CN103306489A - Bridge upright mounting device - Google Patents
Bridge upright mounting device Download PDFInfo
- Publication number
- CN103306489A CN103306489A CN2013102558268A CN201310255826A CN103306489A CN 103306489 A CN103306489 A CN 103306489A CN 2013102558268 A CN2013102558268 A CN 2013102558268A CN 201310255826 A CN201310255826 A CN 201310255826A CN 103306489 A CN103306489 A CN 103306489A
- Authority
- CN
- China
- Prior art keywords
- fixed part
- span structure
- crane span
- structure column
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention relates to a bridge upright mounting device which comprises a base, a connecting sleeve and a fixing component, wherein the base is conical; a cylindrical groove is formed at the top end of the base; and the fixing component is fixed in the groove of the base by the connecting sleeve. An upright can be fixed in a mounting process, so that the manual work is saved, and the construction safety is ensured.
Description
Technical field
The present invention relates to a kind of crane span structure erection equipment, especially a kind of cable bridge upright column erecting device.
Background technology
In the construction of electrical engineering, the column of cable testing bridge all is installed on the structural beams of civil engineering, on-link mode (OLM) has bolt link and welding manner, the most important and difficult point was exactly that column is installed during crane span structure was installed, because column is the bottom surface of clamped beam, unsettled below the column, will manually column be pushed up when installing like this beam below, want centering vertical, if hold up the people of column to move a bit, position and verticality will change so, when being the fixing welding of beam and column, the people can not move, and the people under welding is breakneck like this.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of crane span structure column erecting device for above drawback, and vertical columns has when mounted been saved and guaranteed construction safety artificial the time.
For solving the problems of the technologies described above, technical scheme of the present invention is:
A kind of crane span structure column erecting device comprises base, it is characterized by, and also is provided with adapter sleeve and fixed part, and described base is conical, and its top is provided with a cylinder shape groove, and described fixed part is fixed in the groove of base by adapter sleeve.
Above-mentioned a kind of crane span structure column erecting device, wherein, vertically be provided with some installing holes on the described fixed part wall, its cross sectional shape crane span structure column bottom shape is corresponding, vertically be provided with through hole in the fixed part, the shape of described through hole is all agreed with crane span structure column bottom shape mutually with size.
Above-mentioned a kind of crane span structure column erecting device, wherein, described adapter sleeve is cylindrical structural, and its inside is provided with draw-in groove, and the shape of described draw-in groove is agreed with mutually with size and described fixed part.
Above-mentioned a kind of crane span structure column erecting device wherein, is provided with verticality measuring instrument on the described fixed part outer wall.
Beneficial effect of the present invention is: the fixed part that needs when this device uses to fix in advance first adapter sleeve is enclosed within crane span structure column outside, regulate its length make its just can be connected with base rear with bolt with the locking of fixed part and crane span structure column, then adapter sleeve being installed into base gets final product, at this moment, make column maintenance level by observation verticality measuring instrument, fine setting movable base, as long as a workman installs welding operation at last.Whole process is simple and convenient, has saved manually, has guaranteed construction safety.Simultaneously because the base quality is larger, this device need to be changed corresponding fixed part and adapter sleeve gets final product according to the type of crane span structure column, and applicability is extensive, has saved again cost.
Description of drawings
Fig. 1 is lateral view of the present invention
Fig. 2 is fixed part A-A sectional view of the present invention
Fig. 3 is adapter sleeve B-B sectional view of the present invention
The specific embodiment
The present invention will be further described below in conjunction with accompanying drawing.
A kind of crane span structure column erecting device comprises base 1 as shown in the figure, and adapter sleeve 2 and fixed part 3, base 1 are conical, and its top is provided with a cylinder shape groove; Vertically be provided with some installing holes 31 on fixed part 3 walls, its cross sectional shape crane span structure column 4 bottom shapes are corresponding, if crane span structure column 4 bottom shapes are " worker " font, then its cross sectional shape also is " worker " font, the fixed part 3 interior through holes 32 that vertically are provided with, the shape of described through hole 32 is all agreed with crane span structure column 4 bottom shapes mutually with size, and is provided with verticality measuring instrument 33 on fixed part 3 outer walls; Adapter sleeve 2 is cylindrical structural, and its inside is provided with draw-in groove 21, and the shape of draw-in groove 21 is agreed with mutually with size and fixed part 3; Fixed part 3 is fixed in the groove 11 of base by adapter sleeve 2.
The fixed part that needs when this device uses to fix in advance first adapter sleeve is enclosed within crane span structure column outside, regulate its length make its just can be connected with base rear with bolt with the locking of fixed part and crane span structure column, then adapter sleeve being installed into base gets final product, at this moment, make column maintenance level by observation verticality measuring instrument, fine setting movable base, as long as a workman installs welding operation at last.Whole process is simple and convenient, has saved manually, has guaranteed construction safety.Simultaneously because the base quality is larger, this device need to be changed corresponding fixed part and adapter sleeve gets final product according to the type of crane span structure column, and applicability is extensive, has saved again cost.
Claims (4)
1. a crane span structure column erecting device comprises base, it is characterized by, and also is provided with adapter sleeve and fixed part, and described base is conical, and its top is provided with a cylinder shape groove, and described fixed part is fixed in the groove of base by adapter sleeve.
2. a kind of crane span structure column erecting device as claimed in claim 1, it is characterized by, vertically be provided with some installing holes on the described fixed part wall, its cross sectional shape crane span structure column bottom shape is corresponding, vertically be provided with through hole in the fixed part, the shape of described through hole is all agreed with crane span structure column bottom shape mutually with size.
3. a kind of crane span structure column erecting device as claimed in claim 1 is characterized by, and described adapter sleeve is cylindrical structural, and its inside is provided with draw-in groove, and the shape of described draw-in groove is agreed with mutually with size and described fixed part.
4. a kind of crane span structure column erecting device as claimed in claim 1 is characterized by, and is provided with verticality measuring instrument on the described fixed part outer wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102558268A CN103306489A (en) | 2013-06-24 | 2013-06-24 | Bridge upright mounting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102558268A CN103306489A (en) | 2013-06-24 | 2013-06-24 | Bridge upright mounting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103306489A true CN103306489A (en) | 2013-09-18 |
Family
ID=49132171
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013102558268A Pending CN103306489A (en) | 2013-06-24 | 2013-06-24 | Bridge upright mounting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103306489A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108751058A (en) * | 2018-05-31 | 2018-11-06 | 湖北沛函建设有限公司 | Lift-on/lift-off type building-supporting device |
CN114809668A (en) * | 2022-04-15 | 2022-07-29 | 中建八局第一建设有限公司 | Steel column mounting and fixing device and implementation method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201783771U (en) * | 2010-07-21 | 2011-04-06 | 中国一冶集团有限公司 | Stabilizer for cable bridge upright column |
CN201794354U (en) * | 2010-06-21 | 2011-04-13 | 深圳市格林美高新技术股份有限公司 | Combined wood-plastic upright column |
CN202000680U (en) * | 2011-03-21 | 2011-10-05 | 中国十九冶集团有限公司 | Verticality alignment device for upright post |
CN103015450A (en) * | 2012-11-23 | 2013-04-03 | 山东杭萧钢构有限公司 | Inserted column base in steel structure |
CN203347250U (en) * | 2013-06-24 | 2013-12-18 | 向荣集团有限公司 | Cable tray stand column mounting device |
-
2013
- 2013-06-24 CN CN2013102558268A patent/CN103306489A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201794354U (en) * | 2010-06-21 | 2011-04-13 | 深圳市格林美高新技术股份有限公司 | Combined wood-plastic upright column |
CN201783771U (en) * | 2010-07-21 | 2011-04-06 | 中国一冶集团有限公司 | Stabilizer for cable bridge upright column |
CN202000680U (en) * | 2011-03-21 | 2011-10-05 | 中国十九冶集团有限公司 | Verticality alignment device for upright post |
CN103015450A (en) * | 2012-11-23 | 2013-04-03 | 山东杭萧钢构有限公司 | Inserted column base in steel structure |
CN203347250U (en) * | 2013-06-24 | 2013-12-18 | 向荣集团有限公司 | Cable tray stand column mounting device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108751058A (en) * | 2018-05-31 | 2018-11-06 | 湖北沛函建设有限公司 | Lift-on/lift-off type building-supporting device |
CN108751058B (en) * | 2018-05-31 | 2019-04-19 | 湖北沛函建设有限公司 | Lift-on/lift-off type building-supporting device |
CN114809668A (en) * | 2022-04-15 | 2022-07-29 | 中建八局第一建设有限公司 | Steel column mounting and fixing device and implementation method thereof |
CN114809668B (en) * | 2022-04-15 | 2023-07-07 | 中建八局第一建设有限公司 | Steel column installation and fixing device and implementation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102493471B (en) | Suspending installation construction process method of structural foot margin anchor bolt | |
CN104020055A (en) | Multifunctional direct shear and consolidation device of coarse-grained soil | |
CN103306489A (en) | Bridge upright mounting device | |
CN203866831U (en) | Telescopic splicing guide frame for large-diameter steel protecting cylinder | |
CN203347250U (en) | Cable tray stand column mounting device | |
CN204727362U (en) | Control setup draw-in box | |
CN202706582U (en) | Installation elevation adjusting device for base steel column of cup rabbet | |
CN104308223A (en) | Ceiling punching support | |
CN105644711A (en) | Datum positioning and adjusting device for installing power ship power system | |
CN105780666A (en) | Climbing formwork wall-attaching device and climbing formwork | |
CN203037456U (en) | 1500 t vertical type joint force testing machine anti-unstability apparatus | |
CN203065967U (en) | Stress structure of cast-in-place concrete of bent cap of bridge | |
CN103115761B (en) | 1500t vertical united force testing machine instability preventing device | |
CN207538065U (en) | A kind of foundation bolt accurate-location device | |
CN103741709B (en) | A kind of tower crane pre-embedded bolt mould | |
CN108179749B (en) | Lattice column positioner and positioning method thereof | |
CN103306476B (en) | A kind of fast dismantling removing template system and method for operating thereof | |
JP5794539B2 (en) | How to remove floor slab | |
CN203247718U (en) | Steel column butt-joint mounting device | |
CN103643646A (en) | Bracket-free and pull rod-free steel template device for overhead cast-in-place concrete anti-collision wall | |
CN212927858U (en) | Concrete pouring device for shield starting base | |
CN204127076U (en) | A kind of rapid-assembling/disassembling anti-turn bolt | |
CN204491414U (en) | There is the bridge support frame of autonomous regulatory function | |
CN104155198B (en) | A kind of device of solution erosion condition of resisting while detecting concrete in tension | |
CN208899715U (en) | The inserting core structure of curtain-wall stand-column bottom |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130918 |