CN103247431A - 一种电力变压器高压引线固定装置 - Google Patents

一种电力变压器高压引线固定装置 Download PDF

Info

Publication number
CN103247431A
CN103247431A CN2013102104655A CN201310210465A CN103247431A CN 103247431 A CN103247431 A CN 103247431A CN 2013102104655 A CN2013102104655 A CN 2013102104655A CN 201310210465 A CN201310210465 A CN 201310210465A CN 103247431 A CN103247431 A CN 103247431A
Authority
CN
China
Prior art keywords
electrician
wood clamp
iron support
wood
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102104655A
Other languages
English (en)
Other versions
CN103247431B (zh
Inventor
肖健
黄世付
张维东
张家跃
肖博文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changde Guoli Transformer Co Ltd
Original Assignee
Changde Guoli Transformer Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changde Guoli Transformer Co Ltd filed Critical Changde Guoli Transformer Co Ltd
Priority to CN201310210465.5A priority Critical patent/CN103247431B/zh
Publication of CN103247431A publication Critical patent/CN103247431A/zh
Application granted granted Critical
Publication of CN103247431B publication Critical patent/CN103247431B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Coils Of Transformers For General Uses (AREA)
  • Installation Of Indoor Wiring (AREA)

Abstract

一种电力变压器高压引线固定装置,它由电工木夹件和焊接在上铁芯夹件的2个铁支板组成,利用双头螺栓螺母将电工木夹件和铁支板连为一体。电工木夹件的一侧开有三组与三相高压引线及分接引线的位置和尺寸相对应的方槽和长槽,中部开有9个紧缩带穿孔,后部开有2个固定孔。它克服了目前一块开槽一块不开槽和三块绝缘纸块固定方式耗能费时、效率低、可能造成绕组或引线连接处断裂等缺陷,具有节能省材、工艺简单、整体美观的优点。

Description

一种电力变压器高压引线固定装置
技术领域
本发明属于电力变压器三相高压引线及分接引线的一种固定装置。
背景技术
目前,电力变压器三相高压引线及分接引线的固定一般采用以下两种方式:一是用两块电工木,一块按照引线的大小和尺寸开槽,另一块不开槽,利用螺栓螺母及垫圈夹持引线。其缺点是:①浪费了宝贵的电工木材,提高了成本;②费工时,降低了工作效率;③若电工木夹件过长,其中心还需胶木螺栓螺母固定。二是采用绝缘纸板按照引线的大小和尺寸开孔对引线进行平面二维固定,需要三块绝缘板单独使用。其不足是①轴向不能固定,呈自由状态,在运输或晃动时可能造成引线和绕组的连接处断裂;②绝缘纸板成本高,利用率低,加工复杂,每块固定板需数块绝缘纸板经过上胶粘接和热压完成,耗能;③要多用数个螺栓螺母垫圈。
发明内容
针对上述同类技术的缺点或不足,本发明的目的是提供一种效率高、效果好的电力变压器高压引线固定装置。
本发明的技术方案是:它由电工木夹件和铁支板组成,电工木夹件的一侧依照三相高压引线及分接引线的位置和尺寸各开有3个长槽和3个方槽,长槽和方槽的上方共开有9个紧缩带穿孔,电工木夹件的另一侧两端部各开有固定孔;铁支板依照电工木夹件两端位置焊接在上铁芯夹件上,铁支板中间开有紧固孔;2个双头螺栓螺母通过固定孔和紧固孔将电工木夹板和铁支板连为一体。
本发明的优点是:①结构简单,使用方便,绕组受力均匀;②节能省材,效率高;③简单适用,安全可靠;④生产成本降低,安装方便。
附图说明
图1为本发明的整体示意图;图中:1线圈,2引线,3副绝缘,4铁芯,5上铁芯夹件,6电工木夹件,7紧缩带,8铁支板;
图2为图1的侧面图;
图3为电工木夹件结构示意图;图中6.1长槽,6.2方槽,6.3紧缩带穿孔,6.4固定孔;
图4为图3的A-A剖视图;
图5为铁支板示意图,图中8.1紧固孔。
具体实施方式
现结合附图,对本发明的技术内容进行详尽描述。
本发明由电工木夹件6和铁支板8组成,电工木夹件6的一侧依照三相高压引线及分接线的位置和尺寸各开有3组长槽6.1和方槽6.2,3组长槽6.1和方槽6.2的上方共开有9个紧缩带穿孔6.3,电工木夹件6的另一侧两端部各开有固定孔6.4。2个铁支板8按照电工木夹件6两端相应位置焊接在上铁芯夹件5上,铁支板8中间开有紧固孔8.1。2个双头螺栓螺母通过固定孔6.4和紧固孔8.1将电工木夹板6和铁支板8连为一体。
实施时,先将高压引线及分接引线包上副绝缘3,再用紧缩带7缠绕;将缠绕后的高压引线及分接引线分别置于电工木夹件6的长槽6.1和方槽6.2中,并利用紧缩带穿孔6.3致使紧缩带7首尾死结相连;最后用双头螺栓螺母通过固定孔6.4和紧固孔8.1将电工木夹件6和铁支板8连为一体。

Claims (1)

1.一种电力变压器高压引线固定装置,它由电工木夹件(6)和铁支板(8)组成,其特征是:电工木夹件(6)的一侧依照三相高压引线及分接线的位置和尺寸各开有3组长槽(6.1)和方槽(6.2),3组长槽(6.1)和方槽(6.2)的上方共开有9个紧缩带穿孔(6.3),电工木夹件(6)的另一侧两端部各开有固定孔(6.4);2个铁支板(8)按照电工木夹件(6)两端相应位置焊接在上铁芯夹件(5)上,铁支板(8)中间开有紧固孔(8.1);2个双头螺栓螺母通过固定孔(6.4)和紧固孔(8.1)将电工木夹板(6)和铁支板(8)连为一体。
CN201310210465.5A 2013-05-31 2013-05-31 一种电力变压器高压引线固定装置 Active CN103247431B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310210465.5A CN103247431B (zh) 2013-05-31 2013-05-31 一种电力变压器高压引线固定装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310210465.5A CN103247431B (zh) 2013-05-31 2013-05-31 一种电力变压器高压引线固定装置

Publications (2)

Publication Number Publication Date
CN103247431A true CN103247431A (zh) 2013-08-14
CN103247431B CN103247431B (zh) 2015-07-22

Family

ID=48926892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310210465.5A Active CN103247431B (zh) 2013-05-31 2013-05-31 一种电力变压器高压引线固定装置

Country Status (1)

Country Link
CN (1) CN103247431B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016082195A1 (zh) * 2014-11-28 2016-06-02 特变电工股份有限公司 一种立体三角形变压器引线固定装置
CN108597835A (zh) * 2018-05-22 2018-09-28 苏州翰为电气科技有限公司 一种双开口磁路组合式铁心器身的制造方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201576541U (zh) * 2009-12-04 2010-09-08 安徽广润发电气设备有限公司 一种油浸式变压器高压引线结构
CN202172003U (zh) * 2011-07-27 2012-03-21 正泰电气股份有限公司 一种双分裂干式配电变压器高压引线结构
CN202332530U (zh) * 2011-11-22 2012-07-11 湖南雁能配电设备有限公司 变压器高压引线
CN202721012U (zh) * 2012-04-06 2013-02-06 广州华成电器股份有限公司 一种变压器分接引线支架
CN203312010U (zh) * 2013-05-31 2013-11-27 常德国力变压器有限公司 一种电力变压器高压引线固定装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201576541U (zh) * 2009-12-04 2010-09-08 安徽广润发电气设备有限公司 一种油浸式变压器高压引线结构
CN202172003U (zh) * 2011-07-27 2012-03-21 正泰电气股份有限公司 一种双分裂干式配电变压器高压引线结构
CN202332530U (zh) * 2011-11-22 2012-07-11 湖南雁能配电设备有限公司 变压器高压引线
CN202721012U (zh) * 2012-04-06 2013-02-06 广州华成电器股份有限公司 一种变压器分接引线支架
CN203312010U (zh) * 2013-05-31 2013-11-27 常德国力变压器有限公司 一种电力变压器高压引线固定装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016082195A1 (zh) * 2014-11-28 2016-06-02 特变电工股份有限公司 一种立体三角形变压器引线固定装置
CN108597835A (zh) * 2018-05-22 2018-09-28 苏州翰为电气科技有限公司 一种双开口磁路组合式铁心器身的制造方法

Also Published As

Publication number Publication date
CN103247431B (zh) 2015-07-22

Similar Documents

Publication Publication Date Title
CN203312010U (zh) 一种电力变压器高压引线固定装置
WO2017070986A1 (zh) 一种解决非晶合金变压器抗短路问题的自夹持结构
CN103632820A (zh) 一种有载调容变压器低压出线结构
CN103247431A (zh) 一种电力变压器高压引线固定装置
CN201859744U (zh) 油浸式电抗器的旁轭拉杆夹紧结构
CN201556525U (zh) 铁心旁柱撑紧装置
CN202513010U (zh) 一种电抗器结构
CN203706818U (zh) 一种有载调容变压器低压出线结构
CN204947130U (zh) 一种蓄电池连接线桩头
WO2016082195A1 (zh) 一种立体三角形变压器引线固定装置
CN204686713U (zh) 用于弧形段部件的定位夹具
CN203733583U (zh) 一种油浸式配电变压器高压引线的固定结构
CN206726925U (zh) 一种电源变压器装置
CN203070885U (zh) 一种变压器铁芯夹具
CN204632534U (zh) 一种立体卷铁心干式变压器铁心夹件的拉板结构及其铁心
CN202008917U (zh) 有载调压变压器高压分接线用夹板装置
CN201549325U (zh) 一种变压器用拉板结构
CN104183378A (zh) 一种线包品字形排列的三相变压器
CN109378209B (zh) 一种箔绕变压器线圈绕制时铜排的固定结构
CN203441576U (zh) 一种新型排气管固定结构
CN215069626U (zh) 一种变压器低压线圈引线铜排压紧工装结构
CN214254092U (zh) 一种增强抗短路能力的长圆配电变压器结构
CN203205210U (zh) 一种铁心电抗器用拉紧螺杆装配结构
CN203118737U (zh) 一种变压器引线夹持结构
CN206363866U (zh) 一种改进型变压器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Fixing device of high-voltage leads of power transformer

Effective date of registration: 20190709

Granted publication date: 20150722

Pledgee: Changde Finance Guarantee Co., Ltd.

Pledgor: Changde Guoli Transformer Co., Ltd.

Registration number: 2019430000063

PE01 Entry into force of the registration of the contract for pledge of patent right