CN103334367A - Highway intercepting drain and construction method thereof - Google Patents

Highway intercepting drain and construction method thereof Download PDF

Info

Publication number
CN103334367A
CN103334367A CN2013102992914A CN201310299291A CN103334367A CN 103334367 A CN103334367 A CN 103334367A CN 2013102992914 A CN2013102992914 A CN 2013102992914A CN 201310299291 A CN201310299291 A CN 201310299291A CN 103334367 A CN103334367 A CN 103334367A
Authority
CN
China
Prior art keywords
frp
casing
web
concrete
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102992914A
Other languages
Chinese (zh)
Other versions
CN103334367B (en
Inventor
吴国松
胡嘉鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING GUOTONG CIVIL ENGINEERING TECHNOLOGY Co Ltd
Chongqing Jiaotong University
Original Assignee
CHONGQING GUOTONG CIVIL ENGINEERING TECHNOLOGY Co Ltd
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING GUOTONG CIVIL ENGINEERING TECHNOLOGY Co Ltd, Chongqing Jiaotong University filed Critical CHONGQING GUOTONG CIVIL ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201310299291.4A priority Critical patent/CN103334367B/en
Publication of CN103334367A publication Critical patent/CN103334367A/en
Application granted granted Critical
Publication of CN103334367B publication Critical patent/CN103334367B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses a highway intercepting drain, which comprises an intercepting drain body, an FRP (Fiber Reinforced Plastic) baseplate box body positioned at the bottom of the intercepting drain body and FRP web box bodies positioned on the two sides of the intercepting drain body respectively, wherein the FRP web box bodies incline toward the outer side of the intercepting drain body, a reverse trapezoid structure in which the width of the top of the intercepting drain body is greater than that of the bottom of the intercepting drain body. The FRP baseplate box body is pasted onto the substrate concrete; cast-in-place concrete at the top of the FRP web box bodies is smoothly connected with the ground on the two sides. Meanwhile, as the adopted ERP baseplate box body and the FRP web box bodies are belong to forming equipment, the FRP baseplate box body and the FRP web box bodies can be directly used in a site, the use is simple and convenient, the number of templates can be reduced, and the construction time is shortened. The invention further discloses a construction method for the highway intercepting drain.

Description

A kind of Intercepting Drain Used in Highway and job practices thereof
Technical field
The present invention relates to civil engineering highway technology field, more particularly, relate to a kind of Intercepting Drain Used in Highway and job practices thereof.
Background technology
Intercepting Drain Used in Highway is the drainage of both sides of highway, mostly is concrete structure or stone masonry construction, often adopts cast in situs method or masonry construction.
Please refer to Fig. 1, Fig. 1 is the cross section arrangement diagram of the Intercepting Drain Used in Highway of stone masonry construction in the prior art; Fig. 2 is the vertical view of the Intercepting Drain Used in Highway of stone masonry construction in the prior art.Wherein, base plate 101 is positioned at the bottom of catchwater body, and the both sides of catchwater body are provided with web 102, and web 102 both sides are in tilted layout and form the width on ditch top greater than the inverted trapezoidal structure of the width of bottom of trench.About 40 centimetres of general catchwater medial sulcus bottom width, ditch is high about 40 centimetres, and two coxostermums 102 tilt by 45 degree, and the ditch top width is about 120 centimetres.
Major defect or the deficiency of prior art show:
(1) adopt the Intercepting Drain Used in Highway construction of concrete structure to need a large amount of templates.
(2) Intercepting Drain Used in Highway of employing stone masonry construction, its water resistance is relatively poor.
(3) adopt cast in situs method or masonry construction, the engineering time is all longer.
Summary of the invention
The purpose of this invention is to provide a kind of Intercepting Drain Used in Highway, to reduce the template usage quantity, improve water resistance, shorten the engineering time; Another object of the present invention provides a kind of job practices of Intercepting Drain Used in Highway.
For solving the problems of the technologies described above, the invention provides following scheme:
A kind of Intercepting Drain Used in Highway, comprise the catchwater body, comprise the FRP base plate casing that is positioned at described catchwater body bottom and the FRP web casing that lays respectively at described catchwater body both sides, wherein, described FRP web casing all tilts to the outside of described catchwater body, forms the top width of described catchwater body greater than the inverted trapezoidal structure of bottom width.
Preferably, above-mentioned FRP base plate casing below is provided with base concrete, and described FRP base plate casing sticks on the described base concrete.
Preferably, above-mentioned FRP base plate casing and described FRP web casing are FRP multicell casing overall structure, and the case chamber interior of multicell body structure filling gap filler, and described gap filler is cranny filler of polyurethane foam.
Preferably, the top of the described FRP web casing of above-mentioned catchwater body both sides all arranges cast-in-situ concrete and ground, both sides along connecing.
Preferably, the arranged outside on above-mentioned FRP web casing next-door neighbour ground, joint, two ends along its length has the web substrate concrete, described FRP web casing two ends along its length stick on the described web substrate concrete, and backfill is set in the both sides on described FRP web casing next-door neighbour ground, middle part along its length and ground is closely connected.
Preferably, along its length joint, two ends is provided with diaphragm in the casing of above-mentioned FRP base plate casing and described FRP web casing, fill concrete in the casing between two diaphragms of the joint of two adjacent described FRP base plate casings along its length, fill concrete in the casing between two adjacent diaphragms of the joint of two adjacent described FRP web casings, arrange on the described concrete surface and paste one deck FRP woven roving, described FRP woven roving upper and lower surface all arranges pastes the short felt of cutting of one deck FRP.
The present invention also provides a kind of job practices of Intercepting Drain Used in Highway, comprise: step 1): adopt mold integral to make FRP multicell casing overall structure in factory, described FRP multicell casing overall structure comprises FRP base plate casing and is arranged on the FRP web casing of the both sides of described FRP base plate casing, wherein, described FRP web casing all tilts to the outside of described FRP base plate casing, forms the width at the integrally-built top of described FRP multicell casing greater than the inverted trapezoidal structure of bottom width.Described FRP multicell casing overall structure is transported to the building site by 4 meters one section; Step 2): in the catchwater body, finish the construction that reaches the base concrete of the joint that is used for the described FRP web casing of stickup for the base concrete of pasting described FRP base plate casing; Step 3): after the described web substrate concrete of described base concrete and joint reaches intensity, described FRP multicell casing overall structure is installed in described catchwater body; Step 4): the position in the both sides on the middle part next-door neighbour ground along its length of described FRP web case arranges the closely connected compacting of backfill and ground, builds the cast-in-situ concrete that described FRP web casing top arranges and ground, both sides is suitable connects;
Preferably, described step 1) also comprises step 11): the diaphragm that arranges is pasted at per 4 meters one section two ends on the length direction in described FRP base plate casing and described FRP web casing.
Preferably, described step 3) also comprises step 31) adopt epoxide-resin glue bonding firmly described FRP base plate casing and described FRP web casing, and etc. after described epoxide-resin glue reaches intensity, build the fill concrete in the described FRP base plate casing and described FRP web casing casing between the adjacent diaphragm in joint along its length, and etc. described concrete reach intensity, finish the short construction of cutting felt of the stickup FRP woven roving that arranges on the fill concrete surface, described joint and FRP.
The Intercepting Drain Used in Highway that the invention described above provides, comprise the catchwater body, comprise the FRP base plate casing of the bottom that is positioned at described catchwater body and lay respectively at the FRP web casing of the both sides of described catchwater body, wherein, described FRP web casing all tilts to the outside of described catchwater body, forms the width at top of described catchwater body greater than the inverted trapezoidal structure of bottom width.
Wherein, the English full name of FRP is Fiber Reinforced Polymer, and Chinese is fibre reinforced composites.Fibre reinforced composites were called GFRP(and often claim glass fiber reinforced plastic when fiber adopted glass fiber), fibre reinforced composites were called CFRP when fiber adopted carbon fiber, and GFRP and CFRP are designated hereinafter simply as FRP.About glass fiber tensile strength 1000MPa, about epoxy resin tensile strength 60MPa, glass fiber and epoxy resin can reach about 300MPa in conjunction with back formation GFRP structural strength and steel structure intensity approaches.About tensile strength of carbon fibers 3000MPa, carbon fiber and epoxy resin form CFRP intensity in conjunction with the back and is much higher than steel structure intensity, but the carbon fiber cost is higher, and is uneconomical.The GFRP water resistance is good, the GFRP less expensive, and easy construction, the FRP base plate casing that adopts in the Intercepting Drain Used in Highway provided by the invention and FRP web casing have favorable waterproof property, and have the advantage from heavy and light.
Simultaneously, because employing is FRP base plate casing and FRP web casing, belong to the equipment of moulding, the scene can directly be used, and is simple and convenient, reduces the template usage quantity, and shortened the engineering time.
Description of drawings
Fig. 1 is the cross section arrangement diagram of the Intercepting Drain Used in Highway of stone masonry construction in the prior art;
Fig. 2 is the vertical view of the Intercepting Drain Used in Highway of stone masonry construction in the prior art;
The integrally-built cross-sectional configuration schematic diagram of FRP multicell casing that Fig. 3 provides for the embodiment of the invention;
The integrally-built plan structure schematic diagram of FRP multicell casing that Fig. 4 provides for the embodiment of the invention;
The not fill concrete section cross-sectional configuration schematic diagram of the Intercepting Drain Used in Highway that Fig. 5 provides for the embodiment of the invention;
The fill concrete joint cross-sectional configuration schematic diagram of the Intercepting Drain Used in Highway that Fig. 6 provides for the embodiment of the invention;
Cross-sectional configuration schematic diagram during the integrally-built filled polyurethane foam gap filler of the FRP multicell casing that Fig. 7 provides for the embodiment of the invention;
Base concrete and the web substrate concrete cross-sectional configuration schematic diagram of the Intercepting Drain Used in Highway that Fig. 8 provides for the embodiment of the invention;
Base base concrete and the web substrate concrete plan structure schematic diagram of the Intercepting Drain Used in Highway that Fig. 9 provides for the embodiment of the invention.
Among last Fig. 1-9:
1-FRP base plate casing, 2-FRP web casing, 3-base concrete, 4-cast-in-situ concrete, 5-web substrate concrete, 6-diaphragm, 101-base plate, 102-web.
The specific embodiment
Core of the present invention provides a kind of Intercepting Drain Used in Highway, to reduce the template usage quantity, improves water resistance, shortens the engineering time; Another core of the present invention provides a kind of job practices of Intercepting Drain Used in Highway.
Below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that obtains under the creative work prerequisite.
See also Fig. 1-9, Fig. 1 is the cross section arrangement diagram of the Intercepting Drain Used in Highway of stone masonry construction in the prior art; Fig. 2 is the vertical view of the Intercepting Drain Used in Highway of stone masonry construction in the prior art; The integrally-built cross-sectional configuration schematic diagram of FRP multicell casing that Fig. 3 provides for the embodiment of the invention; The integrally-built plan structure schematic diagram of FRP multicell casing that Fig. 4 provides for the embodiment of the invention; The not fill concrete section cross-sectional configuration schematic diagram of the Intercepting Drain Used in Highway that Fig. 5 provides for the embodiment of the invention; The fill concrete joint cross-sectional configuration schematic diagram of the Intercepting Drain Used in Highway that Fig. 6 provides for the embodiment of the invention; Cross-sectional configuration schematic diagram during the integrally-built filled polyurethane foam gap filler of the FRP multicell casing that Fig. 7 provides for the embodiment of the invention; Base concrete and the web substrate concrete cross-sectional configuration schematic diagram of the Intercepting Drain Used in Highway that Fig. 8 provides for the embodiment of the invention; Base concrete and the web substrate concrete plan structure schematic diagram of the Intercepting Drain Used in Highway that Fig. 9 provides for the embodiment of the invention.
The Intercepting Drain Used in Highway that the embodiment of the invention provides, comprise the catchwater body, comprise the FRP base plate casing 1 of the bottom that is positioned at the catchwater body and lay respectively at the FRP web casing 2 of the both sides of catchwater body, wherein, the FRP web casing 2 of catchwater body both sides all tilts to the outside of catchwater body, and the width at the top of formation catchwater body is greater than the inverted trapezoidal structure of bottom width.
Wherein, the English full name of FRP is Fiber Reinforced Polymer, and Chinese is fibre reinforced composites.Fibre reinforced composites were called GFRP(and often claim glass fiber reinforced plastic when fiber adopted glass fiber), fibre reinforced composites were called CFRP when fiber adopted carbon fiber, and GFRP and CFRP are designated hereinafter simply as FRP.About glass fiber tensile strength 1000MPa, about epoxy resin tensile strength 60MPa, glass fiber and epoxy resin can reach about 300MPa in conjunction with back formation GFRP structural strength and steel structure intensity approaches.About tensile strength of carbon fibers 3000MPa, carbon fiber and epoxy resin form CFRP intensity in conjunction with the back and is much higher than steel structure intensity, but the carbon fiber cost is higher, and is uneconomical.The GFRP water resistance is good, the GFRP less expensive, and FRP base plate casing and FRP web casing are all adopted in easy construction in the Intercepting Drain Used in Highway provided by the invention, have favorable waterproof property, and have the advantage from heavy and light.
Simultaneously, because what adopt is FRP base plate casing 1 and FRP web casing 2, the equipment that belongs to moulding, during use, need to use multistage FRP base plate casing 1 and FRP web casing 2, joint concreting can directly be carried out at the scene in the joint of two adjacent FRP base plate casings 1 and FRP web casing 2 so, and is simple and convenient, reduce the template usage quantity, and shortened the engineering time.
Need to prove, in this specific embodiment, can adopt high 40 centimetres FRP web casing 2 all to spend 40 centimetres of this heights of catchwater to the outside inclination 45 of catchwater body in the catchwater body, the bottom is wide 40 centimetres, 120 centimetres of the width at the top of catchwater body.
Wherein, FRP base plate casing 1 below is provided with base concrete 3, and FRP base plate casing 1 sticks on the base concrete 3, to strengthen the fixed effect of FRP base plate casing 1, base concrete 3 thickness can adopt 20 centimetres, and transverse width is wide consistent with FRP base plate casing 1 bottom.Certainly, also can adopt other size according to the condition of production of reality.
Wherein, FRP base plate casing 1 and FRP web casing 2 are FRP multicell casing overall structure, and casing case chamber interior filling gap filler, and gap filler is cranny filler of polyurethane foam.Adopt FRP base plate casing 1 and the FRP web casing 2 of integral structure, can further improve speed of application, and, adopt cranny filler of polyurethane foam that it is carried out intensity and consolidate, prevent distortion.In the work progress, FRP base plate casing 1 and FRP web casing 2 are inner not concretings, filled polyurethane foam gap filler when only needing to make, thus further shortened the engineering time.
Need to prove that in this specific embodiment, FRP base plate casing 1 and FRP web casing 2 thickness can adopt high 30 centimetres, the FRP case that wall thickness is 5 millimeters.Certainly, also can adopt other size according to the condition of production of reality.
Wherein, the top of FRP web casing 2 all arranges cast-in-situ concrete 4 and ground, both sides along connecing, and backfill is set in the both sides at the top of FRP web casing 2 and ground is closely connected., before concreting, further FRP web casing 2 is fixed, and appearance effect is better by cast-in-situ concrete 4.
Wherein, the joint, two ends of FRP web casing 2 next-door neighbour ground arranged outside has web substrate concrete 5 and ground closely connected along its length, and FRP web casing 2 sticks on the web substrate concrete 5, to strengthen the fixed effect of FRP web casing 2.Because during actual the use, need multistage FRP web casing 2, so only 5 pairs of FRP webs of the arranged outside web substrate concrete casing 2 on next-door neighbour ground, the joint of two adjacent FRP web casings 2 supports, like this, one place's web substrate concrete 5 can be finished the support to an end of two FRP web casings 2, and, only arrange in the joint, thereby further reduced construction cost.
And in the place except the joint, FRP web casing 2 has the space with on every side ground, at this moment, in the both sides on FRP web casing 2 next-door neighbour ground, middle part along its length backfill is set and ground is closely connected, by backfill these spaces are filled up, further reduced construction cost.
Wherein, also be provided with diaphragm 6 in joint, two ends FRP base plate casing 1 along its length and the casing of FRP web casing 2, be actually that each shares a diaphragm 6 in the casing at the two ends of the two ends of every section FRP base plate casing 1 and every section FRP web casing 2, so, there are two diaphragms 6 joint of adjacent two FRP base plate casings 1 and FRP web casing 2, fill concrete in the casing between two diaphragms 6 of the joint of two adjacent FRP base plate casings 1 along its length so, fill concrete in the casing between two adjacent diaphragms 6 of the joint of two adjacent FRP web casings 2, to guarantee its firm intensity, and diaphragm 6 is set is conducive to concrete filling, can also paste one deck FRP woven roving waterproofing course at the concrete upper surface simultaneously, the short felt of cutting of the one deck of stickup up and down FRP of FRP woven roving, joint FRP base plate casing 1 and FRP web casing 2 chamber interior walls can be pasted the FRP plate and connect, and improve waterproof effect and FRP structural integrity.
Need to prove, in this specific embodiment, diaphragm 6 can adopt 25 centimetres apart from FRP base plate casing 1 and FRP web casing 2 ends, distance is 50 centimetres between the adjacent diaphragm 6 in joint, web substrate concrete 5 distance along its length is 50 centimetres, the web substrate concrete 5 high 20 centimetres get final product, diaphragm 6 can adopt the FRP plate of 5 millimeters of wall thickness.Certainly, also can adopt other size according to the condition of production of reality.
The embodiment of the invention also provides a kind of Intercepting Drain Used in Highway job practices, adopts factory to make and the on-the-spot job practices that combines of installing.Construction sequence is as follows:
Step 1): adopt mold integral to make FRP multicell casing overall structure in factory, FRP multicell casing overall structure comprises FRP base plate casing 1 and is arranged on the FRP web casing 2 of the both sides of FRP base plate casing 1, wherein, FRP web casing 2 all tilts to the outside of FRP base plate casing 1, forms the width at the integrally-built top of FRP multicell casing greater than the inverted trapezoidal structure of bottom width.FRP multicell casing overall structure is transported to the building site by 4 meters one section; Step 2): in the catchwater body, finish the construction that reaches the web substrate concrete 5 of the joint that is used for stickup FRP web casing 2 for the base concrete 3 of pasting FRP base plate casing 1; Step 3): after base concrete 3 and web substrate concrete 5 reach intensity, FRP multicell casing overall structure is installed in the catchwater body; Step 4): the position in the both sides on the middle part next-door neighbour ground along its length of FRP web casing 2 arranges the closely connected compacting of backfill and ground, builds the cast-in-situ concrete 4 that FRP web casing 2 tops arrange and ground, both sides is suitable connects.
Wherein, FRP multicell casing overall structure comprises FRP base plate casing 1 and is arranged on the FRP web casing 2 of the both sides of FRP base plate casing 1, wherein, FRP web casing 2 all tilts to the outside of FRP base plate casing 1, form the width at the integrally-built top of FRP multicell casing greater than the inverted trapezoidal structure of bottom width, the inverted trapezoidal structure of this inverted trapezoidal structure and catchwater body can fit like a glove, during use, only FRP multicell casing overall structure need be fixed in the catchwater body and can use, more convenient and swift, the equipment that belongs to moulding, the concreting of the joint of carrying out two adjacent FRP web casings 2 can be directly used at the scene, simple and convenient, reduce the template usage quantity, and shortened the engineering time, and, FRP base plate casing and FRP web casing have favorable waterproof property, and have the advantage from heavy and light.
Concrete, step 1) also comprises step 11): the diaphragm 6 that arranges is pasted at per 4 meters one section two ends on the length direction in FRP base plate casing 1 and FRP web casing 2.Realize better building effect by diaphragm 6, can play the effect of reinforcing.
Concrete, step 3) also comprises step 31) adopt epoxide-resin glue bonding firmly FRP base plate casing 1 and FRP web casing 2, and etc. after epoxide-resin glue reaches intensity, build between the adjacent diaphragm 6 in joint along its length, fill concrete in FRP base plate casing 1 and FRP web casing 2 casings, and etc. concrete reach intensity.Finish the stickup FRP woven roving and the short construction of cutting felt of FRP that arrange on the fill concrete surface, joint.The epoxide-resin glue bond effect is good, wait epoxide-resin glue to reach intensity after, can carry out concrete building.Joint fill concrete, stickup FRP woven roving and FRP weak point are cut felt and can be improved waterproof effect and catchwater structural integrity.
Each embodiment adopts the mode of going forward one by one to describe in this manual, and what each embodiment stressed is and the difference of other embodiment that identical similar part is mutually referring to getting final product between each embodiment.
Used specific case herein principle of the present invention and embodiment are set forth, the explanation of above embodiment just is used for helping to understand method of the present invention and core concept thereof.Should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the principle of the invention, can also carry out some improvement and modification to the present invention, these improvement and modification also fall in the protection domain of claim of the present invention.

Claims (9)

1. Intercepting Drain Used in Highway, comprise the catchwater body, it is characterized in that, comprise the FRP base plate casing (1) that is positioned at described catchwater body bottom and the FRP web casing (2) that lays respectively at described catchwater body both sides, wherein, described FRP web casing (2) all tilts to the outside of described catchwater body, forms the width of described catchwater bodies top greater than the inverted trapezoidal structure of bottom width.
2. Intercepting Drain Used in Highway according to claim 1 is characterized in that, described FRP base plate casing (1) below is provided with base concrete (3), and described FRP base plate casing (1) sticks on the described base concrete (3).
3. Intercepting Drain Used in Highway according to claim 1, it is characterized in that, described FRP base plate casing (1) and described FRP web casing (2) are FRP multicell casing overall structure, and the case chamber interior of multicell body structure filling gap filler, and described gap filler is cranny filler of polyurethane foam.
4. Intercepting Drain Used in Highway according to claim 1 is characterized in that, the top of the described FRP web casing (2) of described catchwater body both sides all arranges cast-in-situ concrete (4) and ground, both sides along connecing.
5. a kind of Intercepting Drain Used in Highway according to claim 1, it is characterized in that, the arranged outside on described FRP web casing (2) next-door neighbour ground, joint, two ends along its length has web substrate concrete (5), described FRP web casing (2) two ends along its length stick on the described web substrate concrete (5), and backfill is set in the both sides on described FRP web casing (2) next-door neighbour ground, middle part along its length and ground is closely connected.
6. a kind of Intercepting Drain Used in Highway according to claim 1, it is characterized in that, along its length joint, two ends is provided with diaphragm (6) in the casing of described FRP base plate casing (1) and described FRP web casing (2), fill concrete in the casing between two diaphragms (6) of the joint of two adjacent described FRP base plate casings (1) along its length, fill concrete in the casing between adjacent two diaphragms (6) of the joint of two adjacent described FRP web casings (2), all arrange on the described concrete surface and paste one deck FRP woven roving, described FRP woven roving upper and lower surface all arranges pastes the short felt of cutting of one deck FRP.
7. the job practices of an Intercepting Drain Used in Highway is characterized in that, comprising:
Step 1): adopt mold integral to make FRP multicell casing overall structure in factory, described FRP multicell casing overall structure comprises FRP base plate casing (1) and is arranged on the FRP web casing (2) of the both sides of described FRP base plate casing (1), wherein, described FRP web casing (2) all tilts to the outside of described FRP base plate casing (1), form the width at the integrally-built top of described FRP multicell casing greater than the inverted trapezoidal structure of bottom width, described FRP multicell casing overall structure is transported to the building site by 4 meters one section;
Step 2): in the catchwater body, finish the construction that reaches the web substrate concrete (5) of the joint that is used for the described FRP web casing of stickup (2) for the base concrete (3) of pasting described FRP base plate casing (1);
Step 3): after described base concrete (3) and described web substrate concrete (5) reach intensity, described FRP multicell casing overall structure is installed in described catchwater body;
Step 4): the position in the both sides on the middle part next-door neighbour ground along its length of described FRP web casing (2) arranges the closely connected compacting of backfill and ground, builds the cast-in-situ concrete (4) that described FRP web casing (2) top arranges and ground, both sides is suitable connects.
8. the job practices of Intercepting Drain Used in Highway according to claim 7, it is characterized in that described step 1) also comprises step 11): the diaphragm (6) that arranges is pasted at per 4 meters one section two ends on the length direction in described FRP base plate casing (1) and described FRP web casing (2).
9. the job practices of Intercepting Drain Used in Highway according to claim 7, it is characterized in that, described step 3) also comprises step 31) adopt epoxide-resin glue bonding firmly described FRP base plate casing (1) and described FRP web casing (2), and etc. after described epoxide-resin glue reaches intensity, build the fill concrete in the described FRP base plate casing (1) and described FRP web casing (2) casing between the adjacent diaphragm (6) in joint along its length, and etc. described concrete reach intensity, finish the short construction of cutting felt of the stickup FRP woven roving that arranges on the fill concrete surface, described joint and FRP.
CN201310299291.4A 2013-07-16 2013-07-16 A kind of Intercepting Drain Used in Highway and construction method thereof Expired - Fee Related CN103334367B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310299291.4A CN103334367B (en) 2013-07-16 2013-07-16 A kind of Intercepting Drain Used in Highway and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310299291.4A CN103334367B (en) 2013-07-16 2013-07-16 A kind of Intercepting Drain Used in Highway and construction method thereof

Publications (2)

Publication Number Publication Date
CN103334367A true CN103334367A (en) 2013-10-02
CN103334367B CN103334367B (en) 2015-11-25

Family

ID=49242565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310299291.4A Expired - Fee Related CN103334367B (en) 2013-07-16 2013-07-16 A kind of Intercepting Drain Used in Highway and construction method thereof

Country Status (1)

Country Link
CN (1) CN103334367B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960342A (en) * 2022-07-19 2022-08-30 河南绿岩工程科技有限公司 Road curb filling structure and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0565736A (en) * 1991-09-05 1993-03-19 P S Co Ltd Drain ditch for replaceable concrete-paved road and repairing method there0f
CN2813710Y (en) * 2005-08-08 2006-09-06 贵阳铝镁设计研究院 Intercepting blind drain
CN1898443A (en) * 2003-12-26 2007-01-17 盛南工业株式会社 Block structure for gutter, water channel formed of block structure for the gutter, and method of manufacturing block the structure for gutter
JP2007046414A (en) * 2005-08-12 2007-02-22 Mitsubishi Chem Mkv Co Lining structure of concrete-made structure
CN201372398Y (en) * 2009-02-11 2009-12-30 王秋林 Prefabricated combination raceway
CN202323623U (en) * 2011-11-17 2012-07-11 王有才 Ladder-shaped water groove
CN203393535U (en) * 2013-07-16 2014-01-15 重庆交通大学 Road intercepting ditch

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0565736A (en) * 1991-09-05 1993-03-19 P S Co Ltd Drain ditch for replaceable concrete-paved road and repairing method there0f
CN1898443A (en) * 2003-12-26 2007-01-17 盛南工业株式会社 Block structure for gutter, water channel formed of block structure for the gutter, and method of manufacturing block the structure for gutter
CN2813710Y (en) * 2005-08-08 2006-09-06 贵阳铝镁设计研究院 Intercepting blind drain
JP2007046414A (en) * 2005-08-12 2007-02-22 Mitsubishi Chem Mkv Co Lining structure of concrete-made structure
CN201372398Y (en) * 2009-02-11 2009-12-30 王秋林 Prefabricated combination raceway
CN202323623U (en) * 2011-11-17 2012-07-11 王有才 Ladder-shaped water groove
CN203393535U (en) * 2013-07-16 2014-01-15 重庆交通大学 Road intercepting ditch

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张锡祥等: "高耐久性FRP桥梁结构、构件的研究与实践", 《重庆交通大学学报》, vol. 30, no. 2, 31 December 2011 (2011-12-31) *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960342A (en) * 2022-07-19 2022-08-30 河南绿岩工程科技有限公司 Road curb filling structure and construction method

Also Published As

Publication number Publication date
CN103334367B (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN106481090B (en) A kind of Shockproof reinforcing method of existing reinforced concrete concrete frame joint
CN105951876A (en) Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof
CN102839601A (en) Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure
CN202787055U (en) Pier fixed connection structure of steel structure overhead bridge
CN205444254U (en) Deformation joint structure
CN102888830A (en) Plastic water channel and construction method thereof
CN201943093U (en) Settlement joint water-proof structure for basement with drainage channel
CN103670442A (en) Prefabricated concrete hyperbolical thin-shell arch type assembled underground space engineering supporting structure
CN203487487U (en) Anti-collision guardrail structure
CN203393535U (en) Road intercepting ditch
CN103334367B (en) A kind of Intercepting Drain Used in Highway and construction method thereof
CN103334441B (en) Road slope protecting structure and construction method thereof
CN203393536U (en) Road side ditch
CN105421679A (en) Dividing joint structure of fine aggregate concrete roof surface layers and construction method of dividing joint structure
CN208578067U (en) Half prefabricated assembled pipe gallery
CN208486388U (en) Waterproof precast floor slab
CN103306226B (en) A kind of anticollision guardrail structure and construction method thereof
CN103321124A (en) Highway gutter and its construction method
CN105822006B (en) Novel light aggregate concrete partition wall batten and its construction technique
CN103334392B (en) Highway spats wall and construction method thereof
CN203393729U (en) Road slope protection structure
CN205742713U (en) Novel light aggregate concrete partition wall batten
CN110424439A (en) A kind of precast ceramsite concrete cored slab sizing fetal membrane and its construction
CN105369770B (en) The construction method of waterfront bank protection landscape prefabricated components and waterfront bank protection
CN205604223U (en) Foundation stabilization is with filling modular structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151125

Termination date: 20170716

CF01 Termination of patent right due to non-payment of annual fee