooses a plurality of pressure measurement electricity at described rock core, and temperature, the pressure condition of simulation infiltration oil reservoir, obtains low-permeability oil deposit energy retention coefficient method of testing.Wherein, concrete, the energy retention coefficient characterizes pressure maintenance level in the displacement process, discloses pressure transitivity and energy supplement validity.Concrete simulation test mode can adopt prior art, repeats no more in the embodiment of the invention.
The invention provides in a kind of method preferred embodiment of estimating low-permeability oil deposit displacement validity, described rock core is the whole rock core of length 0.8m-1.5m.
Step 102 by the variation of described energy curve, is estimated the validity of this displacement.
Preferable, in a kind of method of estimating low-permeability oil deposit displacement validity, the validity of estimating displacement comprises:
When described energy curve increases progressively, then the energy of described displacement keeps high;
When described energy curve successively decreases, then the energy of described displacement keeps low.
The embodiment of the invention is utilized whole rock core and many pressure taps rock core model system by the method for above-mentioned evaluation low-permeability oil deposit displacement validity, and temperature, the pressure condition of simulation low-permeability oil deposit obtain low-permeability oil deposit energy retention coefficient method of testing.Utilize the energy retention coefficient with the energy curve that the displacement time changes, can estimate and to set up effective displacement system.
A kind of method of estimating low-permeability oil deposit displacement validity that the embodiment of the invention provides, wherein, the energy retention coefficient that obtains described rock core comprises:
Choose a plurality of pressure spots and real-time force value of gathering each pressure spot on the rock core;
Calculate the first integral area of each force value and length, calculate the second integral area of force value and the length of described rock core oil phase under the irreducible water condition simultaneously; Described length is that described pressure spot is to the distance of the injection end of described displacing medium;
Calculate the ratio of described first integral area and second integral area, obtain the energy retention coefficient of described rock core.
Concrete, the length of supposing this rock core is L, calculates the pressure value P of each pressure measurement electricity of a certain this rock core of moment t earlier t(x) and the pressure value P of this rock core oil phase under the irreducible water condition OiAfter, try to achieve the pressure value P of each pressure measurement electricity t(x) with the first integral area of length and the pressure value P of oil phase OiWith the second integral area of length, the ratio of described first integral area and second integral area is the energy retention coefficient η of this rock core p, namely
Figure BDA00003418876500041
By above-mentioned identical computational methods, obtain different energy retention coefficients constantly, draw the energy retention coefficient with the energy curve that the displacement time changes, adopt the mode of above-described embodiment to estimate the validity of this displacement system at last.
Among the embodiment of above-mentioned a kind of method of estimating low-permeability oil deposit displacement validity, a plurality of described pressure spots evenly distribute along the seepage direction of described rock core.
A kind of method of estimating low-permeability oil deposit displacement validity that the embodiment of the invention provides, wherein, described displacement comprises: miscible-phase displacement and immiscible displacement.Concrete, the embodiment of the invention has not only adopted water drive but also adopted gas drive.
Above-mentioned a kind of method of estimating low-permeability oil deposit displacement validity, wherein, after adopting multiple displacing medium that described rock core is carried out displacement respectively, obtain the energy curve that different energy retention coefficients constantly changed with the displacement time, the displacement time to every kind of displacing medium is carried out normalized, obtains the time dependent energy curve of energy retention coefficient under every kind of displacing medium.Concrete, because miscible-phase displacement is under the prerequisite of same effect (identical oil saturation), the used time phase difference of different displacing mediums is very big, for the ease of contrast directly perceived, its time is carried out normalization, so use non dimensional time.
The embodiment of the invention is utilized the long rock core simulation system of whole rock core and many pressure taps rock core model, and temperature, the pressure condition of simulation low-permeability oil deposit obtain low-permeability oil deposit energy retention coefficient method of testing.Utilize the energy retention coefficient to estimate to set up effective displacement system.Be significant in low-permeability oil deposit exploitation field.
The embodiment of the invention also provides a kind of device of estimating low-permeability oil deposit displacement validity, and as shown in Figure 2, corresponding device comprises:
Acquiring unit 201 is used for choosing rock core and carries out displacement, and obtains the energy retention coefficient of described rock core with the energy curve of displacement time variation; Described energy retention coefficient is the pressure hold mode of described rock core in displacement process; Preferable, described rock core is chosen whole rock core, and chooses a plurality of pressure measurement electricity at described rock core, and temperature, the pressure condition of simulation infiltration oil reservoir, obtains low-permeability oil deposit energy retention coefficient method of testing.Wherein, concrete, the energy retention coefficient characterizes pressure maintenance level in the displacement process, discloses pressure transitivity and energy supplement validity.Concrete simulation test mode can adopt prior art, repeats no more in the embodiment of the invention.
The invention provides in a kind of device preferred embodiment of estimating low-permeability oil deposit displacement validity, described rock core is the whole rock core of length 0.8m-1.5m.
Analytic unit 202 is used for the variation by described energy curve, estimates the validity of this displacement.
Concrete, adopting whole rock core and many pressure taps rock core model system, temperature, the pressure condition of simulation low-permeability oil deposit obtain low-permeability oil deposit energy retention coefficient.Utilize the energy retention coefficient with the energy curve that the displacement time changes, can estimate and to set up effective displacement system.
Above-mentioned a kind of device of estimating low-permeability oil deposit displacement validity, wherein, described acquiring unit also comprises:
Acquisition module is used for choosing a plurality of pressure spots and real-time force value of gathering each pressure spot on the rock core;
Computing module for the first integral area that calculates each force value and length, calculates the second integral area of force value and the length of described rock core oil phase under the irreducible water condition simultaneously; Described length is that described pressure spot is to the distance of the injection end of described displacing medium;
Described computing unit also is used for calculating the ratio of described first integral area and second integral area, obtains the energy retention coefficient of described rock core.
Above-mentioned a kind of device of estimating low-permeability oil deposit displacement validity, wherein, described device also comprises: processing unit, be used for after adopting multiple displacing medium that described rock core is carried out displacement respectively, the displacement time to every kind of displacing medium is carried out normalized, by the time dependent energy curve of energy retention coefficient under every kind of displacing medium of described acquiring unit acquisition.
The embodiment of the invention provides, and by whole rock core is carried out the multiple spot pressure measurement, temperature, the pressure condition of simulation low-permeability oil deposit obtain low-permeability oil deposit energy retention coefficient method of testing.Utilize the energy retention coefficient to estimate to set up effective displacement system.Be significant in low-permeability oil deposit exploitation field.
Do explanation in further detail below in conjunction with accompanying drawing 3,4 couples of the present invention.
Water drive embodiment one: the employing specification is that the integral body of 4.5cm * 4.5cm * 100cm does not have the butt joint hyposmosis long rock core of appearing, evenly arrange 9 pressure taps along seepage direction, be adjacent two pressure taps apart from 12.5cm, carry out pressure by pressure automatic acquisition device in the prior art and gather in real time.Long core simulation system inlet pressure is controlled by pump, the simulating oil deposit injection pressure, and outlet pressure is controlled by back-pressure valve, bottom hole flowing pressure in the simulation mining process, the experiment confined pressure is controlled to be 32MPa.
Long rock core perm-plug method is 1.96 * 10-3 μ m2, and degree of porosity is 13.8%, and the average pore radius is 1.234 μ m.The long celebrating of this experimental simulation oil field low-permeability oil deposit feature, formation water viscosity is 1mPa.s, and salinity is 10000mg/L, and Simulation of Crude Oil viscosity is 1mPa.s, and experimental procedure is as follows:
Step 11: the whole rock core that with length is 1m is dried 48h in 105 ℃ of insulating boxs;
Step 12: this rock core is put into the long rock core simulation system of many pressure taps rock core model, add confined pressure to 4MPa;
Step 13: with the long rock core simulation system of many pressure taps rock core model vacuumize 24 hours to the model rock core vacuum reach-0.1MPa, adopt pressurization with the slow saturated formation water of rock core, for reducing the stress sensitive effect, the clean effective stress of rock core is no more than 3MPa in the saturation history, finally make the formation water saturation pressure reach 25MPa, increase confined pressure again to 32MPa;
Step 14: use simulated oil to make irreducible water, constant voltage 7MPa, rock core outlet back pressure 5MPa, and improve displacement pressure gradually to 25MPa, reach 20 times of voids volumes up to saturated oil mass;
Step 15: carry out water drive oil, water drive pressure 25MPa, production end back pressure 5MPa gathers each the pressure tap pressure dynamic change of water drive oil process rock core diverse location in real time, metering extraction profit amount;
Step 16: utilize a certain moment t of displacement pressure value P t(x) with length integral area and irreducible water condition under the pressure value P of oil phase OiRatio calculating energy retention coefficient η with the length integral area p, design formulas is:
η P = ∫ 0 L P t ( x ) dx ∫ 0 L P oi dx × 100 % (1)。
The concrete schematic diagram that calculates is referring to Fig. 3.(t=0 represents under the irreducible water saturation among the figure, the pressure distribution when namely oil phase flows separately; T=t1 represents arbitrary moment pressure distribution situation of displacement; S1 represents displacement t1 moment force value and length gets integral area, the force value of oil phase and the integral area of length under S2 representative and the irreducible water condition.
N2 drives embodiment two: the employing specification is that the integral body of 4.5cm * 4.5cm * 100cm does not have the butt joint hyposmosis long rock core of appearing, evenly arrange 9 pressure taps along seepage direction, adjacent two pressure taps carry out pressure by the pressure automatic acquisition device and gather in real time apart from 12.5cm.Long core simulation system inlet pressure is controlled by pump, the simulating oil deposit injection pressure, and outlet pressure is controlled by back-pressure valve, bottom hole flowing pressure in the simulation mining process, the experiment confined pressure is controlled to be 32MPa.
Long rock core perm-plug method is 1.96 * 10-3 μ m2, and degree of porosity is 13.8%, and the average pore radius is 1.234 μ m.The long celebrating of this experimental simulation oil field low-permeability oil deposit feature, formation water viscosity is 1mPa.s, and salinity is 10000mg/L, and Simulation of Crude Oil viscosity is 1mPa.s, and experimental procedure is as follows:
Step 21: the whole rock core that with length is 1m is dried 48h in 105 ℃ of insulating boxs;
Step 22: this rock core is put into the long rock core simulation system of many pressure taps rock core model, add confined pressure 4MPa;
Step 23: with the long rock core simulation system of many pressure taps rock core model vacuumize 24 hours to the model rock core vacuum reach-0.1MPa, adopt pressurization with the slow saturated formation water of rock core, for reducing the stress sensitive effect, the clean effective stress of rock core is no more than 3MPa in the saturation history, finally make the formation water saturation pressure reach 25MPa, increase confined pressure again to 32MPa;
Step 24: use simulated oil to make irreducible water, constant voltage 7MPa, rock core outlet back pressure 5MPa, and improve displacement pressure gradually to 25MPa, reach 20 times of voids volumes up to saturated oil mass;
Step 25: carry out N 2The displacement of reservoir oil, water drive pressure 25MPa, production end back pressure 5MPa gathers N in real time 2Each the pressure tap pressure dynamic change of oil displacement process rock core diverse location, metering extraction oil, tolerance;
Step 26: utilize a certain moment t of displacement pressure value P t(x) with length integral area and irreducible water condition under the pressure value P of oil phase OiRatio calculating energy retention coefficient η with the length integral area p, design formulas is:
η P = ∫ 0 L P t ( x ) dx ∫ 0 L P oi dx × 100 % (1)。
The concrete schematic diagram that calculates is referring to Fig. 3.
CO 2Drive embodiment three: the employing specification is that the integral body of 4.5cm * 4.5cm * 100cm does not have the butt joint hyposmosis long rock core of appearing, and evenly arranges 9 pressure taps along seepage direction, and adjacent two pressure taps carry out pressure by the pressure automatic acquisition device and gather in real time apart from 12.5cm.Long core simulation system inlet pressure is controlled by pump, the simulating oil deposit injection pressure, and outlet pressure is controlled by back-pressure valve, bottom hole flowing pressure in the simulation mining process, the experiment confined pressure is controlled to be 32MPa.
Long rock core perm-plug method is 1.96 * 10-3 μ m2, and degree of porosity is 13.8%, and the average pore radius is 1.234 μ m.The long celebrating of this experimental simulation oil field low-permeability oil deposit feature, formation water viscosity is 1mPa.s, and salinity is 10000mg/L, and Simulation of Crude Oil viscosity is 1mPa.s, and experimental procedure is as follows:
Step 31: the whole rock core that with length is 1m is dried 48h in 105 ℃ of insulating boxs;
Step 32: this rock core is put into the long rock core simulation system of many pressure taps rock core model, add confined pressure 4MPa;
Step 33: with the long rock core simulation system of many pressure taps rock core model vacuumize 24 hours to the model rock core vacuum reach-0.1MPa, adopt pressurization with the slow saturated formation water of rock core, for reducing the stress sensitive effect, the clean effective stress of rock core is no more than 3MPa in the saturation history, finally make the formation water saturation pressure reach 25MPa, increase confined pressure again to 32MPa;
Step 34: use simulated oil to make irreducible water, constant voltage 7MPa, rock core outlet back pressure 5MPa, and improve displacement pressure gradually to 25MPa, reach 20 times of voids volumes up to saturated oil mass;
Step 35: carry out CO 2The displacement of reservoir oil, water drive pressure 25MPa, production end back pressure 5MPa gathers CO in real time 2Each the pressure tap pressure dynamic change of oil displacement process rock core diverse location, metering extraction profit amount;
Step 36: utilize a certain moment t of displacement pressure value P t(x) with length integral area and irreducible water condition under the pressure value P of oil phase OiRatio calculating energy retention coefficient η with the length integral area p, design formulas is:
η P = ∫ 0 L P t ( x ) dx ∫ 0 L P oi dx × 100 % (1)。
The concrete schematic diagram that calculates is referring to Fig. 3.
With reference to Fig. 4, show water drive of the present invention, N 2Drive and CO 2The energy retention coefficient schematic diagram of correspondence when mixed phase drives the every propelling of process displacing front 12.5cm.Because gas drive arrives under the prerequisite of same effect (identical oil saturation) with water drive, both used time phase differences are very big, for the ease of contrast directly perceived, its time carried out normalization, so use non dimensional time.
The energy retention coefficient characterizes pressure maintenance level in the displacement process, discloses pressure transitivity and energy supplement validity.As seen from Figure 4: by energy retention coefficient η pAs can be known, water drive oil energy retention coefficient descends earlier in time and afterwards rises, and has flex point, and the initial stage reduces very fast, minimumly is reduced to 63%, and the later stage slowly rises.N2 displacement of reservoir oil energy retention coefficient is monotonic increase, finally remains on 125%, and stratum energy replenishes fully in the displacement process.CO2 miscible displacement of reservoir energy retention coefficient rises earlier and afterwards descends, and has flex point, and after mixed phase finished, pressure maintenance level was down to 112%, and the displacement process stratum energy is abundant.High infiltration rock core water drive effective pressure coefficient is about 100%, and water drive is less to the reservoir pressure systematic influence.The hyposmosis water drive should be optimized well pattern, well spacing, keeps stratum energy as far as possible.Draw low-permeability oil deposit displacement validity with this.
The embodiment of the invention has not only adopted water drive but also adopted gas drive, has namely related to mixed phase and has driven and related to non-phase-mixing driving, and provided detailed experiments step and evaluation method, and drawn the valuable true conclusion that meets.This shows, further, adopt similar method, can utilize the energy retention coefficient η that sets up in this experiment pJudge the validity of any one low-permeability oil deposit displacement system.
The above-described specific embodiment; purpose of the present invention, technical scheme and beneficial effect are further described; institute is understood that; the above only is the specific embodiment of the present invention; and be not intended to limit the scope of the invention; within the spirit and principles in the present invention all, any modification of making, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. a method of estimating low-permeability oil deposit displacement validity is characterized in that, comprising:
Choose rock core and carry out displacement, and obtain the energy retention coefficient of described rock core with the energy curve of displacement time variation; Described energy retention coefficient is the pressure hold mode of described rock core in displacement process;
By the variation of described energy curve, estimate the validity of this displacement.
2. a kind of method of estimating low-permeability oil deposit displacement validity as claimed in claim 1 is characterized in that described method also comprises:
When described energy curve increases progressively, then the energy of described displacement keeps high;
When described energy curve successively decreases, then the energy of described displacement keeps low.
3. a kind of method of estimating low-permeability oil deposit displacement validity as claimed in claim 1 is characterized in that, the energy retention coefficient that obtains described rock core comprises:
Choose a plurality of pressure spots and real-time force value of gathering each pressure spot on the rock core;
Calculate the first integral area of each force value and length, calculate the second integral area of force value and the length of described rock core oil phase under the irreducible water condition simultaneously; Described length is that described pressure spot is to the distance of the injection end of described displacing medium;
Calculate the ratio of described first integral area and second integral area, obtain the energy retention coefficient of described rock core.
4. a kind of method of estimating low-permeability oil deposit displacement validity as claimed in claim 3 is characterized in that, a plurality of described pressure spots evenly distribute along the seepage direction of described rock core.
5. a kind of method of estimating low-permeability oil deposit displacement validity as claimed in claim 1 is characterized in that described displacement comprises: miscible-phase displacement and immiscible displacement.
6. a kind of method of estimating low-permeability oil deposit displacement validity as claimed in claim 1, it is characterized in that, after adopting multiple displacing medium that described rock core is carried out displacement respectively, the displacement time to every kind of displacing medium is carried out normalized, obtains the time dependent energy curve of energy retention coefficient under every kind of displacing medium.
7. a kind of method of estimating low-permeability oil deposit displacement validity as claimed in claim 1 is characterized in that, described rock core is the whole rock core of length 0.8m-1.5m.
8. device of estimating low-permeability oil deposit displacement validity is characterized in that corresponding device comprises:
Acquiring unit is used for choosing rock core and carries out displacement, and obtains the energy retention coefficient of described rock core with the energy curve of displacement time variation; Described energy retention coefficient is the pressure hold mode of described rock core in displacement process;
Analytic unit is used for the variation by described energy curve, estimates the validity of this displacement.
9. a kind of device of estimating low-permeability oil deposit displacement validity as claimed in claim 8 is characterized in that described acquiring unit also comprises:
Acquisition module is used for choosing a plurality of pressure spots and real-time force value of gathering each pressure spot on the rock core;
Computing module for the first integral area that calculates each force value and length, calculates the second integral area of force value and the length of described rock core oil phase under the irreducible water condition simultaneously; Described length is that described pressure spot is to the distance of the injection end of described displacing medium;
Described computing unit also is used for calculating the ratio of described first integral area and second integral area, obtains the energy retention coefficient of described rock core.
10. a kind of device of estimating low-permeability oil deposit displacement validity as claimed in claim 8, it is characterized in that, described device also comprises: processing unit, be used for after adopting multiple displacing medium that described rock core is carried out displacement respectively, the displacement time to every kind of displacing medium is carried out normalized, by the time dependent energy curve of energy retention coefficient under every kind of displacing medium of described acquiring unit acquisition.
CN201310261808.0A 2013-06-27 2013-06-27 Evaluate the method and device of low-permeability oil deposit displacement validity Active CN103334725B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310261808.0A CN103334725B (en) 2013-06-27 2013-06-27 Evaluate the method and device of low-permeability oil deposit displacement validity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310261808.0A CN103334725B (en) 2013-06-27 2013-06-27 Evaluate the method and device of low-permeability oil deposit displacement validity

Publications (2)

Publication Number Publication Date
CN103334725A true CN103334725A (en) 2013-10-02
CN103334725B CN103334725B (en) 2017-03-08

Family

ID=49242929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310261808.0A Active CN103334725B (en) 2013-06-27 2013-06-27 Evaluate the method and device of low-permeability oil deposit displacement validity

Country Status (1)

Country Link
CN (1) CN103334725B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103645276A (en) * 2013-10-31 2014-03-19 北京科技大学 Simple core oil-displacement test system prepared from injector tube barrel and simulation method using the same
CN105606509A (en) * 2015-12-22 2016-05-25 中国石油大学(华东) Measuring method of high-temperature oil-water relative permeability of heavy oil reservoir
CN106401544A (en) * 2016-08-31 2017-02-15 东北石油大学 Displacement pressure determining method and system for constant-speed and constant-pressure water drive oil displacement test
CN106894808A (en) * 2017-03-01 2017-06-27 中国石油大学(华东) It is a kind of to determine hypotonic closing sand body gas drive and handle up the method for limit operating radius
CN109577929A (en) * 2018-10-24 2019-04-05 中国石油天然气股份有限公司 A kind of Oil in Super-low Permeability compact oil reservoir horizontal well establishes the quantitative evaluation method of effective displacement
CN110298048A (en) * 2018-03-22 2019-10-01 中国石油化工股份有限公司 A kind of supercritical CO considering interface phase2Condensate gas multiphase porous flow analogy method
CN111305801A (en) * 2020-03-09 2020-06-19 中国石油化工股份有限公司 Carbon dioxide flooding front edge description method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU791949A1 (en) * 1978-06-26 1980-12-30 Центральная научно-исследовательская лаборатория Производственного объединения "Укрнефть" Device for investigating the process of capillary substitution of water for oil in a rock specimen
CN1349037A (en) * 2000-08-25 2002-05-15 施卢默格海外有限公司 Apparatus and method for placing data testing device into under-ground rock stratum
US20020134587A1 (en) * 2000-09-20 2002-09-26 Stephen Rester Method, system and tool for reservoir evaluation and well testing during drilling operations
CN1786411A (en) * 2005-12-12 2006-06-14 大庆油田有限责任公司 Method for optimizing area well net of enhancing lowest permeable reservoir oil extracting amount
CN1807831A (en) * 2006-01-26 2006-07-26 中国石化胜利油田有限公司孤岛采油厂 Indoor evaluation method for profile control and water shutoff technology using polymer microsphere
CN1965249A (en) * 2004-03-03 2007-05-16 哈利伯顿能源服务公司 Surface real-time processing of downhole data
CN102322247A (en) * 2011-06-17 2012-01-18 西南石油大学 Device and method for evaluating displacement capability of wetting phase of rock at high temperature under high pressure
CN102704901A (en) * 2012-05-25 2012-10-03 中国石油化工股份有限公司 Apparatus and method for multipoint pressure measuring long-core deep profile control experiment
CN202645533U (en) * 2012-05-18 2013-01-02 中国石油大学(北京) Physical simulation experiment device for O-shaped well

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU791949A1 (en) * 1978-06-26 1980-12-30 Центральная научно-исследовательская лаборатория Производственного объединения "Укрнефть" Device for investigating the process of capillary substitution of water for oil in a rock specimen
CN1349037A (en) * 2000-08-25 2002-05-15 施卢默格海外有限公司 Apparatus and method for placing data testing device into under-ground rock stratum
US20020134587A1 (en) * 2000-09-20 2002-09-26 Stephen Rester Method, system and tool for reservoir evaluation and well testing during drilling operations
CN1965249A (en) * 2004-03-03 2007-05-16 哈利伯顿能源服务公司 Surface real-time processing of downhole data
CN1786411A (en) * 2005-12-12 2006-06-14 大庆油田有限责任公司 Method for optimizing area well net of enhancing lowest permeable reservoir oil extracting amount
CN1807831A (en) * 2006-01-26 2006-07-26 中国石化胜利油田有限公司孤岛采油厂 Indoor evaluation method for profile control and water shutoff technology using polymer microsphere
CN102322247A (en) * 2011-06-17 2012-01-18 西南石油大学 Device and method for evaluating displacement capability of wetting phase of rock at high temperature under high pressure
CN202645533U (en) * 2012-05-18 2013-01-02 中国石油大学(北京) Physical simulation experiment device for O-shaped well
CN102704901A (en) * 2012-05-25 2012-10-03 中国石油化工股份有限公司 Apparatus and method for multipoint pressure measuring long-core deep profile control experiment

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘忠运等: "低渗透油田超前注水技术研究及应用", 《吐哈油气》 *
宋付权等: "低渗透油藏启动压力梯度的简单测量", 《特种油气藏》 *
李爱芬等: "低渗透油藏注气吸气能力评价方法", 《断块油气田》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103645276A (en) * 2013-10-31 2014-03-19 北京科技大学 Simple core oil-displacement test system prepared from injector tube barrel and simulation method using the same
CN103645276B (en) * 2013-10-31 2015-05-13 北京科技大学 Simple core oil-displacement test system prepared from injector tube barrel and simulation method using the same
CN105606509A (en) * 2015-12-22 2016-05-25 中国石油大学(华东) Measuring method of high-temperature oil-water relative permeability of heavy oil reservoir
CN106401544A (en) * 2016-08-31 2017-02-15 东北石油大学 Displacement pressure determining method and system for constant-speed and constant-pressure water drive oil displacement test
CN106401544B (en) * 2016-08-31 2019-10-01 东北石油大学 The displacement pressure of constant speed and constant pressure water drive oil displacement experiment determines method and system
CN106894808A (en) * 2017-03-01 2017-06-27 中国石油大学(华东) It is a kind of to determine hypotonic closing sand body gas drive and handle up the method for limit operating radius
CN110298048A (en) * 2018-03-22 2019-10-01 中国石油化工股份有限公司 A kind of supercritical CO considering interface phase2Condensate gas multiphase porous flow analogy method
CN110298048B (en) * 2018-03-22 2022-06-17 中国石油化工股份有限公司 Supercritical CO considering interface phase2-condensate gas multiphase seepage simulation method
CN109577929A (en) * 2018-10-24 2019-04-05 中国石油天然气股份有限公司 A kind of Oil in Super-low Permeability compact oil reservoir horizontal well establishes the quantitative evaluation method of effective displacement
CN111305801A (en) * 2020-03-09 2020-06-19 中国石油化工股份有限公司 Carbon dioxide flooding front edge description method
CN111305801B (en) * 2020-03-09 2021-12-14 中国石油化工股份有限公司 Carbon dioxide flooding front edge description method

Also Published As

Publication number Publication date
CN103334725B (en) 2017-03-08

Similar Documents

Publication Publication Date Title
CN103334725A (en) Method and device for evaluating low permeability reservoir displacement effectiveness
CN105626006B (en) Low-permeability oil deposit CO2Drive technical limit well space and determine method
CN104265281B (en) Method for predicting well yield of sealed, unsaturated oil reservoirs through elastic driving water-flooding extraction
CN103556993A (en) Simulation experimental analog method for low permeability oilfield planar five-spot well pattern carbon dioxide flooding
CN104989341B (en) A kind of method for determining low-permeability oil deposit effective displacement injector producer distance
CN102608011B (en) Method for determining and building bound water for crack-pore (hole) type reservoir core
CN105606509A (en) Measuring method of high-temperature oil-water relative permeability of heavy oil reservoir
CN106932324B (en) A kind of method of determining High water cut sandstone oil reservoir reservoir permeability changing rule
CN110306960B (en) Fracturing fluid imbibition production-increasing simulation method and device for double-hole double-permeability medium reservoir
CN104949899B (en) A kind of assay method of Polymer Used For Oil Displacement effective viscosity in porous media
CN104481520A (en) Early evaluation method of recoverable reserves of shale gas wells
CN105738252A (en) Measurement method of flowable opening degree limit of thickened oil in cracks
CN103643928B (en) A kind of depth profile control method step by step based on pressure field and velocity field distribution
CN103674593B (en) A kind of device and method for simulating the flood pot test of low permeability reservoir pressure break straight well
CN104675371A (en) Complex oil displacement experimental method by means of alternately injecting gel and polymer solution after polymer flooding and follow-up water flooding
CN102704901A (en) Apparatus and method for multipoint pressure measuring long-core deep profile control experiment
CN103628868A (en) Method for predicating oil production quantity in high-volatility oil deposit natural gas injection development
CN111878075B (en) Method for testing regional extraction degree of gas-water co-injection of inclined reservoir
CN106194164A (en) Bottom and edge water exploitation core experiment analogy method and device
CN104975827A (en) Substance balance method for predicting carbon dioxide flooding oil reservoir indexes
CN110879196B (en) Oil-water phase permeability testing method for oil-rich condensate gas reservoir
CN104615806A (en) Reservoir oil displacement numerical value simulation research method with gel and chemical agents alternately injected
CN112541287A (en) Loose sandstone fracturing filling sand control production increase and profile control integrated design method
CN102392636B (en) Underground fluid channel parameter description method for water drive development of sandstone reservoir
CN104405350B (en) A kind of horizontal well chemical profile control method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant