CN103324829A - 基于标杆光伏组件的大型光伏发电基地弃光电量评估方法 - Google Patents
基于标杆光伏组件的大型光伏发电基地弃光电量评估方法 Download PDFInfo
- Publication number
- CN103324829A CN103324829A CN2013101687007A CN201310168700A CN103324829A CN 103324829 A CN103324829 A CN 103324829A CN 2013101687007 A CN2013101687007 A CN 2013101687007A CN 201310168700 A CN201310168700 A CN 201310168700A CN 103324829 A CN103324829 A CN 103324829A
- Authority
- CN
- China
- Prior art keywords
- photovoltaic
- mark post
- minutes
- optical quantum
- photovoltaic module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
- Y02P90/82—Energy audits or management systems therefor
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Photovoltaic Devices (AREA)
Abstract
本发明公开了一种基于标杆光伏组件的大型光伏发电基地弃光电量评估方法,包括以下步骤:计算光伏电站每5分钟所有标杆光伏组件的平均出力系数,计算该风电场每5分钟的实时开机容量,计算该光伏组件每5分钟的理论出力,得出每5分钟的弃光电量,得出整个光伏电站一定时间段内的弃光电量,通过计算光伏发电基地中每个光伏电站的弃光电量得到整个光伏发电基地的弃光电量。实现准确计算弃光电量的优点。且该计算弃光电量的方法具有简便易行的特点。
Description
技术领域
本发明涉及光伏发电领域,具体地,涉及一种基于标杆光伏组件的大型光伏发电基地弃光电量评估方法。
背景技术
光伏发电站弃光电量是指受电网传输通道、安全运行需要等因素影响,光伏发电站可发而未能发出的电量,该电量不包括光伏发电站因光伏组件自身设备故障等原因而未能发出的电量。
弃光是光伏发电规模化发展过程中的一种普遍现象,跟水力发电过程中的弃水非常相似。大型光伏发电基地覆盖面积广,一般包含多个光伏电站或光伏电站群,由于电网输送通道送出极限、实时负荷平衡等因素会导致一定程度的弃光。正确科学的认识弃光、以合理的方式计算弃光电量将有助于规模化光伏发电的健康、平稳发展,有助于提升电网调度运行水平、推动光伏发电规划与电网规划的协调发展、提高清洁能源利用率。
目前,由于规模化光伏发电在我国刚刚兴起,因此国内光伏发电行业尚未对弃光电量的评估算法形成标准,现有对弃光电量计算的方法一般是计算光伏电站的出力与装机容量的差额,而后对其进行积分得到弃光电量。但对于百万千瓦级光伏发电基地而言,各光伏电站实际出力的同时率一般较低,因此用这种方法计算一般会造成对弃光电量计算的不准确。
发明内容
本发明的目的在于,针对上述问题,提出一种基于标杆光伏组件的大型光伏发电基地弃光电量评估方法,以实现准确计算弃光电量的优点。
为实现上述目的,本发明采用的技术方案是:
一种基于标杆光伏组件的大型光伏发电基地弃光电量评估方法,包括以下步骤:
步骤一:通过光伏电站每5分钟上传一次的光伏发电实时信息得到光伏电站所有光伏组件的运行状态及各组件的实时出力,计算光伏电站每5分钟所有标杆光伏组件的平均出力系数:
步骤二:计算该风电场每5分钟的实时开机容量
步骤三:计算该光伏组件每5分钟的理论出力:
步骤四:通过EMS(能量管理系统)获得光伏电站每5分钟的实时出力值R,当理论出力值T大于实际出力值R时认为出现弃光,因此每5分钟的弃光电量可以表示为:
步骤五:因此整个光伏电站一定时间段内的弃光电量表示为:
光伏电站单机容量以MW为单位,弃光电量的单位为MWh;
步骤六:通过计算光伏发电基地中每个光伏电站的弃光电量得到整个光伏发电基地的弃光电量。
根据本发明的优选实施例,当光伏电站出力受限时,光伏电站标杆光伏组件不参与负荷受限调整,始终保持正常发电状态;当标杆光伏组件均需要停机时,可用光伏电站标杆光伏组件停运前的出力作为限电期间的平均限电电力,计算光伏电站的弃光电量。
本发明的技术方案具有以下有益效果:
本发明的技术方案,通过各个光伏电站内的标杆光伏组件的发电量推算整个光伏电站的理论电量,通过与实际电量的比较得到该光伏电站对应的弃风电量,进而得到整个光伏发电基地的弃光电量。达到了准确计算弃光电量的目的。
下面通过附图和实施例,对本发明的技术方案做进一步的详细描述。
附图说明
图1为本发明实施例所述的基于标杆光伏组件的大型光伏发电基地弃光电量评估方法流程图。
具体实施方式
以下结合附图对本发明的优选实施例进行说明,应当理解,此处所描述的优选实施例仅用于说明和解释本发明,并不用于限定本发明。
一种基于标杆光伏组件的大型光伏发电基地弃光电量评估方法,包括以下步骤:
步骤一:通过光伏电站每5分钟上传一次的光伏发电实时信息得到光伏电站所有光伏组件的运行状态及各组件的实时出力,计算光伏电站每5分钟所有标杆光伏组件的平均出力系数:
步骤二:计算该风电场每5分钟的实时开机容量
其中, 是第i个光伏组件的单机容量,start表示开机光伏组件的集合;
步骤三:计算该光伏组件每5分钟的理论出力:
步骤四:通过EMS(能量管理系统)获得光伏电站每5分钟的实时出力值R,当理论出力值T大于实际出力值R时认为出现弃光,因此每5分钟的弃光电量可以表示为:
步骤五:因此整个光伏电站一定时间段内的弃光电量表示为:
光伏电站单机容量以MW为单位,弃光电量的单位为MWh;
步骤六:通过计算光伏发电基地中每个光伏电站的弃光电量得到整个光伏发电基地的弃光电量。
下文以光伏电站具体运作为例进行进一步的说明,如图1所示:
电网调度机构要求光伏电站限电时,对光伏电站的“标杆光伏组件(逆变器)”不限电,以其发电量作为该光伏电站同类逆变器的理论应发电量,减去同类逆变器的实际发电量,通过求和得到整个光伏电站的弃光受限电量。
通过光伏电站每5分钟上传一次的光伏发电实时信息可以得到光伏电站所有光伏组件的运行状态及各组件的实时出力。计算某一光伏电站每5分钟所有标杆光伏组件的平均出力系数
计算该光伏电站每5分钟的实时开机容量
计算该光伏组件每5分钟的理论出力
通过EMS(能量管理系统)可以获得光伏电站每5分钟的实时出力值R,当理论出力值T大于实际出力值R时认为出现弃光,因此每5分钟的弃光电量可以表示为
因此整个光伏电站某一时间段内的弃光电量可以表示为
如光伏电站单机容量以MW为单位,则弃光电量的单位为MWh。
通过计算光伏发电基地中每个光伏电站的弃光电量可以得到整个光伏发电基地的弃光电量。
在光伏电站标杆组件的确定,原则上按地理位置均匀分布,能够选取不同型号,不同容量的逆变器,准确反映该光伏电站总体实际发电能力。
各调度机构可以根据实际情况与光伏电站共同确定标杆光伏组件,光伏电站标杆组件的选择原则上要求不超过光伏逆变器数量的10%。
选定的标杆光伏组件发生故障时,光伏电站可以用相邻光伏逆变器组件代替故障标杆组件,并及时报电力调度机构。
当光伏电站出力受限时,光伏电站标杆组件原则上不参与负荷受限调整,始终保持正常发电状态;当包括标杆组件在内的逆变器均需要停机时,可用光伏电站光伏逆变器停运前的出力作为限电期间的平均限电电力,计算光伏电站的弃光电量。
文中i为大于零的整数。
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (2)
1.一种基于标杆光伏组件的大型光伏发电基地弃光电量评估方法,其特征在于,包括以下步骤:
步骤一:通过光伏电站每5分钟上传一次的光伏发电实时信息得到光伏电站所有光伏组件的运行状态及各组件的实时出力,计算光伏电站每5分钟所有标杆光伏组件的平均出力系数:
步骤二:计算该风电场每5分钟的实时开机容量:
步骤三:计算该光伏组件每5分钟的理论出力:
步骤四:通过EMS(能量管理系统)获得光伏电站每5分钟的实时出力值R,当理论出力值T大于实际出力值R时认为出现弃光,因此每5分钟的弃光电量可以表示为:
步骤五:因此整个光伏电站一定时间段内的弃光电量表示为:
光伏电站单机容量以MW为单位,弃光电量的单位为MWh;
步骤六:通过计算光伏发电基地中每个光伏电站的弃光电量得到整个光伏发电基地的弃光电量。
2.根据权利要求1所述的基于标杆光伏组件的大型光伏发电基地弃光电量评估方法,其特征在于,当光伏电站出力受限时,光伏电站标杆光伏组件不参与负荷受限调整,始终保持正常发电状态;当标杆光伏组件均需要停机时,可用光伏电站标杆光伏组件停运前的出力作为限电期间的平均限电电力,计算光伏电站的弃光电量。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310168700.7A CN103324829B (zh) | 2013-05-09 | 2013-05-09 | 基于标杆光伏组件的大型光伏发电基地弃光电量评估方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310168700.7A CN103324829B (zh) | 2013-05-09 | 2013-05-09 | 基于标杆光伏组件的大型光伏发电基地弃光电量评估方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103324829A true CN103324829A (zh) | 2013-09-25 |
CN103324829B CN103324829B (zh) | 2016-05-11 |
Family
ID=49193568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310168700.7A Expired - Fee Related CN103324829B (zh) | 2013-05-09 | 2013-05-09 | 基于标杆光伏组件的大型光伏发电基地弃光电量评估方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103324829B (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105160602A (zh) * | 2015-09-29 | 2015-12-16 | 国网甘肃省电力公司 | 基于标杆风电场的风电集群弃风电量计算方法 |
CN105160603A (zh) * | 2015-09-29 | 2015-12-16 | 国网甘肃省电力公司 | 基于网架结构分群的大型风力发电集群弃风电量评估方法 |
CN105184681A (zh) * | 2015-09-29 | 2015-12-23 | 国网甘肃省电力公司 | 基于最近距离分群的大型光伏发电集群弃光电量评估法 |
CN105184097A (zh) * | 2015-09-29 | 2015-12-23 | 国网甘肃省电力公司 | 基于网架结构分群的大型光伏发电集群弃光电量评估方法 |
CN105243605A (zh) * | 2015-09-29 | 2016-01-13 | 国网甘肃省电力公司 | 基于辐照相似度的大型光伏发电集群弃光电量评估方法 |
CN105243604A (zh) * | 2015-09-29 | 2016-01-13 | 国网甘肃省电力公司 | 基于标杆光伏电站的大型光伏发电集群弃光电量评估方法 |
CN105932668A (zh) * | 2016-05-20 | 2016-09-07 | 甘肃省电力公司风电技术中心 | 用于最小化弃风弃光电量的新能源发电权置换评估的方法 |
CN107256436A (zh) * | 2017-05-05 | 2017-10-17 | 国家电网公司 | 蓄热电锅炉与清洁能源的预测匹配和消纳控制方法 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111564776B (zh) * | 2020-05-25 | 2021-10-08 | 旻投电力发展有限公司 | 一种基于标杆逆变器发电的光伏电站 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7484363B2 (en) * | 2005-10-20 | 2009-02-03 | Michael Reidy | Wind energy harnessing apparatuses, systems, methods, and improvements |
CN102147839A (zh) * | 2011-05-10 | 2011-08-10 | 云南电力试验研究院(集团)有限公司 | 一种光伏发电量预测方法 |
CN102182629A (zh) * | 2011-03-29 | 2011-09-14 | 国网电力科学研究院 | 基于风资源实时监测数据的弃风电量评估方法 |
-
2013
- 2013-05-09 CN CN201310168700.7A patent/CN103324829B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7484363B2 (en) * | 2005-10-20 | 2009-02-03 | Michael Reidy | Wind energy harnessing apparatuses, systems, methods, and improvements |
CN102182629A (zh) * | 2011-03-29 | 2011-09-14 | 国网电力科学研究院 | 基于风资源实时监测数据的弃风电量评估方法 |
CN102147839A (zh) * | 2011-05-10 | 2011-08-10 | 云南电力试验研究院(集团)有限公司 | 一种光伏发电量预测方法 |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105160602A (zh) * | 2015-09-29 | 2015-12-16 | 国网甘肃省电力公司 | 基于标杆风电场的风电集群弃风电量计算方法 |
CN105160603A (zh) * | 2015-09-29 | 2015-12-16 | 国网甘肃省电力公司 | 基于网架结构分群的大型风力发电集群弃风电量评估方法 |
CN105184681A (zh) * | 2015-09-29 | 2015-12-23 | 国网甘肃省电力公司 | 基于最近距离分群的大型光伏发电集群弃光电量评估法 |
CN105184097A (zh) * | 2015-09-29 | 2015-12-23 | 国网甘肃省电力公司 | 基于网架结构分群的大型光伏发电集群弃光电量评估方法 |
CN105243605A (zh) * | 2015-09-29 | 2016-01-13 | 国网甘肃省电力公司 | 基于辐照相似度的大型光伏发电集群弃光电量评估方法 |
CN105243604A (zh) * | 2015-09-29 | 2016-01-13 | 国网甘肃省电力公司 | 基于标杆光伏电站的大型光伏发电集群弃光电量评估方法 |
CN105184681B (zh) * | 2015-09-29 | 2022-02-11 | 国网甘肃省电力公司 | 基于最近距离分群的大型光伏发电集群弃光电量评估法 |
CN105932668A (zh) * | 2016-05-20 | 2016-09-07 | 甘肃省电力公司风电技术中心 | 用于最小化弃风弃光电量的新能源发电权置换评估的方法 |
CN105932668B (zh) * | 2016-05-20 | 2018-06-01 | 甘肃省电力公司风电技术中心 | 用于最小化弃风弃光电量的新能源发电权置换评估的方法 |
CN107256436A (zh) * | 2017-05-05 | 2017-10-17 | 国家电网公司 | 蓄热电锅炉与清洁能源的预测匹配和消纳控制方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103324829B (zh) | 2016-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103324829A (zh) | 基于标杆光伏组件的大型光伏发电基地弃光电量评估方法 | |
Kim et al. | Operation strategy of multi-energy storage system for ancillary services | |
CN109524958B (zh) | 考虑深度调峰和需求响应的电力系统灵活性优化调度方法 | |
CN106485352A (zh) | 一种多类电源发电计划组合决策方法 | |
CN103277250B (zh) | 基于标杆机组的大型风电基地弃风电量的评估方法 | |
WO2016037303A1 (zh) | 一种新能源发电在线接纳能力评估方法 | |
CN104092241B (zh) | 一种考虑备用需求的风电消纳能力分析方法 | |
CN102185332B (zh) | 微网与大电网的交换功率控制方法 | |
CN103997039B (zh) | 基于概率区间预测的计及风电接纳的旋转备用区间预测方法 | |
CN102427244A (zh) | 大规模光伏风电信息接入系统 | |
CN103904682B (zh) | 一种基于风光混合模型的功率预测方法 | |
CN103488864A (zh) | 一种风光储联合发电系统风险的评估方法 | |
CN103208086A (zh) | 一种准确计及风电贡献的电力电量平衡方法 | |
CN102255337A (zh) | 一种电网接纳风电场能力的计算方法 | |
CN106684931A (zh) | 一种新能源发电场有功控制方法及控制系统 | |
CN104182808A (zh) | 一种基于等比例限电的新能源场站发电计划制定方法 | |
CN103279649B (zh) | 基于实时光资源监测网络的光伏基地弃光电量评估方法 | |
Ataei et al. | Techno-economic viability of a hybrid wind and solar power system for electrification of a commercial building in Shiraz, Iran | |
CN104484772A (zh) | 电量计划的可行性校验方法和系统 | |
Nzimande et al. | Study on Integration of Large-Scale Photovoltaic and Wind Power Generation into a Grid | |
CN102916433A (zh) | 风机群的无功功率任务分配方法 | |
Zhang et al. | Research on the wind power accommodation based on peak shaving by using heat storage electric boiler | |
Wu et al. | Integration of large-scale renewable power into the Taiwan power system | |
CN105160602A (zh) | 基于标杆风电场的风电集群弃风电量计算方法 | |
CN105184681A (zh) | 基于最近距离分群的大型光伏发电集群弃光电量评估法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160511 Termination date: 20190509 |