CN103302467B - Blower shield top assembly tooling - Google Patents

Blower shield top assembly tooling Download PDF

Info

Publication number
CN103302467B
CN103302467B CN201310192219.1A CN201310192219A CN103302467B CN 103302467 B CN103302467 B CN 103302467B CN 201310192219 A CN201310192219 A CN 201310192219A CN 103302467 B CN103302467 B CN 103302467B
Authority
CN
China
Prior art keywords
plate
steel column
bearing rib
assembly tooling
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310192219.1A
Other languages
Chinese (zh)
Other versions
CN103302467A (en
Inventor
徐建
徐东
吴晓建
楚尊鋆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asia New Energy (china) Ltd
Original Assignee
Asia New Energy (china) Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asia New Energy (china) Ltd filed Critical Asia New Energy (china) Ltd
Priority to CN201310192219.1A priority Critical patent/CN103302467B/en
Publication of CN103302467A publication Critical patent/CN103302467A/en
Application granted granted Critical
Publication of CN103302467B publication Critical patent/CN103302467B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses blower shield top assembly tooling, it is characterized in that: include organizing steel column more, it is fixed on bottom described steel column on straight gusset, described steel column top is fixed with bearing rib steel plate, it is provided with end plate between described bearing rib steel plate and steel column top, being welded with positioning bar slab plate on described bearing rib steel plate, be provided with connecting plate between described positioning bar slab plate and bearing rib steel plate, described steel column is H profile steel column. The invention have the advantage that the physical dimension design according to each set, during assembling, only need to flange and gusset be had good positioning in frock, overall structure just can be seated, and conveniently operates and ensures quality.

Description

Blower shield top assembly tooling
Technical field
The present invention relates to fan shroud assembly tooling, particularly relate to a kind of blower shield top assembly tooling.
Background technology
Fan shroud is for the protection of the heat radiation at position, air draft and the ventilations such as air-conditioning, motor, exhaust fan, radiator, blower fan, electromotor, diesel engine. The part assembly precision of fan shroud is high, and the error of Standard can directly affect later stage overall preassembled quality, if relying on the measurement in workshop cannot ensure precision controlling and assembling quality, it is necessary to the frock of auxiliary assembling guarantees the precision of part. Blower shield top assembly tooling is the important part in fan shroud assembly tooling. Therefore, for making operator in manufacturing process, quality be effectively controlled, it is ensured that with the quality improving this engineering, urgent need provides a kind of blower shield top assembly tooling.
Summary of the invention
It is an object of the invention to provide a kind of blower shield top assembly tooling.
The technical solution used in the present invention is:
Blower shield top assembly tooling, it is characterized in that: include organizing steel column more, it is fixed on bottom described steel column on straight gusset, described steel column top is fixed with bearing rib steel plate, it is provided with end plate between described bearing rib steel plate and steel column top, described bearing rib steel plate is welded with positioning bar slab plate, between described positioning bar slab plate and bearing rib steel plate, is provided with connecting plate.
Described steel column is H profile steel column.
The invention have the advantage that the physical dimension design according to each set, during assembling, only need to flange and gusset be had good positioning in frock, overall structure just can be seated, and conveniently operates and ensures quality.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the top view of the present invention.
Fig. 3 is the A-A structural representation of the present invention.
Fig. 4 is the B-B structural representation of the present invention.
Fig. 5 is the C-C structural representation of the present invention.
Wherein: 1, steel column, 2, straight gusset, 3, bearing rib steel plate, 4, end plate, 5, gusset steel plate, 6, connecting plate.
Detailed description of the invention
As Figure 1-5, the blower shield top assembly tooling of the present invention, including many group steel columns 1, described steel column 1 is H profile steel column, it is fixed on bottom described steel column 1 on straight gusset 2, described steel column 1 top is fixed with bearing rib steel plate 3, it is provided with end plate 4 between described bearing rib steel plate 3 and steel column 1 top, described bearing rib steel plate 3 is welded with positioning bar slab plate 5, it is provided with connecting plate 6 between described positioning bar slab plate 5 and bearing rib steel plate 3, physical dimension design according to each set, during assembling, only flange and gusset need to be had good positioning in frock, overall structure just can be seated, conveniently operate and ensure quality.

Claims (2)

1. blower shield top assembly tooling, it is characterized in that: include organizing steel column more, it is fixed on bottom described steel column on straight gusset, described steel column top is fixed with bearing rib steel plate, it is provided with end plate between described bearing rib steel plate and steel column top, described bearing rib steel plate is welded with positioning bar slab plate, between described positioning bar slab plate and bearing rib steel plate, is provided with connecting plate.
2. blower shield top assembly tooling according to claim 1, it is characterised in that: described steel column is H profile steel column.
CN201310192219.1A 2013-05-23 2013-05-23 Blower shield top assembly tooling Expired - Fee Related CN103302467B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310192219.1A CN103302467B (en) 2013-05-23 2013-05-23 Blower shield top assembly tooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310192219.1A CN103302467B (en) 2013-05-23 2013-05-23 Blower shield top assembly tooling

Publications (2)

Publication Number Publication Date
CN103302467A CN103302467A (en) 2013-09-18
CN103302467B true CN103302467B (en) 2016-06-15

Family

ID=49128422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310192219.1A Expired - Fee Related CN103302467B (en) 2013-05-23 2013-05-23 Blower shield top assembly tooling

Country Status (1)

Country Link
CN (1) CN103302467B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100104878A (en) * 2009-03-19 2010-09-29 주식회사 명현비티시 Jig for welding of curved plate
CN102259256A (en) * 2010-05-31 2011-11-30 三一重型装备有限公司 Vertical tool of hydraulic bracket
CN102581544A (en) * 2012-03-01 2012-07-18 重庆钢铁(集团)有限责任公司 Rack roller overhauling fixture for rough mill
CN202726424U (en) * 2012-07-25 2013-02-13 江阴市振江钢结构有限公司 Large-size shell assembling mould base
CN203266049U (en) * 2013-05-23 2013-11-06 亚洲新能源(中国)有限公司 Top assembly fixture for fan cover

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100104878A (en) * 2009-03-19 2010-09-29 주식회사 명현비티시 Jig for welding of curved plate
CN102259256A (en) * 2010-05-31 2011-11-30 三一重型装备有限公司 Vertical tool of hydraulic bracket
CN102581544A (en) * 2012-03-01 2012-07-18 重庆钢铁(集团)有限责任公司 Rack roller overhauling fixture for rough mill
CN202726424U (en) * 2012-07-25 2013-02-13 江阴市振江钢结构有限公司 Large-size shell assembling mould base
CN203266049U (en) * 2013-05-23 2013-11-06 亚洲新能源(中国)有限公司 Top assembly fixture for fan cover

Also Published As

Publication number Publication date
CN103302467A (en) 2013-09-18

Similar Documents

Publication Publication Date Title
CN203696313U (en) Flexible welding tool for forklift carriages
CN103302467B (en) Blower shield top assembly tooling
CN203266049U (en) Top assembly fixture for fan cover
CN203266496U (en) Left and right door assembly fixture for fan cover
CN103302612B (en) The assembly tooling of fan shroud left and right door
CN104275687A (en) Processing device of car purifier
CN205668093U (en) A kind of sheet metal Cutting platform
CN203266481U (en) Bottom assembly fixture for fan cover
CN103302608B (en) Blower shield bottom assembly tooling
CN105180306B (en) Mounting seat and air conditioner with the mounting seat
CN207004764U (en) Mounting bracket, the pump housing and reciprocating compressor
CN202070873U (en) Simple welding mold device of front cabin double-layered support mounting point
CN108189634B (en) High-precision front plate spring support and machining method thereof
CN205714456U (en) From cooling diesel engine cylinder block
CN204470888U (en) The precision welding frock of car engine suspension frame
CN204700495U (en) The hand turnover mechanism of automobile welding and assembling clamp
CN209578587U (en) Automobile oil cooler mounting seat improves structure
CN204118906U (en) A kind of mount fixing structure of ventilating fan motor
CN103624438A (en) Left and right radiator installation crossbeam plate assembly fixture
CN204603754U (en) Battery of electric vehicle framework general assembly special purpose device
CN204035892U (en) Container automatic track loop wheel machine cross member producing device
CN203124957U (en) Spot welding machine additionally provided with radiator
CN103101414B (en) Front support of passenger car chassis control arm
CN203394863U (en) Forward bending type high-pressure centrifugal fan front cover plate
CN105257511A (en) Large compressor casing with high strength

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160615

Termination date: 20170523