CN103313041A - Intelligent construction site monitoring and management method - Google Patents

Intelligent construction site monitoring and management method Download PDF

Info

Publication number
CN103313041A
CN103313041A CN 201310238451 CN201310238451A CN103313041A CN 103313041 A CN103313041 A CN 103313041A CN 201310238451 CN201310238451 CN 201310238451 CN 201310238451 A CN201310238451 A CN 201310238451A CN 103313041 A CN103313041 A CN 103313041A
Authority
CN
China
Prior art keywords
data
building site
dump truck
management method
intelligent monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201310238451
Other languages
Chinese (zh)
Inventor
李航
杜胜堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG NEW VISION INFO-TECH Co Ltd
Original Assignee
GUANGDONG NEW VISION INFO-TECH Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG NEW VISION INFO-TECH Co Ltd filed Critical GUANGDONG NEW VISION INFO-TECH Co Ltd
Priority to CN 201310238451 priority Critical patent/CN103313041A/en
Publication of CN103313041A publication Critical patent/CN103313041A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses an intelligent construction site monitoring and management method. The method includes: setting alarm standard data by pre-storing construction site project manager identity data and plate number data of dump trucks, collecting the plate number data of dump trucks entering a construction site and the identity data of a project manager entering the construction site, collecting video data, noise data, dust data and dump truck mud carrying airtightness data of the construction site, and using preset manners to give out alarm. By the method, construction videos and construction dust and noise can be monitored intelligently, the project manage in charge of construction guidance and the dump trucks for carrying mud can be managed in a centralized manner, abnormality can be discovered and alarmed timely, construction at the construction site can be performed safely and smoothly, and monitoring and management are centralized, intelligent and convenient.

Description

A kind of building site intelligent monitoring management method
Technical field
The present invention relates to electronic information technology, in particular a kind of building site intelligent monitoring management method.
Background technology
In the construction, carry out safely in order to ensure each project, each project all is equipped with a special-purpose project manager with practicing requirements, when construction, dump truck to the construction site, and the sealing of dump truck dress mud all has strict requirement, in the prior art, the management of job site project manager and dump truck is relatively more chaotic, and the project manager usually replaces phenomenon, and, dump truck dress mud is also lack of standardization, the dump truck car plate is covered easily, and, at the construction field (site) in, there is potential safety hazard easily in construction, and the dust noise exceeds standard easily and influences near resident.
Therefore, there is defective in prior art, needs to improve.
Summary of the invention
Technical problem to be solved by this invention is: providing a kind of can monitor the construction site potential safety hazard, dump truck, project manager are managed concentratedly, can in time find and report to the police in the generation abnormal conditions, guarantee the building site intelligent monitoring management method of site construction safety.
Technical scheme of the present invention is as follows: a kind of building site intelligent monitoring management method comprises the steps: A: project manager's identity data in the project that prestores building site and dump truck car plate data to data storehouse; B: the alarm criteria data are set, and it comprises: the unusual picture data of video, noise exceed standard normal data, dust exceed standard normal data, dump truck dress mud sealing range data not up to standard, and store into respectively in the described database; C: gathering dump truck car plate data and the project manager's identity data that enters the building site respectively, judge whether to be stored in the described database, is then to pass through, otherwise generates alarm signal and warning; D: video data, noise data, dust data, the dump truck dress mud sealing data of gathering the building site; E: each data of gathering among step D back of encoding being shown, and judge according to predetermined manner whether each data of gathering reach the alarm criteria data of setting, is then to generate alarm signal and report to the police.
Be applied to technique scheme, in the described building site intelligent monitoring management method, among the step C, be to gather described dump truck car plate data by the RFID radio-frequency (RF) identification, and gather described project manager's identity data by face identification device.
Be applied to each technique scheme, in the described building site intelligent monitoring management method, in step D, be respectively by the described video data of camera acquisition, sensor noise is gathered described noise data, dust sensor is gathered described dust data, and by infrared injection device is gathered described dump truck dress mud sealing data.
Be applied to each technique scheme, in the described building site intelligent monitoring management method, after the step e, with each data of storing in the described database and each data of collection, generate table data according to default form, and send described table data by Ethernet.
Be applied to each technique scheme, in the described building site intelligent monitoring management method, when sending described table data, also send described alarm signal.
Be applied to each technique scheme, in the described building site intelligent monitoring management method, after the steps A, also carry out A1: the described project manager's identity data of real-time update and dump truck car plate data, and storage.
Be applied to each technique scheme, in the described building site intelligent monitoring management method, after the step B, also carry out B1: regularly reset described alarm criteria data and storage.
Adopt such scheme, the present invention is by each step, can realize construction video, the dust when constructing and the intelligent monitoring of noise content to the construction building site, and the project manager that is responsible for guiding construction and the dump truck of delivery mud managed concentratedly, can in time find and report to the police in the generation abnormal conditions, guarantee that site construction carries out safely smoothly, monitoring management is concentrated, intelligence, easy to use.
Description of drawings
Fig. 1 schematic flow sheet of the present invention.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
As shown in Figure 1, present embodiment provides a kind of building site intelligent monitoring management method, described building site intelligent monitoring management method is applied to the monitoring in construction building site, can monitor construction video, dust and the noise content when constructing in building site, and the project manager that is responsible for guiding construction and the dump truck of delivery mud managed concentratedly, in time find potential safety hazard, guarantee that construction complies with relevant regulations, and safety is carried out.
Building site intelligent monitoring management method comprises the steps: at first to carry out first step A: project manager's identity data in the project that prestores building site and dump truck car plate data to data storehouse; Wherein, at each concrete project under construction, selected project manager's identity data is input in the database, wherein, identity data can comprise data such as project manager's facial feature data, finger print information, age, identity document, and storage allows the number-plate number data at the dump truck of this construction site shipment mud.
Then; carry out the second step B: the alarm criteria data are set; wherein; the alarm criteria data comprise: the unusual picture data of video, noise exceed standard normal data, dust exceed standard normal data, dump truck dress mud sealing range data not up to standard, and the alarm criteria data that arrange are stored in the described database.
Carry out the 3rd step C again: gathering dump truck car plate data and the project manager's identity data that enters the building site respectively, judge whether to be stored in the described database, is then to pass through, otherwise generates alarm signal and warning; Namely when project manager and dump truck enter the job site and leave the job site, at first need to gather the car plate data of dump truck and project manager's identity data through supervisory control system, when conforming to dump truck car plate data to data through definite with the default project manager's identity data of supervisory control system, then allow it to pass through, as with default when inconsistent, then sending reports to the police handles, and, by gathering dump truck car plate data, can also guarantee the definition of dump truck car plate, avoid being hidden illegal traffic regulation because of car plate by dust.
For example, come the described dump truck car plate of Recognition and Acquisition data by the RFID radio-frequency (RF) device, and gather described project manager's identity data by face identification device, so, the Information Monitoring data are accurate, the reliability height, and acquisition operations is convenient.
And, after finishing for the 3rd step, also carry out the 4th step D: video data, noise data, dust data, the dump truck dress mud sealing data of gathering the building site; For example, can pass through the described video data of camera acquisition, wherein, a plurality of video cameras can be set, and each video camera is installed in each corner of job site, and not only can check the site operation situation by video camera, can also be by checking video, whether the discovery scene exists potential safety hazard, and the processing of in time reporting to the police.
And, can gather described noise data by sensor noise, and dust sensor gathers described dust data, and obtains noise data and the dust data of construction site by supervisory control system; And, can gather described dump truck dress mud sealing data to injection device by infrared, thereby check whether the sealing behind the dump truck dress mud is up to standard.
Behind execution of step D, namely carry out the 5th step E: the video data, noise data, dust data, the dump truck dress mud sealing data that collect are shown that it can show by the various displays that arrange after encoding respectively; And, when showing, also judge according to predetermined manner whether each data of gathering reach the alarm criteria data of setting, for example, by mode relatively, whether the noise data of judge gathering reaches the noise normal data that exceeds standard, and judges whether the dust data of gathering reach the dust normal data that exceeds standard, and judges whether the dump truck dress mud sealing data of gathering reach dump truck dress mud sealing range data not up to standard; And for example, adopt the mode of the unusual picture data of store video in advance, judge whether the video data of gathering is consistent with the unusual picture data of the video of having stored, is then for reaching the unusual picture data of video.
Judge finish after, be then to generate alarm signal and report to the police, so, can cause staff's attention by warning, in time find potential safety hazard, or do not meet and standardize behavior, and in time handle, guarantee that the safety of constructing carries out smoothly.
Perhaps, after complete the 5th step, also by computer with each data of storing in the described database and each data of gathering, form according to default form generates table data, and send described table data by ethernet network, wherein, can send in many long-range communicating terminals and show, realize remote monitoring, use convenient.
Or, when sending described table data, also send described alarm signal, so, can send distant early warning, the warning better effects if.
Again or, after carrying out first step A, execution in step A1 also: i.e. the described project manager's identity data of real-time update and dump truck car plate data, and storage, so, thereby can avoid having expired influence because of storage device stores up-to-date operational data.
And, after executing the second step B, execution in step B1 also: regularly reset described alarm criteria data and storage, wherein, a week, a month equal time cycle are reset according to actual needs, by resetting, can keep each alarm criteria data is up-to-date alarm criteria data.
Be preferred embodiment of the present invention only below, be not limited to the present invention, all any modifications of doing within the spirit and principles in the present invention, be equal to and replace and improvement etc., all should be included within protection scope of the present invention.

Claims (7)

1. a building site intelligent monitoring management method is characterized in that, comprises the steps:
A: project manager's identity data in the project that prestores building site and dump truck car plate data to data storehouse;
B: the alarm criteria data are set, and it comprises: the unusual picture data of video, noise exceed standard normal data, dust exceed standard normal data, dump truck dress mud sealing range data not up to standard, and store into respectively in the described database;
C: gathering dump truck car plate data and the project manager's identity data that enters the building site respectively, judge whether to be stored in the described database, is then to pass through, otherwise generates alarm signal and warning;
D: video data, noise data, dust data, the dump truck dress mud sealing data of gathering the building site;
E: each data of gathering among step D back of encoding being shown, and judge according to predetermined manner whether each data of gathering reach the described alarm criteria data of setting, is then to generate alarm signal and report to the police.
2. intelligent monitoring management method in building site according to claim 1 is characterized in that, among the step C, is to gather described dump truck car plate data by the RFID RF Reader, and gathers described project manager's identity data by face identification device.
3. intelligent monitoring management method in building site according to claim 2, it is characterized in that, in step D, be respectively by the described video data of camera acquisition, sensor noise is gathered described noise data, dust sensor is gathered described dust data, and by infrared injection device is gathered described dump truck dress mud sealing data.
4. intelligent monitoring management method in building site according to claim 2, it is characterized in that, after the step e, with each data of storing in the described database and each data of collection, generate table data according to default form, and send described table data by Ethernet.
5. intelligent monitoring management method in building site according to claim 4 is characterized in that, when sending described table data, also sends described alarm signal.
6. intelligent monitoring management method in building site according to claim 2 is characterized in that, after the steps A, also carries out A1: the described project manager's identity data of real-time update and dump truck car plate data, and storage.
7. intelligent monitoring management method in building site according to claim 2 is characterized in that, after the step B, also carries out B1: regularly reset described alarm criteria data and storage.
CN 201310238451 2013-06-17 2013-06-17 Intelligent construction site monitoring and management method Pending CN103313041A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201310238451 CN103313041A (en) 2013-06-17 2013-06-17 Intelligent construction site monitoring and management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201310238451 CN103313041A (en) 2013-06-17 2013-06-17 Intelligent construction site monitoring and management method

Publications (1)

Publication Number Publication Date
CN103313041A true CN103313041A (en) 2013-09-18

Family

ID=49137762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201310238451 Pending CN103313041A (en) 2013-06-17 2013-06-17 Intelligent construction site monitoring and management method

Country Status (1)

Country Link
CN (1) CN103313041A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107493459A (en) * 2017-09-15 2017-12-19 赵立峰 A kind of engineer operation plateform system
CN107563281A (en) * 2017-07-24 2018-01-09 南京邮电大学 A kind of construction site personal security hidden danger monitoring method based on deep learning
CN107729842A (en) * 2017-10-18 2018-02-23 中国石油大学(北京) Oil-gas pipeline damage from third-party dangerous discernment method, apparatus and system based on machine vision
CN108307150A (en) * 2017-12-29 2018-07-20 安徽博诺思信息科技有限公司 A kind of visualized presence monitoring system and method having personnel's management and control function
CN109829450A (en) * 2019-03-08 2019-05-31 中国联合网络通信有限公司广州市分公司 A kind of building site dump truck intelligent monitoring system and monitoring and managing method
CN109993167A (en) * 2019-04-03 2019-07-09 刘西 A kind of safety inspection method of construction vehicle
CN110031371A (en) * 2019-04-29 2019-07-19 李旭 A kind of environment monitoring device of architectural engineering
CN110177254A (en) * 2019-05-28 2019-08-27 北京建工路桥集团有限公司 A kind of wisdom building site system for managing video and its control method
CN113299040A (en) * 2021-05-27 2021-08-24 河南富达电力集团有限公司 Safe and efficient work site safety monitoring and early warning system
CN113593178A (en) * 2021-08-03 2021-11-02 安徽迪曙智能科技有限公司 Visual field monitoring method with construction dynamic monitoring function

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107563281A (en) * 2017-07-24 2018-01-09 南京邮电大学 A kind of construction site personal security hidden danger monitoring method based on deep learning
CN107493459A (en) * 2017-09-15 2017-12-19 赵立峰 A kind of engineer operation plateform system
CN107729842A (en) * 2017-10-18 2018-02-23 中国石油大学(北京) Oil-gas pipeline damage from third-party dangerous discernment method, apparatus and system based on machine vision
CN108307150A (en) * 2017-12-29 2018-07-20 安徽博诺思信息科技有限公司 A kind of visualized presence monitoring system and method having personnel's management and control function
CN109829450A (en) * 2019-03-08 2019-05-31 中国联合网络通信有限公司广州市分公司 A kind of building site dump truck intelligent monitoring system and monitoring and managing method
CN109993167A (en) * 2019-04-03 2019-07-09 刘西 A kind of safety inspection method of construction vehicle
CN110031371A (en) * 2019-04-29 2019-07-19 李旭 A kind of environment monitoring device of architectural engineering
CN110031371B (en) * 2019-04-29 2022-05-06 李旭 Environmental monitoring device that building engineering used
CN110177254A (en) * 2019-05-28 2019-08-27 北京建工路桥集团有限公司 A kind of wisdom building site system for managing video and its control method
CN113299040A (en) * 2021-05-27 2021-08-24 河南富达电力集团有限公司 Safe and efficient work site safety monitoring and early warning system
CN113593178A (en) * 2021-08-03 2021-11-02 安徽迪曙智能科技有限公司 Visual field monitoring method with construction dynamic monitoring function

Similar Documents

Publication Publication Date Title
CN103313041A (en) Intelligent construction site monitoring and management method
CN205015693U (en) Storage safety monitoring system
CN105205632A (en) Intelligent warehousing control system
KR20200136937A (en) Method and apparatus for monitoring and managing loading dock and facility operations
CN201682559U (en) Intelligent video analyzing and monitoring pick-up camera
KR101386591B1 (en) CCTV integrated management system
CN105321021A (en) Maintenance staff positioning and work management system and realization method thereof
CN107728514A (en) A kind of intelligent building security protection monitoring system
CN109361594A (en) The gateway system and Multifunctional rod of Multifunctional rod
CN104766436A (en) Residential intelligent system with multiple alarming devices
KR20160080159A (en) Integrated Security Remote monitoring System and its method
CN109816215A (en) Vehicle arrangement operation management system in a kind of railway goods yard lifting and field
CN203366086U (en) Intelligent monitoring and management system for construction site
CN110892374A (en) System and method for providing access management platform
CN104869366A (en) Alarming monitoring people-searching system and multifunctional automatic people-searching method based on alarming monitoring people-searching system
CN115278542A (en) Ultra-wideband technology-based construction site personnel positioning management system and method
CN108408362A (en) A kind of intelligent transportation monitoring system and monitoring method for conveyer belt
CN107885831A (en) A kind of collection and analysis method and system of field data
CN201955856U (en) Device for monitoring and recognizing personnel validity of important site
CN110501962A (en) A kind of monitoring system of electric automobile charging station
CN210222962U (en) Intelligent electronic fence system
CN218037759U (en) Production safety sensing and control system of wind power plant
KR101686851B1 (en) Integrated control system using cctv camera
CN105448054A (en) Intelligent security system used for modern community
CN111660272B (en) Intelligent anti-loss storage box and tool management system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: 518000 Guangdong city of Shenzhen province Nanshan District Guangdong streets Xuefu Road software industry base four D block, room 526

Applicant after: Guangdong New Horizons information Polytron Technologies Inc

Address before: 518000, room 507, west block, Nanshan District coastal building, Shenzhen, Guangdong

Applicant before: Guangdong New Vision Info-Tech Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: GUANGDONG NEW VISION INFORMATION TECHNOLOGY CO., LTD. TO: GUANGDONG NEW VISION INFORMATION TECHNOLOGY LTD.

CB02 Change of applicant information

Address after: 518000 Guangdong city of Shenzhen province Nanshan District Guangdong streets Xuefu Road software industry base four D block, room 522

Applicant after: Guangdong New Horizons information Polytron Technologies Inc

Address before: 518000 Guangdong city of Shenzhen province Nanshan District Guangdong streets Xuefu Road software industry base four D block, room 526

Applicant before: Guangdong New Horizons information Polytron Technologies Inc

COR Change of bibliographic data
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130918