CN103267904A - Phase checking method in process of cable installation - Google Patents

Phase checking method in process of cable installation Download PDF

Info

Publication number
CN103267904A
CN103267904A CN2013101513077A CN201310151307A CN103267904A CN 103267904 A CN103267904 A CN 103267904A CN 2013101513077 A CN2013101513077 A CN 2013101513077A CN 201310151307 A CN201310151307 A CN 201310151307A CN 103267904 A CN103267904 A CN 103267904A
Authority
CN
China
Prior art keywords
cable
phase
knob
nuclear
end side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101513077A
Other languages
Chinese (zh)
Other versions
CN103267904B (en
Inventor
刘畅
齐昕
都志军
刘荣浩
沈宾
刘丽瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tianjin Electric Power Corp
Original Assignee
State Grid Corp of China SGCC
Tianjin Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tianjin Electric Power Corp filed Critical State Grid Corp of China SGCC
Priority to CN201310151307.7A priority Critical patent/CN103267904B/en
Publication of CN103267904A publication Critical patent/CN103267904A/en
Application granted granted Critical
Publication of CN103267904B publication Critical patent/CN103267904B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a phase checking method in the process of cable installation. The phase checking method in the process of the cable installation comprises the steps that both sides firstly turn on work beginning warning lights on control boards of auxiliary devices, and the warning lights of the both sides are mutually light; the process that an A phase cable begins to be detected right now is confirmed; the fact that grounding is finished is told to workers on a near-end side; the near-end side tells a far-end side that grounding of a tramegger is finished; the far-end side tells the near-end side that operation can be begun; the near-end side firstly screws and twists a pressurizing knob corresponding to phase checking states and then begins to pressurize a cable. When phase is checked, a copper shielding layer of the cable is used as a communication medium of the workers at two ends of the cable, due to the fact that the workers work at the two ends of the cable, whether wireless communication signals exist or not, the cable shielding layer certainly can be connected with the two ends of the cable and used as the communication medium, and therefore the phenomena that errors easily occur due to the fact information is told step-by-step, if one worker does not understand the information or express the information clearly, tells the wrong information, the working errors can be caused, and even dangers are brought to the workers are avoided.

Description

Nuclear-phase method when a kind of cable is installed
Technical field
The invention belongs to the power construction technical field, check phase sequence, nuclear-phase method when especially a kind of cable is installed when relating to power cable and installing.
Background technology
Electric system is three-phase AC electrical supply system, and a fixing phase differential is arranged between its three-phase when normally moving, and three-phase current has fixing sequencing, and the people is for after providing phase sequence, and being electrically connected of all devices all must be according to this order.The effect of cable line in electric system is that the electrical equipment with certain part two ends in the system couples together, this just requires the phase place of the terminal device that cable line whenever is connected identical, for example the electrical equipment at A phase cable connection two ends also must be the A phase, if A phase cable near-end connects the A phase, what far-end connected is B phase equipment, is setup error.If threephase cable phase sequence setup error, can cause its corresponding low-pressure side phase sequence of when operation energising mistake too, might cause the motor counter-rotating when causing low pressure side joint threephase motor, also can cause when this part equipment and other charging equipments side by side or during cyclization, produce very big electric current, huge electric current can cause electrical equipment to damage, even blast causes personal injury.It is very important checking phase sequence when therefore, cable is installed.
The resistance to earth method is the most traditional nuclear-phase method, and operation steps is: 1, cable near-end personnel prepare to survey A resistance relatively with megger, inform the far-end staff with mobile phone or intercom; 2, the far-end personnel inform that the near-end personnel can begin operation, and personnel are away from cable end with a certain phase cable grounding; 3, the near-end personnel test A resistance relatively with megger: if resistance to earth is 0, determine that then the cable of opposite end ground connection is the A phase, at this moment stop test, and inform that the opposite end has stopped test, the opposite end phase sequence is correct, the far-end personnel make marks A phase cable; If resistance to earth is very big, not the A phase then, and inform that the opposite end has stopped test, opposite end phase sequence mistake that the far-end personnel are earlier this discharge of phase cable, wireline test of gravity treatment again.
Whole wireline test process need cable two ends staff links up at any time, and communication mode is mainly mobile phone or intercom, and the other side informed in staff's language.Yet along with the development of modern city, high building stands in great numbers, and cable machinery mainly all is placed in the basement of skyscraper at present, when airtight basement is installed, does not have wireless communication signals usually, and mobile phone can't use.The a plurality of intercoms of general use are as intermediate link now, and middle a plurality of staff pass on step by step, could realize that the staff at cable two ends communicates by letter mutually.The defective of doing like this is: 1, passing on step by step occurs mistake easily, if intermediate link has a staff to understand unclear or expresses unclearly, error understanding or pass on can cause the mistake in the work, even bring danger can for other staff.2, pass on step by step and reduce work efficiency greatly, lengthen working hours.3, the labor cost of finishing a job can increase, especially long apart from the time because the intercom speech range is limited, more to increase manpower.
Summary of the invention
The objective of the invention is to overcome the weak point of original technology, nuclear-phase method when providing a kind of cable to install, check phase sequence work in the time of can realizing cable installed and play effective help, help staff's efficient communication at cable two ends, confirm the other side's duty with the way of acousto-optic hint mutually.
The technical scheme that technical solution problem of the present invention adopts is:
Nuclear-phase method when a kind of cable is installed, step is:
⑴ both sides earlier begin the work on the console panel of servicing unit warning light and beat brightly, and both sides' warning light is bright mutually;
⑵ both sides' A phase relay indicating light knob of console panel separately open, and by opening A earlier in near-end side, far end party is also opened A after receiving signal.Confirm to begin now setup test A phase cable;
⑶ far end party is screwed nuclear phase state respective knob with a certain phase cable grounding, informs that near-end side's personnel's ground connection finishes;
⑷ near-end side at A phase cable, connects the megger wiring, screws nuclear phase state respective knob, informs that the wiring of far end party megger finishes;
⑸ far end party is withdrawn safe distance to, screws nuclear phase state respective knob, informs that near-end side can begin operation;
⑹ the corresponding pressurization knob of nuclear phase state is screwed earlier in near-end side, begins the cable pressurization is begun to take place following situation:
Situation 1: if resistance to earth is 0, determine that then the cable of far end party ground connection is the A phase, at this moment stop pressurization, screw the correct knob of phase sequence of nuclear phase state, and screw nuclear phase state respective knob, inform that far end party has stopped pressurization; Far end party is discharged cable, and this phase cable is done A phase mark, screws the nuclear phase state phase nuclear phase button that finishes;
Situation 2: if resistance to earth is very big, determine that then the cable of far end party ground connection is not the A phase, at this moment stop pressurization, screw nuclear phase state phase sequence mistake knob, and screw and stop pressurizing button; " far end party is changed a phase cable again to this cable discharge, repeats above-mentioned steps, proceeds A phase cable nuclear phase, up to finding A phase cable.
⑺ repeat above-mentioned steps, carries out B phase cable nuclear phase.
And, panel, machine plate are set on the described servicing unit, panel is provided with power switch, loudspeaker, our console panel, the other side's console panel and nuclear phase state set of knobs, electric wave carrier and power supply are installed on the machine plate, servicing unit adopts plug-in inductive coupler and cable under test socket by high frequency cable, this servicing unit uses the screen layer of cable under test as communication media, utilizes the electric wave carrier load signal to communicate.
And, described nuclear phase state set of knobs comprises eight knobs, is respectively: cable grounding the finish knob, personnel of knob, megger wiring that finish withdraws that safe distance knob, pressurization beginning knob, the correct knob of phase sequence, phase sequence mistake knob, pressurization stop knob, knob is finished in discharge to.
Advantage of the present invention and good effect are:
1, the present invention is when nuclear phase, utilize the copper shield of cable itself as cable two ends staff's telecommunication media, owing to be to work at the cable two ends, no matter have or not wireless communication signals, cable shield can serve as communication media in the stube cable two ends certainly, and avoiding passing on step by step occurs mistake easily, if intermediate link has a staff to understand unclear or represents unclear, mistake is pass on, and can cause the mistake in the work, even can bring danger to the staff.
The problem that intercoms mutually when 2, the invention solves the traditional cable nuclear phase and exist, no matter reach which kind of external condition, can both allow staff's direct communication at cable two ends, do not need intermediate link to pass on, and make cable two ends personnel can both see the instant duty that the opposite end personnel are present, show with sound and light signal, accomplish effective prompting, in order to avoid make mistakes.
Description of drawings
Fig. 1 is the panel construction synoptic diagram of servicing unit of the present invention;
Fig. 2 is principle of work synoptic diagram of the present invention.
Embodiment:
For further understanding content of the present invention, characteristics and effect, exemplify following examples now, and conjunction with figs. is described in detail as follows.Need to prove that present embodiment is descriptive, is not determinate, can not limit protection scope of the present invention thus.
At first narrate nuclear phase servicing unit when cable of the present invention is installed, this servicing unit arranges panel 2, machine plate 7, panel is provided with power switch 6, loudspeaker 1, our console panel 3, the other side's console panel 5 and nuclear phase state set of knobs 4, electric wave carrier and power supply are installed on the machine plate, servicing unit adopts plug-in inductive coupler 9 and cable under test 10 sockets by high frequency cable 8, and concrete structure is referring to Fig. 1,2.This servicing unit uses the screen layer of cable under test as communication media, utilize the electric wave carrier load signal to communicate, the upper strata connects a servicing unit that overlaps when checking the cable phase sequence, the staff at cable two ends respectively holds a cover respectively, plays mutually the effect that intercoms, informs the other side's duty.Described nuclear phase state set of knobs comprises eight knobs, is respectively: cable grounding the finish knob, personnel of knob, megger wiring that finish withdraws that safe distance knob, pressurization beginning knob, the correct knob of phase sequence, phase sequence mistake knob, pressurization stop knob, knob is finished in discharge to.
This servicing unit is two that are complementary, and uses for respectively the staff at cable two ends.
The near-end staff is responsible for the distant cable of megger, and the opposite end staff is responsible for cable grounding; The A that indicates on each side's console panel, B, C indicate the three-phase of cable, and three letter belows are corresponding LED light, and respectively corresponding yellow, green, red led.
Nuclear-phase method when a kind of cable is installed, step is:
1, both sides earlier begin the work on the console panel warning light and beat brightly, and both sides' warning light is bright mutually;
2, both sides will be separately the A phase relay indicating light knob of console panel open, by opening A earlier in near-end side, far end party is also opened A after receiving signal.Confirm to begin now setup test A phase cable;
3, far end party is screwed nuclear phase state respective knob with a certain phase cable grounding, informs that near-end side's personnel's ground connection finishes;
4, near-end side at A phase cable, connects the megger wiring, screws nuclear phase state respective knob, informs that the wiring of far end party megger finishes;
5, far end party is withdrawn safe distance to, screws nuclear phase state respective knob, informs that near-end side can begin operation;
6, the corresponding pressurization knob of nuclear phase state is screwed earlier in near-end side, begins the cable pressurization is begun to take place following situation:
Situation 1: if resistance to earth is 0, determine that then the cable of far end party ground connection is the A phase, at this moment stop pressurization, screw the correct knob of phase sequence of nuclear phase state, and screw nuclear phase state respective knob, inform that far end party has stopped pressurization; Far end party is discharged cable, and this phase cable is done A phase mark, screws the nuclear phase state phase nuclear phase button that finishes;
Situation 2: if resistance to earth is very big, determine that then the cable of far end party ground connection is not the A phase, at this moment stop pressurization, screw nuclear phase state phase sequence mistake knob, and screw and stop pressurizing button; " far end party is changed a phase cable again to this cable discharge, repeats above-mentioned steps, proceeds A phase cable nuclear phase, up to finding A phase cable.
Repeat above-mentioned steps, carry out B phase cable nuclear phase.
Do not select that the copper core is because need it to do electric test in the cable, and when making electric test, because the frequency of carrier communication apparatus is selected, do not influence the use of screen layer.

Claims (3)

1. nuclear-phase method when a cable is installed, it is characterized in that: step is:
⑴ both sides earlier begin the work on the console panel of servicing unit warning light and beat brightly, and both sides' warning light is bright mutually;
⑵ both sides' A phase relay indicating light knob of console panel separately open, and by opening A earlier in near-end side, far end party is also opened A after receiving signal, confirm to begin now setup test A phase cable;
⑶ far end party is screwed nuclear phase state respective knob with a certain phase cable grounding, informs that near-end side's personnel's ground connection finishes;
⑷ near-end side at A phase cable, connects the megger wiring, screws nuclear phase state respective knob, informs that the wiring of far end party megger finishes;
⑸ far end party is withdrawn safe distance to, screws nuclear phase state respective knob, informs that near-end side can begin operation;
⑹ the corresponding pressurization knob of nuclear phase state is screwed earlier in near-end side, begins the cable pressurization is begun to take place following situation:
Situation 1: if resistance to earth is 0, determine that then the cable of far end party ground connection is the A phase, at this moment stop pressurization, screw the correct knob of phase sequence of nuclear phase state, and screw nuclear phase state respective knob, inform that far end party has stopped pressurization; Far end party is discharged cable, and this phase cable is done A phase mark, screws the nuclear phase state phase nuclear phase button that finishes;
Situation 2: if resistance to earth is very big, determine that then the cable of far end party ground connection is not the A phase, at this moment stop pressurization, screw nuclear phase state phase sequence mistake knob, and screw and stop pressurizing button; " far end party is changed a phase cable again to this cable discharge, repeats above-mentioned steps, proceeds A phase cable nuclear phase, up to finding A phase cable.
⑺ repeat above-mentioned steps, carries out B phase cable nuclear phase.
2. nuclear-phase method when cable according to claim 1 is installed, it is characterized in that: panel, machine plate are set on the described servicing unit, panel is provided with power switch, loudspeaker, our console panel, the other side's console panel and nuclear phase state set of knobs, electric wave carrier and power supply are installed on the machine plate, servicing unit adopts plug-in inductive coupler and cable under test socket by high frequency cable, this servicing unit uses the screen layer of cable under test as communication media, utilizes the electric wave carrier load signal to communicate.
3. nuclear-phase method when cable according to claim 1 is installed, it is characterized in that: described nuclear phase state set of knobs comprises eight knobs, is respectively: cable grounding the finish knob, personnel of knob, megger wiring that finish withdraws that safe distance knob, pressurization beginning knob, the correct knob of phase sequence, phase sequence mistake knob, pressurization stop knob, knob is finished in discharge to.
CN201310151307.7A 2013-04-27 2013-04-27 Nuclear-phase method when a kind of cable is installed Active CN103267904B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310151307.7A CN103267904B (en) 2013-04-27 2013-04-27 Nuclear-phase method when a kind of cable is installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310151307.7A CN103267904B (en) 2013-04-27 2013-04-27 Nuclear-phase method when a kind of cable is installed

Publications (2)

Publication Number Publication Date
CN103267904A true CN103267904A (en) 2013-08-28
CN103267904B CN103267904B (en) 2015-08-05

Family

ID=49011543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310151307.7A Active CN103267904B (en) 2013-04-27 2013-04-27 Nuclear-phase method when a kind of cable is installed

Country Status (1)

Country Link
CN (1) CN103267904B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104569629A (en) * 2015-02-03 2015-04-29 孙超 Phase sequence tester of low-voltage cables
CN106226608A (en) * 2016-08-02 2016-12-14 国家电网公司 A kind of cable phase sequence determinator
CN107831376A (en) * 2017-12-06 2018-03-23 国网宁夏电力有限公司宁东供电公司 Intelligent nuclear phase meter and Intelligent nuclear phase method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08248083A (en) * 1995-03-13 1996-09-27 Toshiba Corp Three phase main circuit testing apparatus
JP2938053B1 (en) * 1998-07-30 1999-08-23 西日本電気システム株式会社 Cable check device and cable checker
CN2916644Y (en) * 2006-07-13 2007-06-27 江苏省电力公司苏州供电公司 Intelligent nuclear phase instrument
CN201532437U (en) * 2009-11-13 2010-07-21 徐天锡 Cable number checking and phase checking device
CN101937028A (en) * 2009-06-30 2011-01-05 武汉思威科技投资有限公司 Wireless nuclear phase instrument

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08248083A (en) * 1995-03-13 1996-09-27 Toshiba Corp Three phase main circuit testing apparatus
JP2938053B1 (en) * 1998-07-30 1999-08-23 西日本電気システム株式会社 Cable check device and cable checker
CN2916644Y (en) * 2006-07-13 2007-06-27 江苏省电力公司苏州供电公司 Intelligent nuclear phase instrument
CN101937028A (en) * 2009-06-30 2011-01-05 武汉思威科技投资有限公司 Wireless nuclear phase instrument
CN201532437U (en) * 2009-11-13 2010-07-21 徐天锡 Cable number checking and phase checking device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104569629A (en) * 2015-02-03 2015-04-29 孙超 Phase sequence tester of low-voltage cables
CN106226608A (en) * 2016-08-02 2016-12-14 国家电网公司 A kind of cable phase sequence determinator
CN107831376A (en) * 2017-12-06 2018-03-23 国网宁夏电力有限公司宁东供电公司 Intelligent nuclear phase meter and Intelligent nuclear phase method

Also Published As

Publication number Publication date
CN103267904B (en) 2015-08-05

Similar Documents

Publication Publication Date Title
CN103269035B (en) Nuclear phase assisting device when a kind of cable is installed
CN102998520B (en) Digital display high-voltage electroscope of telescopic rod
CN108808556A (en) A kind of electrical verification for power distribution line maintenance is grounded integrated apparatus
CN103267904B (en) Nuclear-phase method when a kind of cable is installed
CN103884924A (en) Low-voltage cable nuclear phase device
CN103969474B (en) Measurement sensor fastening device is put in multi-purpose rapid GIS office
CN104865471B (en) Low-voltage electric cable pair verifies instrument
CN204597008U (en) A kind of anti-virtual connection current testing binding post
CN108152779A (en) Electronic current mutual inductor check system and method
CN102723675A (en) Instrument box wiring fixture
CN104716596A (en) Movement debugging trolley for electrical equipment
CN102064896A (en) 2M communication channel loopback detection method
CN205374516U (en) But extra -high voltage owner becomes single -point running ground device for partial discharge test
CN204989315U (en) Threephase cable phase place checking apparatus
CN103197127A (en) Grounding step voltage detecting method and grounding step voltage detecting device of high-voltage equipment of switch gear room of converting station
CN204156252U (en) A kind of PDU unit for network cabinet
CN210378035U (en) Electrician and electronic wiring training device
CN202563012U (en) Large-scale power station grounding net impedance parameter measuring device
CN209471149U (en) A kind of auxiliary connection device of high-voltage inverter test macro
CN203164278U (en) Transformer substation switch chamber high-voltage equipment grounding step voltage detecting device
CN201937599U (en) Loopback inspecting device for 2M communication passage
CN104590087A (en) Electric power engineering start-up debugging car
CN203870201U (en) Gis equipment test device
CN205301429U (en) Intelligent substation presses and becomes automatic nuclear phase ware of secondary
CN105277847A (en) Fault positioning system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant