- CN103268325A CN103268325A CN2013101499309A CN201310149930A CN103268325A CN 103268325 A CN103268325 A CN 103268325A CN 2013101499309 A CN2013101499309 A CN 2013101499309A CN 201310149930 A CN201310149930 A CN 201310149930A CN 103268325 A CN103268325 A CN 103268325A
- Authority
- CN
- China
- Prior art keywords
- ied
- file
- model information
- scd
- database file
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
Abstract
本发明公开了一种基于SCD文件的智能变电站IED模型配置正确性动态校核方法,适用于采用IEC61850通信的数字化变电站及智能变电站。具体步骤如下:首先从SCD文件中提取出待测IED相关的模型信息,然后将其映射成MMS有名变量,最终将其存储为数据库文件1;然后以客户端模式与被测IED通信,通过ACSI读模型服务来在线读取被测IED的各层模型信息,并将其存储为数据库文件2。最后采用双向比较法比对数据库文件1和数据库文件2中的模型信息是否一致。本发明的优点是能够自动检查下载到智能变电站IED中的CID文件和导入到后台中的SCD文件信息是否一致。
Description
技术领域
本发明涉及一种基于SCD文件的智能变电站IED(智能电子设备)模型配置正确性动态校核方法,用于测试下载到IED中的CID配置文件和导入到监控后台中的SCD文件相关信息是否一致,适用于采用IEC 61850标准的数字化变电站及智能变电站。
背景技术
采用IEC 61850标准的数字化变电站工程实施具体流程如下:首先各装置厂家通过自己的装置配置工具生成本装置的ICD文件,然后提供给系统集成商;系统集成商根据设计图纸和用户需求负责整个系统的配置,在各个ICD文件基础上生成SCD文件;然后,各装置厂商从SCD文件中导出本装置的CID文件。最终,CID文件将被下载到IED中运行,SCD文件将被导入到后台监控系统中。
DL/T 1146《DL/T 860实施技术规范》和Q/GDW 396《IEC 61850工程继电保护应用模型》两项标准均规定SCD文件是全站统一的数据源,无论是后台、远动还是各间隔层IED,其配置信息均应从SCD文件中导出。在实际工程中装置厂家、系统集成商需要良好的配合才能保证配置的正确性。然后由于设计变更、用户需求等原因,ICD、SCD文件经常需要修改,因此存在数量众多的版本,装置厂家、系统集成商配合稍有差错就会导致ICD文件、SCD文件内的信息不一致;另外还有的装置厂家不经过系统集成商,直接私自修改CID配置文件。这些问题都会造成实际下载到装置中的CID文件和SCD文件版本不一致,最终有可能导致信号错位、通信服务访问出错等问题。只能通过重复各种继电保护试验(或者通过保护装置的模拟传动功能)进行信号验证,工作量非常大,导致效率低而且容易遗漏、出错。因此在实际工程应用中迫切需要一种方便的测试方法,有效地检查下载到装置中的CID文件和导入到后台中的SCD文件信息是否一致,确保配置准确无误,保证信号正确上送。
发明内容
本发明所要解决的技术问题是提供一种基于SCD文件的智能变电站IED模型配置正确性动态校核方法,该测试方法准确率高,效率高。
为解决上述技术问题,本发明所采取的技术方案是:一种基于SCD文件的智能变电站IED模型配置正确性动态校核方法,其特征在于:所述测试方法用于检查下载到IED中的CID文件和导入到当地监控后台中的SCD文件信息是否一致,步骤如下:
1)利用XML解析器读取并解析SCD文件,然后提取与待测IED有关的模型信息;SCD文件是全站统一的数据源;
2)以逻辑节点为基本单位,将提取的待测IED模型信息(包括逻辑节点内的数据、数据属性、数据集、各种控制块等),映射到结构体类型的MMS有名变量,最终将其存储为数据库文件1;
3)以客户端模式与被测IED通信,通过ACSI读模型服务来在线读取被测IED的各层模型信息,并将其存储为数据库文件2;
4)数据库文件1含有SCD文件中与待测IED有关的模型信息,数据库文件2含有被测IED解析CID文件后实际运行的模型信息,通过比对数据库文件1和数据库文件2是否一致,可以检查CID配置文件和SCD文件相关信息是否一致。
采用上述技术方案所产生的有益效果在于:采用本发明方法后准确率高,其能有效地检查下载到装置中的CID文件和导入到后台中的SCD文件信息是否一致,确保配置准确无误,保证信号正确上送。因为本发明利用计算机比较两个数据库文件,只要两个数据库文件有不同之处就能发现。而之前只能通过重复各种继电保护试验(或者通过保护装置的模拟传动功能)进行信号验证,不仅效率低而且容易遗漏、出错。
附图说明
图1是本发明的流程框图;
图2是本发明读取被测IED模型流程图。
其中附图2中, Server代表服务器,File代表文件,LDNames代表逻辑设备名字,LNNames代表逻辑节点名字,DataNames代表数据名字,Dname.Attr代表数据属性名字。
具体实施方式
下面结合附图对本发明进行详细的说明。
(1) 参见附图1,利用XML解析器读取并解析SCD文件,提取出待测IED相关的模型信息。然后将提取的待测IED模型信息(包括逻辑节点内的数据、数据属性、数据集、各种控制块等),映射成MMS有名变量,最终将其存储为数据库文件1。
(2)参见附图1和附图2,以客户端模式与被测IED通信时,通过GetServerDirectory(读服务器目录)收集被测IED模型中所有的逻辑设备,通过GetLogicalDeviceDirectory(读逻辑设备目录,简称LD)收集每个逻辑设备中的逻辑节点,通过GetLogicalNodeDirectory(读逻辑节点目录,简称LN)收集每个逻辑节点中的数据、各种控制块和数据集,通过GetDataDefinition(读数据定义)服务读取各个数据下所有数据属性(简称DA)的名称和类型,通过GetDataValues(读数据值,简称DATA)服务读取各个数据的当前值,通过GetDataSetDirectory(读数据集目录)获得该数据集中所有成员的名称。利用这些服务,客户端获得被测IED完整的分层信息模型及其当前值,并将其存储为数据库文件2。上述读取流程的相关技术术语参见DL/T860系列标准。上述GetServerDirectory、GetLogicalDeviceDirectory、GetDataDefinition、GetDataValues、GetDataSetDirectory即为ACSI读模型服务。
在比对数据库文件1和数据库文件2时,采用双向比较的做法。第一步以数据库文件1中存放的IED数据模型信息为参考,将数据库文件2中的IED模型信息与其进行比较,可以检查出数据库文件1中存在但在数据库文件2中却不存在的模型信息。第二步以数据库文件2中存放的IED模型信息为参考,将数据库文件1中的IED模型信息与其进行比较,可以检查出数据库文件2中存在但在数据库文件1中却不存在的模型信息。
Claims (2)
1.一种基于SCD文件的智能变电站IED模型配置正确性动态校核方法,其特征在于:所述测试方法用于检查下载到IED中的CID文件和导入到当地监控后台中的SCD文件信息是否一致,步骤如下:
1)利用XML解析器读取并解析SCD文件,然后提取与待测IED有关的模型信息;
2)以逻辑节点为基本单位,将提取的待测IED模型信息,映射到结构体类型的MMS有名变量,最终将其存储为数据库文件1;
3)以客户端模式与被测IED通信,通过ACSI读模型服务来在线读取被测IED的各层模型信息,并将其存储为数据库文件2;
4)数据库文件1含有SCD文件中与待测IED有关的模型信息,数据库文件2含有被测IED解析CID文件后实际运行的模型信息,通过比对数据库文件1和数据库文件2是否一致,可以检查CID配置文件和SCD文件相关信息是否一致。
2.根据权利要求1所述的基于SCD文件的智能变电站IED模型配置正确性动态校核方法,其特征在于:所述步骤4)中的比较方法采用双向比较法;
第一步以数据库文件1中存放的IED数据模型信息为参考,将数据库文件2中的IED模型信息与其进行比较,检查出数据库文件1中存在但在数据库文件2中却不存在的模型信息;
第二步以数据库文件2中存放的IED模型信息为参考,将数据库文件1中的IED模型信息与其进行比较,检查出数据库文件2中存在但在数据库文件1中却不存在的模型信息。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101499309A CN103268325A (zh) | 2013-04-26 | 2013-04-26 | 基于scd文件的智能变电站ied模型配置正确性动态校核方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101499309A CN103268325A (zh) | 2013-04-26 | 2013-04-26 | 基于scd文件的智能变电站ied模型配置正确性动态校核方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103268325A true CN103268325A (zh) | 2013-08-28 |
Family
ID=49011954
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013101499309A Pending CN103268325A (zh) | 2013-04-26 | 2013-04-26 | 基于scd文件的智能变电站ied模型配置正确性动态校核方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103268325A (zh) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105140810A (zh) * | 2015-08-13 | 2015-12-09 | 国网安徽省电力公司 | 智能变电站全站软压板投退状态校验系统及方法 |
CN105184189A (zh) * | 2015-08-26 | 2015-12-23 | 国家电网公司 | 智能变电站scd文件在线管控系统 |
CN105866567A (zh) * | 2016-03-24 | 2016-08-17 | 南京能云电力科技有限公司 | 一种基于基础模板技术的继电保护装置自动测试系统 |
CN106294750A (zh) * | 2016-08-10 | 2017-01-04 | 国家电网公司 | Icd模型文件家族性缺陷升级系统及方法 |
CN106528722A (zh) * | 2016-10-26 | 2017-03-22 | 南京能云电力科技有限公司 | 智能电子装置设备数据模型的一致性测试方法及系统 |
CN107562950A (zh) * | 2017-09-28 | 2018-01-09 | 广东电网有限责任公司电力调度控制中心 | 基于icd文件的保护装置断面数据文件形成方法和系统 |
CN105116248B (zh) * | 2015-08-05 | 2018-09-21 | 国家电网公司 | 智能变电站继电保护装置自动闭环测试方法 |
CN108595390A (zh) * | 2018-04-25 | 2018-09-28 | 国网安徽省电力有限公司亳州供电公司 | 智能变电站scd与ied参数一致性的校验方法 |
CN110298585A (zh) * | 2019-06-28 | 2019-10-01 | 云南电网有限责任公司昭通供电局 | 一种变电站设备监控信息分层分级自动审核方法 |
CN111143296A (zh) * | 2019-11-22 | 2020-05-12 | 贵州电网有限责任公司 | 变电站scd文件分类方法、装置、终端及存储介质 |
CN113612638A (zh) * | 2021-07-30 | 2021-11-05 | 成都交大许继电气有限责任公司 | 一种基于虚拟多ied转发的集控数据传输系统及方法 |
CN116738496A (zh) * | 2023-02-06 | 2023-09-12 | 中国电力科学研究院有限公司 | 一种变电站继电保护装置icd模型的校核方法及系统 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5963734A (en) * | 1997-04-03 | 1999-10-05 | Abb Power T&D Company Inc. | Method and apparatus for configuring an intelligent electronic device for use in supervisory control and data acquisition system verification |
US20050182979A1 (en) * | 2004-02-17 | 2005-08-18 | Gross Scott J. | System and method for customizing design of settings management user interface systems used to configure settings for intelligent electronic devices |
CN101432612A (zh) * | 2006-04-24 | 2009-05-13 | Abb研究有限公司 | 智能电子设备配置验证 |
CN101706816A (zh) * | 2009-12-22 | 2010-05-12 | 广东电网公司电力科学研究院 | 一种数字化变电站模型检测方法 |
CN102005818A (zh) * | 2010-11-10 | 2011-04-06 | 国电南瑞科技股份有限公司 | 一种在线检测scd文件和ied模型一致性的方法 |
CN102930111A (zh) * | 2012-11-12 | 2013-02-13 | 广东电网公司电力科学研究院 | 变电站scd模型文件的生成方法及装置 |
-
2013
- 2013-04-26 CN CN2013101499309A patent/CN103268325A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5963734A (en) * | 1997-04-03 | 1999-10-05 | Abb Power T&D Company Inc. | Method and apparatus for configuring an intelligent electronic device for use in supervisory control and data acquisition system verification |
US20050182979A1 (en) * | 2004-02-17 | 2005-08-18 | Gross Scott J. | System and method for customizing design of settings management user interface systems used to configure settings for intelligent electronic devices |
CN101432612A (zh) * | 2006-04-24 | 2009-05-13 | Abb研究有限公司 | 智能电子设备配置验证 |
CN101706816A (zh) * | 2009-12-22 | 2010-05-12 | 广东电网公司电力科学研究院 | 一种数字化变电站模型检测方法 |
CN102005818A (zh) * | 2010-11-10 | 2011-04-06 | 国电南瑞科技股份有限公司 | 一种在线检测scd文件和ied模型一致性的方法 |
CN102930111A (zh) * | 2012-11-12 | 2013-02-13 | 广东电网公司电力科学研究院 | 变电站scd模型文件的生成方法及装置 |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105116248B (zh) * | 2015-08-05 | 2018-09-21 | 国家电网公司 | 智能变电站继电保护装置自动闭环测试方法 |
CN105140810A (zh) * | 2015-08-13 | 2015-12-09 | 国网安徽省电力公司 | 智能变电站全站软压板投退状态校验系统及方法 |
CN105184189A (zh) * | 2015-08-26 | 2015-12-23 | 国家电网公司 | 智能变电站scd文件在线管控系统 |
CN105184189B (zh) * | 2015-08-26 | 2018-05-04 | 国家电网公司 | 智能变电站scd文件在线管控系统 |
CN105866567A (zh) * | 2016-03-24 | 2016-08-17 | 南京能云电力科技有限公司 | 一种基于基础模板技术的继电保护装置自动测试系统 |
CN106294750A (zh) * | 2016-08-10 | 2017-01-04 | 国家电网公司 | Icd模型文件家族性缺陷升级系统及方法 |
CN106294750B (zh) * | 2016-08-10 | 2019-08-06 | 国家电网公司 | Icd模型文件家族性缺陷升级系统及方法 |
CN106528722A (zh) * | 2016-10-26 | 2017-03-22 | 南京能云电力科技有限公司 | 智能电子装置设备数据模型的一致性测试方法及系统 |
CN107562950B (zh) * | 2017-09-28 | 2023-05-12 | 广东电网有限责任公司电力调度控制中心 | 基于icd文件的保护装置断面数据文件形成方法和系统 |
CN107562950A (zh) * | 2017-09-28 | 2018-01-09 | 广东电网有限责任公司电力调度控制中心 | 基于icd文件的保护装置断面数据文件形成方法和系统 |
CN108595390A (zh) * | 2018-04-25 | 2018-09-28 | 国网安徽省电力有限公司亳州供电公司 | 智能变电站scd与ied参数一致性的校验方法 |
CN108595390B (zh) * | 2018-04-25 | 2020-02-11 | 国网安徽省电力有限公司亳州供电公司 | 智能变电站scd与ied参数一致性的校验方法 |
CN110298585A (zh) * | 2019-06-28 | 2019-10-01 | 云南电网有限责任公司昭通供电局 | 一种变电站设备监控信息分层分级自动审核方法 |
CN110298585B (zh) * | 2019-06-28 | 2024-01-26 | 云南电网有限责任公司昭通供电局 | 一种变电站设备监控信息分层分级自动审核方法 |
CN111143296A (zh) * | 2019-11-22 | 2020-05-12 | 贵州电网有限责任公司 | 变电站scd文件分类方法、装置、终端及存储介质 |
CN113612638A (zh) * | 2021-07-30 | 2021-11-05 | 成都交大许继电气有限责任公司 | 一种基于虚拟多ied转发的集控数据传输系统及方法 |
CN116738496A (zh) * | 2023-02-06 | 2023-09-12 | 中国电力科学研究院有限公司 | 一种变电站继电保护装置icd模型的校核方法及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103268325A (zh) | 基于scd文件的智能变电站ied模型配置正确性动态校核方法 | |
CN110147411B (zh) | 数据同步方法、装置、计算机设备及存储介质 | |
CN106951694B (zh) | 一种电力系统二次设备在线监测系统自适应建模方法 | |
CN102981501B (zh) | 一种基于xml的汽车ecu故障诊断信息匹配方法 | |
KR101574524B1 (ko) | Iec61850와 opc ua 간의 상호 호환 방법 및 그 기록 매체 | |
US20120099478A1 (en) | Method and Device for Auto-Generating Goose Signal Connection Topology from Substation Level | |
CN103473108A (zh) | 一种Java代码生成方法 | |
CN102043719A (zh) | 一种对iec61850配置描述文件进行测试的方法 | |
WO2005088473A1 (en) | Apparatus and method for data consistency validation | |
CN108595390B (zh) | 智能变电站scd与ied参数一致性的校验方法 | |
CN104851056A (zh) | 智能变电站二次系统信息模型标准库管理系统及管理方法 | |
CN113792008B (zh) | 网络拓扑结构的获取方法、装置、电子设备及存储介质 | |
CN110413465A (zh) | 一种基于信息交互总线的信息一致性测试方法、系统和验证服务器 | |
CN112287648A (zh) | 一种基于scd的变电站监控系统数据点表生成与同步方法 | |
CN102340429B (zh) | 一种互联网协议还原自动化检测方法 | |
CN102930111A (zh) | 变电站scd模型文件的生成方法及装置 | |
CN105404757A (zh) | 一种智能变电站scd文件标准化程度的校验方法 | |
CN105488293B (zh) | 一种配置scd中虚端子连线的方法及系统 | |
US20180262589A1 (en) | Control system with persistent and transient data stores for registration, production and status data for networked devices | |
CN111078213A (zh) | 一种代码生成方法及代码生成装置 | |
CN116431299B (zh) | 一种CTyunOS操作系统的迁移评估方法及系统 | |
Jang et al. | IEC 61850 SCL validation using UML model in modern digital substation | |
KR20220010294A (ko) | 규칙 기반의 opc ua 노드 생성 시스템 및 방법 | |
CN112230929B (zh) | 一种cim模型的数据解析方法、装置及存储介质 | |
KR20180037487A (ko) | Real World의 Node와 Cyber World Node를 OPC UA Node와 동일하게 모델링하여 OPC UA Server를 CPS서버로 활용하는 방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130828 |
|
RJ01 | Rejection of invention patent application after publication |