CN103306247A - Movable water retaining dam for water conservancy landscape - Google Patents

Movable water retaining dam for water conservancy landscape Download PDF

Info

Publication number
CN103306247A
CN103306247A CN2013102325516A CN201310232551A CN103306247A CN 103306247 A CN103306247 A CN 103306247A CN 2013102325516 A CN2013102325516 A CN 2013102325516A CN 201310232551 A CN201310232551 A CN 201310232551A CN 103306247 A CN103306247 A CN 103306247A
Authority
CN
China
Prior art keywords
dam
steel
sealing
axle sleeve
movable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102325516A
Other languages
Chinese (zh)
Other versions
CN103306247B (en
Inventor
王辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Ting Hang Construction Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310232551.6A priority Critical patent/CN103306247B/en
Publication of CN103306247A publication Critical patent/CN103306247A/en
Application granted granted Critical
Publication of CN103306247B publication Critical patent/CN103306247B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)
  • Barrages (AREA)

Abstract

The invention discloses a movable water retaining dam for a water conservancy landscape. The movable water retaining dam comprises a dam foundation, movable dam faces, bottom rotating shafts, foundation embedded fixing seats, hydraulic cylinders, hydraulic pump stations and water retaining height control devices, wherein the foundation embedded fixing seats are mounted on the dam foundation; the bottom rotating shafts are mounted on the foundation embedded fixing seats; the movable dam faces are fixedly connected to the bottom rotating shafts; the movable dam faces can rotate around the bottom rotating shafts; one end of each hydraulic cylinder is movably connected with the back side of one movable dam face, and the other end of each hydraulic cylinder is movably connected with one foundation embedded fixing seat; and the hydraulic cylinders are connected with the hydraulic pump stations which are connected with the water retaining height control devices. The movable water retaining dam is reasonable in structure, firm, reliable and high in flood impact resistance, is not influenced by floating impurities, is not limited by width of a river, is not prone to retain the floating impurities, can be controlled automatically and can be ascended and descended rapidly, the dam can be descended for draining off floodwater without a battery, and flood control safety is realized.

Description

Water conservancy view active catch dam
Technical field
The present invention relates to the water retaining structure field, more specifically relate to water conservancy view active catch dam.
Background technology
Dam, be the block rivers ditch water flow with the water retaining structure of heading up or adjust flux, be used for flood control, water supply, irrigation, hydroelectric generation, improve shipping etc.Dam commonly used has rubber dam, hurdle sluice and turnover panel wicket dam, rubber dam since its be close to that the riverbed does not block water, simple in structure, the dam body span is large, anti-seismic performance good, dam type is attractive in appearance, from heavy and light, be widely used, but, what rubber dam adopted is elastomeric material, shock resistance is poor, easily by sharp objects scratch, the easy explosion of dam body, dam body lifting speed spend slowly; Although the hurdle sluice is sturdy and durable, its construction period is long, cost is high; Although turnover panel wicket dam result is simple, the construction period is short, but it cannot stand the impact of extraodinary flood, causing to affect flood control safety by automatic panel-turnover, after opening a sluice gate to put flood, the turnover panel wicket dam is shut and is made easily by river surface floating thing jam, normally retaining, and then the floating thing that makes can't be cleared up, the river course is dirty and messy, affects landscape effect.
Summary of the invention
In order to address the above problem, the invention provides water conservancy view active catch dam.
According to an aspect of the present invention, provide water conservancy view active catch dam, it comprises dam basis, movable dam facing, bottom rotating shaft, basic pre-buried holder, hydraulic cylinder, hydraulic power unit and dash height controller.The pre-buried holder in basis is installed on the dam basis, the bottom rotating shaft is installed on basic pre-buried holder, movable dam facing is fixedly connected on the bottom rotating shaft, movable dam facing can rotate around the bottom rotating shaft, the back side of one end flexible connection activity dam facing of hydraulic cylinder, the other end of hydraulic cylinder is flexibly connected basic pre-buried holder, and hydraulic cylinder connects hydraulic power unit, and hydraulic power unit connects the dash height controller.The dam basis is adopted steel concrete to build and is formed, and comparatively robust is durable; The dash height controller can detected activity dam facing dash height and the length that hydraulic cylinder stretches out, and then by hydraulic power unit control hydraulic cylinder motion so that movable dam facing rotates around the bottom rotating shaft, thereby reach the purpose of dash.
In some embodiments, the dash height controller comprises position detecting system, PLC and the host computer that is arranged in the hydraulic cylinder.Position detecting system connects PLC, and PLC connects host computer, and PLC connects hydraulic power unit.The length that the height of dash height controller detected activity dam facing dash and hydraulic cylinder stretch out further can calculate the height of movable dam facing lifting and the angle that forwards to.
In some embodiments, the bottom rotating shaft comprises axle sleeve and axle core, and axle sleeve is fixedly connected on basic pre-buried holder, and the axle core is arranged in axle sleeve, and the axle core is fixedly connected with movable dam facing, and movable dam facing can rotate around the axle core.
In some embodiments, the movable dam face comprises steel skeleton floor, bearing pin, steel panel, hinged axle sleeve and hinged axle sleeve fixing rib plate.Steel skeleton floor and hinged axle sleeve fixing rib plate are equipped with pin-and-hole, bearing pin is arranged in the pin-and-hole on steel skeleton floor and the hinged axle sleeve fixing rib plate, steel skeleton floor and hinged axle sleeve fixing rib plate are provided with steel panel outward, hinged axle sleeve fixing rib plate is connected with hinged axle sleeve, hinged axle sleeve is sheathed on bearing pin, the top of hydraulic cylinder is movably connected on bearing pin, the two ends, the left and right sides on the top of hydraulic cylinder are provided with limiting plate, one end of limiting plate is fixedly connected on bearing pin, and the other end of limiting plate is movably set in another root bearing pin.
In some embodiments, movable dam facing is provided with one at least.Can be according to the actual conditions of river width, the size of adjustment activity dam facing or the number of the movable dam facing of increase and decrease.Hydraulic cylinder on the same movable dam facing is connected in same hydraulic power unit, is connected in parallel in PLC between each hydraulic power unit.Control hydraulic power unit by PLC, and then the control hydraulic cylinder is realized the automation control to movable dam facing.
In some embodiments, basic pre-buried holder comprises gudgeon under steel built-in fitting, basic pre-embedded steel slab, pre-embedded bolt and the hydraulic pressure support.Gudgeon is installed on basic pre-embedded steel slab under the hydraulic pressure support, and basic pre-embedded steel slab is connected pre-embedded bolt with the steel built-in fitting and connects, steel built-in fitting welding axle sleeve, the end of gudgeon connecting fluid cylinder pressure under the hydraulic pressure support.
In some embodiments, be provided with end water between dam basis and the bottom rotating shaft, end water comprises the first sealing pressing plate, sealing abnormity angle steel and a P type rubber fastening band.The one P type rubber fastening band is pressed on the sealing abnormity angle steel by the first sealing pressing plate, be bolted to connection between the first sealing pressing plate, a P type rubber fastening band and the sealing abnormity angle steel, the one P type rubber fastening band is installed by fashion of extrusion and is made the top of a P type rubber fastening band be close to the axle core, and sealing abnormity angle steel is built by second stage concrete and is fixed on the dam basis.End water can effectively prevent from leaking.
In some embodiments, be provided with the side sealing between two movable dam facings, the side sealing comprises side steel plate for sealing water, the second sealing pressing plate, waterstop slotted-angle shelving and the 2nd P type rubber fastening band.The side steel plate for sealing water is installed on the lateral edge of movable dam facing, the waterstop slotted-angle shelving is installed on the steel skeleton floor on the adjacent activities dam facing, the 2nd P type rubber fastening band is pressed on the waterstop slotted-angle shelving by the second sealing pressing plate, be bolted to connection between the second sealing pressing plate, waterstop slotted-angle shelving and the 2nd P type rubber fastening band, the side steel plate for sealing water is close on the top of the 2nd P type rubber fastening band.The side sealing can effectively prevent from leaking between two movable dam facings, and its side water-stopping structure can be cut off the floating foreign material between two movable dam facings, can protect the 2nd P type rubber fastening band, can guarantee that again floating foreign material are not detained, and is difficult for causing the river course dirty and messy.
In some embodiments, hydraulic power unit is provided with manual pressure relief valve.In the situation of the whole system cut-offs of awful weather, flood arrives or when having the dam of falling to need, can realize the unpowered dam flood passage that falls by the manual pressure relief valve of opening on the hydraulic power unit.
In some embodiments, the steel panel surface is provided with topping.Thus, the steel panel surface can prevent corrosion, effectively increases the service life.
Advantage of the present invention is: water conservancy view active catch dam structure of the present invention is reasonable, firm reliable, the ability of flood fighting water slug is strong, be not subjected to the impact of floating foreign material, not limited by river width, be difficult for being detained floating foreign material, automation control, rise the dam, to fall the dam quick, also can fall the dam flood passage in power free situation, do not affect flood control safety.
Description of drawings
Fig. 1 is the structural representation of an embodiment of water conservancy view active catch dam of the present invention;
Fig. 2 is the hydraulic cylinder of an embodiment of water conservancy view active catch dam of the present invention and the annexation schematic diagram of movable dam facing and basic pre-buried holder;
Fig. 3 is the explosive view schematic diagram of basic pre-buried holder of an embodiment of water conservancy view active catch dam of the present invention;
Fig. 4 is the end Water structure schematic diagram of an embodiment of water conservancy view active catch dam of the present invention;
Fig. 5 is the structural representation of side sealing of an embodiment of water conservancy view active catch dam of the present invention;
Fig. 6 is the dash height controller of an embodiment of water conservancy view active catch dam of the present invention and the annexation schematic diagram of hydraulic power unit.
The specific embodiment
The present invention is further illustrated below in conjunction with the specific embodiment.
Shown in Fig. 1 to 6, the water conservancy view active catch dam of an embodiment of the present invention comprises dam basis 1, movable dam facing 2, bottom rotating shaft 3, basic pre-buried holder 4, hydraulic cylinder 5, hydraulic power unit 6 and dash height controller 7.By the mode of building basic pre-buried holder 4 being inlayed is installed on the dam basis 1, bottom rotating shaft 3 comprises axle sleeve 31 and axle core 32, the axle sleeve 31 pre-buried holder 4 in the basis that is fixedly connected by welding, axle core 32 is arranged in axle sleeve 31, axle core 32 welds the activity dam facing 2 that is fixedly connected by welding, according to the triangle mechanics principle, movable dam facing 2 can rotate around axle core 32,0 °~75 ° of corner angular ranges, the back side of one end flexible connection activity dam facing 2 of hydraulic cylinder 5, the other end of hydraulic cylinder 5 is flexibly connected basic pre-buried holder 4, and hydraulic cylinder 5 connects hydraulic power unit 6, and hydraulic power unit 6 connects dash height controller 7.Dam basis 1 is adopted steel concrete to build and is formed, and comparatively robust is durable; Dash height controller 7 can detected activity dam facing 2 dash height and the length that hydraulic cylinder 5 stretches out, and then by hydraulic power unit 6 control hydraulic cylinder 5 motion, so that movable dam facing 2 rotates around the axle core 32 of bottom rotating shaft 3, thereby reach the purpose of dash.Hydraulic power unit 6 comprises combination valve and oil pump.
Dash height controller 7 comprises position detecting system 71, PLC72 and the host computer 73 that is arranged in the hydraulic cylinder 5.Position detecting system 71 connects PLC72, and PLC72 connects host computer 73, and PLC72 connects hydraulic power unit 6.Concrete, position detecting system 71 in the hydraulic cylinder 5 detects the height of movable dam facing 2 dash and the length that hydraulic cylinder 5 stretches out, displacement information is fed back to PLC72, PLC72 further calculates the height of movable dam facing 2 liftings and the angle of rotation according to displacement information, show at host computer 73, by regulating host computer 73 target setting water levels, host computer 73 with the target water level information conveyance to PLC72, PLC72 sends control signal, control hydraulic power unit 6, hydraulic power unit 6 drive hydraulic cylinder 5 motions.
Movable dam facing 2 comprises steel skeleton floor 21, bearing pin 22, steel panel 23, hinged axle sleeve 24 and hinged axle sleeve fixing rib plate 25.Steel skeleton floor 21 and hinged axle sleeve fixing rib plate 25 are equipped with pin-and-hole, bearing pin 22 is arranged in the pin-and-hole on steel skeleton floor 21 and the hinged axle sleeve fixing rib plate 25, the skeleton of formation activity dam facing, steel panel 23 is located at outside this skeleton, steel panel 23 is welded and fixed by welding manner with the seam crossing of steel skeleton floor 21 and hinged axle sleeve fixing rib plate 25, hinged axle sleeve fixing rib plate 25 is connected with hinged axle sleeve 24, hinged axle sleeve 24 is sheathed on bearing pin 22, the top of hydraulic cylinder 5 is movably connected on bearing pin 22, the two ends, the left and right sides on the top of hydraulic cylinder 5 are provided with limiting plate 26, one end of limiting plate 26 is fixedly connected on bearing pin 22, and the other end of limiting plate 26 is movably set in another root bearing pin 22.
Movable dam facing 2 is provided with one at least.Can be according to the actual conditions of river width, the number of the size of adjustment activity dam facing 2 or the movable dam facing 2 of increase and decrease.Hydraulic cylinder 5 on the same movable dam facing 2 is connected in same hydraulic power unit 6, is connected in parallel in PLC(72 between each hydraulic power unit 6).Control hydraulic power unit 6 by PLC72, and then control hydraulic cylinder 5 is realized the automation control to movable dam facing 2.
The pre-buried holder 4 in basis comprises gudgeon 44 under steel built-in fitting 41, basic pre-embedded steel slab 42, pre-embedded bolt 43 and the hydraulic pressure support.Gudgeon 44 is installed on basic pre-embedded steel slab 42 under the hydraulic pressure support, basis pre-embedded steel slab 42 is provided with bolt hole, the bottom of steel built-in fitting 41 also is provided with bolt hole, basis pre-embedded steel slab 42 is connected with the steel built-in fitting by pre-embedded bolt 43 connections, steel built-in fitting 41 welding axle sleeves 31, the end of gudgeon 44 connecting fluid cylinder pressures 5 under the hydraulic pressure support.
Be provided with end water 8 between dam basis 1 and the bottom rotating shaft 3, end water 8 comprises the first sealing pressing plate 81, sealing abnormity angle steel 82 and a P type rubber fastening band 83.The one P type rubber fastening band 83 is pressed on the sealing abnormity angle steel 82 by the first sealing pressing plate 81, be bolted to connection between the first sealing pressing plate 81, a P type rubber fastening band 83 and the sealing abnormity angle steel 82, the one P type rubber fastening band 83 is installed by fashion of extrusion and is made the top of a P type rubber fastening band 83 be close to axle core 32, and sealing abnormity angle steel 82 is built by second stage concrete 84 and is fixed on the dam basis 1.End water 8 can effectively prevent from leaking.
Be provided with side sealing 9 between two movable dam facings 2, side sealing 9 comprises side steel plate for sealing water 91, the second sealing pressing plate 92, waterstop slotted-angle shelving 93 and the 2nd P type rubber fastening band 94.Side steel plate for sealing water 91 is installed on the lateral edge of movable dam facing 2, waterstop slotted-angle shelving 93 is installed on the steel skeleton floor 21 on the adjacent activities dam facing 2, the 2nd P type rubber fastening band 94 is pressed on the waterstop slotted-angle shelving 93 by the second sealing pressing plate 92, be bolted to connection between the second sealing pressing plate 92, waterstop slotted-angle shelving 93 and the 2nd P type rubber fastening band 94, side steel plate for sealing water 91 is close on the top of the 2nd P type rubber fastening band 94.Side sealing 9 can effectively prevent from leaking between two movable dam facings 2; its side sealing 9 structures can be cut off the floating foreign material of 2 of two movable dam facings; can protect the 2nd P type rubber fastening band 94, can guarantee that again floating foreign material are not detained, be difficult for causing the river course dirty and messy.
Hydraulic power unit 6 is provided with manual pressure relief valve (scheming not shown).In the situation of the whole system cut-offs of awful weather, flood arrives or when having the dam of falling to need, can realize the unpowered dam flood passage that falls by the manual pressure relief valve of opening on the hydraulic power unit 6.
Steel panel 23 surfaces are provided with topping, and are splendid by spraying nickel dam or zinc layer effect in the present embodiment, can prevent corrosion, effectively increase the service life.Because the water quality acid-base value is different, in case of necessity, porcelain can be plated in the surface of hydraulic cylinder 5, effectively prevents hydraulic cylinder 5 surface oxidations, increases the service life.
Therefore, water conservancy view active catch dam structure of the present invention is reasonable, firm reliable, the ability of flood fighting water slug is strong, is not subjected to the impact of floating foreign material, not limited by river width, be difficult for to be detained floating foreign material, automation control rises the dam, to fall the dam quick, in power free situation, also can fall the dam flood passage, not affect flood control safety.
Above-described only is some embodiments of the present invention, should be pointed out that for the person of ordinary skill of the art, under the prerequisite that does not break away from creation design of the present invention, can also make other distortion and improvement, and these all belong to protection scope of the present invention.

Claims (10)

1. water conservancy view active catch dam, it is characterized in that, comprise dam basis (1), movable dam facing (2), bottom rotating shaft (3), basis pre-buried holder (4), hydraulic cylinder (5), hydraulic power unit (6) and dash height controller (7), the pre-buried holder in described basis (4) is installed on the dam basis (1), described bottom rotating shaft (3) is installed on basic pre-buried holder (4), described movable dam facing (2) is fixedly connected on bottom rotating shaft (3), described movable dam facing (2) can rotate around bottom rotating shaft (3), the back side of one end flexible connection activity dam facing (2) of described hydraulic cylinder (5), the other end of described hydraulic cylinder (5) is flexibly connected basic pre-buried holder (4), described hydraulic cylinder (5) connects hydraulic power unit (6), and described hydraulic power unit (6) connects dash height controller (7).
2. water conservancy view active catch dam according to claim 1, it is characterized in that, described dash height controller (7) comprises position detecting system (71), the PLC(72 that is arranged in the hydraulic cylinder) and host computer (73), described position detecting system (71) connects PLC(72), described PLC(72) connect host computer (73), described PLC(72) connection hydraulic power unit (6).
3. water conservancy view active catch dam according to claim 1, it is characterized in that, described bottom rotating shaft (3) comprises axle sleeve (31) and axle core (32), described axle sleeve (31) is fixedly connected on basic pre-buried holder (4), described axle core (32) is arranged in axle sleeve (31), described axle core (32) is fixedly connected with movable dam facing (2), and described movable dam facing (2) can rotate around axle core (32).
4. water conservancy view active catch dam according to claim 1, it is characterized in that, described movable dam facing (2) comprises steel skeleton floor (21), bearing pin (22), steel panel (23), hinged axle sleeve (24) and hinged axle sleeve fixing rib plate (25), described steel skeleton floor (21) and hinged axle sleeve fixing rib plate (25) are equipped with pin-and-hole, described bearing pin (22) is arranged in the pin-and-hole on steel skeleton floor (21) and the hinged axle sleeve fixing rib plate (25), the outer steel panel (23) that is provided with of described steel skeleton floor (21) and hinged axle sleeve fixing rib plate (25), described hinged axle sleeve fixing rib plate (25) is connected with hinged axle sleeve (24), described hinged axle sleeve (24) is sheathed on bearing pin (22), the top of hydraulic cylinder (5) is movably connected on bearing pin (22), the two ends, the left and right sides on the top of described hydraulic cylinder (5) are provided with limiting plate (26), one end of described limiting plate (26) is fixedly connected on bearing pin (22), and the other end of described limiting plate (26) is movably set in another root bearing pin (22).
5. water conservancy view active catch dam according to claim 4, it is characterized in that, described movable dam facing (2) is provided with one at least, hydraulic cylinder (5) on the described same movable dam facing (2) is connected in same hydraulic power unit (6), is connected in parallel in PLC(72 between described each hydraulic power unit (6)).
6. water conservancy view active catch dam according to claim 3, it is characterized in that, the pre-buried holder in described basis (4) comprises steel built-in fitting (41), basis pre-embedded steel slab (42), gudgeon (44) under pre-embedded bolt (43) and the hydraulic pressure support, gudgeon under the described hydraulic pressure support (44) is installed on basic pre-embedded steel slab (42), described basic pre-embedded steel slab (42) is connected 41 with the steel built-in fitting) connect by pre-embedded bolt (43), described steel built-in fitting (41) welding axle sleeve (31), the end of gudgeon under the described hydraulic pressure support (44) connecting fluid cylinder pressure (5).
7. water conservancy view active catch dam according to claim 6, it is characterized in that, be provided with end water (8) between described dam basis (1) and the bottom rotating shaft (3), described end water (8) comprises the first sealing pressing plate (81), sealing abnormity angle steel (82) and a P type rubber fastening band (83), a described P type rubber fastening band (83) is pressed on the sealing abnormity angle steel (82) by the first sealing pressing plate (81), described the first sealing pressing plate (81), be bolted to connection between the one P type rubber fastening band (83) and the sealing abnormity angle steel (82), a described P type rubber fastening band (83) is installed by fashion of extrusion and is made the top of a P type rubber fastening band (83) be close to axle core (32), and described sealing abnormity angle steel (82) is built by second stage concrete (84) and is fixed on the dam basis (1).
8. water conservancy view active catch dam according to claim 7, it is characterized in that, be provided with side sealing (9) between described two movable dam facings (2), described side sealing (9) comprises side steel plate for sealing water (91), the second sealing pressing plate (92), waterstop slotted-angle shelving (93) and the 2nd P type rubber fastening band (94), described side steel plate for sealing water (91) is installed on the lateral edge of movable dam facing (2), described waterstop slotted-angle shelving (93) is installed on the steel skeleton floor (21) on the adjacent activities dam facing (2), described the 2nd P type rubber fastening band (94) is pressed on the waterstop slotted-angle shelving (93) by the second sealing pressing plate (92), described the second sealing pressing plate (92), be bolted to connection between waterstop slotted-angle shelving (93) and the 2nd P type rubber fastening band (94), side steel plate for sealing water (91) is close on the top of described the 2nd P type rubber fastening band (94).
9. want 5 described water conservancy view active catch dams according to right, it is characterized in that, described hydraulic power unit (6) is provided with manual pressure relief valve.
10. want 4 described water conservancy view active catch dams according to right, it is characterized in that, described steel panel (23) surface is provided with topping.
CN201310232551.6A 2013-06-09 2013-06-09 Water conservancy view active catch dam Expired - Fee Related CN103306247B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310232551.6A CN103306247B (en) 2013-06-09 2013-06-09 Water conservancy view active catch dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310232551.6A CN103306247B (en) 2013-06-09 2013-06-09 Water conservancy view active catch dam

Publications (2)

Publication Number Publication Date
CN103306247A true CN103306247A (en) 2013-09-18
CN103306247B CN103306247B (en) 2015-10-14

Family

ID=49131934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310232551.6A Expired - Fee Related CN103306247B (en) 2013-06-09 2013-06-09 Water conservancy view active catch dam

Country Status (1)

Country Link
CN (1) CN103306247B (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741648A (en) * 2013-10-30 2014-04-23 高邮市恒立液压成套设备有限公司 Full-automatic hydraulic horizontal dam gate
CN103911975A (en) * 2014-04-28 2014-07-09 牛菊香 Movable dam
CN103938586A (en) * 2014-04-29 2014-07-23 王敏 Hydraulic lifting dam capable of being controlled wirelessly and remotely
CN104250965A (en) * 2014-03-05 2014-12-31 安徽池州百川液压坝科技有限公司 Intelligent arc-shaped hydraulic dam
CN104674771A (en) * 2015-02-11 2015-06-03 阮建华 Concentric shaft for active plate
CN104674768A (en) * 2015-02-11 2015-06-03 阮建华 Hand-operated movable dam
CN104674769A (en) * 2015-02-11 2015-06-03 阮建华 Control system of movable dam
CN105220660A (en) * 2015-09-01 2016-01-06 河北工程大学 A kind of adjustable aeration ecoscape check dam
CN105545190A (en) * 2015-10-31 2016-05-04 南京军理科技股份有限公司 Modular automatic water stop device
CN105839601A (en) * 2016-05-20 2016-08-10 中国水利水电科学研究院 Hydraulically driven landscape hinged movable dam
CN106641521A (en) * 2016-10-18 2017-05-10 白建明 Hydraulic rotating joint and movable retaining dam
WO2017133680A1 (en) * 2016-02-04 2017-08-10 南京军理科技股份有限公司 Automatic water barrier device
CN107119640A (en) * 2017-06-23 2017-09-01 无锡启集智能科技有限公司 A kind of checkdam panel of active blocking dam
CN107178071A (en) * 2017-04-25 2017-09-19 北京赛旺特科技发展有限公司 A kind of hinge dam
CN107489130A (en) * 2017-09-29 2017-12-19 万绿生态园林股份有限公司 The two-part river course blocking apparatus improved for city appearance water body
CN107604881A (en) * 2017-08-28 2018-01-19 水利部长春机械研究所 A kind of steel hydraulic pressure regulating dam
CN108149647A (en) * 2017-12-28 2018-06-12 陕西阳程机电科技有限公司 A kind of hydraulic pressure landscape lifting gate and its application method
CN110080165A (en) * 2019-03-29 2019-08-02 张谦 A kind of arch thin-wall construction checkdam and its application method that can quickly construct
CN112267437A (en) * 2020-11-04 2021-01-26 岭南水务集团有限公司 Can prevent split type hydraulic pressure lift dam that shocks resistance of torrent
CN113897921A (en) * 2021-10-19 2022-01-07 安徽金川活动坝科技有限公司 Hydraulic pressure dam with power generation facility

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030902A (en) * 2020-09-10 2020-12-04 安徽金川活动坝科技有限公司 Automatic hydraulic pressure activity retaining dam that goes up and down based on PLC control

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11256556A (en) * 1998-03-13 1999-09-21 Kurimoto Ltd Derricking gate
CN101126231A (en) * 2007-08-22 2008-02-20 朱水生 Hydraulic lifting dam
CN202099789U (en) * 2011-05-24 2012-01-04 浙江衢州河口闸门有限公司 Fully-opened hydraulic control flap gate
CN102323797A (en) * 2011-05-16 2012-01-18 衢州市河川翻板闸门有限公司 Flap gate real-time monitoring system and use method thereof
CN103015375A (en) * 2013-01-09 2013-04-03 扬州楚门机电设备制造有限公司 Water retaining device
CN203284767U (en) * 2013-06-09 2013-11-13 王辉 Water conservancy landscape movable retaining dam

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11256556A (en) * 1998-03-13 1999-09-21 Kurimoto Ltd Derricking gate
CN101126231A (en) * 2007-08-22 2008-02-20 朱水生 Hydraulic lifting dam
CN102323797A (en) * 2011-05-16 2012-01-18 衢州市河川翻板闸门有限公司 Flap gate real-time monitoring system and use method thereof
CN202099789U (en) * 2011-05-24 2012-01-04 浙江衢州河口闸门有限公司 Fully-opened hydraulic control flap gate
CN103015375A (en) * 2013-01-09 2013-04-03 扬州楚门机电设备制造有限公司 Water retaining device
CN203284767U (en) * 2013-06-09 2013-11-13 王辉 Water conservancy landscape movable retaining dam

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741648A (en) * 2013-10-30 2014-04-23 高邮市恒立液压成套设备有限公司 Full-automatic hydraulic horizontal dam gate
CN104250965A (en) * 2014-03-05 2014-12-31 安徽池州百川液压坝科技有限公司 Intelligent arc-shaped hydraulic dam
CN103911975B (en) * 2014-04-28 2016-03-09 白建明 Movable dam
CN103911975A (en) * 2014-04-28 2014-07-09 牛菊香 Movable dam
CN103938586A (en) * 2014-04-29 2014-07-23 王敏 Hydraulic lifting dam capable of being controlled wirelessly and remotely
CN104674769A (en) * 2015-02-11 2015-06-03 阮建华 Control system of movable dam
CN104674768A (en) * 2015-02-11 2015-06-03 阮建华 Hand-operated movable dam
CN104674771A (en) * 2015-02-11 2015-06-03 阮建华 Concentric shaft for active plate
CN105220660A (en) * 2015-09-01 2016-01-06 河北工程大学 A kind of adjustable aeration ecoscape check dam
CN105220660B (en) * 2015-09-01 2017-01-11 河北工程大学 Adjustable aeration ecology landscape retaining dam
CN105545190A (en) * 2015-10-31 2016-05-04 南京军理科技股份有限公司 Modular automatic water stop device
GB2561798A (en) * 2016-02-04 2018-10-24 Nanjing Junli Tech Co Ltd Automatic water barrier device
WO2017133680A1 (en) * 2016-02-04 2017-08-10 南京军理科技股份有限公司 Automatic water barrier device
GB2561798B (en) * 2016-02-04 2019-06-26 Nanjing Junli Tech Co Ltd Automatic water retaining device
CN105839601A (en) * 2016-05-20 2016-08-10 中国水利水电科学研究院 Hydraulically driven landscape hinged movable dam
CN105839601B (en) * 2016-05-20 2019-03-12 中国水利水电科学研究院 A kind of hydraulic-driven landscape hinge movable dam
CN106641521A (en) * 2016-10-18 2017-05-10 白建明 Hydraulic rotating joint and movable retaining dam
CN107178071A (en) * 2017-04-25 2017-09-19 北京赛旺特科技发展有限公司 A kind of hinge dam
CN107178071B (en) * 2017-04-25 2023-10-20 北京赛旺特科技发展有限公司 Hinge dam
CN107119640A (en) * 2017-06-23 2017-09-01 无锡启集智能科技有限公司 A kind of checkdam panel of active blocking dam
CN107604881A (en) * 2017-08-28 2018-01-19 水利部长春机械研究所 A kind of steel hydraulic pressure regulating dam
CN107489130A (en) * 2017-09-29 2017-12-19 万绿生态园林股份有限公司 The two-part river course blocking apparatus improved for city appearance water body
CN108149647A (en) * 2017-12-28 2018-06-12 陕西阳程机电科技有限公司 A kind of hydraulic pressure landscape lifting gate and its application method
CN110080165A (en) * 2019-03-29 2019-08-02 张谦 A kind of arch thin-wall construction checkdam and its application method that can quickly construct
CN112267437A (en) * 2020-11-04 2021-01-26 岭南水务集团有限公司 Can prevent split type hydraulic pressure lift dam that shocks resistance of torrent
CN113897921A (en) * 2021-10-19 2022-01-07 安徽金川活动坝科技有限公司 Hydraulic pressure dam with power generation facility
CN113897921B (en) * 2021-10-19 2022-10-04 安徽金川活动坝科技有限公司 Hydraulic pressure dam with power generation facility

Also Published As

Publication number Publication date
CN103306247B (en) 2015-10-14

Similar Documents

Publication Publication Date Title
CN103306247A (en) Movable water retaining dam for water conservancy landscape
CN103911975B (en) Movable dam
CN203334250U (en) Mechanical movable retaining dam
CN104532796B (en) The rubber dam of a kind of wear-resistant steel plate of self-control type band
CN105804021B (en) Hydraulic-driven landscape hinge movable dam system
CN102095004B (en) Large-sized hydraulic speed change floating box flap valve
CN103290815B (en) Mechanical movable retaining dam
CN102296576B (en) Full-open type hydraulic control flap gate and using method thereof
CN107178071A (en) A kind of hinge dam
CN110284466B (en) River channel combined gate and water control method thereof
CN202989879U (en) Hydraulic bracing rod gate device for movable dam
CN204112288U (en) Movable dam
CN203284767U (en) Water conservancy landscape movable retaining dam
CN102677637A (en) Self-control flap gate
CN204728287U (en) Water control turnover panel gate dam
CN105696530B (en) Hydraulic rotating steel dam
CN205712005U (en) Hydraulic-driven view hinge movable dam system
CN104452682A (en) Automatic control type steel faceplate dam
US10233894B2 (en) Artificial coastal-protection reef with energy generation unit with or without direct contact with seawater
CN206721840U (en) A kind of hinge dam
CN202347502U (en) Trunnion lodging type gate
CN112878282B (en) Bottom shaft lower horizontal gate
CN206521737U (en) Hydraulic pressure checkdam
CN211898197U (en) Water retaining structure for water conservancy and hydropower
CN204676491U (en) A kind of reservoir seepage-proofing structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Gao Shaopeng

Inventor before: Wang Hui

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20151030

Address after: 710000 Shaanxi city of Xi'an Province Economic and Technological Development Zone of Fengcheng Weiyang Road eight eighteenth Building 1 unit 11 scenic garden 11112

Patentee after: Shaanxi Ting hang Construction Engineering Co., Ltd.

Address before: 214200, Jiangsu Province, Wuxi City, Yixing City, Shek Wan Town, big pointed village, big sharp Village No. 131

Patentee before: Wang Hui

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Movable water retaining dam for water conservancy landscape

Effective date of registration: 20170705

Granted publication date: 20151014

Pledgee: Xi'an innovation financing Company limited by guarantee

Pledgor: Shaanxi Ting hang Construction Engineering Co., Ltd.

Registration number: 2017990000589

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20180313

Granted publication date: 20151014

Pledgee: Xi'an innovation financing Company limited by guarantee

Pledgor: Shaanxi Ting hang Construction Engineering Co., Ltd.

Registration number: 2017990000589

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Movable water retaining dam for water conservancy landscape

Effective date of registration: 20180323

Granted publication date: 20151014

Pledgee: Xi'an investment and financing Company limited by guarantee

Pledgor: Shaanxi Ting hang Construction Engineering Co., Ltd.

Registration number: 2018610000038

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20190404

Granted publication date: 20151014

Pledgee: Xi'an investment and financing Company limited by guarantee

Pledgor: Shaanxi Ting hang Construction Engineering Co., Ltd.

Registration number: 2018610000038

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Movable water retaining dam for water conservancy landscape

Effective date of registration: 20190409

Granted publication date: 20151014

Pledgee: Xi'an investment and financing Company limited by guarantee

Pledgor: Shaanxi Ting hang Construction Engineering Co., Ltd.

Registration number: 2019610000063

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200513

Granted publication date: 20151014

Pledgee: Xi'an investment and financing Company limited by guarantee

Pledgor: SHAANXI DINGHANG CONSTRUCTION ENGINEERING Co.,Ltd.

Registration number: 2019610000063

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Movable water retaining dam for water conservancy landscape

Effective date of registration: 20200527

Granted publication date: 20151014

Pledgee: Xi'an investment and financing Company limited by guarantee

Pledgor: SHAANXI DINGHANG CONSTRUCTION ENGINEERING Co.,Ltd.

Registration number: Y2020980002534

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210721

Granted publication date: 20151014

Pledgee: Xi'an investment and financing Company limited by guarantee

Pledgor: SHAANXI DINGHANG CONSTRUCTION ENGINEERING Co.,Ltd.

Registration number: Y2020980002534

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151014

Termination date: 20210609

CF01 Termination of patent right due to non-payment of annual fee