CN103246939B - 基于安全稳定裕度的电网运行安全风险事件在线辨识方法 - Google Patents
基于安全稳定裕度的电网运行安全风险事件在线辨识方法 Download PDFInfo
- Publication number
- CN103246939B CN103246939B CN201310176767.5A CN201310176767A CN103246939B CN 103246939 B CN103246939 B CN 103246939B CN 201310176767 A CN201310176767 A CN 201310176767A CN 103246939 B CN103246939 B CN 103246939B
- Authority
- CN
- China
- Prior art keywords
- forecast failure
- probability
- risk
- security margin
- period
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310176767.5A CN103246939B (zh) | 2013-05-14 | 2013-05-14 | 基于安全稳定裕度的电网运行安全风险事件在线辨识方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310176767.5A CN103246939B (zh) | 2013-05-14 | 2013-05-14 | 基于安全稳定裕度的电网运行安全风险事件在线辨识方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103246939A CN103246939A (zh) | 2013-08-14 |
CN103246939B true CN103246939B (zh) | 2016-06-22 |
Family
ID=48926450
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310176767.5A Active CN103246939B (zh) | 2013-05-14 | 2013-05-14 | 基于安全稳定裕度的电网运行安全风险事件在线辨识方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103246939B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103488891B (zh) * | 2013-09-22 | 2017-01-18 | 国网电力科学研究院 | 基于风险的大电网安全稳定预防控制性能代价指标计算方法 |
CN105406458B (zh) * | 2014-08-28 | 2017-11-03 | 国家电网公司 | 一种风电汇集系统送电能力实用评估方法及装置 |
CN104200111A (zh) * | 2014-09-10 | 2014-12-10 | 国网浙江余姚市供电公司 | 一种可靠性检测方法及装置 |
CN105141029B (zh) * | 2015-06-19 | 2017-08-22 | 国电南瑞科技股份有限公司 | 电力系统安全稳定自适应紧急控制系统及方法 |
CN106447522A (zh) * | 2016-06-30 | 2017-02-22 | 国网福建省电力有限公司电力科学研究院 | 一种全电压序列一体化电网的可靠性与风险评估方法 |
CN107342589B (zh) * | 2017-07-18 | 2020-05-15 | 国电南瑞科技股份有限公司 | 基于能量变化评估紧急控制措施改善暂态频率安全贡献度的方法 |
CN109272154B (zh) * | 2018-09-11 | 2021-08-06 | 浙江大学 | 基于典型变量分析与隐马尔可夫的送风机故障预测方法 |
CN109713668B (zh) * | 2019-01-24 | 2022-05-10 | 国电南瑞科技股份有限公司 | 一种新能源基地直流外送连锁脱网预警和防御系统及方法 |
-
2013
- 2013-05-14 CN CN201310176767.5A patent/CN103246939B/zh active Active
Non-Patent Citations (1)
Title |
---|
关于电网运行安全风险在线评估的评述;李碧君等;《电力系统自动化》;20120925;第36卷(第18期);第171-177页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103246939A (zh) | 2013-08-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103246939B (zh) | 基于安全稳定裕度的电网运行安全风险事件在线辨识方法 | |
US11387778B2 (en) | Photovoltaic system failure and alerting | |
CN102063651B (zh) | 一种基于在线采集数据的城市电网风险评估系统 | |
EP2537222B1 (en) | Energy generating system and control thereof | |
CN105894133B (zh) | 一种风电机组部件维修及备品备件需求预测方法 | |
Yue et al. | Grid inertial response-based probabilistic determination of energy storage system capacity under high solar penetration | |
US10691085B2 (en) | Defect detection in power distribution system | |
EP2381094A1 (en) | Energy network and control thereof | |
US20150100284A1 (en) | Metrics and Semiparametric Model Estimating Failure Rate and Mean time Between Failures | |
CN103150635A (zh) | 电力设备运维方法 | |
Guo et al. | Evidence-based approach to power transmission risk assessment with component failure risk analysis | |
Poudel et al. | Probabilistic quantification of power distribution system operational resilience | |
CN102570447B (zh) | 一种电网发展阶段划分方法 | |
Ma et al. | Probabilistic vulnerability assessment based on power flow and voltage distribution | |
Kahrobaee et al. | Short and long-term reliability assessment of wind farms | |
Blackmore et al. | Improving network reliability through effective asset management | |
Hunt et al. | Availability of utility-scale photovoltaic power plants | |
Pan et al. | Condition based failure rate modeling for electric network components | |
Jaleel et al. | Reliability analysis using fault tree method and its prediction using neural networks | |
Steinbusch et al. | Determination of the future actuator demand of adaptive Smart low voltage Grids | |
Nguyen et al. | Probabilistic risk-based security assessment for power systems with wind power generation | |
Jayaweera et al. | Security assessment in active distribution networks with change in weather patterns | |
Ambühl et al. | Different reliability assessment approaches for wave energy converters | |
Hu et al. | Reliability evaluation of power system operations considering time-varying features of components | |
Nguyen et al. | A risk assessment approach for power system with significant penetration levels of wind power generation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: NARI TECHNOLOGY DEVELOPMENT CO., LTD. Effective date: 20141125 Owner name: STATE GRID ELECTRIC POWER RESEARCH INSITITUTE Free format text: FORMER OWNER: NANJING NARI CO., LTD. Effective date: 20141125 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20141125 Address after: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003 Applicant after: State Grid Electric Power Research Insititute Applicant after: NARI Technology Development Co., Ltd. Address before: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003 Applicant before: Nanjing Nari Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |