CN103266620A - 输电线路经煤矸石区域杆塔的组立方法 - Google Patents

输电线路经煤矸石区域杆塔的组立方法 Download PDF

Info

Publication number
CN103266620A
CN103266620A CN201310181607XA CN201310181607A CN103266620A CN 103266620 A CN103266620 A CN 103266620A CN 201310181607X A CN201310181607X A CN 201310181607XA CN 201310181607 A CN201310181607 A CN 201310181607A CN 103266620 A CN103266620 A CN 103266620A
Authority
CN
China
Prior art keywords
gangue
tower
transmission line
shaft tower
transmission lines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310181607XA
Other languages
English (en)
Other versions
CN103266620B (zh
Inventor
张大霖
李险峰
孙洪新
李萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Fushun Power Supply Co of Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Fushun Power Supply Co of Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Fushun Power Supply Co of Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310181607.XA priority Critical patent/CN103266620B/zh
Publication of CN103266620A publication Critical patent/CN103266620A/zh
Application granted granted Critical
Publication of CN103266620B publication Critical patent/CN103266620B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明涉及一种输电线路经煤矸石区域杆塔的组立方法,包括如下步骤,采用架空方式架设输电线路;输电线路经由堆填区时,杆塔基础采用将基础垫层及柱头用连接梁进行连接的联合式台阶基础,同时砌筑护坡及挡土墙;杆塔接地采取土壤更换粉质粘土夯实及SDF-I型石墨接地模块接地。本发明路径合理、工期短、投资少、运行维护方便,填补了煤矸石区域地质条件下架设杆塔的空白,为今后在煤矸石、油母页岩、强风化岩等地质条件下组立砼杆、通信杆、跨越架、环网柜、箱变甚至于新建变电站提供技术支撑奠定坚实的基础。

Description

输电线路经煤矸石区域杆塔的组立方法
技术领域
本发明涉及一种输电线路的架设方法,尤其涉及一种输电线路经煤矸石区域杆塔的组立方法。
背景技术
煤矸石的主要化学成分为SiO2、Al2O2。在Ca(OH) 2溶液中发生火山灰反应,生成水化硅酸钙和水化铝酸钙凝胶,煤矸石随水化物不断产生而结晶硬化。同时分析稳定煤矸石混合料抗冻性能的影响得知,煤矸石经数次冻融后发生水化反映,其质量会不断增加。煤矸石长期堆存,占用大量土地,且风化分解产生大量粉尘酸性水。携带有重金属的离子水。会污染大气、地面水源或下渗损害地下水质。同时堆填区由于其硫铁矿物和碳物质的存在而发生自燃。大量的有毒气体的释放严重污染环境,给生态造成破坏。
输电线路经过以煤矸石为主的区域时,由于这种区域为堆填区域,地质情况不稳定,同时基础土壤上层滞水及孔隙潜水还可能造成煤矸石经涨冻产生不均匀沉降;导致在新建变电站的过程中,如何铺设输电线路和组立杆塔造成了很大的困扰。
发明内容
本发明针对上述现有技术中存在的问题,提供了一种输电线路经煤矸石区域杆塔的组立方法,解决了现有技术中在煤矸石区域铺设输电线路和组立杆塔存在很大困扰的问题。
本发明的技术方案包括如下步骤:
步骤1,采用架空方式架设输电线路;
步骤2,输电线路经由堆填区时,杆塔基础采用将基础垫层及柱头用连接梁进行连接的联合式台阶基础,同时砌筑护坡及挡土墙;
步骤3,杆塔接地采取土壤更换粉质粘土夯实及SDF-I型石墨接地模块接地。
所述的步骤2中,杆塔基础采用模板浇制,成型后再回填土。
所述的步骤2中,挡土墙内填料灌浆采用的砂浆水灰物填充10%煤矸石,同时为保证挡土墙基础不受煤矸石冻涨影响变形,将挡土墙埋深至过冻土层。
所述的步骤3中,每基杆塔主材采用Q420高强钢,用Φ12圆钢单独接地,与杆塔连接部分采用50×4扁钢,接地圆钢外露部分及50×4扁钢均热镀锌。
本发明的优点效果如下:
1、基础选用台阶式基础,可以抵消基础土壤不是原状土的基础上拔力。基础垫层及柱头进行连接的联合式台阶基础,避免基础岩石在受冻涨后可能发生的不均匀沉降。
2、采用模板浇制,成型后再回填土,利用土体与混凝土重量抗拔,基础底板抗压。由于本工程线路经由堆填区,开挖量产生大量弃土可以直接倾倒在周边地区,大大降低了环保费用,以减少土石量,降低造价。
3、杆塔接地采取土壤更换粉质粘土夯实及SDF-I型石墨接地模块接地等步骤,解决了基础土壤上层滞水及孔隙潜水可能造成煤矸石经涨冻产生不均匀沉降的问题。
4、路径合理、工期短、投资少、运行维护方便,填补了煤矸石区域地质条件下架设杆塔的空白,为今后在煤矸石、油母页岩、强风化岩等地质条件下组立砼杆、通信杆、跨越架、环网柜、箱变甚至于新建变电站提供技术支撑奠定坚实的基础。
附图说明
图1为在本发明联合式台阶基础的应用示意图。
图中,1、连接梁,2、柱头。
具体实施方式
以下参照附图,结合具体实施例,详细描述本发明。
实施例
步骤1,采用架空方式架设输电线路。
步骤2,输电线路经由堆填区时,杆塔基础采用模板浇制,成型后再回填土;杆塔基础采用将基础垫层及柱头用连接梁进行连接的联合式台阶基础,同时砌筑护坡及挡土墙;挡土墙内填料灌浆采用的砂浆水灰物填充10%煤矸石,同时为保证挡土墙基础不受煤矸石冻涨影响变形,将挡土墙埋深至过冻土层。
步骤3,杆塔接地采取土壤更换粉质粘土夯实及SDF-I型石墨接地模块接地;每基杆塔主材采用Q420高强钢,用Φ12圆钢单独接地,与杆塔连接部分采用50×4扁钢,接地圆钢外露部分及50×4扁钢均热镀锌,确保在雷季干燥时每基杆塔的工频接地电阻值不大于表1所示电阻值。
本发明试验后,设备基础、挡土墙等土建设施没有因为冻涨发生变形或不均匀沉降。杆塔接地电阻、线路盐密、灰密等均满足运行要求。
 表1
Figure 201310181607X100002DEST_PATH_IMAGE002AA

Claims (4)

1.输电线路经煤矸石区域杆塔的组立方法,其特征在于包括如下步骤:
步骤1,采用架空方式架设输电线路;
步骤2,输电线路经由堆填区时,杆塔基础采用将基础垫层及柱头用连接梁进行连接的联合式台阶基础,同时砌筑护坡及挡土墙;
步骤3,杆塔接地采取土壤更换粉质粘土夯实及SDF-I型石墨接地模块接地。
2.根据权利要求1所述的输电线路经煤矸石区域杆塔的组立方法,其特征在于所述的步骤2中,杆塔基础采用模板浇制,成型后再回填土。
3.根据权利要求1或2所述的输电线路经煤矸石区域杆塔的组立方法,其特征在于所述的步骤2中,挡土墙内填料灌浆采用的砂浆水灰物填充10%煤矸石,同时为保证挡土墙基础不受煤矸石冻涨影响变形,将挡土墙埋深至过冻土层。
4.根据权利要求1所述的输电线路经煤矸石区域杆塔的组立方法,其特征在于所述的步骤3中,每基杆塔主材采用Q420高强钢,用Φ12圆钢单独接地,与杆塔连接部分采用50×4扁钢,接地圆钢外露部分及50×4扁钢均热镀锌。
CN201310181607.XA 2013-05-16 2013-05-16 输电线路经煤矸石区域杆塔的组立方法 Active CN103266620B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310181607.XA CN103266620B (zh) 2013-05-16 2013-05-16 输电线路经煤矸石区域杆塔的组立方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310181607.XA CN103266620B (zh) 2013-05-16 2013-05-16 输电线路经煤矸石区域杆塔的组立方法

Publications (2)

Publication Number Publication Date
CN103266620A true CN103266620A (zh) 2013-08-28
CN103266620B CN103266620B (zh) 2015-09-16

Family

ID=49010274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310181607.XA Active CN103266620B (zh) 2013-05-16 2013-05-16 输电线路经煤矸石区域杆塔的组立方法

Country Status (1)

Country Link
CN (1) CN103266620B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2304665C1 (ru) * 2006-02-06 2007-08-20 Юрий Робертович Гунгер Железобетонный фундамент для опор воздушных линий электропередачи (варианты)
CN101349063A (zh) * 2008-08-21 2009-01-21 孟庆波 架空送电线路强风化岩层缠绕锚杆的铁塔基础
CN201347560Y (zh) * 2009-01-09 2009-11-18 中国矿业大学 一种煤矿塌陷区输电杆塔复合板基础
CN102720223A (zh) * 2011-03-31 2012-10-10 上海宝冶集团有限公司 输电线路杆塔基础加固方法
CN102828525A (zh) * 2012-08-16 2012-12-19 国核电力规划设计研究院 输电线路杆塔的基础结构

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2304665C1 (ru) * 2006-02-06 2007-08-20 Юрий Робертович Гунгер Железобетонный фундамент для опор воздушных линий электропередачи (варианты)
CN101349063A (zh) * 2008-08-21 2009-01-21 孟庆波 架空送电线路强风化岩层缠绕锚杆的铁塔基础
CN201347560Y (zh) * 2009-01-09 2009-11-18 中国矿业大学 一种煤矿塌陷区输电杆塔复合板基础
CN102720223A (zh) * 2011-03-31 2012-10-10 上海宝冶集团有限公司 输电线路杆塔基础加固方法
CN102828525A (zh) * 2012-08-16 2012-12-19 国核电力规划设计研究院 输电线路杆塔的基础结构

Also Published As

Publication number Publication date
CN103266620B (zh) 2015-09-16

Similar Documents

Publication Publication Date Title
CN102146679B (zh) 复杂地质地段土压平衡盾构通过中间风井施工方法
CN106242422A (zh) 肥槽回填用自密实水泥土浆液
CN101509261B (zh) 一种用于软弱地基上超高压输电线铁塔的桩板基础的施工方法
CN102561384A (zh) 钢抱箍桁架式高桩承台塔吊基础的施工方法及结构
CN113343417A (zh) 一种基于采动地表裂缝的含隔水层及表土层再造修复方法
CN103334452A (zh) 一种地下工程混合施工法
CN202519697U (zh) 钢抱箍桁架式高桩承台塔吊基础结构
Orense et al. Ground performance in Wellington waterfront area following the 2016 Kaikōura earthquake
CN103266620B (zh) 输电线路经煤矸石区域杆塔的组立方法
CN209194466U (zh) 一种水库库岸防渗结构
CN215857732U (zh) 一种潜水砂卵石地层基坑封底结构
CN104420479A (zh) 光伏组件支架带混凝土块的锚杆基础结构及设置方法
CN102953367A (zh) 盐渍土地基处理方法
CN202595755U (zh) 一种窄基输电塔筏板基础结构
CN203247604U (zh) 港口工程抛石基床与水下不分散混凝土混合的复合基础
CN201738340U (zh) 新型地下止水结构
CN104963427A (zh) 一种日光温室墙体及其制备方法
CN104967392A (zh) 一种建造在粉煤灰场地上的光伏电站
CN110106930A (zh) 一种新型铁塔基础加固保护方法
CN205259207U (zh) 箱式变压器的基础结构
Kaplan ARCHAEOLOGICAL IMPACT ASSESSMENT THE PROPOSED WHITEBANK KEREN ENERGY SOLAR PLANT ON FARM 379 NEAR KURUMAN NORTHERN CAPE PROVINCE
Lina et al. Research on the slope support technology in civil engineering construction
CN219621795U (zh) 一种利用工程渣土修复废弃矿山的重建结构
CN202390847U (zh) 盐湖地区桥梁基础混凝土防腐蚀结构
Xu et al. Geotechnical analysis of building foundation in beihai sand dam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant