CN103236683A - Grid fault accident management method - Google Patents

Grid fault accident management method Download PDF

Info

Publication number
CN103236683A
CN103236683A CN2013101471267A CN201310147126A CN103236683A CN 103236683 A CN103236683 A CN 103236683A CN 2013101471267 A CN2013101471267 A CN 2013101471267A CN 201310147126 A CN201310147126 A CN 201310147126A CN 103236683 A CN103236683 A CN 103236683A
Authority
CN
China
Prior art keywords
equipment
electricity
send
fault accident
accident
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101471267A
Other languages
Chinese (zh)
Inventor
王立峰
陈东
顾黎强
王沁
徐芳敏
骆亮
袁一鸣
盛佳蓉
张麟
胡年平
吴世敏
沈祝萍
贾优
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Shanghai Municipal Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN2013101471267A priority Critical patent/CN103236683A/en
Publication of CN103236683A publication Critical patent/CN103236683A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a grid fault accident management method. The management method comprises the following steps: step 1, determining a fault accident management sequence according to a fault accident conclusion; step 2, determining isolation equipment according to the fault accident management sequence; step 3, determining initial recovery equipment; step 4, forming an island to be recovered; step 5, selecting single equipment power transmission rules; step 6, selecting an optimal power transmission scheme; and step 7, transferring power to equipment, and finishing the fault accident management. An effective solution can be provided for fault accident reasons, a recovery scheme is intelligently or manually generated, the accident management reliability is ensured, and electric power can be conveniently and quickly recovered.

Description

Electric network fault accident treatment method
Technical field
The present invention relates to electric network fault accident treatment method.
Background technology
Electric power system has the characteristics of hierarchical structure, i.e. electric power system is made up of factory station, circuit, and factory is made up of equipment such as switch, disconnecting link, bus, transformer, generator, capacitor, load circuits at the station.Factory constitutes network topology by line connecting relation between the station, constitutes factory's station topology with switch and plug-in strip annexation between the electric equipment.In the prior art, power system accident is handled according to rules text and abstract scheduling experience, wastes time and energy, and the result is not accurate enough.After having an accident, report protection action situation and switch trip situation by operator on duty's phone of transformer station or subordinate's scheduling, and manually check the equipment fault situation to the trip device place.During the processing accident, also be according to the topological structure of the operational mode behind the power grid accident and electrical network and accident treatment rules etc., manually design feasible fault recovery scheme, and finish the grid switching operation of accident treatment by the mode that straighforward operation or phone are issued a notice.As seen, the mode of this manual analysis and processing accident is with power network safety operation and prevent that the requirement of large-area power-cuts from being incompatible.
Summary of the invention
The object of the present invention is to provide a kind of electric network fault accident treatment method, can guarantee the reliability of accident treatment, convenient fast quick-recovery electric power.
In order to achieve the above object, the present invention is achieved through the following technical solutions: electric network fault accident treatment method is characterized in that described processing method comprises following steps:
Step 1, determine the failure accident processing sequence according to the failure accident conclusion;
Step 2, determine xegregating unit according to the failure accident processing sequence;
Step 3, determine initial restorer;
Step 4, formation island to be recovered;
Step 5, choose individual equipment and send electricity rule;
Step 6, selection the best are sent electric scheme;
Step 7, send electricity to equipment, failure accident disposes.
Determine the failure accident processing sequence to judge according to the operating mode before the power failure of faulty equipment in the above-mentioned step 1.
Determine in the above-mentioned step 2 that xegregating unit refers to contacting fully between faulty equipment and the non-faulty equipment cut off.
Determine all power equipments that need to be connected with this equipment before the initial restorer to disconnect in the above-mentioned step 3.
Individual equipment send electric rule to comprise in the above-mentioned step 5: bus send to stop using before the electricity and autotomys, and send to use behind the electricity and autotomys;
Circuit send the reclosing of stopping using before the electricity, uses reclosing after sending electricity.
Electric network fault accident treatment method of the present invention compared with prior art has the following advantages: the present invention can be at the failure accident reason, propose effectively to solve countermeasure, intelligent or manually generate recovery scheme, guarantee the reliability of accident treatment, convenient fast quick-recovery electric power.
Description of drawings
Fig. 1 is the method flow diagram of electric network fault accident treatment method of the present invention.
Embodiment
Below in conjunction with accompanying drawing, by describing a preferable specific embodiment in detail, the present invention is further elaborated.
As shown in Figure 1, electric network fault accident treatment method, processing method comprises following steps:
Step 1, determine the failure accident processing sequence according to the failure accident conclusion, determine the failure accident processing sequence to judge according to the operating mode before the power failure of faulty equipment, better, when the load line fault, if it causes the higher level equipment dead electricity, processing sequence is so, draws back on-load switch earlier, recover then, isolate on-load switch at last;
Step 2, determine xegregating unit according to the failure accident processing sequence, contacting fully between faulty equipment and the non-faulty equipment cut off, better, when busbar fault, if fault bus has bus arranged side by side, and side by side bus is electriferous state, so during the handling failure bus, need pour on the bus arranged side by side the load line of fault bus is cold, carry out the isolation of bus then;
Step 3, determine initial restorer, all power equipments that will be connected with this equipment disconnect;
Step 4, formation island to be recovered;
Step 5, choose individual equipment and send electricity rule, individual equipment to send electric rule to comprise bus to send to stop using before the electricity and autotomy, send to use behind the electricity and autotomy; Circuit send the reclosing of stopping using before the electricity, uses reclosing after sending electricity;
Step 6, selection the best are sent electric scheme;
Step 7, send electricity to equipment, failure accident disposes.
Although content of the present invention has been done detailed introduction by above preferred embodiment, will be appreciated that above-mentioned description should not be considered to limitation of the present invention.After those skilled in the art have read foregoing, for multiple modification of the present invention with to substitute all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (5)

1. electric network fault accident treatment method is characterized in that, described processing method comprises following steps:
Step 1, determine the failure accident processing sequence according to the failure accident conclusion;
Step 2, determine xegregating unit according to the failure accident processing sequence;
Step 3, determine initial restorer;
Step 4, formation island to be recovered;
Step 5, choose individual equipment and send electricity rule;
Step 6, selection the best are sent electric scheme;
Step 7, send electricity to equipment, failure accident disposes.
2. electric network fault accident treatment method as claimed in claim 1 is characterized in that, determines the failure accident processing sequence to judge according to the operating mode before the power failure of faulty equipment in the described step 1.
3. electric network fault accident treatment method as claimed in claim 1 is characterized in that, determines in the described step 2 that xegregating unit refers to contacting fully between faulty equipment and the non-faulty equipment cut off.
4. electric network fault accident treatment method as claimed in claim 1 is characterized in that, determines all power equipments that need to be connected with this equipment before the initial restorer to disconnect in the described step 3.
5. electric network fault accident treatment method as claimed in claim 1 is characterized in that, individual equipment send electric rule to comprise in the described step 5: bus send to stop using before the electricity and autotomys, and send to use behind the electricity and autotomys;
Circuit send the reclosing of stopping using before the electricity, uses reclosing after sending electricity.
CN2013101471267A 2013-04-25 2013-04-25 Grid fault accident management method Pending CN103236683A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101471267A CN103236683A (en) 2013-04-25 2013-04-25 Grid fault accident management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101471267A CN103236683A (en) 2013-04-25 2013-04-25 Grid fault accident management method

Publications (1)

Publication Number Publication Date
CN103236683A true CN103236683A (en) 2013-08-07

Family

ID=48884708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101471267A Pending CN103236683A (en) 2013-04-25 2013-04-25 Grid fault accident management method

Country Status (1)

Country Link
CN (1) CN103236683A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106451334A (en) * 2016-08-28 2017-02-22 安徽普天电力科技有限公司 Method for controlling switching controller
CN108777482A (en) * 2018-05-28 2018-11-09 国家电网公司华中分部 A kind of optimal power transmission path decision method of the power grid of rule-based formula

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000228823A (en) * 1999-02-08 2000-08-15 Hitachi Ltd Method for presuming failed equipment in power system
CN102290799A (en) * 2011-08-11 2011-12-21 中国电力科学研究院 Small-scale quick recovery method for power supply of power distribution network in open loop running

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000228823A (en) * 1999-02-08 2000-08-15 Hitachi Ltd Method for presuming failed equipment in power system
CN102290799A (en) * 2011-08-11 2011-12-21 中国电力科学研究院 Small-scale quick recovery method for power supply of power distribution network in open loop running

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘柏良: "馈线自动化系统改进方案研究", 《江苏电机工程》, vol. 28, no. 4, 31 July 2009 (2009-07-31), pages 46 - 50 *
朱芸: "《变电站站长必读》", 31 January 2006, 中国水利水电出版社 *
李凌: "馈线自动化相关技术及实践研究", 《全国优秀硕士学位论文全文数据库》, 15 May 2006 (2006-05-15), pages 11 - 56 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106451334A (en) * 2016-08-28 2017-02-22 安徽普天电力科技有限公司 Method for controlling switching controller
CN108777482A (en) * 2018-05-28 2018-11-09 国家电网公司华中分部 A kind of optimal power transmission path decision method of the power grid of rule-based formula

Similar Documents

Publication Publication Date Title
CN103022994B (en) Method for achieving fault isolation and recovery of power distribution network with permeability distribution type power supply
US20170331281A1 (en) Dc electrical network
CN102185278A (en) Extra-high-voltage direct-current power transmission converter station protecting method
CN107294073B (en) Control protection system of hybrid topology direct current circuit breaker
CN103218756A (en) Grid fault accident identification system
CN104701825A (en) Quick protection method applicable to intelligent distribution network
CN107069686A (en) Grid-connected moment impact current suppressing circuit and apply its photovoltaic inversion system
CN104242455A (en) 110 kV substation protection and control action cooperation strategy suitable for DG (distributed generation) accessing
CN105633917A (en) Unified power flow controller-based fault processing method and system
CN103825363B (en) A kind of wind-light storage low pressure micro-capacitance sensor group protection coordination controller
US20200136389A1 (en) Protection For An HVDC Network
CN101860075A (en) Three-power supply automatic switching device
CN201160223Y (en) Multi-ring website system
CN103236683A (en) Grid fault accident management method
CN203352192U (en) Direct current switch device
CN103235224B (en) Grid fault analytical method
CN101707397A (en) Auto-switch-on system on basis of power grid dispatching and implementation method thereof
CN205610208U (en) Fault handling system based on unified power flow controller
CN203553882U (en) Transformer low-voltage tripping automatic reclosing device
CN106159987B (en) A kind of method of DC grid topology and the fast quick-recovery of fault isolation system
CN105356585A (en) Breaker closing and blocking loop
CN105162088A (en) 10kV cable network feed line power distribution station fault automatic detection system
CN104377805A (en) Communication station low-voltage distribution system
CN104009473A (en) Self-healing method of distribution network system
CN111786383B (en) Spare power automatic switching device and method for realizing mutual backup of multiple power incoming lines

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130807