CN103236683A - Grid fault accident management method - Google Patents
Grid fault accident management method Download PDFInfo
- Publication number
- CN103236683A CN103236683A CN2013101471267A CN201310147126A CN103236683A CN 103236683 A CN103236683 A CN 103236683A CN 2013101471267 A CN2013101471267 A CN 2013101471267A CN 201310147126 A CN201310147126 A CN 201310147126A CN 103236683 A CN103236683 A CN 103236683A
- Authority
- CN
- China
- Prior art keywords
- equipment
- electricity
- send
- fault accident
- accident
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses a grid fault accident management method. The management method comprises the following steps: step 1, determining a fault accident management sequence according to a fault accident conclusion; step 2, determining isolation equipment according to the fault accident management sequence; step 3, determining initial recovery equipment; step 4, forming an island to be recovered; step 5, selecting single equipment power transmission rules; step 6, selecting an optimal power transmission scheme; and step 7, transferring power to equipment, and finishing the fault accident management. An effective solution can be provided for fault accident reasons, a recovery scheme is intelligently or manually generated, the accident management reliability is ensured, and electric power can be conveniently and quickly recovered.
Description
Technical field
The present invention relates to electric network fault accident treatment method.
Background technology
Electric power system has the characteristics of hierarchical structure, i.e. electric power system is made up of factory station, circuit, and factory is made up of equipment such as switch, disconnecting link, bus, transformer, generator, capacitor, load circuits at the station.Factory constitutes network topology by line connecting relation between the station, constitutes factory's station topology with switch and plug-in strip annexation between the electric equipment.In the prior art, power system accident is handled according to rules text and abstract scheduling experience, wastes time and energy, and the result is not accurate enough.After having an accident, report protection action situation and switch trip situation by operator on duty's phone of transformer station or subordinate's scheduling, and manually check the equipment fault situation to the trip device place.During the processing accident, also be according to the topological structure of the operational mode behind the power grid accident and electrical network and accident treatment rules etc., manually design feasible fault recovery scheme, and finish the grid switching operation of accident treatment by the mode that straighforward operation or phone are issued a notice.As seen, the mode of this manual analysis and processing accident is with power network safety operation and prevent that the requirement of large-area power-cuts from being incompatible.
Summary of the invention
The object of the present invention is to provide a kind of electric network fault accident treatment method, can guarantee the reliability of accident treatment, convenient fast quick-recovery electric power.
In order to achieve the above object, the present invention is achieved through the following technical solutions: electric network fault accident treatment method is characterized in that described processing method comprises following steps:
Step 1, determine the failure accident processing sequence according to the failure accident conclusion;
Step 2, determine xegregating unit according to the failure accident processing sequence;
Step 3, determine initial restorer;
Step 4, formation island to be recovered;
Step 5, choose individual equipment and send electricity rule;
Step 6, selection the best are sent electric scheme;
Step 7, send electricity to equipment, failure accident disposes.
Determine the failure accident processing sequence to judge according to the operating mode before the power failure of faulty equipment in the above-mentioned step 1.
Determine in the above-mentioned step 2 that xegregating unit refers to contacting fully between faulty equipment and the non-faulty equipment cut off.
Determine all power equipments that need to be connected with this equipment before the initial restorer to disconnect in the above-mentioned step 3.
Individual equipment send electric rule to comprise in the above-mentioned step 5: bus send to stop using before the electricity and autotomys, and send to use behind the electricity and autotomys;
Circuit send the reclosing of stopping using before the electricity, uses reclosing after sending electricity.
Electric network fault accident treatment method of the present invention compared with prior art has the following advantages: the present invention can be at the failure accident reason, propose effectively to solve countermeasure, intelligent or manually generate recovery scheme, guarantee the reliability of accident treatment, convenient fast quick-recovery electric power.
Description of drawings
Fig. 1 is the method flow diagram of electric network fault accident treatment method of the present invention.
Embodiment
Below in conjunction with accompanying drawing, by describing a preferable specific embodiment in detail, the present invention is further elaborated.
As shown in Figure 1, electric network fault accident treatment method, processing method comprises following steps:
Step 1, determine the failure accident processing sequence according to the failure accident conclusion, determine the failure accident processing sequence to judge according to the operating mode before the power failure of faulty equipment, better, when the load line fault, if it causes the higher level equipment dead electricity, processing sequence is so, draws back on-load switch earlier, recover then, isolate on-load switch at last;
Step 2, determine xegregating unit according to the failure accident processing sequence, contacting fully between faulty equipment and the non-faulty equipment cut off, better, when busbar fault, if fault bus has bus arranged side by side, and side by side bus is electriferous state, so during the handling failure bus, need pour on the bus arranged side by side the load line of fault bus is cold, carry out the isolation of bus then;
Step 3, determine initial restorer, all power equipments that will be connected with this equipment disconnect;
Step 4, formation island to be recovered;
Step 5, choose individual equipment and send electricity rule, individual equipment to send electric rule to comprise bus to send to stop using before the electricity and autotomy, send to use behind the electricity and autotomy; Circuit send the reclosing of stopping using before the electricity, uses reclosing after sending electricity;
Step 6, selection the best are sent electric scheme;
Step 7, send electricity to equipment, failure accident disposes.
Although content of the present invention has been done detailed introduction by above preferred embodiment, will be appreciated that above-mentioned description should not be considered to limitation of the present invention.After those skilled in the art have read foregoing, for multiple modification of the present invention with to substitute all will be apparent.Therefore, protection scope of the present invention should be limited to the appended claims.
Claims (5)
1. electric network fault accident treatment method is characterized in that, described processing method comprises following steps:
Step 1, determine the failure accident processing sequence according to the failure accident conclusion;
Step 2, determine xegregating unit according to the failure accident processing sequence;
Step 3, determine initial restorer;
Step 4, formation island to be recovered;
Step 5, choose individual equipment and send electricity rule;
Step 6, selection the best are sent electric scheme;
Step 7, send electricity to equipment, failure accident disposes.
2. electric network fault accident treatment method as claimed in claim 1 is characterized in that, determines the failure accident processing sequence to judge according to the operating mode before the power failure of faulty equipment in the described step 1.
3. electric network fault accident treatment method as claimed in claim 1 is characterized in that, determines in the described step 2 that xegregating unit refers to contacting fully between faulty equipment and the non-faulty equipment cut off.
4. electric network fault accident treatment method as claimed in claim 1 is characterized in that, determines all power equipments that need to be connected with this equipment before the initial restorer to disconnect in the described step 3.
5. electric network fault accident treatment method as claimed in claim 1 is characterized in that, individual equipment send electric rule to comprise in the described step 5: bus send to stop using before the electricity and autotomys, and send to use behind the electricity and autotomys;
Circuit send the reclosing of stopping using before the electricity, uses reclosing after sending electricity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101471267A CN103236683A (en) | 2013-04-25 | 2013-04-25 | Grid fault accident management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101471267A CN103236683A (en) | 2013-04-25 | 2013-04-25 | Grid fault accident management method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103236683A true CN103236683A (en) | 2013-08-07 |
Family
ID=48884708
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013101471267A Pending CN103236683A (en) | 2013-04-25 | 2013-04-25 | Grid fault accident management method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103236683A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106451334A (en) * | 2016-08-28 | 2017-02-22 | 安徽普天电力科技有限公司 | Method for controlling switching controller |
CN108777482A (en) * | 2018-05-28 | 2018-11-09 | 国家电网公司华中分部 | A kind of optimal power transmission path decision method of the power grid of rule-based formula |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000228823A (en) * | 1999-02-08 | 2000-08-15 | Hitachi Ltd | Method for presuming failed equipment in power system |
CN102290799A (en) * | 2011-08-11 | 2011-12-21 | 中国电力科学研究院 | Small-scale quick recovery method for power supply of power distribution network in open loop running |
-
2013
- 2013-04-25 CN CN2013101471267A patent/CN103236683A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000228823A (en) * | 1999-02-08 | 2000-08-15 | Hitachi Ltd | Method for presuming failed equipment in power system |
CN102290799A (en) * | 2011-08-11 | 2011-12-21 | 中国电力科学研究院 | Small-scale quick recovery method for power supply of power distribution network in open loop running |
Non-Patent Citations (3)
Title |
---|
刘柏良: "馈线自动化系统改进方案研究", 《江苏电机工程》, vol. 28, no. 4, 31 July 2009 (2009-07-31), pages 46 - 50 * |
朱芸: "《变电站站长必读》", 31 January 2006, 中国水利水电出版社 * |
李凌: "馈线自动化相关技术及实践研究", 《全国优秀硕士学位论文全文数据库》, 15 May 2006 (2006-05-15), pages 11 - 56 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106451334A (en) * | 2016-08-28 | 2017-02-22 | 安徽普天电力科技有限公司 | Method for controlling switching controller |
CN108777482A (en) * | 2018-05-28 | 2018-11-09 | 国家电网公司华中分部 | A kind of optimal power transmission path decision method of the power grid of rule-based formula |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103022994B (en) | Method for achieving fault isolation and recovery of power distribution network with permeability distribution type power supply | |
US20170331281A1 (en) | Dc electrical network | |
CN102185278A (en) | Extra-high-voltage direct-current power transmission converter station protecting method | |
CN107294073B (en) | Control protection system of hybrid topology direct current circuit breaker | |
CN103218756A (en) | Grid fault accident identification system | |
CN104701825A (en) | Quick protection method applicable to intelligent distribution network | |
CN107069686A (en) | Grid-connected moment impact current suppressing circuit and apply its photovoltaic inversion system | |
CN104242455A (en) | 110 kV substation protection and control action cooperation strategy suitable for DG (distributed generation) accessing | |
CN105633917A (en) | Unified power flow controller-based fault processing method and system | |
CN103825363B (en) | A kind of wind-light storage low pressure micro-capacitance sensor group protection coordination controller | |
US20200136389A1 (en) | Protection For An HVDC Network | |
CN101860075A (en) | Three-power supply automatic switching device | |
CN201160223Y (en) | Multi-ring website system | |
CN103236683A (en) | Grid fault accident management method | |
CN203352192U (en) | Direct current switch device | |
CN103235224B (en) | Grid fault analytical method | |
CN101707397A (en) | Auto-switch-on system on basis of power grid dispatching and implementation method thereof | |
CN205610208U (en) | Fault handling system based on unified power flow controller | |
CN203553882U (en) | Transformer low-voltage tripping automatic reclosing device | |
CN106159987B (en) | A kind of method of DC grid topology and the fast quick-recovery of fault isolation system | |
CN105356585A (en) | Breaker closing and blocking loop | |
CN105162088A (en) | 10kV cable network feed line power distribution station fault automatic detection system | |
CN104377805A (en) | Communication station low-voltage distribution system | |
CN104009473A (en) | Self-healing method of distribution network system | |
CN111786383B (en) | Spare power automatic switching device and method for realizing mutual backup of multiple power incoming lines |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130807 |