CN103293411A - 一种220kv变压器试验辅助支架 - Google Patents
一种220kv变压器试验辅助支架 Download PDFInfo
- Publication number
- CN103293411A CN103293411A CN2013101726321A CN201310172632A CN103293411A CN 103293411 A CN103293411 A CN 103293411A CN 2013101726321 A CN2013101726321 A CN 2013101726321A CN 201310172632 A CN201310172632 A CN 201310172632A CN 103293411 A CN103293411 A CN 103293411A
- Authority
- CN
- China
- Prior art keywords
- support
- testing auxiliary
- auxiliary support
- safety belt
- transformer testing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
一种220kV变压器试验辅助支架,属于电力设备机械领域,包括安全带固定孔、安全带固定支架、踩踏面板、折页、底座固定环,支撑架,所述的安全带固定支架的上端设置有安全带固定孔,其中安全带固定支架与支撑架连接,支撑架的底部对称的两个支架上分别设置有两个底座固定环,所述支撑架上部设置有踩踏面板,本发明是一种安全可靠,操作简单,携带方便的工具,来提高试验人员脚下的支撑点,完成试验工作的220kV变压器试验辅助支架。经统计,试验辅助支架的拆装时间,不超过3分钟,满足设定目标。同时,试验辅助支架可折叠,携带方便,安装牢固,承重150kg不变形,不晃动,且有安全带绑扎位置,安全可靠,使用效果良好。
Description
技术领域
本发明属于电力设备机械领域,特别是涉及到一种220kV变压器试验辅助支架的研制。
背景技术
变压器是电网运行的主要设备,每个试验周期都要进行预试及诊断性试验。近年来,新更换220kV变压器均采用意大利生产的套管,此种套管不能采用原始套管的试验方法进行,必须使用斗臂车进行辅助操作。
目前,试验专业并没有配备斗臂车,需要时,只能与检修专业沟通,使用检修专业的斗臂车。而定检工作中,检修专业所有的打头工作均需要使用斗臂车,试验工作只能等检修专业的打头工作完成后,才能开始进行。而在使用斗臂车配合试验时,试验人员需要在斗臂车与变压器之间反复更换工作地点,工序繁琐,存在安全隐患。220kV变压器的定检试验,有3个试验项目(绝缘、直阻、绕组变形)需要斗臂车配合,需要切换接线9次,而验收试验,有6个试验项目(绝缘、直阻、变比、拍波、绕组变形、零序阻抗)需要使用斗臂车,切换接线更多达18次甚至更多。不但耗费大量的时间,更耽误检修专业接头(使用斗臂车),严重影响送电可靠性,试验效率有待提高。新型变压器采用油浸自冷式的冷却方式,套管下方有很大面积的散热器,新型套管的长度也有所缩减,倾斜角度较大,目前所有新增的220kV变压器,新型套管的接线触头都在散热器的正上方,在试验时,个子高的试验人员踩在散热器上,基本可以接触到套管接线位置。于是,小组成员设想,如果我们的试验人员能够更高一些,是不是就可以不使用斗臂车,而完成试验工作,解决借用检修专业斗臂车而产生的沟通、等待、低效等问题。
发明内容
为了解决现有技术中不足和缺陷,本发明提供一种研制一种安全可靠,操作简单,携带方便的工具,来提高试验人员脚下的支撑点,完成试验工作的220kV变压器试验辅助支架。
设计一种220kV变压器试验辅助支架,其特征在于,包括安全带固定孔、安全带固定支架、踩踏面板、折页、底座固定环,支撑架,所述的安全带固定支架的上端设置有安全带固定孔,其中安全带固定支架与支撑架连接,支撑架的底部对称的两个支架上分别设置有两个底座固定环,所述支撑架上部设置有踩踏面板,其中安全带固定支架与支撑架连接处设置有折页。
本发明具有如下有益效果:本发明是一种安全可靠,操作简单,携带方便的工具,来提高试验人员脚下的支撑点,完成试验工作的220kV变压器试验辅助支架。经统计,试验辅助支架的拆装时间,不超过3分钟,满足设定目标。同时,新制作的试验辅助支架可折叠,携带方便,安装牢固,承重150kg不变形,不晃动,且有安全带绑扎位置,安全可靠,使用效果良好。
附图说明
下面结合附图及具体实施方式对本发明作进一步说明。
图1为本发明的结构示意图。
图中:1-安全带固定孔、2-安全带固定支架、3-踩踏面板、4-折页、5-底座固定环,6-支撑架。
具体实施方式
如图1所示,本发明是这样进行设计的,研制一种一种220kV变压器试验辅助支架,包括安全带固定孔1、安全带固定支架2、踩踏面板3、折页4、底座固定环5,支撑架6,所述的安全带固定支架2的上端设置有安全带固定孔1,其中安全带固定支架2与支撑架6连接,支撑架6的底部对称的两个支架上分别设置有两个底座固定环5,所述支撑架6上部设置有踩踏面板3,其中安全带固定支架2与支撑架6连接处设置有折页4。
方案对比并确定最佳方案:
选择方案3做为最佳方案。确定最佳方案后,小组召开研讨会议,认为研制的辅助支架应具备强度高,重量轻,结构坚固,拆装方便等特点。整个辅助支架由主枝干(安全带固定点),踩踏面,支撑架,底角固定几部分组成。
Claims (1)
1.一种220kV变压器试验辅助支架,其特征在于,包括安全带固定孔(1)、安全带固定支架(2)、踩踏面板(3)、折页(4)、底座固定环(5)、支撑架(6),所述的安全带固定支架(2)的上端设置有安全带固定孔(1),其中安全带固定支架(2)与支撑架(6)连接,支撑架(6)的底部对称的两个支架上分别设置有两个底座固定环(5),所述支撑架(6)上部设置有踩踏面板(3),其中安全带固定支架(2)与支撑架(6)连接处设置有折页(4)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101726321A CN103293411A (zh) | 2013-05-10 | 2013-05-10 | 一种220kv变压器试验辅助支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101726321A CN103293411A (zh) | 2013-05-10 | 2013-05-10 | 一种220kv变压器试验辅助支架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103293411A true CN103293411A (zh) | 2013-09-11 |
Family
ID=49094621
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013101726321A Pending CN103293411A (zh) | 2013-05-10 | 2013-05-10 | 一种220kv变压器试验辅助支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103293411A (zh) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201252355Y (zh) * | 2008-07-29 | 2009-06-03 | 淄博供电公司 | 220kv隔离开关用检修平台 |
CN201303221Y (zh) * | 2008-06-27 | 2009-09-02 | 安徽省电力公司阜阳供电公司 | 一种10kV柱上配电变压器检修平台装置 |
CN201918653U (zh) * | 2011-01-05 | 2011-08-03 | 华北电网有限公司唐山供电公司 | 高压隔离开关检修防护支架 |
CN201921350U (zh) * | 2010-12-03 | 2011-08-10 | 吉林省电力有限公司白山供电公司 | 悬挂式安全带支架 |
CN201985455U (zh) * | 2011-03-11 | 2011-09-21 | 邢台供电公司 | 一种开关类设备检修平台 |
US20120118668A1 (en) * | 2009-05-19 | 2012-05-17 | Claus Lundgaard Ernstsen | Rescue training equipment |
CN202519959U (zh) * | 2012-04-11 | 2012-11-07 | 中国长江三峡集团公司 | 一种大型变压器检修用快速脚手架 |
CN203310932U (zh) * | 2013-05-10 | 2013-11-27 | 吉林省电力有限公司长春供电公司 | 一种220kV变压器试验辅助支架 |
-
2013
- 2013-05-10 CN CN2013101726321A patent/CN103293411A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201303221Y (zh) * | 2008-06-27 | 2009-09-02 | 安徽省电力公司阜阳供电公司 | 一种10kV柱上配电变压器检修平台装置 |
CN201252355Y (zh) * | 2008-07-29 | 2009-06-03 | 淄博供电公司 | 220kv隔离开关用检修平台 |
US20120118668A1 (en) * | 2009-05-19 | 2012-05-17 | Claus Lundgaard Ernstsen | Rescue training equipment |
CN201921350U (zh) * | 2010-12-03 | 2011-08-10 | 吉林省电力有限公司白山供电公司 | 悬挂式安全带支架 |
CN201918653U (zh) * | 2011-01-05 | 2011-08-03 | 华北电网有限公司唐山供电公司 | 高压隔离开关检修防护支架 |
CN201985455U (zh) * | 2011-03-11 | 2011-09-21 | 邢台供电公司 | 一种开关类设备检修平台 |
CN202519959U (zh) * | 2012-04-11 | 2012-11-07 | 中国长江三峡集团公司 | 一种大型变压器检修用快速脚手架 |
CN203310932U (zh) * | 2013-05-10 | 2013-11-27 | 吉林省电力有限公司长春供电公司 | 一种220kV变压器试验辅助支架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107414481B (zh) | 一种腕臂组装设备及其吊装方法 | |
CN103579961A (zh) | 应用于电缆接头制作的可调升降式固定装置及其实现方法 | |
CN102661077A (zh) | 一种支杆的竖立方法 | |
CN203310932U (zh) | 一种220kV变压器试验辅助支架 | |
CN207239655U (zh) | 一种腕臂组装设备 | |
CN101037181A (zh) | 可移动高空带电作业绝缘平台 | |
CN203742903U (zh) | 一种大功率海上风力发电机组塔架外置电器组件工作平台 | |
CN107069590B (zh) | 电缆终端制作自动升降架 | |
CN103293411A (zh) | 一种220kv变压器试验辅助支架 | |
CN203365481U (zh) | 折叠式绝缘杆耐压试验支架 | |
CN204575690U (zh) | 高压试验引线可伸缩专用支撑架 | |
CN203251011U (zh) | 一种便携式多功能电缆头支架 | |
CN202513517U (zh) | 一种托担抱箍 | |
CN207217978U (zh) | 并沟线夹装拆操作工具 | |
CN206035075U (zh) | 一种安装便捷的桅杆拉线塔 | |
CN206147013U (zh) | 一种串补电容器电容量测量装置 | |
CN101696982A (zh) | 印刷电路板性能检测台 | |
CN205426995U (zh) | 新型接线盒的电能表支撑固定装置 | |
CN204408513U (zh) | 一种遥控式登电线杆巡视装置 | |
CN209000816U (zh) | 一种户外真空断路器壳体 | |
CN204703489U (zh) | 绝缘快装脚手架专用固定装置 | |
CN203961417U (zh) | 一种电杆横担及其挂线装置 | |
CN203859421U (zh) | 220kV以上绝缘传流伸缩器 | |
CN202906257U (zh) | 变电站隔离开关安装用移动式工作平台 | |
CN202633820U (zh) | 电瓷瓶移动用升降装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130911 |