CN103280804A - 一种解决分区电网主变过载问题的分区合环支援方法 - Google Patents
一种解决分区电网主变过载问题的分区合环支援方法 Download PDFInfo
- Publication number
- CN103280804A CN103280804A CN2013102559186A CN201310255918A CN103280804A CN 103280804 A CN103280804 A CN 103280804A CN 2013102559186 A CN2013102559186 A CN 2013102559186A CN 201310255918 A CN201310255918 A CN 201310255918A CN 103280804 A CN103280804 A CN 103280804A
- Authority
- CN
- China
- Prior art keywords
- subregion
- subarea
- cyclization
- loop closing
- main transformer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Protection Of Transformers (AREA)
Abstract
本发明涉及一种解决分区电网主变过载问题的分区合环支援方法,该方法包括以下步骤:1)各分区的控制子站实时监控本分区主变的负载状态,当分区主变出现过载时,控制子站判断是否存在可寻求合环支援的设定,若是,则执行步骤2);2)控制子站向控制主站发送合环支援请求;3)控制主站根据当前其它各分区的运行情况,计算出现过载分区与各可能提供合环支援分区进行合环后的功率、电压和短路电流,并根据计算结果选择最适宜进行合环的分区,将并合环指令发送给需要进行合环的分区的控制子站;4)各控制子站根据合环指令进行合环操作。与现有技术相比,本发明具有降低电力系统成本、提高供电可靠性等优点。
Description
技术领域
本发明涉及电力系统安全稳定分析与控制领域,尤其是涉及一种解决分区电网主变过载问题的分区合环支援方法。
背景技术
从近年来国内外发生的大停电事故的主导因素来看,电网严重故障频次不断增加,具有极强的不可预见性,电网严重事故发生的可能性始终存在,一旦发生所引起的局部甚至大范围停电将对社会和经济发展造成巨大损害。为抑制短路电流,目前220kV电网主要采取分层分区的方式,安全稳定形势相对清晰。由于电气连接紧密功角稳定问题并不突出,分区电网主要是热稳定、频率稳定和电压稳定问题。500kV线路、500kV主变、220kV母线、大机组的安全性是220kV分区电网安全稳定的关键所在。
分区电网主变的N-1以上故障将造成主变超稳定或设备限额;分区内的大电厂发生停机事故,将可能引起主变严重过载而切除,导致分区电网频率崩溃或电压崩溃。因此确保分区主变的正常运行,以及在主变发生过载情况下采取有效措施来消除过载,对分区电网安全稳定运行具有重要的意义。
目前消除主变过载的方法,主要有分区内发电机组增加出力,或减控部分负荷,或者通过向其他分区转移负荷,来减少本分区500kV主变的下网功率。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种降低电力系统成本、提高供电可靠性的解决分区电网主变过载问题的分区合环支援方法。
本发明的目的可以通过以下技术方案来实现:
一种解决分区电网主变过载问题的分区合环支援方法,该方法包括以下步骤:
1)各分区的控制子站实时监控本分区主变的负载状态,当分区主变出现过载时,控制子站判断是否存在可寻求合环支援的设定,若是,则执行步骤2);
2)控制子站向控制主站发送合环支援请求;
3)控制主站根据当前其它各分区的运行情况,计算出现过载分区与各可能提供合环支援分区进行合环后的功率、电压和短路电流,并根据计算结果选择最适宜进行合环的分区,将并合环指令发送给需要进行合环的分区的控制子站;
4)各控制子站根据合环指令进行合环操作。
与现有技术相比,本发明提出解决分区电网主变过载问题的分区合环支援方法。当分区电网主变过载时,通过分区间的合环支援解决主变过载问题或减轻主变过载程度,该方法不仅可以减少稳控装置的布点,并且可以减少稳控装置切负荷的量,有利于提高供电可靠性,确保分区电网的安全稳定运行。
附图说明
图1为本发明方法的流程示意图。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。本实施例以本发明技术方案为前提进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。
如图1所示,一种解决分区电网主变过载问题的分区合环支援方法,该方法包括以下步骤:
1)各分区的控制子站实时监控本分区主变的负载状态,当分区主变出现过载时,控制子站判断是否存在可寻求合环支援的设定,若是(设分区1的主变过载),则执行步骤2);
2)控制子站向控制主站发送合环支援请求;
3)控制主站根据当前其它各分区的运行情况,计算出现过载分区与各可能提供合环支援分区进行合环后的功率、电压和短路电流,计算公式采用现有的基本潮流计算公式,并根据计算结果判断功率、电压、短路电流是否满足要求(潮流是否过流、短路电流是否超标),评估合环支援的可能性,并决策出最适宜合环的分区(分区2),将并合环指令发送给需要进行合环的分区的控制子站,若没有可接受的合环方案,则向分区主变过载的控制子站发送请求失败指令;
4)各控制子站根据合环指令进行合环操作。
Claims (1)
1.一种解决分区电网主变过载问题的分区合环支援方法,其特征在于,该方法包括以下步骤:
1)各分区的控制子站实时监控本分区主变的负载状态,当分区主变出现过载时,控制子站判断是否存在可寻求合环支援的设定,若是,则执行步骤2);
2)控制子站向控制主站发送合环支援请求;
3)控制主站根据当前其它各分区的运行情况,计算出现过载分区与各可能提供合环支援分区进行合环后的功率、电压和短路电流,并根据计算结果选择最适宜进行合环的分区,将并合环指令发送给需要进行合环的分区的控制子站;
4)各控制子站根据合环指令进行合环操作。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102559186A CN103280804A (zh) | 2013-06-25 | 2013-06-25 | 一种解决分区电网主变过载问题的分区合环支援方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013102559186A CN103280804A (zh) | 2013-06-25 | 2013-06-25 | 一种解决分区电网主变过载问题的分区合环支援方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103280804A true CN103280804A (zh) | 2013-09-04 |
Family
ID=49063280
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013102559186A Pending CN103280804A (zh) | 2013-06-25 | 2013-06-25 | 一种解决分区电网主变过载问题的分区合环支援方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103280804A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105207199A (zh) * | 2015-09-08 | 2015-12-30 | 江苏省电力公司 | 分区电网主供元件过载量填补方法 |
CN105656086A (zh) * | 2015-11-26 | 2016-06-08 | 国家电网公司 | 过载处理方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011012135A2 (en) * | 2009-07-31 | 2011-02-03 | Gridmanager A/S | Method and apparatus for managing transmission of power in a power transmission network |
CN102035193A (zh) * | 2010-12-21 | 2011-04-27 | 南京南瑞继保电气有限公司 | 一种电网安全稳定控制与防御的方法 |
CN102938587A (zh) * | 2012-12-10 | 2013-02-20 | 上海市电力公司 | 电网智能安全稳定预警与控制方法 |
-
2013
- 2013-06-25 CN CN2013102559186A patent/CN103280804A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011012135A2 (en) * | 2009-07-31 | 2011-02-03 | Gridmanager A/S | Method and apparatus for managing transmission of power in a power transmission network |
CN102035193A (zh) * | 2010-12-21 | 2011-04-27 | 南京南瑞继保电气有限公司 | 一种电网安全稳定控制与防御的方法 |
CN102938587A (zh) * | 2012-12-10 | 2013-02-20 | 上海市电力公司 | 电网智能安全稳定预警与控制方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105207199A (zh) * | 2015-09-08 | 2015-12-30 | 江苏省电力公司 | 分区电网主供元件过载量填补方法 |
CN105207199B (zh) * | 2015-09-08 | 2017-05-10 | 江苏省电力公司 | 分区电网主供元件过载量填补方法 |
CN105656086A (zh) * | 2015-11-26 | 2016-06-08 | 国家电网公司 | 过载处理方法 |
CN105656086B (zh) * | 2015-11-26 | 2018-09-14 | 国家电网公司 | 过载处理方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2880635C (en) | Method for analyzing operation state of substation by combining whole grid model with local grid model | |
CN103560541B (zh) | 一种交直流混合微网故障穿越控制装置及方法 | |
CN105186518A (zh) | 一种配电网电能质量综合优化系统 | |
CN103457296B (zh) | 一种独立运行微电网主控电源切换方法 | |
CN105048497A (zh) | 一种双馈型风电机组高电压穿越方法 | |
CN203491725U (zh) | 一种新型高可靠性ups | |
CN106599341B (zh) | 含柔性直流输电系统的安稳控制策略表生成方法 | |
CN205960668U (zh) | 一种光伏电站用节能保护开关装置 | |
CN112421621B (zh) | 一种基于5g物联网的一体化智能配网运行监控云系统 | |
CN204679566U (zh) | 一种高压柔性直流输电功率单元强电试验回路 | |
CN202949138U (zh) | 低压电缆分线箱 | |
CN103280804A (zh) | 一种解决分区电网主变过载问题的分区合环支援方法 | |
CN204649899U (zh) | 一种电网调度中的小电流接地故障选线系统 | |
CN203607863U (zh) | 一种光伏并网防逆流系统 | |
CN105811444B (zh) | 一种电动汽车与电网互动模拟负载系统及其电气保护方法 | |
CN203377601U (zh) | 可调功率因数启备变无功补偿装置 | |
CN203896038U (zh) | 一种具有电源快速切换装置的应急发电车 | |
CN203014360U (zh) | 一种在线线路故障监测与保护装置 | |
CN112003293A (zh) | 一种基于电压源逆变器的分布式潮流控制装置和方法 | |
CN105449682A (zh) | 一种过负荷控制方法及与备用电源自投的配合方法 | |
Xu et al. | Impact of the UHVDC on Performance Characteristics of Power Grid | |
CN204578197U (zh) | 大功率发射机的不间断供电系统 | |
CN203135434U (zh) | 中性点虚拟接地装置 | |
CN201821006U (zh) | 大电流高速开断控制装置 | |
CN203434496U (zh) | 风电场的电流接地系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130904 |