CN103244065B CN201210030631.9A CN201210030631A CN103244065B CN 103244065 B CN103244065 B CN 103244065B CN 201210030631 A CN201210030631 A CN 201210030631A CN 103244065 B CN103244065 B CN 103244065B
Authority
CN
China
Prior art keywords
mud
slurry
tubing
test macro
mud circulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210030631.9A
Other languages
Chinese (zh)
Other versions
CN103244065A (en
Inventor
曾骥
祝奎臣
宋金扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI WAIGAOQIAO SHIPBUILDING OCEAN ENGINEERING Co Ltd
Shanghai Waigaoqiao Shipbuilding Co Ltd
Original Assignee
SHANGHAI WAIGAOQIAO SHIPBUILDING OCEAN ENGINEERING Co Ltd
Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI WAIGAOQIAO SHIPBUILDING OCEAN ENGINEERING Co Ltd, Shanghai Waigaoqiao Shipbuilding Co Ltd filed Critical SHANGHAI WAIGAOQIAO SHIPBUILDING OCEAN ENGINEERING Co Ltd
Priority to CN201210030631.9A priority Critical patent/CN103244065B/en
Publication of CN103244065A publication Critical patent/CN103244065A/en
Application granted granted Critical
Publication of CN103244065B publication Critical patent/CN103244065B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention discloses a kind of wellhead slurry reflux and drilling mud circulation test macro.This wellhead slurry reflux comprises a tubing, tubing comprise one for turn spray apparatus be connected, open wide link, and one close bottom, this bottom is provided with reinforcing mechanisms.This drilling mud circulation test macro comprises slurry prime path and mud current return circuit, and this slurry prime path is communicated with by described wellhead slurry reflux with this mud current return circuit, forms a mud circulation loop.The alternative preventer of wellhead slurry reflux of the present invention and mozzle carry out mud circulation test, and drilling mud circulation test macro and preventer are synchronously tested, and reduce stand-by period and the test risk of test macro, reduce testing cost.And this wellhead slurry reflux structure is simple, simple installation, does not affect by experiment marine environment.The testing cost of this drilling mud circulation test macro is low, test risk is little, not by the impact of project process.

Description

Wellhead slurry reflux and drilling mud circulation test macro
Technical field
The present invention relates to a kind of wellhead slurry reflux and drilling mud circulation test macro.
Background technology
After offshore boring island has been debugged maritime applications system and well system, according to certification (CDS) code requirement of steel ship construction rules (ABS) and well system, need to carry out combined debugging to drilling system, guarantee that in drilling process, mud can reflux smoothly.
As shown in Figure 1, mud during normal drilling operability in mud pit 100 drives 106 by slurry prime pump 101, high pressure slurry pump 102, mud standpipe manifold 103, mud standpipe 104, mud hose 105, top successively, drilling rod 107, well head 108, be sheathed on the mozzle 109 outside drilling rod 107 or be sheathed on marine riser outside drilling rod, be connected with mozzle 109 turn spray apparatus 110, mud return duct 111, scraper 112, slurry dispenser 113, vibrosieve 114, mud conditioning tank 115, mud overflow passage 116 after again return in mud pit 100.
But in order to ensure the normal work of whole well system, need to carry out mud circulation test to this system before formally carrying out drillng operation.As shown in Figure 2, in existing mud circulation test process, connect a preventer 108 ' in the bottom of mozzle 109, the order of connection of remaining part is identical with normal drilling operability in Fig. 1.In test process, define closed mud circulation loop after being closed by preventer 108 ', just can carry out mud reflux test subsequently.During pending formal drillng operation, removal preventer.
There is following shortcoming in existing mud circulation test:
1), need mozzle and preventer and control system thereof, require very high to project process.
2), due to the length requirement of mozzle and preventer, this test needs the marine site more than 50 meters of depth of water to carry out, and test request is harsh.
3), mozzle and lubricator self involve great expense, and preventer is delegated to below the water surface 50 meters, therefore tests very risky.
4), before preventer is connected to mud circulation test macro need the test carrying out the long period, cause the needs that cannot meet mud circulation test the time, incur loss through delay the testing time of the circulating system.
Summary of the invention
The technical problem to be solved in the present invention is that the preventer in order to overcome prior art involves great expense, testing time in early stage is long, mud circulation test macro can only be carried out under comparatively harsh environment, and operation risk is large, the defect that cost is high, provides a kind of wellhead slurry reflux and drilling mud circulation test macro.
The present invention solves above-mentioned technical problem by following technical proposals:
A kind of wellhead slurry reflux, its feature is, it comprises a tubing, the link that this tubing comprising for being connected with one turn of spray apparatus, opening wide, and the bottom that closes, and this bottom is provided with some reinforcing mechanisms.
Wherein, this link is provided with one and turns the flange of spray apparatus adaptation with this, this tubing and this turn spray apparatus by this Flange joint.
Wherein, the external surface of this tubing sets firmly and somely hangs horse.Describedly hang horse for lifting this wellhead slurry reflux to carry out installation or removal operation.
Wherein, this bottom is also provided with one along the base plate extended radially outwardly of this tubing.This base plate is used for strengthening this bottom, bears the impact to bottom when mud circulation is tested, to simulate shaft mouth operation truly.
Wherein, this reinforcing mechanisms is some brackets, the side of this bracket and this tubing affixed, the opposite side of this bracket and this base plate affixed.This bracket is used for strengthening this bottom, improves the holding capacity that bottom is impacted mud, to simulate shaft mouth operation truly.
Present invention also offers a kind of drilling mud circulation test macro, it comprises a slurry prime path and a mud current return circuit, its feature is, this slurry prime path is communicated with by described wellhead slurry reflux with this mud current return circuit, forms a mud circulation loop.
Wherein, this slurry prime path comprises and connecting successively: this slurry prime path comprises and connecting successively: a slurry prime pump be connected with a mud pit, a high pressure slurry pump, a mud standpipe manifold, at least one mud standpipe, at least one mud hose, push up to drive and drive to be connected with this top and extend to drilling rod in this tubing and drill bit from this link, and the top of this tubing is equipped with one turn of spray apparatus.
Wherein, this mud current return circuit comprises and connecting successively: turn with this at least one mud return duct, a scraper, a slurry dispenser, a vibrosieve, a mud conditioning tank, mud overflow passage be connected with this mud pit that spray apparatus is connected.
In the present invention, above-mentioned optimum condition can be combined on the basis meeting this area general knowledge, obtains each preferred embodiment of the present invention.
Positive progressive effect of the present invention is: the alternative preventer of wellhead slurry reflux of the present invention and mozzle carry out mud circulation test to drilling mud circulation test macro, drilling mud circulation test macro and preventer are synchronously tested, in addition do not need to install in advance mozzle and preventer and control system thereof yet, thus decrease stand-by period and the test risk of this test macro, reduce testing cost.Further, the structure of wellhead slurry reflux of the present invention is simple, simple installation, requires therefore be not subject to the impact of experiment marine environment without the depth of water.The testing cost of drilling mud circulation test macro of the present invention is low, test risk is little, because not needing to install in advance mozzle and preventer and control system thereof, is not thus subject to the impact of project process.
Accompanying drawing explanation
Fig. 1 is that in prior art, well system is carrying out the structural representation under shaft mouth operation state.
Fig. 2 is the structural representation of well system when carrying out mud circulation test in prior art.
Fig. 3 is the structural representation of wellhead slurry reflux in preferred embodiment of the present invention.
Fig. 4 is the structural representation of drilling mud reflux cycle test macro in present pre-ferred embodiments.
Detailed description of the invention
Present pre-ferred embodiments is provided, to describe technical scheme of the present invention in detail below in conjunction with accompanying drawing.
As shown in Figure 3, the wellhead slurry reflux in the present invention comprises the tubing 201 of a hollow, and this tubing 201 comprises the link opened wide 211 and the bottom 213 closed.The external surface of this tubing 201 is provided with four and hangs horse 216.
In addition, link 211 is also provided with the flange 212 connected for turning spray apparatus (not shown).Bottom 213 is provided with the base plate 214 as reinforcing mechanisms and bracket 215.Wherein the side of bracket 215 and the external surface of this tubing 201 affixed, the opposite side of bracket 215 is then affixed with base plate 214.
As shown in Figure 4, same as the prior art, drilling mud reflux test system of the present invention includes a slurry prime path and a mud current return circuit.
Wherein, this slurry prime path comprises and connecting successively: the slurry prime pump be connected with mud pit 100 101, high pressure slurry pump 102, mud standpipe manifold 103, mud standpipe 104, mud hose 105, push up and drive 106, and the below that this top drives 106 is provided with one turn of spray apparatus 110, one drives drilling rod 107 and the drill bit (not shown) of 106 drivings by this top, and the well head to seabed after this drilling rod 107 and drill bit turn spray apparatus 110 through this extends.
This mud current return circuit then comprises and connecting successively: the mud bleed off pipe 116 turning mud return duct 111, scraper 112, slurry dispenser 113, vibrosieve 114 that spray apparatus 110 is connected, mud conditioning tank 115 with this and be communicated with mud pit.
And unlike the prior art, this slurry prime path and mud current return circuit form a mud circulation loop by the wellhead slurry reflux 200 be set in outside drilling rod 107.Wherein, the link 211 of this wellhead slurry reflux 200 turns spray apparatus 110 with this and passes through Flange joint.
At test phase, the mud in mud pit injects the tubing of well head mud returning device via slurry prime path, and the mud in tubing returns via entering mud current return circuit after turning spray apparatus conversion, finally gets back to mud pit.After being completed, this wellhead slurry reflux being removed installation mozzle can carry out normal drilling operability.
Although the foregoing describe the specific embodiment of the present invention, it will be understood by those of skill in the art that these only illustrate, protection scope of the present invention is defined by the appended claims.Those skilled in the art, under the prerequisite not deviating from principle of the present invention and essence, can make various changes or modifications to these embodiments, but these change and amendment all falls into protection scope of the present invention.

Claims (3)

1. a drilling mud circulation test macro, it comprises a slurry prime path and a mud current return circuit, it is characterized in that, it comprises a wellhead slurry reflux, this wellhead slurry reflux comprises a tubing, the link that this tubing comprises one for being connected with one turn of spray apparatus, open wide, and the bottom that closes, this bottom is provided with some reinforcing mechanisms; This link is provided with one and turns the flange of spray apparatus adaptation with this, this tubing and this turn spray apparatus by this Flange joint; The external surface of this tubing sets firmly and somely hangs horse; This bottom is also provided with one along the base plate extended radially outwardly of this tubing; This reinforcing mechanisms is some brackets, the side of this bracket and this tubing affixed, the opposite side of this bracket and this base plate affixed; This slurry prime path is communicated with by described wellhead slurry reflux with this mud current return circuit, forms a mud circulation loop.
2. drilling mud circulation test macro as claimed in claim 1, it is characterized in that, this slurry prime path comprises and connecting successively: a slurry prime pump be connected with a mud pit, a high pressure slurry pump, a mud standpipe manifold, at least one mud standpipe, at least one mud hose, push up to drive and drive with this top and be connected and extend to drilling rod in this tubing and drill bit from this link, and the top of this tubing is equipped with one turn of spray apparatus.
3. drilling mud circulation test macro as claimed in claim 2, it is characterized in that, this mud current return circuit comprises and connecting successively: turn with this at least one mud return duct, a scraper, a slurry dispenser, a vibrosieve, a mud conditioning tank, mud overflow passage be connected with this mud pit that spray apparatus is connected.
CN201210030631.9A 2012-02-10 2012-02-10 Wellhead slurry reflux and drilling mud circulation test macro Expired - Fee Related CN103244065B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210030631.9A CN103244065B (en) 2012-02-10 2012-02-10 Wellhead slurry reflux and drilling mud circulation test macro

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210030631.9A CN103244065B (en) 2012-02-10 2012-02-10 Wellhead slurry reflux and drilling mud circulation test macro

Publications (2)

Publication Number Publication Date
CN103244065A CN103244065A (en) 2013-08-14
CN103244065B true CN103244065B (en) 2016-01-20

Family

ID=48923906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210030631.9A Expired - Fee Related CN103244065B (en) 2012-02-10 2012-02-10 Wellhead slurry reflux and drilling mud circulation test macro

Country Status (1)

Country Link
CN (1) CN103244065B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103531076B (en) * 2013-11-06 2015-09-23 西南石油大学 A set of drilling condition simulation system and workflow thereof
CN110043212B (en) * 2019-05-08 2023-10-24 中国石油大学(北京) Auxiliary water-stop conduit mud outlet device
CN115410443B (en) * 2022-10-31 2023-03-24 西南石油大学 Control system for blowout simulation training

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3726136A (en) * 1970-12-17 1973-04-10 Petro Electronics Inc Drilling-fluid control-monitoring apparatus
CN1465844A (en) * 2002-06-28 2004-01-07 河南石油勘探局南阳石油机械厂 Mud circulation system
CN2839551Y (en) * 2005-07-15 2006-11-22 中国石化集团江汉石油管理局第四机械厂 Integrated whole-closed mud returning device
CN101082270A (en) * 2007-07-10 2007-12-05 中国海洋石油总公司 Drilling fluid treatment system
CN101929331A (en) * 2009-06-25 2010-12-29 中国石油集团西部钻探工程有限公司克拉玛依钻井工艺研究院 Overall process under-balance drilling pressure compensation system and method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO337346B1 (en) * 2001-09-10 2016-03-21 Ocean Riser Systems As Methods for circulating a formation influx from a subsurface formation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3726136A (en) * 1970-12-17 1973-04-10 Petro Electronics Inc Drilling-fluid control-monitoring apparatus
CN1465844A (en) * 2002-06-28 2004-01-07 河南石油勘探局南阳石油机械厂 Mud circulation system
CN2839551Y (en) * 2005-07-15 2006-11-22 中国石化集团江汉石油管理局第四机械厂 Integrated whole-closed mud returning device
CN101082270A (en) * 2007-07-10 2007-12-05 中国海洋石油总公司 Drilling fluid treatment system
CN101929331A (en) * 2009-06-25 2010-12-29 中国石油集团西部钻探工程有限公司克拉玛依钻井工艺研究院 Overall process under-balance drilling pressure compensation system and method

Also Published As

Publication number Publication date
CN103244065A (en) 2013-08-14

Similar Documents

Publication Publication Date Title
CN106218828B (en) Removable wellhead platform and application method for offshore marginal oilfield exploitation
CN103244065B (en) Wellhead slurry reflux and drilling mud circulation test macro
CN105064958B (en) Vertical polylinker band fishing net protection subsea manifold
CN105201456B (en) A kind of Dlagnosis of Sucker Rod Pumping Well light maintenance environmental protection operation technique
CN202990947U (en) Basement type underwater dry wellhead structure
CN104502006A (en) Iron roughneck makeup-breakout torque testing method
CN102913177A (en) Template type underwater dry-type well head structure
CN104533888A (en) One-stop flushing and pressure testing method of hydraulic system of self-elevating drilling platform
CN203257349U (en) Ocean module drill rig slurry backflow device
CN202073098U (en) Anti-deflection pipe thread connector flow guiding device
CN205931180U (en) A portable wellhead platform for development of marine marginal oil field
CN101545358B (en) Erosion reducing system for gas drilling
CN204646148U (en) A kind of well cementation interface cleaning efficiency evaluating apparatus
CN2851542Y (en) Drilling anti-blowout device in downhole water exploring and water-draining
CN206903614U (en) A kind of silt particle fishing device of hydraulic-driven
CN208012715U (en) A kind of gas flowmeter high pressure durability test device
CN102287157A (en) Multifunctional well-killing open flow manifold
CN105114036B (en) Axial sliding type marine riser cleaning device
CN201843543U (en) Device for preventing wellhead drilling fluid from splashing
CN206091928U (en) A sealing device that is used for SAGD well surveying temperature cable area pressure to carry, descend
CN201090415Y (en) Tubing pump with short pump barrel and long plunger capable of automatically draining oil
CN205369256U (en) Solidification cement clean -up equipment in piling bar
CN204851183U (en) Endwise slip formula marine riser cleaning device
CN201129173Y (en) Sliding bush type pipe testing device
CN204002693U (en) Offshore oil production flange

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20200210

CF01 Termination of patent right due to non-payment of annual fee