CN103321149B - The built-in mounting platform of bridge tower lightning rod and the method with its installation lightning rod - Google Patents
The built-in mounting platform of bridge tower lightning rod and the method with its installation lightning rod Download PDFInfo
- Publication number
- CN103321149B CN103321149B CN201310248422.6A CN201310248422A CN103321149B CN 103321149 B CN103321149 B CN 103321149B CN 201310248422 A CN201310248422 A CN 201310248422A CN 103321149 B CN103321149 B CN 103321149B
- Authority
- CN
- China
- Prior art keywords
- lightning rod
- bridge
- tower
- pipe
- stainless steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The present invention relates to the built-in mounting platform of a kind of bridge tower lightning rod and the method with its installation lightning rod, bridge is cable stayed bridge, suspension bridge, mounting platform is formed by there being the inside and outside sleeve pipe of certain altitude, in the ordinary steel of outer tube, pipe to be preced with bridge tower tower by shear connector and to be connected, the common steel tube upper and lower end welded steel pipe junction plate of inner sleeve, stainless steel external screw thread steel pipe, stainless steel external screw thread steel pipe connects lightning rod bed plate, handle junction plate, mounting handle; Inside and outside casing threads connects.Mounting method: the pre-buried outer tube being welded with shear connector, placing of concrete, lightning rod is fixed on lightning rod bed plate, and rotation lightning rod and inner sleeve are through outer tube, and lightning rod stretches out and puts in place.Adopt the installation of the lightning rod of the present invention's towering bridge tower and later maintenance just can complete in tower, avoid the outer work high above the ground of tower; Meet again the requirement of bridge tower view, do not increase the component outside bridge tower tower hat; Steadiness and operability good; Install simple, it is convenient to safeguard.
Description
Technical field
The present invention relates to a kind of bridge, mainly the method for cable stayed bridge, the built-in mounting platform of Construction of Pylon of Long Span Suspension Bridge lightning rod and installation lightning rod thereof.
Background technology
The lightning protection device that the bridge tower structure that lightning rod is cable stayed bridge, suspension bridge is towering must be arranged.Traditional lightning rod is installed needs bridge tower top to have a larger platform space, and constructor wants to arrive this mounting platform operates, and which limits the moulding of bridge tower.And along with people are to the more and more attention of bridge construction aesthetics, bridge tower structure itself, except meeting structure stress needs, also passes through the moulding imparting mechanism of self in addition with function attractive in appearance.
Usu, black bear island, Heilongjiang Province bridge is positioned at Fuyuan delta, Heilongjiang Province (also known as black bear island), is located in the eastern pole of China, is described as " east first bridge ".Because geographical position is special, bridge tower tower hat is set to the form of heronsbill, and plastic simplicity is attractive in appearance.And tower is preced with moulding attractive in appearance and is arranged the installation and maintenance of lightning rod and cause inconvenience.What traditional lightning rod platform arranged that way can destroy bridge tower itself enriches the landscape effect that distinctive creation brings.Need to design a kind of method that bridge tower headspace stenosis installs lightning rod.
Summary of the invention
The object of the invention is for above-mentioned present situation, aim to provide a kind of installation simple, it is convenient to safeguard, is suitable for bridge tower headspace narrow, installs and safeguard the built-in mounting platform of bridge tower lightning rod need do not implemented from bridge tower outside and the method for installing lightning rod thereof.
The implementation of the object of the invention is, the built-in mounting platform of bridge tower lightning rod, and by there being the inside and outside sleeve pipe of certain altitude to form, in the ordinary steel of outer tube, pipe to be preced with bridge tower tower by shear connector and to be connected, and outer tube is upper and lower is welded with stainless steel inner thread steel pipe; The upper and lower steel pipe connecting fishplate bar that passes through of the common steel tube of inner sleeve is together with stainless steel external screw thread steel-pipe welding, and upper stainless steel external screw thread steel pipe connects lightning rod bed plate, lower stainless steel external screw thread steel pipe connecting handle junction plate, welded and installed handle on handle junction plate; Stainless steel external screw thread steel pipe is threaded with stainless steel inner thread steel pipe, and described bridge is cable stayed bridge, suspension bridge.
The method of lightning rod is installed with the built-in mounting platform of bridge tower lightning rod, first the outer tube being welded with shear connector is embedded in bridge tower tower hat, placing of concrete again, lightning rod is fixed on the lightning rod bed plate of inner sleeve, then lightning rod and inner sleeve are passed outer tube by the method rotating screw thread, lightning rod stretches out and puts in place; Described bridge is cable stayed bridge, suspension bridge.
Outer layer pipe of the present invention is preced with bridge tower tower and is connected by shear connector; Inside and outside sleeve pipe has certain height, to increase himself as the rigidity of platform, the steadiness be connected with bridge tower and operability; Adopt stainless steel, to ensure the convertibility of durability and the lightning rod be threaded.
The present invention had both overcome towering bridge tower lightning rod and has installed and safeguard the difficulty changed, and installation and later maintenance just can complete in tower, avoided the outer work high above the ground of tower; Meet again the requirement of bridge tower view simultaneously, do not have additionally to increase the component outside bridge tower tower hat because of lightning rod.
The present invention installs simply, and it is convenient to safeguard, is suitable for bridge tower headspace narrow, installs and safeguards the situation being all not easy to implement from bridge tower outside.
The present invention adopts at Usu, black bear island, Heilongjiang Province bridge, achieves and well uses effect.
Accompanying drawing explanation
Fig. 1 is the sectional view of the present invention along bridge tower steel sleeve transverse direction,
Fig. 2 is the sectional view of the present invention along bridge tower steel sleeve longitudinal direction,
Fig. 3 is outer steel tubular structure figure of the present invention,
Fig. 4 is interior steel tubular structure figure of the present invention.
Detailed description of the invention
With reference to Fig. 1-4, the built-in mounting platform of bridge tower lightning rod of the present invention is made up of inside and outside sleeve pipe, and in the ordinary steel of outer tube 1, pipe is preced with 12 by shear connector 4 and bridge tower tower and is connected, and outer tube upper and lower end is welded with stainless steel inner thread steel pipe 5.Common steel tube 6 upper and lower end of inner sleeve 2 is welded together by steel pipe connecting fishplate bar 9 and stainless steel external screw thread steel pipe 7, upper stainless steel external screw thread steel pipe connects lightning rod bed plate 8, lower stainless steel external screw thread steel pipe connecting handle junction plate 11, welded and installed handle 10 on handle junction plate; Stainless steel external screw thread steel pipe 7 is threaded with stainless steel inner thread steel pipe 5.
The inside and outside sleeve pipe of certain altitude, refers to the rigidity that can meet inside and outside sleeve pipe platform, height that firm and lightning rod is installed, has enough rigidity, steadiness and operability to make this structure.The minimum diameter of stainless steel inner thread steel pipe 5 and stainless steel external screw thread steel pipe 7 is determined according to lightning rod specification.
The method of lightning rod is installed with the built-in mounting platform of bridge tower lightning rod, first the outer tube 1 being welded with shear connector 4 is embedded in cable stayed bridge or Construction of Pylon of Long Span Suspension Bridge tower hat 12, placing of concrete again, lightning rod is fixed on the lightning rod bed plate 8 of inner sleeve 2, then lightning rod and inner sleeve 2 are passed outer tube by the method rotating screw thread, lightning rod stretches out and puts in place.When need change, derotation lightning rod and inner sleeve, lightning rod and inner sleeve are fallen, and can change, and it is convenient to change.
The present invention had both overcome towering bridge tower lightning rod and has installed and safeguard the difficulty changed, and installation and later maintenance just can complete in tower, avoided the outer work high above the ground of tower; Meet again the requirement of bridge tower view simultaneously, do not have additionally to increase the component outside bridge tower tower hat because of lightning rod.
The present invention installs simply, and it is convenient to safeguard, is suitable for bridge tower headspace narrow, installs and safeguards the situation being all not easy to implement from bridge tower outside.
The present invention adopts at Usu, black bear island, Heilongjiang Province bridge, achieves and well uses effect.
Claims (4)
1. the built-in mounting platform of bridge tower lightning rod, is characterized in that by there being the inside and outside sleeve pipe of certain altitude to form, and in the ordinary steel of outer tube, pipe to be preced with bridge tower tower by shear connector and to be connected, and outer tube upper and lower end is welded with stainless steel inner thread steel pipe; The common steel tube upper and lower end of inner sleeve is by steel pipe connecting fishplate bar together with stainless steel external screw thread steel-pipe welding, and upper stainless steel external screw thread steel pipe connects lightning rod bed plate, lower stainless steel external screw thread steel pipe connecting handle junction plate, welded and installed handle on handle junction plate; Stainless steel external screw thread steel pipe is threaded with stainless steel inner thread steel pipe, and described bridge is cable stayed bridge, suspension bridge.
2. the built-in mounting platform of bridge tower lightning rod according to claim 1, is characterized in that the inside and outside sleeve pipe of certain altitude, refers to the rigidity that can meet inside and outside sleeve pipe platform, the sleeve pipe of height that firm and lightning rod is installed.
3. the built-in mounting platform of bridge tower lightning rod according to claim 1, is characterized in that the minimum diameter of stainless steel inner thread steel pipe (5) and stainless steel external screw thread steel pipe (7) is determined by lightning rod specification.
4. the method for lightning rod is installed with the built-in mounting platform of bridge tower lightning rod according to claim 1, it is characterized in that first by be welded with shear connector outer tube be embedded in bridge tower tower hat in, placing of concrete again, lightning rod is fixed on the lightning rod bed plate of inner sleeve, then lightning rod and inner sleeve are passed outer tube by the method rotating screw thread, lightning rod stretches out and puts in place, and described bridge is cable stayed bridge, suspension bridge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310248422.6A CN103321149B (en) | 2013-06-21 | 2013-06-21 | The built-in mounting platform of bridge tower lightning rod and the method with its installation lightning rod |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310248422.6A CN103321149B (en) | 2013-06-21 | 2013-06-21 | The built-in mounting platform of bridge tower lightning rod and the method with its installation lightning rod |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103321149A CN103321149A (en) | 2013-09-25 |
CN103321149B true CN103321149B (en) | 2015-09-16 |
Family
ID=49190173
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310248422.6A Active CN103321149B (en) | 2013-06-21 | 2013-06-21 | The built-in mounting platform of bridge tower lightning rod and the method with its installation lightning rod |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103321149B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101605511B1 (en) * | 2015-12-14 | 2016-04-01 | (주)옴니엘피에스 | Lightning protecting apparatus for spreading lightning current for cable-stayed bridge |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005344503A (en) * | 2004-06-01 | 2005-12-15 | Dywidag-Systems Internatl Gmbh | Corrosion prevented traction member in region of turning part disposed at support part, particularly structure of diagonally stretched cable in bridge pier of cable-stayed bridge |
JP2007197930A (en) * | 2006-01-24 | 2007-08-09 | Nagoya Institute Of Technology | Base isolation/seismic response control device used for arch bridge, high pier, cable stayed bridge and suspension bridge main tower |
CN201013008Y (en) * | 2007-03-21 | 2008-01-30 | 浙江省交通规划设计研究院 | Corbel of cable-stayed bridge rope tower anchorage zone |
CN101191321A (en) * | 2007-11-26 | 2008-06-04 | 中铁大桥勘测设计院有限公司 | Cable-stayed bridge inclined dragline and steel main bear armtie type anchoring structure |
CN101338550A (en) * | 2008-08-29 | 2009-01-07 | 清华大学 | Double-steel tube-concrete combined structural pylon |
-
2013
- 2013-06-21 CN CN201310248422.6A patent/CN103321149B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005344503A (en) * | 2004-06-01 | 2005-12-15 | Dywidag-Systems Internatl Gmbh | Corrosion prevented traction member in region of turning part disposed at support part, particularly structure of diagonally stretched cable in bridge pier of cable-stayed bridge |
JP2007197930A (en) * | 2006-01-24 | 2007-08-09 | Nagoya Institute Of Technology | Base isolation/seismic response control device used for arch bridge, high pier, cable stayed bridge and suspension bridge main tower |
CN201013008Y (en) * | 2007-03-21 | 2008-01-30 | 浙江省交通规划设计研究院 | Corbel of cable-stayed bridge rope tower anchorage zone |
CN101191321A (en) * | 2007-11-26 | 2008-06-04 | 中铁大桥勘测设计院有限公司 | Cable-stayed bridge inclined dragline and steel main bear armtie type anchoring structure |
CN101338550A (en) * | 2008-08-29 | 2009-01-07 | 清华大学 | Double-steel tube-concrete combined structural pylon |
Also Published As
Publication number | Publication date |
---|---|
CN103321149A (en) | 2013-09-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205017986U (en) | Nursery stock support frame | |
CN205025117U (en) | Adjustable bearing diagonal is used in assembly type structure prefabricated component installation | |
CN205480040U (en) | Display connecting device | |
CN103321149B (en) | The built-in mounting platform of bridge tower lightning rod and the method with its installation lightning rod | |
CN204163398U (en) | A kind of horizontal climbing form system device | |
CN202767391U (en) | Rain water pipe fixing piece | |
CN204089082U (en) | Lighting proof strip device | |
CN203435818U (en) | Fixedly-used large-scale umbrella | |
CN203960984U (en) | Suspension, the bracing means of the indoor drainage pipe of burying underground in Soft Soil Area | |
CN201700575U (en) | Rain collector for umbrella | |
CN203741837U (en) | Ground anchor | |
CN205296980U (en) | But diagonal brace of angle of adjustment and height | |
CN204510204U (en) | The adjustable pile of a kind of mounting flange | |
CN205293599U (en) | Civil engineering pipe fitting shelf | |
CN203640050U (en) | Rectangular overall roof jacking device of spherical grid structure | |
CN206800428U (en) | A kind of fixed protection column for cofferdam weir crest | |
CN203531322U (en) | Outdoor raised flooring support | |
CN203322938U (en) | Environment-friendly streetlamp | |
CN206496089U (en) | A kind of convenient pipe clamp structure installed | |
CN204838328U (en) | Walking stick | |
CN207869031U (en) | A kind of pre-buried understructure for photovoltaic system | |
CN206337883U (en) | A kind of anti-climbing antidetonation steel tube tower | |
CN206529997U (en) | A kind of building decoration guardrail | |
CN204163379U (en) | A kind of scaffold upright rod | |
CN204530861U (en) | Underground, hydrant fixed on ground water outlet sleeve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |