CN103305015A - Warm-mixing high-elastoplasticity bridge expansion joint sealing material and preparation method thereof - Google Patents

Warm-mixing high-elastoplasticity bridge expansion joint sealing material and preparation method thereof Download PDF

Info

Publication number
CN103305015A
CN103305015A CN2013102093769A CN201310209376A CN103305015A CN 103305015 A CN103305015 A CN 103305015A CN 2013102093769 A CN2013102093769 A CN 2013102093769A CN 201310209376 A CN201310209376 A CN 201310209376A CN 103305015 A CN103305015 A CN 103305015A
Authority
CN
China
Prior art keywords
warm
resin
sbr
sulphur
pitch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102093769A
Other languages
Chinese (zh)
Other versions
CN103305015B (en
Inventor
孙大权
曹林辉
胡金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201310209376.9A priority Critical patent/CN103305015B/en
Publication of CN103305015A publication Critical patent/CN103305015A/en
Application granted granted Critical
Publication of CN103305015B publication Critical patent/CN103305015B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Abstract

The invention discloses a warm-mixing high-elastoplasticity bridge expansion joint sealing material and a preparation method thereof. The warm-mixing high-elastoplasticity bridge expansion joint sealing material comprises the following components: petroleum asphalt: SBS (Styrene-Butadiene Block Polymer):SBR (Styrene Butadiene Rubber):resin: stabilizing agents: warm-mixing agents=100:(3-10):(1-5):(0-10):(2-6):(1-5), wherein the resin is petroleum resin or abietic resin; and the stabilizing agents are mixtures of sulphur and TOR (trans-polyoctenamer rubber) stabilizing agents, and the proportion of the sulphur to TOR is 4: (1-2). The joint sealing material obtained through a formula has the characteristics of being a warm-mixing type modified asphalt material which has stability at high temperature, cracking resistance at low temperature, good bonding capacity and very good elastic recovery capacity.

Description

Temperature is mixed high-elastic plasticity bridge expanssion joint seam sealer and preparation method
Technical field
The invention belongs to material of construction, relate to a kind of temperature and mix the type high elasticity modified asphalt, be mainly used in the elasticity of pitch and the construction temperature of reduction pitch, be applicable to the bridge expanssion joint seam sealer of bridge gapless.
Background technology
The temperature technology of mixing is by adding certain additive or adopt special technology so that the mix degree of asking of pitch reduces in pitch.Warm-mixed asphalt is compared with traditional asphalt, and construction temperature can descend 30 ~ 60 ℃.The reduction of bitumen construction temperature not only can reduce the energy consumption when producing, and reduces the quantity discharged of the waste gas such as carbonic acid gas, flue dust, effectively protects surrounding environment, can also protect the healthy of workmen, prolongs the work-ing life of construction equipment.
The expansion joint is between adjacent beams and the retractor device that arranges between beam-ends and the abutment parados, and its Main Function is to ensure that the bridge structure thing can free deformation under the effects such as temperature, humidity, load, for Vehicle Driving Cycle provides smooth-going, comfortable surface.The science design at expansion joint, well construction and in time maintenance are safe, quick, the comfortable bases that guarantees transport by road, also directly affect the work-ing life of bridge structure simultaneously.The gapless retractor device can satisfy the flexible requirement of bridge by inserting highly elastic material, has again good road-ability simultaneously, is used widely in recent years.But, pointing requires to have good elasticity, between energy and bridge good viscosifying power is arranged simultaneously, in recent years, occurred many elastoplasticity bridge expanssion joint pointings both at home and abroad, still, have two problems: 1. the elasticity of material does not reach requirement, be difficult to and the bridge compatible deformation, thereby cause the crack disease of retractor device; 2. high temperature construction is generally more than 200 ℃, high to construction requirement.
Summary of the invention
The object of the invention is to overcome plain asphalt and be difficult to satisfy the requirements such as the snappiness of bridge expanssion joint and high-temperature stability, therefore it is carried out modification.Temperature provided by the invention is mixed high elasticity modified asphalt of type and preparation method thereof, and is low than the traditional asphalt construction temperature, improved simultaneously high-temperature stability, low-temperature cracking-resistance, ageing resistance and the elastic recovery capability of pitch.
Formula technique scheme disclosed by the invention:
A kind of temperature is mixed type high elasticity modified asphalt prescription, it is characterized in that, comprises following composition:
(1) petroleum pitch is major ingredient.
(2) vinylbenzene-butadiene block polymkeric substance (SBS), be properties-correcting agent, be used for improving these three kinds of pavement performances of elasticity, high-temperature stability and crack resistance at low-temperature of pitch, but the too high easy segregation of volume, the viscosifying power of simultaneously all right strongthener is conducive to the interface bonding between material and decking.
(3) styrene-butadiene rubber(SBR) (SBR) is properties-correcting agent.
(4) resin is properties-correcting agent, selects petroleum resin or Gum Rosin, mainly is high-temperature stability and the rutting resistance of strongthener.
(5) stablizer is sulphur and TOR rubber stabilizer mixture, wherein sulphur: TOR=4:1-2 in mass ratio.Stablizer can effectively subtract the segregation of polymkeric substance, and sulphur is generally used for preventing the segregation of SBS polymkeric substance, and TOR is a kind of rubber stabilizer, is mainly used in guaranteeing that SBR's is stable.
(6) warm-mixing agent is organic viscosity-depression agent.Above five kinds of components are mixed can obtain high viscoelastic material, but construction temperature more than 190 ℃, therefore, in the prescription also design added warm-mixing agent, thereby construction temperature is reduced to 135 ~ 150 ℃, can the use so that product is directly constructed.
Above-mentioned complete petroleum pitch prescription, according to massfraction, vinylbenzene-butadiene block polymkeric substance (SBS): styrene-butadiene rubber(SBR) (SBR): resin: stablizer: the mass ratio of warm-mixing agent is: 100:3-10:1-5:0-10:2-6:1-5.
Based on above-mentioned prescription, preparation method's technical scheme of the present invention is:
A kind of temperature is mixed the preparation method of type high elasticity modified asphalt, it is characterized in that, step is as follows:
1, raw material is prepared:
Proportioning according to various materials takes by weighing consumption, according to massfraction, and petroleum pitch: vinylbenzene-butadiene block polymkeric substance (SBS): styrene-butadiene rubber(SBR) (SBR): resin: stablizer: warm-mixing agent=100:3-10:1-5:0-10:2-6:1-5.Described resin is petroleum resin or Gum Rosin.Described stablizer is sulphur and TOR rubber stabilizer mixture, and ratio is: sulphur: TOR=4:1-2.
2, pitch is put into 120 ℃ of insulations 1 hour, treated that pitch is liquid state.
3, adopt heating by electric cooker, design temperature is 175 ~ 180 ℃, the vinylbenzene that weighs up-butadiene block polymkeric substance (SBS) is added in the pitch, adopt high-speed shearing machine to carry out high speed shear, rotating speed is 1500 ~ 3000r/min, shear time is 30 ~ 45min, adds SBR again and carries out high speed shear 30 ~ 60min, adds resin and TOR rubber stabilizer and shears 20 ~ 30min.
4, warm-mixing agent is added in the said mixture, stir 60min under 175 ~ 180 ℃ of conditions, add the sulphur stablizer, stir 60 ~ 90min, so that asphalt mixing is even, bitumen construction mix temperature is 135 ~ 150 ℃, thus, can be directly used in construction.
The pitch that the present invention obtains satisfies the cementing material for bridge expansion joint requirement, and softening point temperature has good high temperature rutting resistance up to 100 ℃; 5 ℃ of ductilities can reach 31.9cm, and the illustrative material low-temperature performance is good than plain asphalt; 25 degrees centigrade of elastic restoration ratios can reach 95%, and illustrative material just has good elasticity.After adding warm-mixing agent, the viscosity of pitch effectively reduces, and the elastoplasticity pitch that the mix temperature is more traditional descends about 30 ℃.
Embodiment
In order to understand better the present invention, further illustrate content of the present invention below in conjunction with embodiment, but content of the present invention is not
Only be confined to the following examples.
Embodiment 1
A kind of temperature is mixed the type high elasticity modified asphalt, comprises following composition:
70# bi tumenf orr oad: vinylbenzene-butadiene block polymkeric substance (SBS): styrene-butadiene rubber(SBR) (SBR): resin: stablizer: warm-mixing agent=100:9:4:4:3:3.Described vinylbenzene-butadiene block polymkeric substance is star-like.Described resin is petroleum resin.Described stablizer is sulphur and TOR rubber stabilizer mixture, and ratio is: sulphur: TOR=4:1.Described warm-mixing agent is the Sasobit viscosity-depression agent.
1, pitch is put into 120 ℃ of insulations 1 hour, treated that pitch is liquid state.
2, adopt heating by electric cooker, design temperature is 175 ~ 180 ℃, the vinylbenzene that weighs up-butadiene block polymkeric substance (SBS) is added in the pitch, adopt high-speed shearing machine to carry out high speed shear, rotating speed is 1500 ~ 3000r/min, shear time is 30 ~ 45min, adds SBR again and carries out high speed shear 30 ~ 60min, adds resin and TOR rubber stabilizer and shears 20 ~ 30min.
3, warm-mixing agent is added in the said mixture, under 175 ~ 180 ℃ of conditions, stir 60min, add the sulphur stablizer, stir 60 ~ 90min, so that asphalt mixing is even.
4, under 135 ~ 150 ℃ with asphalt melting, can be directly used in construction.
According to the test specimen behind " highway engineering pitch and Asphalt Mixture Experiment rules " (JTG E20-2011) casting, it is carried out performance test under the temperature of regulation, the performance index that obtain pitch are as follows:
Penetration degree (40 ℃/0.1mm): 31;
Softening temperature (25 ℃/℃): 96.7 ℃;
Ductility (5 ℃/cm): 31.9cm;
Elastic restoration ratio (25 ℃/%): 92%;
Mass loss after RTFOT is aging: 0.46%.
The softening temperature test illustrates high-temperature stability; Ductility test explanation low temperature cracking resistance energy; Residue test explanation ageing resistance behind the RTFOT.
Embodiment 2
A kind of temperature is mixed the type high elasticity modified asphalt, comprises following composition:
70# bi tumenf orr oad: vinylbenzene-butadiene block polymkeric substance (SBS): styrene-butadiene rubber(SBR) (SBR): resin: stablizer: warm-mixing agent=100:5:4:4:3:3.Described vinylbenzene-butadiene block polymkeric substance is star-like.Described resin is petroleum resin.Described stablizer is sulphur and TOR rubber stabilizer mixture, and ratio is: sulphur: TOR=4:1.Described warm-mixing agent is the Sasobit viscosity-depression agent.
1, pitch is put into 120 ℃ of insulations 1 hour, treated that pitch is liquid state.
2, adopt heating by electric cooker, design temperature is 175 ~ 180 ℃, the vinylbenzene that weighs up-butadiene block polymkeric substance (SBS) is added in the pitch, adopt high-speed shearing machine to carry out high speed shear, rotating speed is 1500 ~ 3000r/min, shear time is 30 ~ 45min, adds SBR again and carries out high speed shear 30 ~ 60min, adds resin and TOR rubber stabilizer and shears 20 ~ 30min.
3, warm-mixing agent is added in the said mixture, under 175 ~ 180 ℃ of conditions, stir 60min, add the sulphur stablizer, stir 60 ~ 90min, so that asphalt mixing is even, cool off for subsequent use.
4, under 135 ~ 150 ℃ with asphalt melting, can be directly used in construction.
Build test specimen after the moulding according to " highway engineering pitch and Asphalt Mixture Experiment rules " (JTG E20-2011), it is carried out performance test under the temperature of regulation, the performance index that obtain pitch are as follows:
Penetration degree (40 ℃/0.1mm): 50.8;
Softening temperature (25 ℃/℃): 94.6;
Ductility (5 ℃/cm): 28.1;
Elastic restoration ratio (25 ℃/%): 90.5;
Mass loss after RTFOT is aging: 0.35%.
The softening temperature test illustrates high-temperature stability; Ductility test explanation low temperature cracking resistance energy; Residue test explanation ageing resistance behind the RTFOT.

Claims (2)

1. a temperature is mixed type high elasticity modified asphalt prescription, it is characterized in that, comprises following composition:
(1) petroleum pitch is major ingredient;
(2) vinylbenzene-butadiene block polymkeric substance (SBS) is properties-correcting agent;
(3) styrene-butadiene rubber(SBR) (SBR) is properties-correcting agent;
(4) resin is properties-correcting agent, selects petroleum resin or Gum Rosin;
(5) stablizer is sulphur and rubber stabilizer TOR mixture, wherein sulphur: TOR=4:1-2 in mass ratio;
(6) warm-mixing agent is organic viscosity-depression agent;
Above-mentioned complete petroleum pitch prescription, according to massfraction, vinylbenzene-butadiene block polymkeric substance (SBS): styrene-butadiene rubber(SBR) (SBR): resin: stablizer: the mass ratio of warm-mixing agent is: 100:3-10:1-5:0-10:2-6:1-5.
2. the preparation method that temperature is mixed the type high elasticity modified asphalt is characterized in that, step is as follows:
(1) raw material is prepared:
Proportioning according to various materials takes by weighing consumption, according to massfraction, and petroleum pitch: vinylbenzene-butadiene block polymkeric substance (SBS): styrene-butadiene rubber(SBR) (SBR): resin: stablizer: warm-mixing agent=100:3-10:1-5:0-10:2-6:1-5; Described resin is petroleum resin or Gum Rosin; Described stablizer is sulphur and rubber stabilizer TOR mixture, and ratio is: sulphur: TOR=4:1-2;
(2) pitch is put into 120 ℃ of insulations 1 hour, treated that pitch is liquid state;
(3) adopt heating by electric cooker, design temperature is 175 ~ 180 ℃, the vinylbenzene that weighs up-butadiene block polymkeric substance (SBS) is added in the pitch, adopt high-speed shearing machine to carry out high speed shear, rotating speed is 1500 ~ 3000r/min, shear time is 30 ~ 45min, adds styrene-butadiene rubber(SBR) (SBR) again and carries out high speed shear 30 ~ 60min, adds resin and rubber stabilizer TOR and shears 20 ~ 30min;
(4) warm-mixing agent is added in the said mixture, stir 60min under 175 ~ 180 ℃ of conditions, add the sulphur stablizer, stir 60 ~ 90min, so that asphalt mixing is even, bitumen construction mix temperature is 135 ~ 150 ℃.
CN201310209376.9A 2013-05-30 2013-05-30 Warm mix high-elastic plasticity bridge expanssion joint seam sealer and preparation method Expired - Fee Related CN103305015B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310209376.9A CN103305015B (en) 2013-05-30 2013-05-30 Warm mix high-elastic plasticity bridge expanssion joint seam sealer and preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310209376.9A CN103305015B (en) 2013-05-30 2013-05-30 Warm mix high-elastic plasticity bridge expanssion joint seam sealer and preparation method

Publications (2)

Publication Number Publication Date
CN103305015A true CN103305015A (en) 2013-09-18
CN103305015B CN103305015B (en) 2016-04-06

Family

ID=49130750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310209376.9A Expired - Fee Related CN103305015B (en) 2013-05-30 2013-05-30 Warm mix high-elastic plasticity bridge expanssion joint seam sealer and preparation method

Country Status (1)

Country Link
CN (1) CN103305015B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104177846A (en) * 2014-07-31 2014-12-03 上海城建新路桥建设工程有限公司 Grouting material, grouting method and road maintenance method
CN104672630A (en) * 2013-11-26 2015-06-03 比亚迪股份有限公司 Modified ethylene propylene rubber and preparation method thereof
CN105331329A (en) * 2015-10-31 2016-02-17 菏泽海诺知识产权服务有限公司 Pressure-sensitive pitch crack pouring sealant
CN105482477A (en) * 2016-01-25 2016-04-13 西安公路研究院 Super-adhesive composite modified emulsified asphalt and preparation method thereof
CN106957534A (en) * 2017-01-18 2017-07-18 盘锦禹王防水建材集团有限公司 A kind of low forming temperature high-polymer modified pitch glue and preparation method thereof
CN107022200A (en) * 2017-05-08 2017-08-08 云南阳光道桥股份有限公司 Modified pitch of Rut resistance and preparation method thereof under thermal extremes fully loaded transportation condition
CN107513278A (en) * 2016-06-17 2017-12-26 中国石油化工股份有限公司 Warm mix modified pitch, contain its compound and preparation method thereof
CN108948752A (en) * 2017-05-17 2018-12-07 中路高科(北京)公路技术有限公司 Porous pavement special asphalt, mixture and preparation method containing it
CN109735125A (en) * 2019-01-14 2019-05-10 广西交通职业技术学院 A kind of novel high-strength anti-rutting modified asphalt and preparation method thereof
CN110903664A (en) * 2019-12-12 2020-03-24 长安大学 Warm-mixed composite modified asphalt and preparation method thereof
CN111471309A (en) * 2020-04-15 2020-07-31 中路高科(北京)公路技术有限公司 Asphalt modifier and preparation method thereof, modified asphalt and preparation method thereof
CN112831189A (en) * 2021-01-05 2021-05-25 长安大学 Asphalt high-ductility cementing material, high-ductility material and preparation method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2472995A (en) * 2009-08-26 2011-03-02 Aggregate Ind Uk Ltd Half-warm foamed asphalt process
CN102199018A (en) * 2011-03-31 2011-09-28 许昌金欧特沥青股份有限公司 Warm mix colored asphalt cementing material and preparation technology thereof
CN102504551A (en) * 2011-09-30 2012-06-20 上海应用技术学院 Cementing material based on continuous elastic-plastic expansion joints of small-span and medium-span bridges and preparation method and application thereof
CN102795809A (en) * 2011-05-23 2012-11-28 河源海川科技有限公司 Warm mixing styrene-butadiene-styrene (SBS) modified asphalt mixture and preparation method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2472995A (en) * 2009-08-26 2011-03-02 Aggregate Ind Uk Ltd Half-warm foamed asphalt process
CN102199018A (en) * 2011-03-31 2011-09-28 许昌金欧特沥青股份有限公司 Warm mix colored asphalt cementing material and preparation technology thereof
CN102795809A (en) * 2011-05-23 2012-11-28 河源海川科技有限公司 Warm mixing styrene-butadiene-styrene (SBS) modified asphalt mixture and preparation method thereof
CN102504551A (en) * 2011-09-30 2012-06-20 上海应用技术学院 Cementing material based on continuous elastic-plastic expansion joints of small-span and medium-span bridges and preparation method and application thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李彦伟等编著: "《温拌沥青路面施工技术》", 31 August 2011, 中国建筑工业出版社 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104672630A (en) * 2013-11-26 2015-06-03 比亚迪股份有限公司 Modified ethylene propylene rubber and preparation method thereof
CN104672630B (en) * 2013-11-26 2017-02-08 比亚迪股份有限公司 Modified ethylene propylene rubber and preparation method thereof
CN104177846B (en) * 2014-07-31 2016-07-06 上海城建新路桥建设工程有限公司 Injecting paste material, grouting method and road maintenance method for maintaining
CN104177846A (en) * 2014-07-31 2014-12-03 上海城建新路桥建设工程有限公司 Grouting material, grouting method and road maintenance method
CN105331329A (en) * 2015-10-31 2016-02-17 菏泽海诺知识产权服务有限公司 Pressure-sensitive pitch crack pouring sealant
CN105482477A (en) * 2016-01-25 2016-04-13 西安公路研究院 Super-adhesive composite modified emulsified asphalt and preparation method thereof
CN107513278A (en) * 2016-06-17 2017-12-26 中国石油化工股份有限公司 Warm mix modified pitch, contain its compound and preparation method thereof
CN106957534A (en) * 2017-01-18 2017-07-18 盘锦禹王防水建材集团有限公司 A kind of low forming temperature high-polymer modified pitch glue and preparation method thereof
CN107022200A (en) * 2017-05-08 2017-08-08 云南阳光道桥股份有限公司 Modified pitch of Rut resistance and preparation method thereof under thermal extremes fully loaded transportation condition
CN108948752A (en) * 2017-05-17 2018-12-07 中路高科(北京)公路技术有限公司 Porous pavement special asphalt, mixture and preparation method containing it
CN108948752B (en) * 2017-05-17 2020-12-01 中路交建(北京)工程材料技术有限公司 Special asphalt for permeable pavement, mixture containing same and preparation method
CN109735125A (en) * 2019-01-14 2019-05-10 广西交通职业技术学院 A kind of novel high-strength anti-rutting modified asphalt and preparation method thereof
CN110903664A (en) * 2019-12-12 2020-03-24 长安大学 Warm-mixed composite modified asphalt and preparation method thereof
CN111471309A (en) * 2020-04-15 2020-07-31 中路高科(北京)公路技术有限公司 Asphalt modifier and preparation method thereof, modified asphalt and preparation method thereof
CN112831189A (en) * 2021-01-05 2021-05-25 长安大学 Asphalt high-ductility cementing material, high-ductility material and preparation method

Also Published As

Publication number Publication date
CN103305015B (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN103305015A (en) Warm-mixing high-elastoplasticity bridge expansion joint sealing material and preparation method thereof
CN105542496B (en) Uncured rubber-asphalt waterproof material and preparation method thereof
CN106800787B (en) A kind of high-temperature storage property high-viscosity high-elasticity modified pitch and preparation method thereof
CN104788975B (en) A kind of bitumen regenerant with modified function and preparation method thereof
CN103613940A (en) Rock asphalt composite modifier as well as preparation method and application thereof
CN105038279B (en) Modified asphalt and preparing method thereof
CN102924935B (en) Method used for modifying low-temperature coal tar asphalt into paving asphalt
CN101265363A (en) Waste and old rubber powder modifying asphalt and preparation method thereof
CN103468006A (en) Material for waste asphalt regeneration pavement and preparation method of material
CN104710804A (en) SBS (styrene butadiene styrene) modified asphalt and preparation method thereof
CN104830076B (en) A kind of preparation method of scrap rubber cracking conversion modified pitch
CN102337036A (en) Oxidized polyethlene wax-containing modified asphalt and preparation method thereof, and asphalt concrete
CN103044933B (en) Stabilizer composition for polymer modified asphalt
CN103709771B (en) Stable type finished product warm mix rubber modified asphalt and preparation method thereof
CN103468010A (en) Modified asphalt as well as preparation method thereof
CN107619609A (en) A kind of novel high-strength rubber powder modified asphalt material and preparation method thereof
CN107266919A (en) A kind of stable type rubber and SBS composite modified asphalts and preparation method thereof
CN107739519A (en) A kind of modified pitch of waterproof roll and preparation method thereof
CN103819918A (en) Composite high-viscosity modified asphalt and preparation method thereof
CN109575876A (en) A kind of Road sealant and preparation method thereof
CN101845227B (en) Plain asphalt reclaiming agent and preparation method and application thereof
CN101880463B (en) Modified asphalt battery sealing agent for sealing zinc-manganese battery and preparation method thereof
CN102977617A (en) Composite asphalt composition and preparation method thereof
CN103396670B (en) A kind of water-repellent modified pitch for dam asphalt well and preparation method thereof
CN101817985A (en) Modified asphalt regeneration agent as well as preparation method and application thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406