CN103329607A - Method and device for communication service scheduling, and communication system - Google Patents

Method and device for communication service scheduling, and communication system Download PDF

Info

Publication number
CN103329607A
CN103329607A CN2011800505388A CN201180050538A CN103329607A CN 103329607 A CN103329607 A CN 103329607A CN 2011800505388 A CN2011800505388 A CN 2011800505388A CN 201180050538 A CN201180050538 A CN 201180050538A CN 103329607 A CN103329607 A CN 103329607A
Authority
CN
China
Prior art keywords
ism
user equipment
communication service
lte
modules
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011800505388A
Other languages
Chinese (zh)
Inventor
汪巍崴
周华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Publication of CN103329607A publication Critical patent/CN103329607A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/06Optimizing the usage of the radio link, e.g. header compression, information sizing, discarding information
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W8/00Network data management
    • H04W8/22Processing or transfer of terminal data, e.g. status or physical capabilities
    • H04W8/24Transfer of terminal data

Abstract

The present invention provides a method and device for communication service scheduling, and a communication system. The method for communication service scheduling includes that: a User Equipment (UE) reports the working state of an Industrial Scientific Medical (ISM) module to a device at the network side (S101); the device at the network side allocates Long Term Evolution (LTE) communication service for the UE according to the working state reported by the UE (S102). With the application of the technical solution, the device at the network side can allocate, according to the working state reported by the UE, the LTE communication service for the UE within the remaining time during the unscheduled period, and therefore the utility rate of the time slot resources can be enhanced; the device can also adjust the scheduling mode of the LTE communication service during the scheduled period, so as to reduce or avoid the conflict between the LTE communication service and the ISM communication service of the UE.

Description

A kind of communication service dispatching method, device and communication system
A kind of communication service dispatching method, device and communication system
Technical field
[01] this invention relates generally to communication technical field, more particularly, to a kind of communication service dispatching method, device and communication system.
Background technology
[02] with the development of the communication technology, in UE (a user equipment, user equipment)In, may integrated various wireless communication module, this mode is referred to as coexistence.For example, in LTE (Long Term Evolution, Long Term Evolution)In system and its enhanced edition lte-a system, in UE in addition to including basic LTE/LTE-A modules, others ISM (Industrial Scientific Medical, industry, science, medical treatment can also be included)Module, such as WLAN (Wireless Local Area Network, WLAN)Module, Bluetooth (bluetooths)Module and GNSS (Global Navigation Satellite System, GPS)Module etc..Because LTE/LTE-A modules and ISM modules are all integrated in a UE, therefore more serious mutual interference is there is between module.
[03] in order to reduce the communication performance loss that mutual interference is brought, current 3GPP proposes that it is using TDM (Time Division Multiplexing, time division multiplexing to solve one of scheme of the problem)Mechanism, i.e., be divided into scheduled period (scheduling slots by time shaft)With unscheduled period (the non-scheduled periods)Two parts, and scheduled period are distributed to the LTE/LTE-A modules on UE, distribute to ISM modules, two kinds of periods periodically substitute by unscheduled period, ensure that each module will not receiving and transmitting signal simultaneously with this.
[04] according to 3GPP related conference content, it is believed that UE ISM modules should support ower saving mode (energy saver modes in LTE/LTE-A systems), when UE ISM modules are worked under energy saver mode, in the non-scheduled period, ISM modules allow to be waken up execution communication service, after business execution terminates, reenter sleep state, so may result in two aspect problems:On the one hand, ISM modules complete communication service before may terminating in the non-scheduled period, cause the waste of non-scheduled period remaining time slots resource;On the other hand, ISM modules still need to proceed communication service after in the non-scheduled period may terminating, and now LTE/LTE-A modules have started, so as to cause the interference between LTE/LTE-A modules and ISM modules. The content of the invention
[05] in view of this, the embodiments of the invention provide a kind of communication service dispatching method, device and communication system.The scheme provided using the embodiment of the present invention, network side equipment can be UE distribution LTE communication business, so as to improve the utilization rate of time interval resource according on user equipment 4 blunt working conditions, in the remaining time in scheduling slot;The scheduling mode of LTE communication services in scheduling slot, can also be adjusted, conflict is produced with the LTE communication business and ISM communication services that reduce or avoid UE.
[06] embodiment of the present invention provides a kind of communication service dispatching method, including:
User equipment reports the working condition of ISM modules to network side equipment;
Network side equipment, according to the working condition of the user equipment to report, is the user equipment distribution LTE communication business.
[07] other side according to embodiments of the present invention is there is provided a kind of user equipment, including:
ISM module working condition acquisition modules, the working condition for obtaining ISM modules in user equipment;
ISM module working condition reporting modules, the working condition for reporting ISM modules to network side equipment, to indicate network side equipment as user equipment distribution LTE communication business.
[08] other side according to embodiments of the present invention is there is provided a kind of base station, including:
ISM module working condition receiving modules, the working condition of the ISM modules for receiving user equipment to report;
LTE communication service distribution module, is the user equipment distribution LTE communication business for the working condition according to the user equipment to report.
[09] other side according to embodiments of the present invention is there is provided a kind of GSM, and the system includes foregoing user equipment and foregoing base station.
[10] another further aspect according to embodiments of the present invention, additionally provides a kind of program product of the instruction code for the machine-readable that is stored with, when the instruction code is read and performed by machine, can perform above-mentioned communication service dispatching method.
[11] another aspect according to embodiments of the present invention, one kind storage Jie's shield, it carries the instruction code of machine-readable, when the instruction code is read and performed by machine, can perform above-mentioned communication Business scheduling method.
[12] the various specific implementations of the embodiment of the present invention are provided in following specification part, wherein, the preferred embodiment for fully disclosing the embodiment of the present invention is described in detail, without applying restriction to it.
Brief description of the drawings
[13] with reference to specific embodiment, and referring to the drawings, above and other objects and advantages to the embodiment of the present invention are further described.In the accompanying drawings, identical or corresponding technical characteristic or part will be represented using identical or corresponding reference.In the drawings:
[14] Fig. 1 is scheduling slot according to embodiments of the present invention and non-scheduled Time segments division schematic diagram;
[15] Fig. 2 is communication service dispatching method flow chart according to embodiments of the present invention;
[16] Fig. 3 is the schematic diagram of the first application scenarios of the embodiment of the present invention;
[17] Fig. 4 is the communication service dispatching method flow chart of the first application scenarios according to embodiments of the present invention;
[18] Fig. 5 is the schematic diagram of second of application scenarios of the embodiment of the present invention;
[19] Fig. 6 is the communication service dispatching method flow chart of second of application scenarios according to embodiments of the present invention;
[20] Fig. 7 is the schematic diagram of the third application scenarios of the embodiment of the present invention;
[21] Fig. 8 is the communication service dispatching method flow chart of the third application scenarios according to embodiments of the present invention;
[22] Fig. 9 is the structural representation of user equipment according to embodiments of the present invention;
[23] Figure 10 is the structural representation of base station according to embodiments of the present invention;
[24] Figure 11 is the exemplary block diagram of the personal computer as the message processing device employed in embodiments of the invention.
Embodiment
[25] embodiments of the invention are illustrated with reference to the accompanying drawings. [26] according to 3GPP suggestion, the mutual interference in LTE user equipmenies can be reduced using TDM modes, shown in Figure 1, time shaft is divided into scheduled period (scheduling slots by TDM modes)With unscheduled period (the non-scheduled periods)Two parts, and provide that the LTE/LTE-A modules on UE work in scheduling slot work, ISM modules in the non-scheduled period.Two kinds of periods periodically substitute, so that the working time of two kinds of modules staggers, to reduce the interference between module.
[27] when UE ISM modules are worked under energy saver mode, because ISM business performs the uncertainty of time, it is likely to result in the waste of non-scheduled period slots resource, the interference between ISM modules and LTE/LTE-A modules in scheduling slot may also be caused, to solve problem above, the embodiment of the present invention provides a kind of communication service dispatching method, and the flow chart of this method can be found in shown in Fig. 2, comprise the following steps:
[28] S101, user equipment reports the working condition of ISM modules to network side equipment;
[29] S102, network side equipment, according on user equipment 4 blunt working conditions, is user equipment distribution LTE communication business.
[30] in the above method, network side equipment can be evolution base station(E-Node B) etc. equipment, the working condition of ISM modules can include in UE:ISM communication service termination instruction information or ISM communication services continue configured information.
[31] when UE ISM modules terminate communication service within the non-scheduled period, UE can report ISM communication service termination instruction information to network side equipment;Network side equipment can be UE distribution LTE communication business according to the configured information, in the remaining time within the non-scheduled period.So as to improve the utilization rate of time interval resource.
[32] when UE ISM modules still need after entrance scheduling slot proceeds communication service, UE can report ISM communication services to continue configured information to network side equipment;Network side equipment can adjust LTE traffic scheduling modes of the UE in the scheduling slot according to the configured information, to reduce or avoid UE LTE business and ISM business to produce conflict.
[33] embodiments of the invention will be described in further detail below.
[34] Fig. 3 show the schematic diagram of an embodiment of the present invention application scenarios, UE ISM modules are worked under energy saver mode, in a certain non-scheduled period, ISM modules are waken up execution communication service, and, terminate communication service in the non-scheduled period, ISM reenters sleep state.According to existing traffic scheduling scheme, when a length of T this section of remaining time in, will not appoint for UE distribution What business, causes the waste of this section of time interval resource.To solve the problem, the embodiment of the present invention provides a kind of communication service dispatching method, shown in Figure 4, it may include following steps:
[35] S201, when UE ISM modules terminate communication service within the non-scheduled period, UE reports ISM communication service termination instruction information to eNB;
[36] S202, eNB are according to ISM communication service termination instruction information, the remaining time within the non-scheduled period, are UE distribution LTE communication business.
[37] for UE, when ISM modules terminate communication service within the non-scheduled period, ISM communication service termination instruction information is reported to eNB, it is therefore an objective to indicate that eNB can start in the remaining time within the non-scheduled period as UE distribution LTE communication business.
[38] for eNB, after receiving the ISM communication service termination instruction information that UE is reported within the non-scheduled period, you can to distribute LTE communication business as UE according to the information.
[39] according to the above method, UE sends configured information to eNB, informs that eNB itself ISM modules terminate communication service in the non-scheduled period in advance, and eNB can distribute LTE communication business for UE in advance according to the configured information.In general, the priority of LTE communication business is higher than ISM communication services, therefore, when LTE communication portfolio is larger, the distribution of LTE communication business can be effectively carried out using idle non-scheduled period resource using such scheme.
[40] wherein, the ISM communication service termination instruction information that UE is sent in the non-scheduled period to eNB, can be existing LTE signalings, such as SR (scheduling request, dispatch request)Or a radio resource control signaling redefined.For former mode, eNB is after the SR of UE transmissions is received, you can terminates communication service in advance in the non-scheduled period with the ISM modules for determining the UE, and performs subsequent operation;And the radio resource control signaling for redefining, it can be sent by random access procedure, can also be using being retransmited after SR and BSR application resources, the embodiment of the present invention is to the sending method of configured information and need not be defined.
[41] in a kind of implementation of the present embodiment, in S201, when UE ISM modules terminate communication service within the non-scheduled period, UE can first judge whether the remaining time length T in the non-scheduled period is more than a certain default threshold value, if T values are more than the threshold value, then report ISM communication service termination instruction information to network side equipment.This threshold value can be the minimum duration for guaranteeing completely to carry out a data transfer, can also set in other ways.If T values are too small, illustrate to enter scheduling slot soon and distribute LTE communication business, now it is considered that the non-scheduled period remaining time interval resource value is little, therefore be not necessarily to Reported again to network side.
[42] Fig. 5 show the schematic diagram of another embodiment application scenarios of the invention, UE ISM modules are worked under energy saver mode, in a certain scheduling slot, ISM modules perform communication service, and when entering the non-scheduled period, there is still a need for the business is continued executing with, and now LTE/LTE-A modules have started, so as to cause the interference between LTE/LTE-A modules and ISM modules.To solve the problem, the embodiment of the present invention provides a kind of communication service dispatching method, shown in Figure 6, it may include following steps:
[43] S301, when UE enter scheduling slot and ISM modules be not over yet communication service when, UE reports ISM communication services to continue configured information to eNB;
[44] S302, eNB continue configured information according to ISM communication services, in the scheduling slot, adjust UE LTE communication traffic scheduling mode to reduce interference.
[45] for UE, when UE enter scheduling slot and ISM modules be not over yet communication service when, UE reports ISM communication services to continue configured information to eNB, purpose is to indicate that eNB can start in the scheduling slot, adjusts UE LTE communication traffic scheduling mode to reduce interference.
[46] for eNB, UE is received after the ISM communication services that scheduling slot is reported continue configured information, can be adjusted UE LTE communication traffic scheduling mode to reduce interference in the scheduling slot.
[47] according to the above method, UE sends configured information to eNB, informs that eNB itself ISM modules still need carry out communication service in scheduling slot, eNB is according to the configured information, thus it is possible to vary the scheduling mode of LTE business is to reduce interference.
[48] wherein, UE continues configured information in scheduling slot to the eNB ISM communication services sent, can be a radio resource control signaling redefined.The radio resource control signaling redefined, can be sent by random access procedure, can also be using being retransmited after SR and BSR application resources, and the embodiment of the present invention is to the sending method of configured information and need not be defined.
[49] in general, for ISM uplink communication business, UE can stop transmission with autonomous control at the end of the non-scheduled period, but for some ISM downlink communications business, for example wlan system broadcasts the message, and ISM modules may need continuous work to ensure complete reception.Assuming that considering the case when:ISM downlink communications business will not be interfered to LTE communication business, and LTE is descending logical Communication service will not also be interfered to ISM communication services, but LTE uplink communications business can be interfered to ISM downlink communication business.Therefore, the LTE communication traffic scheduling mode that eNB adjusts UE can be reduction or cancel the LTE uplink communication business distributed for UE, so as to realize reduction or avoid interference of the LTE uplink communications business to ISM downlink communication business.
[50] certainly, the mode of adjustment scheduling is not constituted to the present invention program above limits, if it is considered that the presence of other disturbed conditions, then eNB can also be reduced using other Dispatching Form Headways or avoid the interference between UE ISM modules and LTE/LTE-A modules.
[51] relative to the application scenarios shown in Fig. 5, it is understood that there may be a kind of situation be:ISM modules simultaneously need not all continuously carry out communication service in whole scheduling slot, as shown in Figure 7, certain point in the scheduling slot, ISM modules terminate communication, interference are now not present between LTE/LTE-A modules and ISM modules, therefore can recover the scheduling mode of LTE communication business, it is shown in Figure 6, the embodiment of the present invention provides a kind of communication service dispatching method, shown in Figure 6, it may include following steps:
[52] S301-S302, it is identical with the corresponding steps in a upper embodiment, explanation is not repeated herein.
[53] S303, when UE ISM modules terminate communication service in scheduling slot, UE reports ISM communication service termination instruction information to eNB;
[54] S304, eNB recover UE LTE communication service scheduling modes according to ISM communication service termination instruction information.
[55] for UE, when UE ISM modules terminate communication service in scheduling slot, UE reports ISM communication service termination instruction information to eNB, it is therefore an objective to indicate that eNB recovers UE LTE communication traffic scheduling mode.
[56] for eNB, UE is received after the ISM communication service termination instruction information that scheduling slot is reported, and in the scheduling slot, can recover UE LTE communication traffic scheduling mode.
[57] according to the above method, UE sends configured information to eNB, inform that eNB itself ISM modules are over communication service in scheduling slot, eNB can recover the scheduling mode of LTE communication services to ensure being normally carried out for LTE communication business according to the configured information.It is understood that the recovery described in S304 should be the recovery made relative to the adjustment in S302.
[58] wherein, the ISM communication service termination instruction information that UE is sent in scheduling slot to eNB, can be a radio resource control signaling redefined.The Radio Resource control redefined Signaling processed, can be sent by random access procedure, can also be using being retransmited after SR and BSR application resources, and the embodiment of the present invention is to the sending method of configured information and need not be defined.
[59] above method is the configured informations that are sent according to UE of eNB to recover the scheduling mode of LTE communication business, in another implementation of this implementation, eNB can also actively recover the scheduling mode of LTE communication services, for example, timer is set, duration is carried out to the duration for adjusting LTE communication traffic scheduling mode in the scheduling slot to be monitored, and after the duration exceedes default threshold value, actively recovers UE LTE communication traffic scheduling mode.Because now UE ISM modules are still in work, therefore after recovery LTE communication traffic scheduling mode, LTE uplink communications business may be interfered to ISM downlink communication business, it is contemplated that the priority of LTE communication services is higher than ISM communication services, and ISM downlink communications business will not be interfered to LTE communication business, therefore in some cases, to avoid the overlong time of adjustment scheduling mode the decline of LTE communication business shield amount can be caused excessively serious by way of limiting the time span of whole scheduling mode.
[60] it should be noted, in the communication service dispatching method of the various embodiments described above, the ISM modules that UE includes can be one or more, and above-mentioned communication service dispatching method is can carry out between the UE LTE modules included and each ISM module.
[61] above method embodiment is corresponded to, the embodiment of the present invention also provides a kind of user equipment, shown in Figure 9, including:
[62] ISM modules working condition acquisition module 910, the working condition for obtaining ISM modules in user equipment;
[63] ISM modules working condition reporting module 920, the working condition for reporting ISM modules to network side equipment, to indicate network side equipment as user equipment distribution LTE communication business.
[64] certainly, in a user device, basic communication module should also be included:LTE/LTE-A modules and ISM modules(Such as WLAN module, Bluetooth modules, GNSS module), and other supplementary modules such as power supply module, display module etc., these are not showed that in fig .9.
[65] wherein, the working condition of ISM modules can include:ISM communication service termination instruction information or ISM communication services continue configured information. [66] when UE ISM modules terminate communication service within the non-scheduled period, UE can report ISM communication service termination instruction information to network side equipment;Network side equipment can be UE distribution LTE communication business according to the configured information, in the remaining time within the non-scheduled period.So as to improve the utilization rate of time interval resource.
[67] when UE ISM modules still need after entrance scheduling slot proceeds communication service, UE can report ISM communication services to continue configured information to network side equipment;Network side equipment can adjust LTE traffic scheduling modes of the UE in the scheduling slot according to the configured information, to reduce or avoid UE LTE business and ISM business to produce conflict.
[68] in one embodiment of the invention, ISM modules working condition reporting module 910, can using concrete configuration as:
[69] it is used for when the ISM modules of user equipment terminate communication service within the non-scheduled period, ISM communication service termination instruction information is reported to network side equipment, it is the user equipment distribution LTE communication business to indicate remaining time of the network side equipment within the non-scheduled period.
[70] user equipment (UE) presented above, by sending configured information to eNB, informs that eNB itself ISM modules terminate communication service in the non-scheduled period in advance, and eNB can distribute LTE communication business for UE in advance according to the configured information.In general, the priority of LTE communication business is higher than ISM communication services, therefore, when LTE communication portfolio is larger, the distribution of LTE communication services can be effectively carried out using idle non-scheduled period resource using such scheme.
[71] wherein, the ISM communication service termination instruction information that UE is sent in the non-scheduled period to eNB, can be existing LTE signalings, such as SR (scheduling request, dispatch request)Or a radio resource control signaling redefined.For former mode, eNB is after the SR of UE transmissions is received, you can terminates communication service in advance in the non-scheduled period with the ISM modules for determining the UE, and performs subsequent operation;And the radio resource control signaling for redefining, it can be sent by random access procedure, can also be using being retransmited after SR and BSR application resources, the embodiment of the present invention is to the sending method of configured information and need not be defined.
[72] in a kind of implementation of the present embodiment, ISM module working conditions reporting module 910 can specifically include:
[73] judging submodule, judges whether the remaining time length in the non-scheduled period is more than default threshold value; [74] submodule is reported, in the case of being in the judging submodule judged result, ISM communication service termination instruction information is reported to network side equipment.
[75] according to above-mentioned implementation, when UE ISM modules terminate communication service within the non-scheduled period, UE can first judge whether the remaining time length T in the non-scheduled period is more than a certain default threshold value, if T values are more than the threshold value, then report ISM communication service termination instruction information to network side equipment.This threshold value can be the minimum duration for guaranteeing completely to carry out a data transfer, can also set in other ways.If T values are too small, illustrate to enter scheduling slot soon and distribute LTE communication business, now it is considered that the non-scheduled period remaining time interval resource value is little, therefore be not necessarily to report to network side again.
[76] in another embodiment of the present invention, ISM modules working condition reporting module 910, can using concrete configuration as:
[77] be used for when user equipment enter scheduling slot and ISM modules be not over yet communication service when, ISM communication services are reported to continue configured information to network side equipment, to indicate network side equipment in the scheduling slot, adjust the LTE communication traffic scheduling mode of the user equipment to reduce interference.
[78] user equipment (UE) presented above, by sending configured information to eNB, inform that eNB itself ISM modules still need carry out communication service in scheduling slot, eNB is according to the configured information, thus it is possible to vary the scheduling mode of LTE business is to reduce interference.
[79] wherein, UE continues configured information in scheduling slot to the eNB ISM communication services sent, can be a radio resource control signaling redefined.The radio resource control signaling redefined, can be sent by random access procedure, can also be using being retransmited after SR and BSR application resources, and the embodiment of the present invention is to the sending method of configured information and need not be defined.
[80] in another embodiment of the present invention, ISM module working conditions reporting module 910, it can be also used for when the ISM modules of user equipment terminate communication service in scheduling slot, ISM communication service termination instruction information is reported to network side equipment, to indicate that network side equipment, according to the ISM communication services termination instruction information, recovers the LTE communication traffic scheduling mode of the user equipment.
[81] user equipment (UE) presented above, by eNB send configured information, inform that eNB itself ISM modules are over communication service in scheduling slot, eNB according to the configured information, The scheduling mode of LTE communication business can be recovered to ensure being normally carried out for LTE communication business.
[82] wherein, the ISM communication service termination instruction information that UE is sent in scheduling slot to eNB, can be a radio resource control signaling redefined.The radio resource control signaling redefined, can be sent by random access procedure, can also be using being retransmited after SR and BSR application resources, and the embodiment of the present invention is to the sending method of configured information and need not be defined.
[83] above method embodiment is corresponded to, the embodiment of the present invention also provides a kind of base station, shown in Figure 10, including:
[84] ISM modules working condition receiving module 1010, the working condition of the ISM modules for receiving user equipment to report;
[85] LTE communication service distribution module 1020, is the user equipment distribution LTE communication business for the working condition according to the user equipment to report.
[86] wherein, the working condition of ISM modules can include in UE:ISM communication service termination instruction information or ISM communication services continue configured information.
[87] when UE ISM modules terminate communication service within the non-scheduled period, the ISM communication service termination instruction information that base station can be reported according to UE is UE distribution LTE communication business in the remaining time within the non-scheduled period.So as to improve the utilization rate of time interval resource.
[88] when UE ISM modules still need after entrance scheduling slot proceeds communication service, the ISM communication services that base station can be reported according to UE continue configured information, LTE traffic scheduling modes of the UE in the scheduling slot is adjusted, to reduce or avoid UE LTE business and ISM business to produce conflict.
[89] in one embodiment of the invention, LTE communication service distribution module 1020 can include the first distribution sub module, in the case of ISM communication service termination instruction information is received in the non-scheduled period of user equipment in ISM module working conditions receiving module 1010, remaining time within the non-scheduled period, is the user equipment distribution LTE communication business.
[90] base station presented above, the configured information sent according to UE learns that UE ISM modules terminate communication service in the non-scheduled period in advance, and base station can distribute LTE communication business for UE in advance according to the configured information.In general, the priority of LTE communication business is higher than ISM communication services, therefore, can be effectively sharp using such scheme when LTE communication portfolio is larger The distribution of LTE communication business is carried out with idle non-scheduled period resource.
[91] in another embodiment of the present invention, LTE communication service distribution module 1020 can include the second distribution sub module, for ISM module working conditions receiving module 1010 the scheduling slot of user equipment receive ISM communication services continue configured information in the case of, in the scheduling slot, adjust the LTE communication traffic scheduling mode of the user equipment to reduce interference.
[92] base station presented above, the configured information sent according to UE learns that UE itself ISM modules still need carry out communication service in scheduling slot, base station is according to the configured information, thus it is possible to vary the scheduling mode of LTE business is to reduce interference.
[93] in general, for ISM uplink communication business, UE can stop transmission with autonomous control at the end of the non-scheduled period, but for some ISM downlink communications business, for example wlan system broadcasts the message, and ISM modules may need continuous work to ensure complete reception.Assuming that considering the case when:ISM downlink communications business will not be interfered to LTE communication business, and LTE downlink communications business will not also be interfered to ISM communication services, but LTE uplink communications business can be interfered to ISM downlink communication business.Therefore, base station adjustment UE LTE communication traffic scheduling mode can be reduction or cancel the LTE uplink communication business distributed for UE, so as to realize reduction or avoid interference of the LTE uplink communications business to ISM downlink communication business.
[94] certainly, the mode of adjustment scheduling is not constituted to the present invention program above limits, if it is considered that the presence of other disturbed conditions, then base station can also be reduced using other Dispatching Form Headways or avoid the interference between UE ISM modules and LTE/LTE-A modules.
[95] in another embodiment of the present invention, LTE communication service distribution module 1020 also includes the 3rd distribution sub module, for, in the case where the scheduling slot of user equipment receives ISM communication service termination instruction information, recovering the LTE communication traffic scheduling mode of the user equipment in ISM module working conditions receiving module 1010.
[96] base station presented above, 3rd distribution sub module cooperates with the 3rd distribution sub module, the configured information sent according to UE, learn that UE itself ISM modules are over communication service in scheduling slot, base station can recover the scheduling mode of LTE communication business to ensure being normally carried out for LTE communication business according to the configured information.
[97] in another embodiment of the present invention, the LTE communication service distribution module 1020 also includes the 4th distribution sub module, LTE communication traffic scheduling mode duration for adjusting user equipment in the second distribution sub module exceedes after default threshold value, recovers the LTE communication traffic scheduling mode of the user equipment. [98] base station presented above, 4th distribution sub module cooperates with the 3rd distribution sub module, so as to realize that the scheduling mode of LTE communication business is actively recovered in base station, timer can be set in the 4th distribution sub module, duration is carried out to the duration for adjusting LTE communication traffic scheduling mode in the scheduling slot to be monitored, after the duration exceedes default threshold value, actively recover UE LTE communication traffic scheduling mode.Because now UE ISM modules are still in work, therefore after recovery LTE communication traffic scheduling mode, LTE uplink communications business may be interfered to ISM downlink communication business, it is contemplated that the priority of LTE communication business is higher than ISM communication services, and ISM downlink communications business will not be interfered to LTE communication business, therefore in some cases, to avoid the overlong time of adjustment scheduling mode the decline of LTE communication business shield amount can be caused excessively serious by way of limiting the time span of whole scheduling mode.
[99] the embodiment of the invention also discloses a kind of GSM, the system can include the user equipment described in any one foregoing embodiment and the base station described in foregoing any embodiment.
[100] in the GSM of the present embodiment, use equipment UE as shown in Figure 9 and base station as shown in Figure 10 can be included.The communication service dispatching method performed between the base station of the system and terminal user UE may refer to the description above in association with Fig. 2-8, and detail will not be repeated here.In addition, those skilled in the art should be recognized that, many user equipmenies can be included according to the wireless communication system of the present embodiment of the present invention, every user equipment therein can perform the communication service dispatching method according to described in the various embodiments described above of the present invention with base station.
[101] it should be noted that each embodiment in this specification is described by the way of progressive, identical similar part is mutually referring to what each embodiment was stressed is the difference with other embodiment between each embodiment.Especially, for device or system embodiment, the sequence of maneuvers in embodiment of the method is substantially similar to due to the operation performed by its all modules or submodule, so describing fairly simple, the relevent part can refer to the partial explaination of embodiments of method.System embodiment described above is only schematical, the wherein described unit illustrated as separating component can be or may not be physically separate, the part shown as module can be or may not be physical module, a place can be located at, or can also be distributed on multiple NEs.Some or all of module therein can be selected to realize the purpose of this embodiment scheme according to the actual needs.Those of ordinary skill in the art are without creative efforts, you can to understand and implement.
[102] in addition, it should also be noted that according to equipment, the system of the above-mentioned each embodiment of the present invention Function and the series of processes of method can be realized by hardware, software and/or firmware.In the case where being realized by software and/or firmware, from storage medium or network to the computer with specialized hardware structure, general purpose personal computer 900 for example shown in Figure 11 installs the program for constituting the software, the computer is able to carry out various functions and processing etc. when being provided with various programs.
[103] in fig. 11, CPU (CPU) llOl is loaded into the various processing of program execution with ability reservoir (RAM) 1103 according to the program stored in read-only storage (ROM) 1102 or from storage part 1108.In RAM 1103, the data required when CPU 1101 performs various processing etc. are stored also according to needs.
[104] CPU 1101, ROM 1102 and RAM 1103 are connected to each other via bus 1104.Input/output interface 1105 is also connected to bus 1104.
[105] components described below is connected to input/output interface 1105:Importation 1106, including keyboard, mouse etc.;Output par, c 1107, including display, such as cathode-ray tube (CRT), liquid crystal display (LCD) etc., and loudspeaker etc.;Store part 1108, including hard disk etc.;With communications portion 1109, including NIC such as LAN card, modem etc..Communications portion 1109 performs communication process via network such as internet.
[106] as needed, driver 1110 is also connected to input/output interface 1105.Detachable media 1111 such as disk, CD, magneto-optic disk, semiconductor memory etc. are installed on driver 1110 as needed so that the computer program read out is installed in storage part 1108 as needed.
[107] in the case where realizing above-mentioned series of processes by software, from network such as internet or storage medium, such as detachably Jie's shield 1111 installs the program of composition software.
[108] it will be understood by those of skill in the art that this storage Jie's shield is not limited to wherein having program stored therein, separately distributing to provide a user the detachable media 1111 of program with equipment shown in Fig. 9.The example of detachable media 1111 includes disk(Include floppy disk (registration mark)), CD(Include compact disc read-only memory (CD-ROM) and digital universal disc (DVD)), magneto-optic disk(Include mini-disk (MD) (registration mark)) and semiconductor memory.Or, storage medium can be hard disk for including etc., wherein computer program stored in ROM 1102, storage part 1108, and be distributed to together with the equipment comprising them user.
[109] it may also be noted that the step of performing above-mentioned series of processes can order naturally following the instructions perform in chronological order, but and necessarily need not perform sequentially in time.Some steps can be performed parallel or independently of one another. [110] it is visible, the embodiment of the invention also discloses a kind of program product of the instruction code for the machine-readable that is stored with, when this instruction code is read and performed by machine, it can perform the communication service dispatching method of present invention.Jie's shield is stored the embodiment of the invention also discloses one kind simultaneously, it carries the instruction code of machine-readable, when the instruction code is read and performed by machine, can perform the communication service dispatching method of present invention.
[111] although the present invention and its advantage has been described in detail it should be appreciated that various changes can be carried out in the case where not departing from the spirit and scope of the present invention being defined by the claims appended hereto, substitutes and converts.And, the term " including " of the embodiment of the present invention, " including " or its any other variant are intended to including for nonexcludability, so that process, method, article or equipment including a series of key elements not only include those key elements, but also other key elements including being not expressly set out, or also include for this process, method, article or the intrinsic key element of equipment.In the absence of more restrictions, the key element limited by sentence " including one ... ", it is not excluded that also there is other identical element in the process including the key element, method, article or equipment.

Claims (1)

  1. Claim
    1. a kind of communication service dispatching method, including:
    User equipment reports the working condition of ISM modules to network side equipment, and the ISM modules are operated in energy saver mode;
    Network side equipment, according to the working condition of the user equipment to report, is the user equipment distribution LTE communication business.
    2. according to the method described in claim 1, including:
    When the ISM modules of user equipment terminate communication service within the non-scheduled period, user equipment reports ISM communication service termination instruction information to network side equipment;
    Network side equipment is according to the ISM communication services termination instruction information, the remaining time within the non-scheduled period, is the user equipment distribution LTE communication business.
    3. method according to claim 2, the user equipment reports ISM communication service termination instruction information to network side equipment, including:
    User equipment judges whether the remaining time length in the non-scheduled period is more than default threshold value, if it is, reporting ISM communication service termination instruction information to network side equipment.
    4th, according to the method described in claim 1, including:
    When user equipment enter scheduling slot and ISM modules be not over yet communication service when, user equipment reports ISM communication services to continue configured information to network side equipment;
    Network side equipment continues configured information according to the ISM communication services, in the scheduling slot, adjusts the LTE communication traffic scheduling mode of the user equipment to reduce interference.
    5th, method according to claim 4, in addition to:
    When the ISM modules of user equipment terminate communication service in scheduling slot, user equipment reports ISM communication service termination instruction information to network side equipment;
    Network side equipment recovers the LTE communication traffic scheduling mode of the user equipment according to the ISM communication services termination instruction information.
    6th, method according to claim 4, in addition to:
    Network side equipment recovers the LTE communication traffic scheduling mode of the user equipment after the LTE communication service scheduling modes duration of adjustment user equipment exceedes default threshold value.
    7. the method according to claim 4,5 or 6, the LTE communication service scheduling modes of the adjustment user equipment, including:
    Reduce or cancel the LTE uplink communication business distributed for user equipment.
    8. a kind of user equipment, including:
    ISM module working condition acquisition modules, the working condition for obtaining ISM modules in user equipment, the ISM modules are operated in energy saver mode;
    ISM module working condition reporting modules, the working condition for reporting ISM modules to network side equipment, to indicate network side equipment as user equipment distribution LTE communication business.
    9. user equipment according to claim 8, the ISM modules working condition reporting module, concrete configuration is:
    For when the ISM modules of user equipment terminate communication service within the non-scheduled period, ISM communication service termination instruction information is reported to network side equipment, it is the user equipment distribution LTE communication business to indicate remaining time of the network side equipment within the non-scheduled period.
    10. user equipment according to claim 9, the ISM modules working condition reporting module, including:
    Judging submodule, judges whether the remaining time length in the non-scheduled period is more than default threshold value;
    Submodule is reported, in the case of being in the judging submodule judged result, ISM communication service termination instruction information is reported to network side equipment.
    11st, user equipment according to claim 8, the ISM modules working condition reporting module, concrete configuration is:
    For when user equipment enter scheduling slot and ISM modules be not over yet communication service when, ISM communication services are reported to continue configured information to network side equipment, to indicate network side equipment in the scheduling slot, adjust the LTE communication traffic scheduling mode of the user equipment to reduce interference.
    12nd, user equipment according to claim 11, the ISM modules working condition reporting module, it is additionally operable to when the ISM modules of user equipment terminate communication service in scheduling slot, ISM communication service termination instruction information is reported to network side equipment, to indicate that network side equipment recovers the LTE communication traffic scheduling mode of the user equipment. 13rd, a kind of base station, including:
    ISM module working condition receiving modules, the working condition of the ISM modules for receiving user equipment to report, the ISM modules are operated in energy saver mode;
    LTE communication service distribution module, is the user equipment distribution LTE communication business for the working condition according to the user equipment to report.
    14th, base station according to claim 13,
    The LTE communication services distribute module includes the first distribution sub module, in the case of ISM communication service termination instruction information is received in the non-scheduled period of user equipment in the ISM modules working condition receiving module, remaining time within the non-scheduled period, is the user equipment distribution LTE communication business.
    15th, base station according to claim 13,
    The LTE communication services distribute module includes the second distribution sub module, for the ISM modules working condition receiving module the scheduling slot of user equipment receive ISM communication services continue configured information in the case of, in the scheduling slot, adjust the LTE communication traffic scheduling mode of the user equipment to reduce interference.
    16th, base station according to claim 15,
    The LTE communication service distribution module also includes the 3rd distribution sub module, for, in the case where the scheduling slot of user equipment receives ISM communication service termination instruction information, recovering the LTE communication traffic scheduling mode of the user equipment in the ISM modules working condition receiving module.
    17th, base station according to claim 15,
    The LTE communication service distribution module also includes the 4th distribution sub module, LTE communication service scheduling modes duration for adjusting user equipment in second distribution sub module exceedes after default threshold value, recovers the LTE communication traffic scheduling mode of the user equipment.
    18th, the base station according to claim 15,16 or 17, second distribution sub module, concrete configuration is:
    For reducing or cancelling the LTE uplink communication business distributed for user equipment.
    19. a kind of GSM, the system includes the user equipment as described in claim 8-12 any one and the base station as described in claim 13-18 any one.
    20. a kind of program product of the instruction code for the machine-readable that is stored with, when the instruction code is read and performed by machine, can perform the communication service dispatching method as any one of claim 1-7.
    21. a kind of storage medium, it carries the instruction code of machine-readable, when the instruction code is read and performed by machine, can perform the communication service dispatching method as any one of claim 1-7.
CN2011800505388A 2011-02-11 2011-02-11 Method and device for communication service scheduling, and communication system Pending CN103329607A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2011/070931 WO2012106845A1 (en) 2011-02-11 2011-02-11 Method and device for communication service scheduling, and communication system

Publications (1)

Publication Number Publication Date
CN103329607A true CN103329607A (en) 2013-09-25

Family

ID=46638122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011800505388A Pending CN103329607A (en) 2011-02-11 2011-02-11 Method and device for communication service scheduling, and communication system

Country Status (2)

Country Link
CN (1) CN103329607A (en)
WO (1) WO2012106845A1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101483511A (en) * 2008-01-09 2009-07-15 三星电子株式会社 Method suitable for multiple TDD system coexistence
CN101640565A (en) * 2008-07-30 2010-02-03 英特尔公司 Techniques to improve co-existence among multiple radios
CN101772192A (en) * 2008-12-31 2010-07-07 联发科技股份有限公司 Method and apparatus for wireless communication

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101621324A (en) * 2008-07-01 2010-01-06 联想(北京)有限公司 Coordination method for communication resources and Bluetooth communication terminal

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101483511A (en) * 2008-01-09 2009-07-15 三星电子株式会社 Method suitable for multiple TDD system coexistence
CN101640565A (en) * 2008-07-30 2010-02-03 英特尔公司 Techniques to improve co-existence among multiple radios
CN101772192A (en) * 2008-12-31 2010-07-07 联发科技股份有限公司 Method and apparatus for wireless communication

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
MOTOROLA: "Discussion on TDM approach for In-device coexistence", 《3GPP TSG-RAN WG2#72 》 *

Also Published As

Publication number Publication date
WO2012106845A1 (en) 2012-08-16

Similar Documents

Publication Publication Date Title
US11937216B2 (en) Method and apparatus for determining data feedback resource
US11147054B2 (en) Communication system
CN109196939B (en) Electronic device and method for network control terminal and network node
AU2016428724B2 (en) Slot scheduling method and apparatus
CN112399644B (en) Discontinuous receiving method, related device and system
US8670447B2 (en) Method and equipment for determining the transmission resource of channel quality indicator
US10952148B2 (en) Data transmission method and terminal device thereof
KR102107677B1 (en) Method and apparatus for flexible transmission slot allocation in wireless lan system
CN102858002A (en) Mobile communication system and mobile terminal
CN110546982A (en) Power saving method, device, terminal, access network equipment and readable storage medium
RU2005106258A (en) METHOD AND DEVICE FOR WORKING WITH MOBILE NODES IN MULTIPLE CONDITIONS
EP2745577B1 (en) Power saving in a telecommunications network
CN110557807B (en) Method for carrying out communication in sleep state of terminal and terminal
CN113453317B (en) Side-link communication method and device
CN102118768A (en) Method for controlling carrier communication state in carrier aggregation system and device
CN103329607A (en) Method and device for communication service scheduling, and communication system
CN102076029A (en) Downlink resource distribution method, device, base station and system thereof
EP2651169A1 (en) Terminal device and method thereof for reducing intra-device interference
CN110708707B (en) Method and equipment for returning terminal to resident sub-band in private network wireless communication
EP2492777B1 (en) A method and communication device for reducing power consumption in chip-to-chip signalling
EP4024960A1 (en) Power control method, apparatus and device
CN102142886A (en) Method and equipment for scheduling downlink subframe
CN104919836A (en) Method, base station, and user equipment for sharing radio resource
CN102487512A (en) Interference control method and device
CN103684721A (en) Scheduling method, user equipment and base station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130925