CN103269039A - 10kV架空垂直双回线路带电立杆用导线外拉杆 - Google Patents
10kV架空垂直双回线路带电立杆用导线外拉杆 Download PDFInfo
- Publication number
- CN103269039A CN103269039A CN2012105261668A CN201210526166A CN103269039A CN 103269039 A CN103269039 A CN 103269039A CN 2012105261668 A CN2012105261668 A CN 2012105261668A CN 201210526166 A CN201210526166 A CN 201210526166A CN 103269039 A CN103269039 A CN 103269039A
- Authority
- CN
- China
- Prior art keywords
- insulation
- rope
- insulation rope
- outside link
- conducting wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本发明公开了一种10kV架空垂直双回线路带电立杆用导线外拉杆,由绝缘支撑杆、金属承力管、螺栓紧固扣环构成,绝缘支撑杆顶部、中部及底部均设置有金属承力管,各金属承力管侧壁上均设置有绝缘绳定固定扣、绝缘绳定位卡,绝缘绳定固定扣上形成一用于卡入绝缘绳的固定扣开口,绝缘绳定位卡上、下方形成卡入绝缘绳的定位卡开口,中部形成贯穿绝缘绳的闭口,并配置与闭口相匹配的螺栓紧固扣环。并配有绝缘拉力绳绑扎扣、导线绝缘套管。本发明结构简单轻巧、操作方便、造价低廉;以单次作业为例:单条线路户数为50户,单条线路运行电流值为150A,带电作业时间3小时以上,减少停电时间5小时以上。
Description
技术领域
本发明涉及一种导线外拉杆,尤其涉及一种10kV架空垂直双回线路带电立杆用导线外拉杆。
背景技术
随着社会经济发展,人民生活质量的不断提高,对供电可靠性的要求也越来越高,在10kV配电网检修施工、维护消缺、新用户接入等工作中,应用带电作业技术成为提高供电可靠性的最直接、最有效的重要技术手段。根据2010年11月在湖南长沙召开的国家电网公司第一届10kV架空线路带电作业现场观摩会交流表演项目中表明,北京、上海、湖南等公司已相继开展了带电立杆项目,前提是10kV配网建设将未来带电作业项目的进行要求前期就纳入设计、建设中,如增加横担长度,达到相间水平、垂直距离,以满足带电立杆及其他各项目开展的要求。南昌10kV配网架空线路多为双回垂直排列共杆架设,根据南昌配网设计,现有的两回线路之间水平距离仅为1.2m。如需在此类线路中增设新的电力杆塔,电杆起立时与两侧导线的水平距离不足0.5m,远远不够带电作业操作规程要求的最小安全距离。
根据GB/T 18857-2008 《配电线路带电作业技术导则》、Q/GDW 520-2010 国家电网公司《10kV架空配电线路带电作业现场作业规范》、国家电网生[2009]190 号《关于印发国家电网公司深入开展现场标准化作业工作》及国家电网安监[2009]664 号《国家电网公司电力安全工作规程(线路部分)》规定要求,最小安全距离为0.7m,在带电立杆作业项目中,电杆起立还应足够考虑到电杆全过程中的摆动半径,只有将相邻两回运行线路之间的水平距离增大,保证不小于2.2m,才能安全有效地完成该项带电作业工作。
发明内容
本发明的目的在于:克服现有10kV配网架设属性中存在的不足,发明一种绝缘工具,能将作业点的10kV架空垂直双回线路各回导线两侧外拉,实现作业的空间达到安全要求。
本发明的目的通过以下方案实现:由绝缘支撑杆、金属承力管、螺栓紧固扣环构成,绝缘支撑杆顶部、中部及底部均设置有金属承力管,各金属承力管侧壁上均设置有绝缘绳定固定扣、绝缘绳定位卡,绝缘绳定固定扣上形成一用于卡入绝缘绳的固定扣开口,绝缘绳定位卡上、下方形成卡入绝缘绳的定位卡开口,中部形成贯穿绝缘绳的闭口,并配置与闭口相匹配的螺栓紧固扣环。
本发明配有绝缘拉力绳绑扎扣。
本发明配有导线绝缘套管。
本发明所述绝缘支撑杆三等分位置均设置金属承力管。
本发明所述绝缘绳定固定扣、绝缘绳定位卡相互沿金属承力管周向呈90度角设置。
本发明结构简单轻巧、操作方便、造价低廉;以单次作业为例:单条线路户数为50户,单条线路运行电流值为150A,带电作业时间3小时以上,减少停电时间5小时以上;垂直双回线路带电立杆项目实施率的提升,抹去了配网公变增设、客户增容需求中的计划停电申请、等待时间。
附图说明
图1为本发明结构示意图;
图2为本发明金属承力管与绝缘支撑杆接合部局部放大图。
具体实施方式
以下结合实施例并对照附图对本发明进行详细说明。
本实施例由绝缘支撑杆1、金属承力管2、螺栓紧固扣环6、导线绝缘套管8及绝缘拉力绳绑扎扣10构成。绝缘支撑杆1顶部、中部及底部三等分位置处均设置有金属承力管2,各金属承力管2侧壁上均设置有绝缘绳定固定扣4、绝缘绳定位卡5,绝缘绳定固定扣4上形成一用于卡入绝缘绳的固定扣开口41,绝缘绳定位卡5上、下方形成卡入绝缘绳的定位卡开口51,中部形成贯穿绝缘绳的闭口52,并配置与闭口52相匹配的螺栓紧固扣环6。
绝缘支撑杆1为树脂绝缘管状材料,全长190cm,等分三点,各点装配长为10cm的不锈钢材质金属承力管2,各金属承力管2侧壁上均设置有绝缘绳定固定扣4、绝缘绳定位卡5,绝缘绳定固定扣4、绝缘绳定位卡5相互沿金属承力管周向呈90度角设置。各金属承力管2间净距离为80cm,金属承力管2为固定各相导线绝缘绳、拉力绝缘绳的固定、支撑及受力点。各绝缘绳3为蚕丝编织Φ14mm的专用绝缘绳索,导线绝缘固定绳长度为60cm,绝缘拉力绳长度为上下200cm、中间2000cm。绝缘拉力绳9采用设有螺栓锁扣的环扣、板扣安装在所需的各个点位。
利用本发明的工作过程为:
1、穿戴合格的作业人员(2人)随带电作业绝缘斗臂车工作斗升至10kV架空垂直双回线路一侧指定位置,用导线绝缘套管8对运行导线遵章进行绝缘遮蔽,并在导线绝缘套管受力点处进行50cm的防损伤包垫,以免该点受力时产生对导线绝缘套管的绝缘、机械损伤。
2、斗内作业人员将导线外拉杆手持垂直摆放,导线外拉杆上端与运行导线上线水平,操作工作斗渐进至距导线20cm处,由上至下依次将各相线捆扎固定。
3、将导线固定绝缘绳的活动端环套导线绝缘套管外围,如图逐一将导线卡入绝缘绳定位卡牢靠,活动端卡入最终卡位,然后反向收紧导线固定绝缘绳,确认导线固定绝缘绳受力帖绕金属承力管各卡位不会脱落。
4、绝缘斗臂车斗内人员辅助绝缘拉力绳末端水平外拉,至外拉杆受力后,绝缘斗臂车斗内人员撤离,随工作斗降至地面。
5、通过绝缘拉力绳末端对外拉杆的外拉,将运行导线缓慢外拉至所需位置,然后固定在预先选定的可靠紧固支撑固定点捆绑牢靠,并设专人监护。
6、外拉过程需注意各受力点的受力情况,发现异常,则应立即终止。
7、另一侧遵循相同步骤进行。
Claims (5)
1.一种10kV架空垂直双回线路带电立杆用导线外拉杆,其特征在于:由绝缘支撑杆、金属承力管、螺栓紧固扣环构成,绝缘支撑杆顶部、中部及底部均设置有金属承力管,各金属承力管侧壁上均设置有绝缘绳定固定扣、绝缘绳定位卡,绝缘绳定固定扣上形成一用于卡入绝缘绳的固定扣开口,绝缘绳定位卡上、下方形成卡入绝缘绳的定位卡开口,中部形成贯穿绝缘绳的闭口,并配置与闭口相匹配的螺栓紧固扣环。
2.如权利要求1所述的10kV架空垂直双回线路带电立杆用导线外拉杆,其特征在于:配有绝缘拉力绳绑扎扣。
3.如权利要求1所述的10kV架空垂直双回线路带电立杆用导线外拉杆,其特征在于:配有导线绝缘套管。
4.如权利要求1或2或3所述的10kV架空垂直双回线路带电立杆用导线外拉杆,其特征在于:绝缘支撑杆三等分位置均设置金属承力管。
5.如权利要求1或2或3所述的10kV架空垂直双回线路带电立杆用导线外拉杆,其特征在于:绝缘绳定固定扣、绝缘绳定位卡相互沿金属承力管周向呈90度角设置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012105261668A CN103269039A (zh) | 2012-12-10 | 2012-12-10 | 10kV架空垂直双回线路带电立杆用导线外拉杆 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012105261668A CN103269039A (zh) | 2012-12-10 | 2012-12-10 | 10kV架空垂直双回线路带电立杆用导线外拉杆 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103269039A true CN103269039A (zh) | 2013-08-28 |
Family
ID=49012653
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012105261668A Pending CN103269039A (zh) | 2012-12-10 | 2012-12-10 | 10kV架空垂直双回线路带电立杆用导线外拉杆 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103269039A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103806740A (zh) * | 2013-12-12 | 2014-05-21 | 国家电网公司 | 插入式带电立杆方法 |
CN104810746A (zh) * | 2015-04-13 | 2015-07-29 | 广州供电局有限公司 | 配网多回线路带电检修提线工具 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203312710U (zh) * | 2012-12-10 | 2013-11-27 | 江西南昌供电公司 | 10kV架空垂直双回线路带电立杆用导线外拉杆 |
-
2012
- 2012-12-10 CN CN2012105261668A patent/CN103269039A/zh active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203312710U (zh) * | 2012-12-10 | 2013-11-27 | 江西南昌供电公司 | 10kV架空垂直双回线路带电立杆用导线外拉杆 |
Non-Patent Citations (1)
Title |
---|
刘伟等: "10kV架空垂直双回线路带电立杆用导线外拉杆创新", 《科技与生活》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103806740A (zh) * | 2013-12-12 | 2014-05-21 | 国家电网公司 | 插入式带电立杆方法 |
CN103806740B (zh) * | 2013-12-12 | 2015-01-14 | 国家电网公司 | 插入式带电立杆方法 |
CN104810746A (zh) * | 2015-04-13 | 2015-07-29 | 广州供电局有限公司 | 配网多回线路带电检修提线工具 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203312710U (zh) | 10kV架空垂直双回线路带电立杆用导线外拉杆 | |
CN106816813A (zh) | 配电网电流互感器安装结构和带电更换电流互感器的方法 | |
CN201345512Y (zh) | 220kv双回共塔线路高压强电场专用工具 | |
CN102664358A (zh) | 带电更换220kV软母线静触头的方法 | |
CN104535804A (zh) | 一种便携式电流互感器测试钳 | |
CN103269039A (zh) | 10kV架空垂直双回线路带电立杆用导线外拉杆 | |
CN106025888A (zh) | 10~220kV多功能绝缘操作杆 | |
CN201466574U (zh) | 用于等电位更换输电线路铁塔绝缘子及附件的装置 | |
CN201440584U (zh) | 地电位更换输电线路耐张塔绝缘子及附件的装置 | |
CN201417902Y (zh) | 电力电缆校核装置 | |
CN205489250U (zh) | 进出线构架合并的gis配电装置布置结构 | |
CN201846015U (zh) | 一种采用一个半断路器接线的gis配电装置 | |
CN205303956U (zh) | 一种分组自动投切补偿柜安装结构 | |
CN205177757U (zh) | 一种跌落式熔断器验电接地装置 | |
CN201985528U (zh) | 一种采用线路铁塔串联补偿系统 | |
CN211453743U (zh) | 一种高压线路计量成套装置 | |
CN205036149U (zh) | 电缆终端钢管杆 | |
CN103308784B (zh) | 一种核相仪 | |
JP3085425U (ja) | 柱上高圧変電構造 | |
CN202133684U (zh) | 绝缘工具垂直悬挂装置 | |
Li et al. | Live-line operation and maintenance of power distribution networks | |
CN205791171U (zh) | 一种左右侧进出线的充气柜结构 | |
CN202564822U (zh) | 一种城市配电变压器双台式台区 | |
CN202424000U (zh) | 耐张加长金具串地电位更换绝缘子操作平台 | |
CN205069357U (zh) | 自供电微机保护装置用电流互感器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |