CN103243676A - 确定植被河床底部阻力系统及确定方法 - Google Patents
确定植被河床底部阻力系统及确定方法 Download PDFInfo
- Publication number
- CN103243676A CN103243676A CN2013101887959A CN201310188795A CN103243676A CN 103243676 A CN103243676 A CN 103243676A CN 2013101887959 A CN2013101887959 A CN 2013101887959A CN 201310188795 A CN201310188795 A CN 201310188795A CN 103243676 A CN103243676 A CN 103243676A
- Authority
- CN
- China
- Prior art keywords
- vegetation
- tank
- water
- slope
- downstream
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
本发明是确定植被河床底部阻力的系统及方法,系统结构包括用于模拟城市河道的循环可变坡水槽系统、模拟植被固定系统和物理量测量系统;确定方法包括1)形成植被带、将插有植被的塑料板放置于水槽底部;2)通过调节变频泵控制来流流量;3)计算出相应底坡;4)计算出植被所占水体体积比;5)关闭变频泵,移除塑料板上的植被,重新开启变频泵并控制来流流量;6)计算出相应底坡。优点:1)通过可变坡循环水槽系统,可模拟不同水力条件的城市河道;2)通过植被固定系统,可模拟天然实际存在的不同种类植被,做到植被的不同排列方式、不同植被密度的模拟;3)得出不同水力条件下植被河床底部阻力,为相关城市提供了河道规划设计规范。
Description
技术领域
本发明涉及的是一种确定植被河床底部阻力系统及确定方法,属于环境水力学技术领域。
背景技术
城市是一个地区经济、政治、文化发展的中心地带,在人类发展历程中占据重要地位。随着我国社会经济的持续发展,城市化进程也越来越快,目前我国城市化水平已接近50%。流经城市的天然以及人工河道,是水动力系统中物质循环的重要通道,在城市的规划、建立、发展过程中发挥着重要作用。而城市现代化建设过程中,人们迫切需要实现与河流的和谐相处,“水安全、水环境、水景观、水文化、水经济”五位一体的城市水生态模式愈来愈被倡导,因此对现代城市河道的规划设计也提出更高的要求。
植被为水生生物提供栖息之地,此外也增加行洪阻力,改变泥沙运动规律,影响污染物的扩散输移,是城市河流动力系统中至关重要的影响因子。为满足五位一体的城市水生态模式要求,现代城市河道规划设计越来越重视水生植被的作用,常在河道床面种植各种各样的植被。城市河道规划设计主要是根据行洪量来确定河道断面尺寸和底坡,而在考虑行洪阻力时,目前还没有专门针对含植被河道的设计手册,主要依靠对植被疏密程度的定性判断来进行糙率的修正。此外,目前国内外关于含植被河道阻力问题的研究主要侧重于植被产生的阻力,极少关注河床底部的阻力,甚至认为其相对于植被阻力,可忽略不计。这在植被非常密集的河道中是可以接受的,但在大多数城市河道中,植被的种植密度往往不是非常大,此时必须考虑河床底部阻力。可见,城市河道的规划设计如果不采用专门的植被河床底部阻力确定方法,出现的主要问题有:
1)行洪阻力计算不准确,过高预估行洪能力,增加城市河道行洪风险,易导致发生洪涝灾害;
2)河床底部阻力与泥沙运动密切相关,对其估算不准确容易造成泥沙淤积,降低河道过流能力;
3)忽略河床底部阻力,将导致对植被阻力计算产生偏差,从而错误预估水流对污染物的扩散输移能力,增大城市河道污染风险。
发明内容
本发明提出的是一种确定植被河床底部阻力的系统及方法,其目的旨在克服现有城市河道规划设计中存在出现的上述的主要问题。利用水力学阻力理论知识,科学合理地实现对植被河床底部阻力的计算,填补含植被河道阻力研究领域的空白,同时也为城市河道规划设计提供技术支撑。
本发明的技术解决方案:一种确定植被河床底部阻力的系统,其特征是包括用于模拟城市河道的循环可变坡水槽系统,模拟植被固定系统,物理量测量系统;
所述的用于模拟城市河道的循环可变坡水槽系统,其结构包括水库、抽水管道、变频泵、平水格栅、上游支撑、下游支撑、尾门、泄水池、回水廊道以及水槽,其中抽水管道的一端接入水库,抽水管道的另一端与超声波流量计的一端相接,超声波流量计的另一端相接变频泵的一端,变频泵的一端接入水槽,水槽通过尾门与泄水池相通,泄水池通过回水廊道与水库相通,水槽内装有平水格栅,水槽长12m,宽0.42m,高0.70m,水槽两侧为玻璃边壁,水槽底部铺设大理石板,水槽上、下游设有上游支撑、下游支撑,上游支撑7固定不可调,上游支撑距上游进水口2m;下游支撑可调,下游支撑距下游出水口3.5m;下游支撑上设有齿轮和升降螺杆用以调节底坡;工作时,水流经变频泵工作后抽入水槽,平水格栅用于矫正水流流向,水流经过尾门进入泄水池,然后由回水廊道返回水库1实现循环;
所述的模拟植被固定系统,是用以模拟种植于城市河道的植被,为使植被植入实验水槽,选择有密集钻孔的塑料板为载体;设计若干个植被插入塑料板上的钻孔内;再将塑料板置入水槽,即实现了水槽中植被的植入;
所述的物理量测量系统,其所需测量的基本物理量包括流量、水位以及底坡;
其中流量是设计时必须考虑的参量,为精确起见,选择使用超声波流量计进行流量的测量;
所述的水位是根据设计需要,在水槽侧壁布置刻度尺,精度为1mm;
底坡是通过水准仪来确定水槽底坡;具体做法包括1)对水槽进行率定,利用水准仪将水槽设定为平坡;2)分别记录平坡与设计工况下水槽下游末端间的差△h,且水槽上游固定支架与水槽下游末端间的距离为L,则底坡为△h/L。
一种植被河床底部阻力的确定方法,包括如下步骤:
1)依据设计的植被排列方式将模拟植被插入塑料板孔内,从而形成植被带,然后将插有植被的塑料板放置于水槽底部;
2)通过调节变频泵控制来流流量使其等于设计流量Q,
3)通过反复调节尾门和升降螺杆直至达到设计水深的深度h,计算出相应底坡i;
4)根据植被的数量以及水体体积计算出植被所占水体体积比η;
5)关闭变频泵,将插在塑料板上的植被全部移除;重新开启变频泵并控制流量Q,通过调节尾门和升降螺杆直至水深的深度h(1-η),计算相应底坡i B ;
6)计算河床底部阻力;总底坡为i的含植被明渠均匀流,总底坡i可看作由两部分叠加而成:仅由植被导致的底坡i V 以及仅由床面导致的底坡i B ;所以有:
以控制体积为△x×B×h的水体为研究对象,其中B为水槽宽度,该部分水体受到自重沿水流方向的分量F G ,植被对该部分水体的阻力F V ,以及床面对该部分水体的阻力F B ;由力的平衡可得:
结合式(1)~式(5),可得
本发明的有益效果:1)通过可变坡循环水槽系统,可模拟不同水力条件的城市河道;2)通过植被固定系统,可模拟天然实际存在的不同种类植被,且可做到植被的不同排列方式、不同植被密度的模拟;3)巧妙利用水力学阻力理论知识,得出不同水力条件下植被河床底部阻力,可填补含植被河道床面阻力研究空白,补充相关城市河道规划设计规范。
附图说明
图1-1是循环水槽系统俯视图。
图1-2是循环水槽系统侧视图。
图2-1是模拟植被固定系统俯视图。
图2-2是模拟植被固定系统侧视图。
图3a是含植被水流阻力等效分解中控制体积为△x×B×h水体中植被占有体积的示意图。
图3a1是含植被水流阻力等效分解中仅由植被导致的底坡的示意图。
图3a2是含植被水流阻力等效分解中仅由床面导致的底坡的示意图。
图中的1是水库、2是抽水管道、3是超声波流量计、4是变频泵、5是平水格栅、6是刻度尺、7是上游支撑、8是下游支撑、9是尾门、10是泄水池、11是回水廊道、12是水槽。
具体实施方式
植被河床底部阻力的确定系统,其结构包括用于模拟城市河道的循环可变坡水槽系统,模拟植被固定系统,物理量测量系统;
如图1所示,用于模拟城市河道的循环可变坡水槽系统,其结构包括水库1、抽水管道2、变频泵4、平水格栅5、上游支撑7、下游支撑8、尾门9、泄水池10、回水廊道11以及水槽12,其中抽水管道2的一端接入水库1,抽水管道2的另一端与超声波流量计3的一端相接,超声波流量计3的另一端相接变频泵4的一端,变频泵4的一端接入水槽12,水槽12通过尾门9与泄水池10相通,泄水池10通过回水廊道11与水库1相通,水槽12内装有平水格栅5,水槽12长12m,宽0.42m,高0.70m,水槽12两侧为玻璃边壁,水槽12底部铺设大理石板,水槽12上、下游设有上游支撑7、下游支撑8,上游支撑7固定不可调,上游支撑7距上游进水口2m;下游支撑8可调,下游支撑8距下游出水口3.5m。
下游支撑8上设有齿轮和升降螺杆用以调节底坡;工作时,水流经变频泵4工作后抽入水槽,平水格栅5用于矫正水流流向,水流经过尾门9进入泄水池10,然后由回水廊道11返回水库1实现循环;
模拟植被固定系统,用以模拟种植于城市河道的植被,为使植被植入实验水槽,选择有密集钻孔的塑料板为载体;然后设计若干个植被插入塑料板上的钻孔内;再将塑料板置入水槽,即实现了水槽中植被的植入;如图2-1、图2-2;
物理量测量系统,所需测量的基本物理量包括流量、水位以及底坡;
所述的流量是设计时必须考虑的参量,为精确起见,选择使用超声波流量计3进行流量的测量;
所述的水位是根据设计需要,在水槽侧壁布置刻度尺6,精度为1mm;该方法与在上下游设定水位测针来测量水位的方法有所不同,可免去调节测针的麻烦,在满足精度的同时能节省耗时,有一定优越性;
所述的底坡是通过靠近下游出水口的可升降螺杆调节,对其测量的精度直接关系阻力计算的准确性,本发明通过水准仪来确定水槽底坡;具体包括1)对水槽进行率定,利用水准仪将水槽设定为平坡;2)分别记录平坡与设计工况下水槽下游末端的高差△h,且水槽上游固定支架与水槽下游末端的距离为L,则底坡为△h/L。
植被河床底部阻力的确定方法,包括
依据设计的植被排列方式将模拟植被插入塑料板孔内,从而形成植被带,然后将插有植被的塑料板放置于如图1-1、图1-2所示的水槽底部。
通过调节变频泵4控制来流流量使其等于设计流量Q,再通过反复调节尾门9和下游支撑8直至达到设计水深的深度h,具体做法为:当上游水位高于下游水位时,通过调节下游支撑8使底坡加大;反之则是底坡减小。当整体水深大于设计水深时,增大尾门9的开度;反之则减小尾门9的开度。达到设计水深后,计算出相应底坡i。此外,根据植被的数量以及水体体积计算出植被所占水体体积比η。
关闭变频泵,将插在塑料板上的植被全部移除;重新开启变频泵并控制流量Q,继续通过调节尾门和升降螺杆直至水深的深度h(1-η),计算相应底坡i B 。
水槽的床面以及床面上的植被并不光滑,均存在一定的粗糙度,从而阻滞水流的流动,因而水槽需形成一定的底坡方能保证形成均匀流动。考虑总底坡为i的含植被明渠均匀流,如图3a所示,根据阻力叠加理论,可将含植被水流虚拟分为两部分:仅有植被作用和仅有床面作用,则总底坡i可看作由两部分叠加而成:仅由植被导致的底坡i V (图3a1)以及仅由床面导致的底坡i B (图3a2)。所以有:
(1)
以图3a所示控制体积为△x×B×h的水体为研究对象,其中B为水槽宽,该部分水体受到自重沿水流方向的分量F G ,植被对该部分水体的阻力F V ,以及床面对该部分水体的阻力F B 。由力的平衡可得:
结合式(1)~式(5),可得
实施例
含植被水槽设计流量10.1L/s,设计水深为12cm,水槽长12m,宽0.42m,模拟植被选取刚性圆柱棒,高度为6cm,直径为0.6cm,塑料板上植被排列方式为平行排列,相邻两株植被纵向距离5cm,横向距离2cm,测得有植被时底坡为3.68/1000,植被被移除时底坡为2/10000。
根据资料所提供的模拟植被几何参数以及水深,容易计算出植被所占水体体积比,所以单位河床面积上的底部阻力为42.71cm2/s2,其占总水流阻力的比重为5.43%。
本发明的适用范围不局限于所述实施例。
Claims (2)
1.一种确定植被河床底部阻力的系统,其特征是包括用于模拟城市河道的循环可变坡水槽系统,模拟植被固定系统,物理量测量系统;
所述的用于模拟城市河道的循环可变坡水槽系统,其结构包括水库、抽水管道、变频泵、平水格栅、上游支撑、下游支撑、尾门、泄水池、回水廊道以及水槽,其中抽水管道的一端接入水库,抽水管道的另一端与超声波流量计的一端相接,超声波流量计的另一端相接变频泵的一端,变频泵的一端接入水槽,水槽通过尾门与泄水池相通,泄水池通过回水廊道与水库相通,水槽内装有平水格栅,水槽长12m,宽0.42m,高0.70m,水槽两侧为玻璃边壁,水槽底部铺设大理石板,水槽上、下游设有上游支撑、下游支撑,上游支撑7固定不可调,上游支撑距上游进水口2m;下游支撑可调,下游支撑距下游出水口3.5m;下游支撑上设有齿轮和升降螺杆用以调节底坡;工作时,水流经变频泵工作后抽入水槽,平水格栅用于矫正水流流向,水流经过尾门进入泄水池,然后由回水廊道返回水库1实现循环;
所述的模拟植被固定系统,是用以模拟种植于城市河道的植被,为使植被植入实验水槽,选择有密集钻孔的塑料板为载体;设计若干个植被插入塑料板上的钻孔内;再将塑料板置入水槽,即实现了水槽中植被的植入;
所述的物理量测量系统,其所需测量的基本物理量包括流量、水位以及底坡;
所述的流量是设计时必须考虑的参量,为精确起见,选择使用超声波流量计进行流量的测量;
所述的水位是根据设计需要,在水槽侧壁布置刻度尺,精度为1mm;
所述的底坡是通过水准仪来确定水槽底坡;具体做法包括1)对水槽进行率定,利用水准仪将水槽设定为平坡;2)分别记录平坡与设计工况下水槽下游末端间的差△h,且水槽上游固定支架与水槽下游末端间的距离为L,则底坡为△h/L。
2.一种植被河床底部阻力的确定方法,其特征是该方法包括如下步骤:
1)依据设计的植被排列方式将模拟植被插入塑料板孔内,从而形成植被带,然后将插有植被的塑料板放置于水槽底部;
2)通过调节变频泵控制来流流量使其等于设计流量Q,
3)通过反复调节尾门和升降螺杆直至达到设计水深的深度h,计算出相应底坡i;
4)根据植被的数量以及水体体积计算出植被所占水体体积比η;
5)关闭变频泵,将插在塑料板上的植被全部移除;重新开启变频泵并控制流量Q,通过调节尾门和升降螺杆直至水深的深度h(1-η),计算相应底坡i B ;
6)计算河床底部阻力;总底坡为i的含植被明渠均匀流,总底坡i可看作由两部分叠加而成:仅由植被导致的底坡i V 以及仅由床面导致的底坡i B ;所以有:
以控制体积为△x×B×h的水体为研究对象,其中B为水槽宽度,该部分水体受到自重沿水流方向的分量F G ,植被对该部分水体的阻力F V ,以及床面对该部分水体的阻力F B ;由力的平衡可得:
在仅有床面作用的情况下,由于没有了植被所占的体积,假定等效水深为,则有
结合式(1)~式(5),可得
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310188795.9A CN103243676B (zh) | 2013-05-21 | 2013-05-21 | 确定植被河床底部阻力系统及确定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310188795.9A CN103243676B (zh) | 2013-05-21 | 2013-05-21 | 确定植被河床底部阻力系统及确定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103243676A true CN103243676A (zh) | 2013-08-14 |
CN103243676B CN103243676B (zh) | 2015-01-28 |
Family
ID=48923528
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310188795.9A Expired - Fee Related CN103243676B (zh) | 2013-05-21 | 2013-05-21 | 确定植被河床底部阻力系统及确定方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103243676B (zh) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103526716A (zh) * | 2013-10-25 | 2014-01-22 | 水利部交通运输部国家能源局南京水利科学研究院 | 河工模型塑料草加糙方法 |
CN104032704A (zh) * | 2014-05-08 | 2014-09-10 | 江苏省水利勘测设计研究院有限公司 | 含漂浮植物河道的模拟系统、水流阻力计算方法及装置 |
CN104090588A (zh) * | 2014-03-12 | 2014-10-08 | 南通航运职业技术学院 | 一种明渠实验水槽生成均匀流的自动调节装置及调节方法 |
CN106023766A (zh) * | 2016-07-04 | 2016-10-12 | 山东科技大学 | 用于模拟不同坡度坡面植被对水流阻力影响的实验装置 |
CN107132023A (zh) * | 2017-04-29 | 2017-09-05 | 西南交通大学 | 平坡水槽试验系统 |
CN108398541A (zh) * | 2018-02-26 | 2018-08-14 | 河海大学 | 可调节河床植物的实验装置和实验方法 |
CN109141809A (zh) * | 2018-07-17 | 2019-01-04 | 中山大学 | 用于模拟植被消浪机理的实验系统 |
CN110146551A (zh) * | 2019-06-20 | 2019-08-20 | 中国水利水电科学研究院 | 一种冰塞冰坝和冰下水体介电常数应急标定装置和方法 |
CN110188431A (zh) * | 2019-05-20 | 2019-08-30 | 四川大学 | 有非淹没植被群落河道流速纵向分布预测方法 |
CN111236138A (zh) * | 2020-03-13 | 2020-06-05 | 浙江省水利河口研究院 | 一种用于动床河工模型的多边界联合注水系统及方法 |
CN111270645A (zh) * | 2020-01-21 | 2020-06-12 | 安徽省(水利部淮河水利委员会)水利科学研究院(安徽省水利工程质量检测中心站) | 一种散粒基质河道循环水试验装置 |
CN112382186A (zh) * | 2020-09-27 | 2021-02-19 | 山东大学 | 多功能实验水槽 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522150B (zh) * | 2016-10-14 | 2018-10-16 | 江苏省水利勘测设计研究院有限公司 | 确定城市生态河道水流阻力的模拟系统及水流阻力计算方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2762252Y (zh) * | 2004-07-08 | 2006-03-01 | 浙江大学 | 闸板式水面曲线活动水槽 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1084356A1 (ru) * | 1982-03-01 | 1984-04-07 | Московский Ордена Трудового Красного Знамени Гидромелиоративный Институт | Стенд дл исследовани гидравлических процессов |
-
2013
- 2013-05-21 CN CN201310188795.9A patent/CN103243676B/zh not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2762252Y (zh) * | 2004-07-08 | 2006-03-01 | 浙江大学 | 闸板式水面曲线活动水槽 |
Non-Patent Citations (2)
Title |
---|
侯杰 乔箭: "BPC_2200型变底坡活动玻璃水槽简介", 《实验技术与管理》, 31 December 1994 (1994-12-31), pages 24 - 27 * |
唐洪武 等: "含植物河道曼宁阻力系数的研究", 《水利学报》, vol. 38, no. 11, 30 November 2007 (2007-11-30), pages 1347 - 1353 * |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103526716A (zh) * | 2013-10-25 | 2014-01-22 | 水利部交通运输部国家能源局南京水利科学研究院 | 河工模型塑料草加糙方法 |
CN104090588B (zh) * | 2014-03-12 | 2017-06-09 | 南通航运职业技术学院 | 一种明渠实验水槽生成均匀流的自动调节装置及调节方法 |
CN104090588A (zh) * | 2014-03-12 | 2014-10-08 | 南通航运职业技术学院 | 一种明渠实验水槽生成均匀流的自动调节装置及调节方法 |
CN104032704A (zh) * | 2014-05-08 | 2014-09-10 | 江苏省水利勘测设计研究院有限公司 | 含漂浮植物河道的模拟系统、水流阻力计算方法及装置 |
CN104032704B (zh) * | 2014-05-08 | 2017-02-15 | 江苏省水利勘测设计研究院有限公司 | 含漂浮植物河道的模拟系统、水流阻力计算方法及装置 |
CN106023766B (zh) * | 2016-07-04 | 2018-12-14 | 山东科技大学 | 用于模拟不同坡度坡面植被对水流阻力影响的实验装置 |
CN106023766A (zh) * | 2016-07-04 | 2016-10-12 | 山东科技大学 | 用于模拟不同坡度坡面植被对水流阻力影响的实验装置 |
CN107132023A (zh) * | 2017-04-29 | 2017-09-05 | 西南交通大学 | 平坡水槽试验系统 |
CN108398541A (zh) * | 2018-02-26 | 2018-08-14 | 河海大学 | 可调节河床植物的实验装置和实验方法 |
CN108398541B (zh) * | 2018-02-26 | 2023-09-22 | 河海大学 | 可调节河床植物的实验装置和实验方法 |
CN109141809A (zh) * | 2018-07-17 | 2019-01-04 | 中山大学 | 用于模拟植被消浪机理的实验系统 |
CN110188431A (zh) * | 2019-05-20 | 2019-08-30 | 四川大学 | 有非淹没植被群落河道流速纵向分布预测方法 |
CN110146551A (zh) * | 2019-06-20 | 2019-08-20 | 中国水利水电科学研究院 | 一种冰塞冰坝和冰下水体介电常数应急标定装置和方法 |
CN111270645A (zh) * | 2020-01-21 | 2020-06-12 | 安徽省(水利部淮河水利委员会)水利科学研究院(安徽省水利工程质量检测中心站) | 一种散粒基质河道循环水试验装置 |
CN111236138A (zh) * | 2020-03-13 | 2020-06-05 | 浙江省水利河口研究院 | 一种用于动床河工模型的多边界联合注水系统及方法 |
CN111236138B (zh) * | 2020-03-13 | 2024-04-09 | 浙江省水利河口研究院 | 一种用于动床河工模型的多边界联合注水系统及方法 |
CN112382186A (zh) * | 2020-09-27 | 2021-02-19 | 山东大学 | 多功能实验水槽 |
Also Published As
Publication number | Publication date |
---|---|
CN103243676B (zh) | 2015-01-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103243676B (zh) | 确定植被河床底部阻力系统及确定方法 | |
CN203238590U (zh) | 用于模拟城市河道的循环可变坡水槽系统 | |
CN105678067B (zh) | 城市河涌防洪排涝动态预报控制方法及系统 | |
CN104264622B (zh) | 模拟潮汐往复流河道污染物迁移及盐水上溯的装置及方法 | |
CN104032704A (zh) | 含漂浮植物河道的模拟系统、水流阻力计算方法及装置 | |
CN110197017A (zh) | 一种城市河流橡胶坝群水生态调控方法 | |
CN204000743U (zh) | 一种模拟水温分层流动的实验装置 | |
CN107516172A (zh) | 咸潮影响地区抢淡蓄淡应急供水调度方法 | |
CN203011668U (zh) | 一种可调节坡度的矩形水槽模拟底泥侵蚀和传输特征的装置 | |
CN103324814B (zh) | 一种输水系统的设计方法 | |
CN111046551B (zh) | 一种城市群排水过程模拟方法 | |
CN104933268B (zh) | 一种基于一维非恒定流数值模型的洪水分析方法 | |
WO2023284229A1 (zh) | 河流交汇、分汊及弯曲微生物群落河工模型试验系统及试验方法 | |
CN110080178A (zh) | 一种鱼道设计方法 | |
CN204199236U (zh) | 模拟潮汐往复流河道污染物迁移及盐水上溯的装置 | |
Wang et al. | Integrated simulation and assessment of water quantity and quality for a river under changing environmental conditions | |
CN105547966A (zh) | 间歇性河流控制下的包气带与饱水带渗流实验装置 | |
CN108398377B (zh) | 一种测定浅水湖泊底摩擦系数的模拟装置及其使用方法 | |
CN107219878B (zh) | 一种渠道流量量控一体化装置及其自动测控方法 | |
CN203755229U (zh) | 水流循环的多功能实验系统 | |
CN109060062B (zh) | 一种内筒限位型灌溉水量计量装置 | |
CN113887151A (zh) | 一种灌溉排水过程模拟及预测方法 | |
CN110424323A (zh) | 一种用于实验室的多功能、多维度渠系科研试验系统 | |
CN107034839B (zh) | 自循环式河流演变实验系统 | |
CN103556598B (zh) | 一种变坡水槽供沙仪器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150128 Termination date: 20190521 |