CN103320030A - Pavement seam pasting tape as well as preparation and construction methods thereof - Google Patents

Pavement seam pasting tape as well as preparation and construction methods thereof Download PDF

Info

Publication number
CN103320030A
CN103320030A CN2013102807383A CN201310280738A CN103320030A CN 103320030 A CN103320030 A CN 103320030A CN 2013102807383 A CN2013102807383 A CN 2013102807383A CN 201310280738 A CN201310280738 A CN 201310280738A CN 103320030 A CN103320030 A CN 103320030A
Authority
CN
China
Prior art keywords
road surface
affixing kerfs
kerfs belt
crack
belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102807383A
Other languages
Chinese (zh)
Inventor
李廷刚
王宏伟
胡立志
翟旭红
张晶晶
赵晓涛
李林
崔广建
徐斌
王学波
李天兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING JIAGE WEIYE ROAD BUILDING TECHNOLOGIES Co Ltd
Original Assignee
BEIJING JIAGE WEIYE ROAD BUILDING TECHNOLOGIES Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING JIAGE WEIYE ROAD BUILDING TECHNOLOGIES Co Ltd filed Critical BEIJING JIAGE WEIYE ROAD BUILDING TECHNOLOGIES Co Ltd
Priority to CN2013102807383A priority Critical patent/CN103320030A/en
Publication of CN103320030A publication Critical patent/CN103320030A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Repair (AREA)

Abstract

The invention discloses a pavement seam pasting tape. Raw materials of the pavement seam pasting tape comprise SBS (styrene butadiene styrene) modified asphalt, 70-90-meshes adhesive powder, environment-friendly rubber oil and slaked lime. The invention also discloses a method for preparing the pavement seam pasting tape, as well as a construction method by adopting the pavement seam pasting tape. The pavement seam pasting tape provided by the invention is reasonable and scientific in formula design, is high in bonding property, is good in repairing quality, is good in low-temperature cracking resistance, is not embrittled at a low temperature, is not deformed at a high temperature, is durable, is simple and flexible in construction operation, can prevent rainwater from entering the foundation layer through cracked seams after construction and damaging a road foundation, prolongs the service life of a pavement obviously, is low in cost, and is high in efficiency. The preparation method provided by the invention is simple and easy in technology, and is high in production efficiency. The construction method provided by the invention has the characteristics of simplicity and easiness in construction working procedure, easiness in implementation, greatly shortened working period, effective improvement in construction efficiency, simplicity and convenience in construction operation, good repairing quality, wide application, environment friendliness and the like, and is beneficial to wide popularization and application.

Description

Road surface affixing kerfs belt and preparation thereof, constructional method
Technical field
The invention belongs to the LB mending technique field, be specifically related to a kind of road surface affixing kerfs belt and preparation thereof, constructional method.
Background technology
The crack be the most common in all kinds of breakages of bituminous pavement, the most easily occur, one of disease that very early time produces, it almost is accompanied by the whole usage period of bituminous pavement, and increases the weight of along with the growth in road age.The crack appears in the road surface not only affects the comfortableness that the appearance of a street is attractive in appearance and drive a vehicle, and easily expansion causes the structure deteriorate on road surface and shortens the work-ing life on road surface.The crack appears in bituminous pavement should in time fill out the envelope repairing, otherwise rainwater and other foreign material will enter the Sub structure and roadbed along the crack, causes the road surface supporting capacity to descend, and accelerates part, road surface or in flakes damage.
The crack treatment of bituminous pavement adopts joint filling or the cementation of fissures to carry out crack repairing usually at present.Filling technology not fracture expands groove, directly adopts seam sealer to fill in the crack, and speed also can not damage original road surface, but result of use is generally relatively poor.Slit-pouring Technology at first road pavement crack is slotted and is expanded seam, then adopts seal gum perfusion crack, and result of use is relatively better.But also there is certain limitation in Slit-pouring Technology, at first is that the working efficiency of notch and fill slot is very low, is difficult to satisfy the requirement of repairing road surface at quick speed; Next is to slot easily to bring afterwards to gnaw limit, the sick evil of latasuture grade, and the highway section aging more serious on the road surface is all the more so.
Because the notch and fill slot operating efficiency is low, cause measure expense cost in the construction process far above the priming cost of construction itself.Add heat request in large, the cementation of fissures process of dust in, the fluting purge large to traffic impact simultaneously high, therefore need to seek more fast and convenient bituminous pavement treatment technology.
The at present domestic product innovation that the crack fast processing occurred partly can carrying out comprises affixing kerfs belt, anti-splitting paster etc.
The technology that adopts affixing kerfs belt to carry out the pavement crack repairing is called the tooled joint technology, this technology does not need the road pavement crack to slot, only need the fracture surface simply to clean and get final product, have very high working efficiency, and can not produce the secondary disease that fluting causes.Therefore, the tooled joint technology has remedied the deficiency of Slit-pouring Technology preferably, becomes a kind of novel crack fast repairing material of rising in recent years
At present, domestic affixing kerfs belt product category is various, but ubiquity cohesiveness is strong, low temperature cracking resistance can not enough problem, thus cause come off, the phenomenon such as cracking, especially particularly serious in these phenomenons of northern area.Studies show that the appearance of these problems outside the Pass having with construction technology, mainly is that the deficiency of the performance of material own causes.
Therefore it is reasonable to research and develop a kind of prescription, cohesiveness is strong, repairing quality good, and low temperature cracking resistance is good, and is durable in use, and the road surface affixing kerfs belt that is easy to construct is for working as the required of generation.
Summary of the invention
For above-mentioned deficiency, one of the object of the invention is, provides a kind of prescription reasonable, and cohesiveness is strong, repairing quality good, and low temperature cracking resistance is good, and is durable in use, the road surface affixing kerfs belt that is easy to construct.
Two of the object of the invention is, a kind of preparation method who prepares above-mentioned road surface affixing kerfs belt is provided, and this preparation method's technique is simple and easy, is easy to realize, production efficiency is high.
Three of the object of the invention is, a kind of constructional method that adopts above-mentioned road surface affixing kerfs belt is provided, and the operation of this constructional method is simple and easy, be easy to realize, Effective Raise operating efficiency.
For achieving the above object, technical scheme provided by the present invention is:
A kind of road surface affixing kerfs belt, its each component and mass percent thereof are as follows:
SBS modifying asphalt 50~70%,
70~90 purpose rubber powders 10~20%,
Environment-friendly rubber oil 5~15%,
900~1100 purpose slaked limes 5~20%.
As a kind of improvement of the present invention, the penetration degree of described SBS modifying asphalt>40, softening temperature>60 ℃, 135 ℃<2pas.
As a kind of improvement of the present invention, the ash content of described rubber powder<8%, acetone extract<8%, content of carbon black>26%.
As a kind of improvement of the present invention, the density of described environment-friendly rubber oil is 0.9~1 (g/cm 320 ℃), refractive index is 1~2 (DN20).
As a kind of improvement of the present invention, the calcium hydroxide content of described slaked lime is 93~97%.
A kind of preparation method who prepares above-mentioned road surface affixing kerfs belt, it may further comprise the steps:
(1) preparing material: each component and the mass percent thereof of raw material are as follows:
SBS modifying asphalt 50~70%,
70~90 purpose rubber powders 10~20%,
Environment-friendly rubber oil 5~15%,
900~1100 purpose slaked limes 5~20%;
(2) batch mixing: at normal temperatures, slaked lime is mixed mutually with rubber powder, and fully stir, form the rubber powder compound;
(3) mix: the SBS modifying asphalt is heated to 80~200 ℃, then the rubber powder compound is added the SBS modifying asphalt, stir after 20~40 minutes, add environment-friendly rubber oil and stir after 30~60 minutes, be squeezed into band shape by forming machine, make the road surface affixing kerfs belt.
As a kind of improvement of the present invention, it also comprises step (4) pad pasting: the upper and lower surface that sticks on the road surface affixing kerfs belt with the isolated film that scribbles silicone oil.
As a kind of improvement of the present invention, the thickness of described road surface affixing kerfs belt is about 2~4mm, and width is 1~8cm.
A kind of constructional method that adopts above-mentioned road surface affixing kerfs belt, it may further comprise the steps:
(1) position in both sides, the crack 20cm scope of road pavement is cleaned out, and guarantees that this position is dry;
(2) cleaning hole groove will be will cheat the foreign bodies removal in the groove;
(3) the length road pavement affixing kerfs belt according to the crack carries out clip, and the length that clip goes out slightly is longer than fracture length;
(4) isolated film on the affixing kerfs belt of road surface is thrown off, then direct paving is on the crack;
(5) press...with one's finger and overlay the both sides in road surface affixing kerfs belt and crack, when treating slightly to glue finger, one end of road pavement affixing kerfs belt begins to roll stickup, until the road surface affixing kerfs belt covers whole crack, make the crack be positioned at the middle part of road surface affixing kerfs belt during stickup, avoid simultaneously forming bubble between road surface affixing kerfs belt and the road surface, then use the rubber scraper plate with road surface affixing kerfs belt compacting.
As a kind of improvement of the present invention, described step (4) is further comprising the steps of, throwing off on the road surface affixing kerfs belt one side of isolated film evenly the brushing adhesive stick or at the both sides in crack to be repaired brushing base treatment agent, keep the isolated film on the affixing kerfs belt another side of road surface, to alleviate the corrosion of spontaneous phenomenon road pavement affixing kerfs belt, increase the service life.
Beneficial effect of the present invention is: the formulating of recipe that the invention provides the road surface affixing kerfs belt rationally, science, cohesiveness is strong, repairing quality good, low temperature cracking resistance is good, low temperature not embrittlement, high temperature is indeformable, durable in use, the constructing operation simple and flexible only needs to be affixed on road surface, compression along the shape in crack, and fracture class disease is punished comparatively up hill and dale; Can prevent after the construction that rainwater from entering basic unit by the crack, the infringement roadbed, the significant prolongation service life of road surface, cost is low, and efficient is high; Preparation method's provided by the invention technique is simple and easy, be easy to realize, production efficiency is high; The working procedure of constructional method provided by the invention is simple and easy, and is easy to implement, reduction of erection time greatly, and the Effective Raise operating efficiency, and constructing operation is easy, repairing quality is good, of many uses, be beneficial to the characteristics such as environmental protection, is beneficial to wide popularization and application.
Below in conjunction with embodiment, the invention will be further described.
Embodiment
Embodiment 1: a kind of road surface affixing kerfs belt that the present embodiment provides, its each component and mass percent thereof are as follows: SBS modifying asphalt 50%, 70~90 purpose rubber powders 15%, environment-friendly rubber oil 15%, 900~1100 purpose slaked limes 20%.
The penetration degree of described SBS modifying asphalt>40, softening temperature>60 ℃, 135 ℃<2pas.The ash content of described rubber powder<8%, acetone extract<8%, content of carbon black>26%.The density of described environment-friendly rubber oil is 0.9~1 (g/cm 320 ℃), refractive index is 1~2 (DN20).
The formulating of recipe that the invention provides the road surface affixing kerfs belt rationally, science, cohesiveness is strong, repairing quality good, low temperature cracking resistance is good, low temperature not embrittlement, high temperature is indeformable, durable in use, the constructing operation simple and flexible only needs to be affixed on road surface, compression along the shape in crack, and fracture class disease is punished comparatively up hill and dale; Can prevent after the construction that rainwater from entering basic unit by the crack, the infringement roadbed, the significant prolongation service life of road surface, cost is low, and efficient is high.
A kind of preparation method who prepares above-mentioned road surface affixing kerfs belt, it may further comprise the steps:
(1) preparing material: each component and the mass percent thereof of raw material are as follows: SBS modifying asphalt 50%, 70~90 purpose rubber powders 15%, environment-friendly rubber oil 15%, 900~1100 purpose slaked limes 20%;
(2) batch mixing: at normal temperatures, slaked lime is mixed mutually with rubber powder, and fully stir, form the rubber powder compound;
(3) mix: the SBS modifying asphalt is heated to 80~200 ℃, then the rubber powder compound is added the SBS modifying asphalt, stir after 20~40 minutes, add environment-friendly rubber oil and stir after 30~60 minutes, be squeezed into band shape by forming machine, make the road surface affixing kerfs belt.
(4) pad pasting: the upper and lower surface that sticks on the road surface affixing kerfs belt with the isolated film that scribbles silicone oil.
In the present embodiment, the thickness of described road surface affixing kerfs belt is preferably about 2~4mm, and width is preferably 1~8cm.
Preparation method's provided by the invention technique is simple and easy, be easy to realize, production efficiency is high.
A kind of constructional method that adopts above-mentioned road surface affixing kerfs belt, it may further comprise the steps:
(1) position in both sides, the crack 20cm scope of road pavement is cleaned out, and guarantees that this position is dry;
(2) cleaning hole groove will be will cheat the foreign bodies removal in the groove;
(3) the length road pavement affixing kerfs belt according to the crack carries out clip, and the length that clip goes out slightly is longer than fracture length;
(4) isolated film on the affixing kerfs belt of road surface is thrown off, then direct paving is on the crack;
(5) press...with one's finger and overlay the both sides in road surface affixing kerfs belt and crack, when treating slightly to glue finger, one end of road pavement affixing kerfs belt begins to roll stickup, until the road surface affixing kerfs belt covers whole crack, make the crack be positioned at the middle part of road surface affixing kerfs belt during stickup, avoid simultaneously forming bubble between road surface affixing kerfs belt and the road surface, then use the rubber scraper plate with road surface affixing kerfs belt compacting.
In the present embodiment, described step (4) is further comprising the steps of, throwing off on the road surface affixing kerfs belt one side of isolated film evenly the brushing adhesive stick or at the both sides in crack to be repaired brushing base treatment agent, keep the isolated film on the affixing kerfs belt another side of road surface, to alleviate the corrosion of spontaneous phenomenon road pavement affixing kerfs belt, increase the service life.The storing temp of road surface affixing kerfs belt preferentially is less than or equal to 35 ℃.
Embodiment 2: a kind of road surface affixing kerfs belt that the present embodiment provides and preparation thereof, constructional method, and it is substantially the same manner as Example 1, and difference is that each component and the mass percent thereof in the affixing kerfs belt of road surface is different.Its each component and mass percent thereof are as follows: SBS modifying asphalt 70%, 70~90 purpose rubber powders 10%, environment-friendly rubber oil 12%, 900~1100 purpose slaked limes 8%.
Embodiment 3: a kind of road surface c that the present embodiment provides and preparation thereof, constructional method, and it is substantially the same manner as Example 1, and difference is that each component and the mass percent thereof in the affixing kerfs belt of road surface is different.Its each component and mass percent thereof are as follows: SBS modifying asphalt 62%, 70~90 purpose rubber powders 20%, environment-friendly rubber oil 5%, 900~1100 purpose slaked limes 13%.
Embodiment 4: a kind of road surface affixing kerfs belt that the present embodiment provides and preparation thereof, constructional method, and it is substantially the same manner as Example 1, and difference is that each component and the mass percent thereof in the affixing kerfs belt of road surface is different.Its each component and mass percent thereof are as follows: SBS modifying asphalt 68%, 70~90 purpose rubber powders 18%, environment-friendly rubber oil 9%, 900~1100 purpose slaked limes 5%.
Above-described embodiment only is the present invention's embodiment preferably, and the present invention can not list whole embodiments one by one, and the technical scheme of one of all employing above-described embodiments, or the equivalent variations of doing according to above-described embodiment are all in protection domain of the present invention.
Viscosifying power, high-temperature behavior, the low temperature ductility on the road surface of product of the present invention road surface affixing kerfs belt all are better than domestic same product, referring to table 1, are the important technology index contrast of product of the present invention road surface affixing kerfs belt and traditional road surface affixing kerfs belt.
Table 1:
Figure BSA00000921400200071
Referring to table 2, be the cryogenic tensile test index contrast of product of the present invention road surface affixing kerfs belt and traditional road surface affixing kerfs belt.
Table 2:
Figure BSA00000921400200072
Figure BSA00000921400200073
Can find out by the performance index in table 1 and the table 2, the viscosifying power, high-temperature behavior, the low temperature ductility that the invention provides the road surface of road surface affixing kerfs belt all are better than domestic same product.And cohesiveness is strong, repairing quality is good, and low temperature cracking resistance is good, and low temperature not embrittlement, high temperature is indeformable, durable in use, and the constructing operation simple and flexible only needs be affixed on road surface, compression along the shape in crack, and fracture class disease is punished comparatively up hill and dale; Can prevent after the construction that rainwater from entering basic unit by the crack, the infringement roadbed, the significant prolongation service life of road surface, cost is low, and efficient is high.
The according to the above description announcement of book and instruction, those skilled in the art in the invention can also change and revise above-mentioned embodiment.Therefore, the embodiment that discloses and describe above the present invention is not limited to also should fall in the protection domain of claim of the present invention modifications and changes more of the present invention.In addition, although used some specific terms in this specification sheets, these terms do not consist of any restriction to the present invention just for convenience of description.As described in the above embodiment of the present invention, adopt method same or similar with it and component and other affixing kerfs belt of obtaining and preparation thereof, constructional method, all in protection domain of the present invention.

Claims (10)

1. a road surface affixing kerfs belt is characterized in that, its each component and mass percent thereof are as follows:
SBS modifying asphalt 50~70%,
70~90 purpose rubber powders 10~20%,
Environment-friendly rubber oil 5~15%,
900~1100 purpose slaked limes 5~20%.
2. road surface according to claim 1 affixing kerfs belt is characterized in that, the penetration degree of described SBS modifying asphalt>40, softening temperature>60 ℃, 135 ℃<2pas.
3. road surface according to claim 1 affixing kerfs belt is characterized in that the ash content of described rubber powder<8%, acetone extract<8%, content of carbon black>26%.
4. road surface according to claim 1 affixing kerfs belt is characterized in that, the density of described environment-friendly rubber oil is 0.9~1g/cm 320 ℃, refractive index is 1~2.
5. road surface according to claim 1 affixing kerfs belt is characterized in that, the calcium hydroxide content of described slaked lime is 93~97%.
6. a preparation method who prepares the described road surface of claim 1 affixing kerfs belt is characterized in that, it may further comprise the steps:
(1) preparing material: each component and the mass percent thereof of raw material are as follows:
SBS modifying asphalt 50~70%,
70~90 purpose rubber powders 10~20%,
Environment-friendly rubber oil 5~15%,
900~1100 purpose slaked limes 5~20%;
(2) batch mixing: at normal temperatures, slaked lime is mixed mutually with rubber powder, and fully stir, form the rubber powder compound;
(3) mix: the SBS modifying asphalt is heated to 80~200 ℃, then the rubber powder compound is added the SBS modifying asphalt, stir after 20~40 minutes, add environment-friendly rubber oil and stir after 30~60 minutes, be squeezed into band shape by forming machine, make the road surface affixing kerfs belt.
7. preparation method according to claim 6 is characterized in that, it also comprises step (4) pad pasting: the upper and lower surface that sticks on the road surface affixing kerfs belt with the isolated film that scribbles silicone oil.
8. preparation method according to claim 6 is characterized in that, the thickness of described road surface affixing kerfs belt is about 2~4mm, and width is 1~8cm.
9. a constructional method that adopts the described road surface of claim 1 affixing kerfs belt is characterized in that, it may further comprise the steps:
(1) position in both sides, the crack 20cm scope of road pavement is cleaned out, and guarantees that this position is dry;
(2) cleaning hole groove will be will cheat the foreign bodies removal in the groove;
(3) the length road pavement affixing kerfs belt according to the crack carries out clip, and the length that clip goes out slightly is longer than fracture length;
(4) isolated film on the affixing kerfs belt of road surface is thrown off, then direct paving is on the crack;
(5) press...with one's finger and overlay the both sides in road surface affixing kerfs belt and crack, when treating slightly to glue finger, one end of road pavement affixing kerfs belt begins to roll stickup, until the road surface affixing kerfs belt covers whole crack, make the crack be positioned at the middle part of road surface affixing kerfs belt during stickup, avoid simultaneously forming bubble between road surface affixing kerfs belt and the road surface, then use the rubber scraper plate with road surface affixing kerfs belt compacting.
10. constructional method according to claim 9, it is characterized in that, described step (4) is further comprising the steps of, throwing off on the road surface affixing kerfs belt one side of isolated film evenly the brushing adhesive stick or at the both sides in crack to be repaired brushing base treatment agent, keep the isolated film on the affixing kerfs belt another side of road surface, to alleviate the corrosion of spontaneous phenomenon road pavement affixing kerfs belt, increase the service life.
CN2013102807383A 2013-07-05 2013-07-05 Pavement seam pasting tape as well as preparation and construction methods thereof Pending CN103320030A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102807383A CN103320030A (en) 2013-07-05 2013-07-05 Pavement seam pasting tape as well as preparation and construction methods thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102807383A CN103320030A (en) 2013-07-05 2013-07-05 Pavement seam pasting tape as well as preparation and construction methods thereof

Publications (1)

Publication Number Publication Date
CN103320030A true CN103320030A (en) 2013-09-25

Family

ID=49189087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102807383A Pending CN103320030A (en) 2013-07-05 2013-07-05 Pavement seam pasting tape as well as preparation and construction methods thereof

Country Status (1)

Country Link
CN (1) CN103320030A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104198373A (en) * 2014-08-26 2014-12-10 交通运输部公路科学研究所 Test assembly and method for evaluating construction performance of seam sealing adhesive
CN105349094A (en) * 2015-10-13 2016-02-24 武汉市迪睿道路科技有限公司 Binder and preparation method thereof, and application of binder in treatment of pavement crack with seam tape
CN105675852A (en) * 2014-08-26 2016-06-15 交通运输部公路科学研究所 Method for evaluating road surface driving performance of crack adhesive
CN106087642A (en) * 2016-06-29 2016-11-09 陈平坚 A kind of repair way veil splits and the method peeled off and material
CN110872433A (en) * 2019-12-04 2020-03-10 泰安乐邦环保科技有限公司 Waterproof coiled material prepared from coating waste residues and preparation method thereof
CN111705581A (en) * 2020-06-16 2020-09-25 湖南瑞安公路桥梁建设有限公司 Construction method for repairing asphalt pavement cracks by using joint tape
CN114574121A (en) * 2022-03-07 2022-06-03 新疆心路科技有限公司 Quick paste for road and preparation method and use method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535304A (en) * 2012-03-19 2012-07-04 交通运输部公路科学研究所 Crack pressing tape for cracks of asphalt road surface and preparation method of crack pressing tape
CN103044938A (en) * 2013-01-21 2013-04-17 武汉科技大学 Coal asphalt/SBS (Styrene Butadiene Styrene)/waste colloid powder composite modified asphalt and preparation method thereof
CN103113848A (en) * 2013-01-21 2013-05-22 江苏博特新材料有限公司 Environment-friendly intermediate-temperature pavement pouring glue and preparation method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535304A (en) * 2012-03-19 2012-07-04 交通运输部公路科学研究所 Crack pressing tape for cracks of asphalt road surface and preparation method of crack pressing tape
CN103044938A (en) * 2013-01-21 2013-04-17 武汉科技大学 Coal asphalt/SBS (Styrene Butadiene Styrene)/waste colloid powder composite modified asphalt and preparation method thereof
CN103113848A (en) * 2013-01-21 2013-05-22 江苏博特新材料有限公司 Environment-friendly intermediate-temperature pavement pouring glue and preparation method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104198373A (en) * 2014-08-26 2014-12-10 交通运输部公路科学研究所 Test assembly and method for evaluating construction performance of seam sealing adhesive
CN105675852A (en) * 2014-08-26 2016-06-15 交通运输部公路科学研究所 Method for evaluating road surface driving performance of crack adhesive
CN104198373B (en) * 2014-08-26 2017-01-11 交通运输部公路科学研究所 Test assembly and method for evaluating construction performance of seam sealing adhesive
CN105675852B (en) * 2014-08-26 2017-12-01 交通运输部公路科学研究所 The method of the road traveling performance of evaluation patch seam glue
CN105349094A (en) * 2015-10-13 2016-02-24 武汉市迪睿道路科技有限公司 Binder and preparation method thereof, and application of binder in treatment of pavement crack with seam tape
CN105349094B (en) * 2015-10-13 2017-10-27 武汉市迪睿道路科技有限公司 Binding agent and preparation method thereof and the application in affixing kerfs belt handles pavement crack
CN106087642A (en) * 2016-06-29 2016-11-09 陈平坚 A kind of repair way veil splits and the method peeled off and material
CN110872433A (en) * 2019-12-04 2020-03-10 泰安乐邦环保科技有限公司 Waterproof coiled material prepared from coating waste residues and preparation method thereof
CN111705581A (en) * 2020-06-16 2020-09-25 湖南瑞安公路桥梁建设有限公司 Construction method for repairing asphalt pavement cracks by using joint tape
CN114574121A (en) * 2022-03-07 2022-06-03 新疆心路科技有限公司 Quick paste for road and preparation method and use method thereof

Similar Documents

Publication Publication Date Title
CN103320030A (en) Pavement seam pasting tape as well as preparation and construction methods thereof
CN104109399B (en) A kind of pitch adhesive tape and preparation and construction method
CN106007491B (en) Normal-temperature regeneration asphalt and preparation method thereof
CN104692766B (en) A kind of can be at the road surface that cold district uses and crack material for quickly repairing and preparation method thereof
CN101838510B (en) High efficiency resin fissures cementation glue and preparation thereof
CN104211326B (en) A kind of warm-mixed recycled asphalt mixture and preparation method thereof
CN102704366A (en) High-performance rubberized asphalt composite seal coat and construction method thereof
CN104372727B (en) The mixing proportion design method of normal temperature modified asphalt
CN103204644B (en) Warmly bitumen-mixed modifier and preparation method thereof
CN105417987A (en) High-modulus asphalt concrete material doped with coal gasification slag and preparation method thereof
CN108918301A (en) A kind of cracking resistance test evaluation method of poor asphalt macadam relief layer
CN104326706B (en) A kind of steel slag asphalt compound and preparation method thereof
CN105036613A (en) Crack pressure-sensitive solidification self-healing asphalt concrete, as well as preparation method and application method thereof
CN103805132A (en) Joint filling glue for road maintenance and preparation method thereof
CN103360773B (en) A kind of composite asphalt modifier and preparation method thereof and application
CN114920497B (en) Harmless utilization method of oil shale slag and dry distillation drilling oil scraps
CN105926400A (en) Green low-carbon environment-friendly asphalt pavement structure
CN103771766B (en) Asphalt mixture with capability of recovering deformation by being heated and preparation method of asphalt mixture
CN102746679B (en) Nondestructive pavement crack mending material, preparation method and mending process
CN111747687A (en) Repair type high-speed pavement asphalt mixture and preparation method thereof
CN104030608A (en) Regenerated OGFC (Open-graded Friction Courses) mixed material and preparation method thereof
CN107022198B (en) A kind of bionical self-healing property pitch and preparation method thereof
CN107032665B (en) A kind of bionical self-healing property asphalt and preparation method thereof
CN103496888B (en) Modified asphalt concrete capable of reducing temperature of road surface
CN111286305A (en) Seam-sticking material made of seam-sticking belt and net crack sticker for road crack repair

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130925