CN103331395A - Control method of twist start of steel cord - Google Patents

Control method of twist start of steel cord Download PDF

Info

Publication number
CN103331395A
CN103331395A CN2013102055926A CN201310205592A CN103331395A CN 103331395 A CN103331395 A CN 103331395A CN 2013102055926 A CN2013102055926 A CN 2013102055926A CN 201310205592 A CN201310205592 A CN 201310205592A CN 103331395 A CN103331395 A CN 103331395A
Authority
CN
China
Prior art keywords
steel cord
rotating speed
false twist
twist device
cord
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102055926A
Other languages
Chinese (zh)
Other versions
CN103331395B (en
Inventor
张晓林
李昕月
张磊
苏循志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Sanjiang Space Jiangbei Mechanical Engineering Co Ltd
Original Assignee
Hubei Sanjiang Space Jiangbei Mechanical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Sanjiang Space Jiangbei Mechanical Engineering Co Ltd filed Critical Hubei Sanjiang Space Jiangbei Mechanical Engineering Co Ltd
Priority to CN201310205592.6A priority Critical patent/CN103331395B/en
Publication of CN103331395A publication Critical patent/CN103331395A/en
Application granted granted Critical
Publication of CN103331395B publication Critical patent/CN103331395B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a control method of twist start of a steel cord. The method comprises the steps of adjusting rotating speed of a false twister according to a false twister rotating speed rise standard curve preset in a control system, further slightly adjusting the rotating speed of the false twister according to change in a steel cord twist value detected in real time till twist of each point on the steel cord meet the requirements, wherein the false twister rotating speed rise standard curve is formed by repeatedly starting steel cord production equipment for many times, sampling a plurality of sampling points in the same position on the steel cord, correcting the rotating speed of the false twister at the same sampling point on the steel cord according to a formula, and drawing corresponding to take-up meter length according to the corrected rotating speeds of the false twister at the sampling points. According to the control method, the standard curve is established to allow the rotating speed of the false twister during the start is matched with the speed of a host, so that the twist value of the cord is controlled during the start. According to the control method, the mechanical structure of the original equipment is not require, and the quality of the steel cord can be improved significantly.

Description

The steel cord starts the control method of reversing
Technical field
The present invention relates to steel cord production technical field, refer to that particularly a kind of steel cord starts the control method of reversing.
Background technology
The steel cord is made up of two or two above steel wires, perhaps by thigh with strand combination or by the combination formed structure of thigh with silk.The steel cord (being generally 6m) of specific length, when the one end is fixed, when the other end was let alone to rotate freely, the revolution that rotates was referred to as the Residual torsion value of this section steel cord.Steel cord Residual torsion value (hereinafter to be referred as reversing) is very important technological parameter during the steel cord is produced.
Each section that the steel cord is completely taken turns in steel cord production requirement one reverses must be within certain scope.In put outer receipts type plying equipment and influence principal element that cord reverses the rotating ratio of false twist device and main frame, swage volume under pressure, tension force size, monofilament circle footpath etc. are arranged, but for a certain device start finish, after the stabilization of speed, factors such as swage volume under pressure, tension force size, monofilament circle footpath are almost constant, torsion effect is changed very little, the false twist device that only need search out a best and engine speed are than just guaranteeing that the cord of producing reverses in the scope that is stabilized in requirement.In the prior art, China's utility model patent " the residual on-line measuring device of turning round of cord " (application number: this process has been made detailed description 200920227558.8), its cardinal principle is: detect reversing of steel cord by reversing on-line measuring device, constantly adjust the rotating speed (rotating ratio of false twist device and main frame) of false twist device, until reversing in the scope that is requiring.But in actual production, point on the steel cord after reversing by the false twist device still needs to arrive through tens meters ability and reverses checkout gear, therefore checkout gear has certain hysteresis quality, yet in the device start process, main frame speed rises in time, detect reverse after, main frame speed raises, do not existed adjustment with reference to speed.The uncontrollable device start stage of mode of this so " detect afterwards earlier adjust ", i.e. main frame and false twist device rotating speed reversing from the cord of producing in 0 to stabilized (steady-state) speed stage.
Summary of the invention
The objective of the invention is to overcome that the cord to the device start stage reverses uncontrollable defective in the existing steel cord production, provide a kind of steel cord to start the control method of reversing.
For achieving the above object, the designed steel cord of the present invention starts the control method of reversing, and comprises the steps:
1) steel cord production equipment is set, it comprises residual checkout gear, the take-up pulley turned round of the false twist device, the cord that arrange in proper order according to the steel cord direction of motion, described take-up pulley place is provided with meter counter, and described false twist device, residual checkout gear, the meter counter turned round of cord all link to each other with control system;
2) start steel cord production equipment, adjust the rotating speed of false twist device according to predefined false twist device rotating speed rising calibration curve in the control system, and simultaneously according to the residual variation of turning round the detected steel cord of the checkout gear value of reversing of cord, further finely tune the rotating speed of false twist device, reversing of each point meets the requirements on the steel cord;
Wherein, the acquisition methods of described false twist device rotating speed rising calibration curve is as follows:
(1) every constant spacing, the residual rotating speed of turning round the detected steel cord of the checkout gear value of reversing and false twist device of cord is sampled,
(2) repeated priming steel cord production equipment is repeatedly sampled to the sampled point of a plurality of same positions on the steel cord, and according to following formula, the same sampled point on the steel wire is carried out the rotating speed correction of false twist device,
V N+1=V n+ k(A n-A If)
In the formula, V nThe rotating speed of the false twist device of sample point when being the n time startup steel cord production equipment, V N+1The rotating speed of the false twist device of sample point when being the n+1 time startup steel cord production equipment, A IfBe default value of reversing that the steel cord need reach, A nValue of reversing of sample point when being the n time startup steel cord production equipment, k is that false twist device rotating speed is adjusted coefficient,
(3) according to the rotating speed of the false twist device of above-mentioned a plurality of sample point corrections, the long L of take-up rice of corresponding meter counter record carries out curve and draws, and obtains false twist device rotating speed rising calibration curve;
As preferred version, above-mentioned steel cord starts in the control method of reversing, the definite method that obtains the described false twist device of step (2) the rotating speed adjustment coefficient k of false twist device rotating speed rising calibration curve is: at first, adjust coefficient according to the default false twist device rotating speed less than end value of experience and be designated as b, along with starting steel cord production equipment one by one, continue to increase the b value, and monitoring A nWith A IfBetween difference, when concussion and amplitude occurring and surpass the steel cord and reverse the error range that allows, the false twist device rotating speed of noting this moment is adjusted coefficient and is designated as b ', determines k=(0.6 ~ 0.8 then) b '.
As preferred version, above-mentioned steel cord starts in the control method of reversing, and the described constant spacing of step (1) that obtains false twist device rotating speed rising calibration curve is the distance between the residual test point of turning round checkout gear of false twist device outlet and cord.
Beneficial effect of the present invention: utilization is set up in control system and is continued to optimize false twist device rotating speed rising calibration curve in the start-up course, makes false twist device rotating speed and main frame speeds match in the start-up course, thus value of reversing of cord in the control start-up course.The present invention does not need to change the frame for movement of existing equipment, can significantly improve steel cord quality.
Description of drawings
Fig. 1 is the structural representation of the steel cord production equipment of enforcement the inventive method.
Fig. 2 is false twist device rotating speed rising calibration curve schematic diagram.
The specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.
As shown in Figure 1, 2, the steel cord starts the control method of reversing, and comprises the steps:
1) steel cord production equipment is set, it comprises residual checkout gear 2, the take-up pulley 3 turned round of the false twist device 1, the cord that arrange in proper order according to the steel cord direction of motion, described take-up pulley 3 places are provided with meter counter 4, and described false twist device 1, cord be residual turns round checkout gear 2, meter counter 4 all links to each other with control system;
2) start steel cord production equipment, adjust the rotating speed of false twist device 1 according to predefined false twist device rotating speed rising calibration curve in the control system, and simultaneously according to the residual variation of turning round checkout gear 2 detected steel cord values of reversing of cord, further finely tune the rotating speed of false twist device 1, reversing of each point meets the requirements on the steel cord;
Wherein, the acquisition methods of described false twist device rotating speed rising calibration curve is as follows:
(1) distance of establishing between the residual test point of turning round checkout gear 2 of false twist device 1 outlet and cord is L 0, with L 0Reverse the sampling period as cord, every L 0, the residual rotating speed of turning round checkout gear 2 detected steel cord values of reversing and false twist device 1 of cord is sampled,
(2) repeated priming steel cord production equipment is repeatedly sampled to the sampled point of a plurality of same positions on the steel cord, and according to following formula, the same sampled point on the steel cord is carried out the rotating speed correction of false twist device 1,
V N+1=V n+ k(A n-A If)
In the formula, V nThe rotating speed of the false twist device 1 of sample point when being the n time startup steel cord production equipment, V N+1The rotating speed of the false twist device 1 of sample point when being the n+1 time startup steel cord production equipment, A IfBe default value of reversing that the steel cord need reach, A nValue of reversing of sample point when being the n time startup steel cord production equipment, k is that false twist device rotating speed is adjusted coefficient,
Device start moment, false twist device rotating speed V=0, take-up rice is long to be 0, the value of reversing is A 0, corresponding length is L 0
For same sampled point on the steel cord,
Start for the 1st time, the false twist device rotating speed that records this sampled point is V 1, metering length is L 1, the steel cord value of reversing is A 1, the extension position of this sampled point on the actual corresponding steel cord is L 1+ L 0, this sampled point is through the rotating speed V of the device of false twist next time 1 of correction so 2=V 1+ k(A 1-A If)
After starting for the 2nd time, when metering length is L 1The time, the rotating speed of false twist device is revised speed V 2, detecting metering length again is L 1+ L 0The time steel cord reverse A 2, according to A 2-A IfThe torsional deflection value, obtain the rotating speed V of false twist device 1 next time 3,
Repeating above-mentioned makeover process, is 0 until this sampled point torsional deflection value, and namely this point reverses to equal to set and reverses.
(3) according to the rotating speed of the false twist device 1 of above-mentioned a plurality of sample point corrections, the long L of take-up rice of corresponding meter counter (4) record carries out curve and draws, and obtains false twist device rotating speed rising calibration curve, as shown in Figure 2, and V nThe block curve at place is the n time startup false twist device rotating speed rising calibration curve, V N+1The dashed curve at place is the n+1 time startup false twist device rotating speed rising calibration curve, each curve of all last time being drawn that starts is revised, torsional deflection value until each sampled point is 0, obtains the false twist device rotating speed rising calibration curve that more realistic production needs;
In the acquisition methods of described false twist device rotating speed rising calibration curve, definite method that the described false twist device of step (2) rotating speed is adjusted coefficient k is: at first, adjust coefficient according to the default false twist device rotating speed less than end value of experience and be designated as b, along with starting steel cord production equipment one by one, continue to increase the b value, and monitoring A nWith A IfBetween difference, when concussion and amplitude occurring and surpass the steel cord and reverse the error range that allows, the false twist device rotating speed of noting this moment is adjusted coefficient and is designated as b ', determines k=(0.6 ~ 0.8 then) b '.
Acquisition methods general device according to above-mentioned false twist device rotating speed rising calibration curve only need start about 3 times, just can obtain better suited false twist device rotating speed rising calibration curve, satisfies the steel cord substantially and reverses requirement, has reduced scrappage and the production cost of finished product.

Claims (3)

1. a steel cord starts the control method of reversing, and comprises the steps:
1) steel cord production equipment is set, it comprises residual checkout gear (2), the take-up pulley (3) turned round of the false twist device (1), the cord that arrange in proper order according to the steel cord direction of motion, described take-up pulley (3) locates to be provided with meter counter (4), and described false twist device (1), cord be residual turns round checkout gear (2), meter counter (4) all links to each other with control system;
2) start steel cord production equipment, adjust the rotating speed of false twist device (1) according to predefined false twist device rotating speed rising calibration curve in the control system, and simultaneously according to the residual variation of turning round the detected steel cord of checkout gear (2) value of reversing of cord, further finely tune the rotating speed of false twist device (1), reversing of each point meets the requirements on the steel cord;
Wherein, the acquisition methods of described false twist device rotating speed rising calibration curve is as follows:
(1) every constant spacing, the residual rotating speed of turning round the detected steel cord of checkout gear (2) value of reversing and false twist device (1) of cord is sampled,
(2) repeated priming steel cord production equipment is repeatedly sampled to the sampled point of a plurality of same positions on the steel cord, and according to following formula, the same sampled point on the steel cord is carried out the rotating speed correction of false twist device (1),
V N+1=V n+ k(A n-A If)
In the formula, V nThe rotating speed of the false twist device (1) of sample point when being the n time startup steel cord production equipment, V N+1The rotating speed of the false twist device (1) of sample point when being the n+1 time startup steel cord production equipment, A IfBe default value of reversing that the steel cord need reach, A nValue of reversing of sample point when being the n time startup steel cord production equipment, k is that false twist device rotating speed is adjusted coefficient,
(3) according to the rotating speed of the false twist device (1) of above-mentioned a plurality of sample point corrections, the long L of take-up rice of corresponding meter counter (4) record carries out curve and draws, and obtains false twist device rotating speed rising calibration curve.
2. steel cord according to claim 1 starts the control method of reversing, it is characterized in that: in the acquisition methods of described false twist device rotating speed rising calibration curve, definite method that the described false twist device of step (2) rotating speed is adjusted coefficient k is: at first, adjust coefficient according to the default false twist device rotating speed less than end value of experience and be designated as b, along with starting steel cord production equipment one by one, continue to increase the b value, and monitoring A nWith A IfBetween difference, when concussion and amplitude occurring and surpass the steel cord and reverse the error range that allows, the false twist device rotating speed of noting this moment is adjusted coefficient and is designated as b ', determines k=(0.6 ~ 0.8 then) b '.
3. steel cord according to claim 1 and 2 starts the control method of reversing, it is characterized in that: in the acquisition methods of described false twist device rotating speed rising calibration curve, the described constant spacing of step (1) is the distance between the residual test point of turning round checkout gear (2) of false twist device (1) outlet and cord.
CN201310205592.6A 2013-05-29 2013-05-29 Control method of twist start of steel cord Active CN103331395B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310205592.6A CN103331395B (en) 2013-05-29 2013-05-29 Control method of twist start of steel cord

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310205592.6A CN103331395B (en) 2013-05-29 2013-05-29 Control method of twist start of steel cord

Publications (2)

Publication Number Publication Date
CN103331395A true CN103331395A (en) 2013-10-02
CN103331395B CN103331395B (en) 2015-03-18

Family

ID=49239637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310205592.6A Active CN103331395B (en) 2013-05-29 2013-05-29 Control method of twist start of steel cord

Country Status (1)

Country Link
CN (1) CN103331395B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112813711A (en) * 2019-11-18 2021-05-18 宝钢金属有限公司 Production method and device for accurately controlling torsional fluctuation of steel cord

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55136534A (en) * 1979-04-13 1980-10-24 Tokyo Seikou Kk Production of steel cord
JPH07218788A (en) * 1994-02-04 1995-08-18 Fujikura Ltd Manufacture device for sz slot cable
JP2008304399A (en) * 2007-06-08 2008-12-18 Bridgestone Corp Device for measuring residual torsion of stranded wire, and wire stranding machine and stranded wire winding machine using the device
CN201495446U (en) * 2009-08-21 2010-06-02 国营江北机械厂 On-line detecting device for cord residual twist
CN102039358A (en) * 2009-10-09 2011-05-04 青岛三高自控设备研发有限公司 Steel cord corrector
KR20120111889A (en) * 2011-03-31 2012-10-11 미쓰비시덴키 가부시키가이샤 Wire twisting machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55136534A (en) * 1979-04-13 1980-10-24 Tokyo Seikou Kk Production of steel cord
JPH07218788A (en) * 1994-02-04 1995-08-18 Fujikura Ltd Manufacture device for sz slot cable
JP2008304399A (en) * 2007-06-08 2008-12-18 Bridgestone Corp Device for measuring residual torsion of stranded wire, and wire stranding machine and stranded wire winding machine using the device
CN201495446U (en) * 2009-08-21 2010-06-02 国营江北机械厂 On-line detecting device for cord residual twist
CN102039358A (en) * 2009-10-09 2011-05-04 青岛三高自控设备研发有限公司 Steel cord corrector
KR20120111889A (en) * 2011-03-31 2012-10-11 미쓰비시덴키 가부시키가이샤 Wire twisting machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112813711A (en) * 2019-11-18 2021-05-18 宝钢金属有限公司 Production method and device for accurately controlling torsional fluctuation of steel cord
CN112813711B (en) * 2019-11-18 2022-12-16 宝钢金属有限公司 Production method and device for accurately controlling torsion fluctuation of steel cord

Also Published As

Publication number Publication date
CN103331395B (en) 2015-03-18

Similar Documents

Publication Publication Date Title
CN203565520U (en) Novel constant tension control device for front and back passes of wire drawing machine
CN104291150B (en) Fiber winding method and Filament Winding Equipment
CN104034472A (en) Online measuring device, measurement and control system and measurement and control method for tension of stranding machine
CN104609252B (en) One kind polarization wiregrating automation wind and method
CN110077905A (en) A kind of method and device thereof controlling stranding machine takeup tension
CN202715655U (en) System for precisely determining coil diameter value of strip steel coiling machine
CN107020309B (en) A kind of means for correcting of coiler pinch-roll tracking accuracy and bearing calibration
CN108492930B (en) Steering guide wheel set
CN103331395A (en) Control method of twist start of steel cord
CN202677964U (en) Cable meter counting and word spraying device
CN103645550B (en) A kind of skeleton type optical fiber ribbon cable-former and use the stranding method of this cable-former
CN210150498U (en) Device for controlling take-up tension of stranding machine
CN104034247A (en) Strip-steel length metering method
CN107988738B (en) Active unwinding system and method for yarn dyeing machine
CN204000387U (en) A kind of continuous type glass fibre filoplume checkout gear
CN105512491B (en) The scaling method of the matched curve of the corresponding output voltage of the angle of attack
CN110255257A (en) A kind of control method and winding system of winding tension
CN107020300B (en) A kind of complex correction device and complex correction method improving coiling machine tracking accuracy
CN204162192U (en) Steel cord equipment I-beam wheel rotates detector at the bottom of actinobacillus wheel
CN105463642B (en) Dead zone length automatic testing method in the control of drawing frame autoleveller
CN115067544A (en) Automatic control system and control method for cigarette filter stick production process
CN107246833A (en) A kind of stranding meter-measuring device for OPGW
CN106352962B (en) A kind of meter of weight monitoring system, monitoring method and its controller and control method
CN107618922A (en) Paper machine changes roll speed scaling method
CN1174905C (en) Method for controlling rove tension

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant