CN103235280B - Direct measuring method of magnetic saturation margin of current transformer based on scaling converter - Google Patents
Direct measuring method of magnetic saturation margin of current transformer based on scaling converter Download PDFInfo
- Publication number
- CN103235280B CN103235280B CN201310113636.2A CN201310113636A CN103235280B CN 103235280 B CN103235280 B CN 103235280B CN 201310113636 A CN201310113636 A CN 201310113636A CN 103235280 B CN103235280 B CN 103235280B
- Authority
- CN
- China
- Prior art keywords
- current
- transformer
- current transformer
- magnetic saturation
- terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000012360 testing method Methods 0.000 claims abstract description 67
- 238000005259 measurement Methods 0.000 claims abstract description 17
- 230000009466 transformation Effects 0.000 claims description 16
- 238000000691 measurement method Methods 0.000 claims description 4
- 238000001514 detection method Methods 0.000 abstract description 12
- 238000012795 verification Methods 0.000 description 11
- 238000010586 diagram Methods 0.000 description 5
- 230000004907 flux Effects 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004870 electrical engineering Methods 0.000 description 1
Landscapes
- Measuring Instrument Details And Bridges, And Automatic Balancing Devices (AREA)
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
一种基于比例变换器的电流互感器磁饱和裕度直接测量方法,所述方法将电流比例变换器与试品电流互感器TAx级联,与互感器校验仪、标准电流互感器、负荷箱组成新的测量电流互感器磁饱和裕度的电路,在互感器校验仪上读取试品电流互感器的误差,即比值差f和相位差δ;完成该试品电流互感器的磁饱和裕度测量。本发明利用现有的标准电流互感器、互感器校验仪等电流互感器检定设备,可实现对电流互感器磁饱和裕度直接测量。使标准电流互感器、互感器校验仪工作在额定电流的50%或100%,确保检测装置量值的可溯源性。具有方法简洁、经济、科学、实用、可操作性强、成本低等优点。本发明适用于电流互感器检测技术领域。
A method for directly measuring the magnetic saturation margin of a current transformer based on a proportional converter, in which the current proportional converter is cascaded with the current transformer TAx of the test object, and is connected with a transformer calibrator, a standard current transformer, and a load box Form a new circuit for measuring the magnetic saturation margin of the current transformer, read the error of the current transformer of the test object on the transformer calibrator, that is, the ratio difference f and the phase difference δ; complete the magnetic saturation of the current transformer of the test object margin measurement. The present invention utilizes the existing standard current transformer, transformer calibrator and other current transformer testing equipment, and can realize the direct measurement of the magnetic saturation margin of the current transformer. Make the standard current transformer and transformer calibrator work at 50% or 100% of the rated current to ensure the traceability of the value of the detection device. The method has the advantages of simple, economical, scientific, practical, strong operability and low cost. The invention is applicable to the technical field of current transformer detection.
Description
技术领域 technical field
本发明涉及基于比例变换器的电流互感器磁饱和裕度直接测量方法,属电力计量电流互感器检测技术领域。 The invention relates to a method for directly measuring the magnetic saturation margin of a current transformer based on a proportional converter, and belongs to the technical field of electric power metering current transformer detection.
背景技术 Background technique
JJG1021-2007《电力互感器检定规程》§4.5 磁饱和裕度:“电流互感器铁心磁通密度在相当于额定电流和额定负荷状态下的1.5倍时,误差应不大于额定电流和额定负荷下误差限值的1.5倍。”南方电网要求:电流互感器铁心磁通密度在相当于额定电流和额定负荷状态下的2倍时,误差应不大于额定电流和额定负荷下误差限值的2倍。电流互感器检定装置主要由:标准电流互感器、互感器校验仪及负荷箱构成,依据JJG313-2010《测量用电流互感器检定规程》、JJG169-2010《互感器校验仪检定规程》及JJF1264-2010《互感器负荷箱校准规范》要求标准电流互感器、互感器校验仪及负荷箱均不能满足过载到额定电流1.5倍的要求,现有电流互感器检定装置不能直接测量电流互感器的磁饱和裕度。JJG1021-2007《电力互感器检定规程》§6.3.8.2 间接测量:“如果不具备在150%额定电流点测量误差的标准装置,可以通过增加二次负荷的方法间接测量,测量时选定的电流不小于额定电流的20%。设选定的电流百分点为m%,电流互感器的额定二次负荷为ZB,二次绕组电阻的漏电抗为Z2,分别在二次负荷ZB,电流百分点m%以及二次负荷2ZB+ Z2,电流百分点0.5 m%下测量电流互感器的误差,得到f1、δ1和f2、δ2。然后在二次负荷(150/m)ZB+(150/m-1)Z2,电流百分点m%下测量电流互感器的误差,得到f3、δ3。被检电流互感器150%电流百分点下的误差按下式计算: JJG1021-2007 "Verification Regulations for Power Transformers" §4.5 Magnetic saturation margin: "When the magnetic flux density of the core of the current transformer is equivalent to 1.5 times the rated current and rated load, the error should not be greater than the rated current and rated load. 1.5 times the error limit." Southern Power Grid requires that when the flux density of the current transformer core is equivalent to twice the rated current and rated load, the error should not be greater than 2 times the error limit under the rated current and rated load. . The current transformer verification device is mainly composed of: standard current transformer, transformer calibrator and load box, according to JJG313-2010 "Verification Regulations for Current Transformers for Measurement", JJG169-2010 "Verification Regulations for Transformer Calibrators" and JJF1264-2010 "Calibration Specification for Transformer Load Box" requires that standard current transformers, transformer calibrators and load boxes cannot meet the requirements of overloading to 1.5 times the rated current, and the existing current transformer verification devices cannot directly measure current transformers magnetic saturation margin. JJG1021-2007 "Verification Regulations for Power Transformers" §6.3.8.2 Indirect measurement: "If there is no standard device for measuring the error at 150% of the rated current point, it can be measured indirectly by adding a secondary load. The current selected during measurement Not less than 20% of the rated current. Set the selected current percentage point as m%, the rated secondary load of the current transformer is Z B , and the leakage reactance of the secondary winding resistance is Z 2 . Percentage point m% and secondary load 2Z B + Z 2 , current percentage point 0.5 m% to measure the error of the current transformer, get f 1 , δ 1 and f 2 , δ 2 . Then in the secondary load (150/m) Z B + (150/m-1) Z 2 , measure the error of the current transformer at the current percentage point m%, and obtain f 3 , δ 3 . The error at the 150% current percentage point of the tested current transformer is calculated as follows:
…………⑴ …………⑴
…………⑵ …………⑵
间接测量法需要测量试品二次绕组阻抗,并计算Z2;依据Z2值配置二次负荷;但Z2值为随机数值,传统串联方式负荷箱已无法满足要求,必须研制新型阻抗网络;该二次负荷箱存在原理上的短板,外接导线的电阻难以扣除。为此研究一种科学、准确、可操作性强的电流互感器磁饱和裕度直接检测方法,具有现实意义。 The indirect measurement method needs to measure the impedance of the secondary winding of the test product and calculate Z 2 ; configure the secondary load according to the value of Z 2 ; however, the value of Z 2 is a random value, and the traditional series load box can no longer meet the requirements, so a new impedance network must be developed; The secondary load box has a short board in principle, and it is difficult to deduct the resistance of the external wire. Therefore, it is of practical significance to study a scientific, accurate and operable direct detection method for the magnetic saturation margin of current transformers.
发明内容 Invention content
本发明的目的是,为了解决目前电流互感器的检测设备均不能满足过载到额定电流1.5倍的要求,无法进行电流互感器的磁饱和裕度的问题,如何在现有设备检测基础上进行技术改进,实现电流互感器的磁饱和裕度测量,本发明提供了一种电流互感器磁饱和裕度直接测量方法。 The purpose of the present invention is, in order to solve the problem that the current detection equipment of the current transformer cannot meet the requirement of being overloaded to 1.5 times of the rated current, and the magnetic saturation margin of the current transformer cannot be carried out. The method is improved to realize the measurement of the magnetic saturation margin of the current transformer, and the invention provides a method for directly measuring the magnetic saturation margin of the current transformer.
本发明的技术方案是,在现有《电流互感器检定规程》的检定线路基础上,将电流比例变换器与试品电流互感器TAX级联,与互感器校验仪、标准电流互感器、负荷箱组成新的测量电流互感器磁饱和裕度的电路,在互感器校验仪上读取试品电流互感器的误差,即比值差f和相位差δ;完成该试品电流互感器的磁饱和裕度测量。f为比值差,单位:(%);δ相位差,单位:(′)分。 The technical scheme of the present invention is, on the basis of the verification circuit of the existing "Current Transformer Verification Regulations", the current proportional converter is cascaded with the test current transformer TA X , and the transformer calibrator, the standard current transformer , load box to form a new circuit for measuring the magnetic saturation margin of the current transformer, read the error of the current transformer of the test product on the transformer calibrator, that is, the ratio difference f and the phase difference δ; complete the current transformer of the test product The magnetic saturation margin measurement. f is the ratio difference, unit: (%); δ phase difference, unit: (′) points.
本发明依据JJG1021-2007《电流互感器检定规程》的检定线路图(见图1),使用1台变比为10A/5A;准确度等级为0.01%级的电流比例变换器与试品电流互感器TAX级联,连接成如图2所示的电流互感器磁饱和裕度直接测量检测接线图。 According to the verification circuit diagram (see Figure 1) of JJG1021-2007 "Current Transformer Verification Regulations", the present invention uses a current proportional converter with a transformation ratio of 10A/5A; an accuracy level of 0.01% and the current mutual inductance of the test product The transformer TA X is cascaded and connected to form the direct measurement and detection wiring diagram of the magnetic saturation margin of the current transformer as shown in Figure 2.
本发明测量电流互感器磁饱和裕度的电路为:将标准电流互感器TAO的二次电流端子K2接互感器校验仪工作电流回路测试端子T0,标准电流互感器TAO的二次电流极性端子K1与电流比例变换器二次电流极性端子K2并联接至互感器校验仪差值电流回路测试端子K,电流比例变换器二次电流极性端子K1接互感器校验仪工作电流回路测试端子TX;标准电流互感器TAO的一次电流极性端子L1与试品电流互感器TAX的一次电流极性端子L1串联,标准电流互感器TAO的一次电流极性端子L2与试品电流互感器TAX的一次电流极性端子L2分别接升流器输出端;电流比例变换器一次电流极性端子L1通过负荷箱Z与试品电流互感器TAX的二次电流极性端子K2相连,电流比例变换器一次电流极性端子L2与试品电流互感器TAX的二次电流极性端子K1相连;互感器校验仪差值电流回路测试端子D接地。 The circuit for measuring the magnetic saturation margin of the current transformer in the present invention is: connect the secondary current terminal K2 of the standard current transformer TA0 to the working current loop test terminal T0 of the transformer calibrator, and connect the secondary current terminal K2 of the standard current transformer TA0 to the secondary current terminal K2 of the standard current transformer TA0 The secondary current polarity terminal K 1 and the secondary current polarity terminal K 2 of the current proportional converter are connected in parallel to the differential current loop test terminal K of the transformer calibrator, and the secondary current polarity terminal K 1 of the current proportional converter is connected to the mutual inductance The working current loop test terminal T X of the device calibrator; the primary current polarity terminal L 1 of the standard current transformer TA O is connected in series with the primary current polarity terminal L 1 of the test current transformer TA X , and the standard current transformer TA O The primary current polarity terminal L 2 of the test object current transformer TA X is respectively connected to the output terminal of the current booster; the primary current polarity terminal L 1 of the current proportional converter passes through the load box Z and the test object The secondary current polarity terminal K 2 of the current transformer TA X is connected, and the primary current polarity terminal L 2 of the current proportional converter is connected with the secondary current polarity terminal K 1 of the current transformer TA X of the test object; transformer calibration The instrument differential current loop test terminal D is grounded.
依据GB1208-2006《电流互感器》§5.2 额定二次电流标准值:“额定二次电流标准值为:1A和5A。”因此,本发明方法仅考虑额定二次电流为1A和5A电流互感器磁饱和裕度的测量。 According to GB1208-2006 "Current Transformer" §5.2 Rated secondary current standard value: "The rated secondary current standard value is: 1A and 5A." Therefore, the method of the present invention only considers the rated secondary current of 1A and 5A current transformers Measurement of magnetic saturation margin.
设:试品电流互感器TAX的变比为Kx,则: Assuming: the transformation ratio of the current transformer TA X of the test product is K x , then:
…………⑶ …………⑶
电流比例变换器与试品电流互感器TAX级联后的等效变比为Kx1: The equivalent transformation ratio after cascading the current proportional converter and the current transformer TA X of the test object is K x1 :
…………⑷ …………⑷
由式⑷可知,变比为10A/5A的电流比例变换器与被检电流互感器TAX级联后可使电流比例变换器二次回路电流减少50%。即当试品电流互感器一次电流为额定一次电流的150%时,电流比例变换器的二次电流为: It can be seen from formula (4) that the current proportional converter with a transformation ratio of 10A/5A can reduce the secondary circuit current of the current proportional converter by 50% after being cascaded with the tested current transformer TA X. That is, when the primary current of the current transformer under test is 150% of the rated primary current, the secondary current of the current proportional converter is:
按南方电网的要求,当试品电流互感器一次电流为额定一次电流的200%时,电流比例变换器的二次电流为: According to the requirements of China Southern Power Grid, when the primary current of the current transformer under test is 200% of the rated primary current, the secondary current of the current proportional converter is:
要比较上述变比的试品电流互感器TAX必须选择与其相同变比的标准电流互感器,即必须选择标准电流互感器变比为Kx1。同理可使标准电流互感器二次电流减少50%,使标准电流互感器工作在额定电流的50%或100%。该方法同时解决了互感器校验仪和标准电流互感器的过电流问题。负荷箱的额定电流可按试品电流互感器额定二次电流的2倍进行选择,当额定二次电流为5A时,可选择额定电流为10A的负荷箱,解决负荷箱的过电流问题。 To compare the test current transformer TA X with the above transformation ratio, a standard current transformer with the same transformation ratio must be selected, that is, the transformation ratio of the standard current transformer must be K x1 . In the same way, the secondary current of the standard current transformer can be reduced by 50%, so that the standard current transformer can work at 50% or 100% of the rated current. The method simultaneously solves the overcurrent problem of the transformer calibrator and the standard current transformer. The rated current of the load box can be selected according to twice the rated secondary current of the current transformer of the test product. When the rated secondary current is 5A, a load box with a rated current of 10A can be selected to solve the overcurrent problem of the load box.
本发明电流互感器磁饱和裕度直接测量方法的步骤如下: The steps of the method for directly measuring the magnetic saturation margin of the current transformer of the present invention are as follows:
(1)采用的设备,本发明实施例采用的设备有(1):一台标准电流互感器(0.02级)、一台互感器校验仪(2级)、一台额定电流为10A的负荷箱(3级)、一台变比为10A/5A;准确度等级为0.01%级的电流比例变换器; (1) The equipment used, the equipment used in the embodiment of the present invention has (1): a standard current transformer (0.02 level), a transformer calibrator (2 level), and a load with a rated current of 10A box (3 levels), a current proportional converter with a transformation ratio of 10A/5A and an accuracy level of 0.01%;
(2)按图2所示接线方式进行接线; (2) Carry out wiring according to the wiring method shown in Figure 2;
(3)根据试品电流互感器铭牌参数“额定二次负荷”设置负荷箱; (3) Set the load box according to the parameter "rated secondary load" on the nameplate of the current transformer of the test product;
(4)按规程要求将试品电流互感器的一次电流升至额定一次电流的150%,此时,标准电流互感器和电流比例变换器二次电流为额定二次电流的75%。或按南方电网公司要求将试品电流互感器的一次电流升至额定一次电流的200%,此时,标准电流互感器和电流比例变换器二次电流为额定二次电流的100%。 (4) Raise the primary current of the current transformer under test to 150% of the rated primary current according to the requirements of the regulations. At this time, the secondary current of the standard current transformer and current proportional converter is 75% of the rated secondary current. Or increase the primary current of the test current transformer to 200% of the rated primary current according to the requirements of China Southern Power Grid Corporation. At this time, the secondary current of the standard current transformer and current proportional converter is 100% of the rated secondary current.
(5)在互感器校验仪上读取试品电流互感器的误差f和δ,f为比值差,单位:(%);δ相位差,单位:(′)分。 (5) Read the errors f and δ of the current transformer of the test product on the transformer calibrator, f is the ratio difference, unit: (%); δ phase difference, unit: (′) minutes.
(6)将试品电流互感器的一次电流电流降至0。 (6) Reduce the primary current of the current transformer under test to 0.
(7)完成该试品电流互感器的磁饱和裕度测量。 (7) Complete the measurement of the magnetic saturation margin of the current transformer of the test product.
本发明的有益效果是,检测试品电流互感器的磁饱和裕度时,使用一台标准电流互感器(0.02级)、一台互感器校验仪(2级)、一台额定电流为10A的负荷箱(3级)、一台变比为10A/5A;准确度等级为0.01%级的电流比例变换器。构成电流互感器的磁饱和裕度直接测量的检测线路,利用现有的标准电流互感器、互感器校验仪等电流互感器检定设备,可实现对电流互感器磁饱和裕度直接测量。使标准电流互感器、互感器校验仪工作在额定电流的50%或100%,确保检测装置量值的可溯源性。具有方法简洁、经济、科学、实用、可操作性强、成本低等优点。 The beneficial effect of the present invention is that when testing the magnetic saturation margin of the current transformer of the test product, a standard current transformer (0.02 level), a transformer calibrator (2 levels), and a rated current transformer of 10A are used. The load box (3 levels), a current proportional converter with a transformation ratio of 10A/5A and an accuracy level of 0.01%. The detection circuit for direct measurement of the magnetic saturation margin of the current transformer is formed, and the current transformer verification equipment such as the existing standard current transformer and the transformer calibrator can be used to realize the direct measurement of the magnetic saturation margin of the current transformer. Make the standard current transformer and transformer calibrator work at 50% or 100% of the rated current to ensure the traceability of the value of the detection device. The method has the advantages of simple, economical, scientific, practical, strong operability and low cost.
本发明适用于电流互感器检测技术领域。 The invention is applicable to the technical field of current transformer detection.
附图说明 Description of drawings
图1是常规电流互感器检测接线图; Figure 1 is a conventional current transformer detection wiring diagram;
图2是电流互感器磁饱和裕度直接测量检测接线图; Figure 2 is a wiring diagram for direct measurement and detection of the magnetic saturation margin of a current transformer;
图中符号:TA0是标准电流互感器;TAx是试品电流互感器;TAT是电流比例变换器;Z是电流互感器负荷箱;I0是标准电流互感器二次电流;Ix是试品电流互感器二次电流;IT是电流比例变换器一次电流;ΔI是测量回路差值电流;I1是检测电路一次电流;L1、L2分别为标准电流互感器、电流比例变换器和试品电流互感器一次电流极性端子;K1、K2分别为标准电流互感器、电流比例变换器和试品电流互感器二次电流极性端子;T0 、TX 为互感器校验仪工作电流回路测试端子;K、D为互感器校验仪差值电流回路测试端子。 Symbols in the figure: TA 0 is the standard current transformer; TA x is the test current transformer; TA T is the current proportional converter; Z is the load box of the current transformer; I 0 is the secondary current of the standard current transformer; I x I T is the secondary current of the current transformer of the test product; I T is the primary current of the current proportional converter; ΔI is the difference current of the measurement circuit; I 1 is the primary current of the detection circuit ; Transformer and current transformer primary current polarity terminals; K 1 , K 2 are standard current transformer, current proportional converter and secondary current polarity terminals of current transformer under test; T 0 , T X are mutual inductance The working current loop test terminals of the transformer calibrator; K and D are the differential current loop test terminals of the transformer calibrator.
具体实施方式 Detailed ways
以下结合附图对本发明进行详细说明。 The present invention will be described in detail below in conjunction with the accompanying drawings.
1、本方法采用的设备: 1. The equipment used in this method:
一台标准电流互感器(0.02级)、一台互感器校验仪(2级)、一台额定电流为10A的负荷箱(3级)、一台变比为10A/5A;准确度等级为0.01%级的电流比例变换器。 One standard current transformer (level 0.02), one transformer calibrator (level 2), one load box (level 3) with a rated current of 10A, and one with a transformation ratio of 10A/5A; the accuracy level is 0.01% class current proportional converter.
2、接线方式 2. Wiring method
(1)选择标准电流互感器的变比: (1) Select the transformation ratio of the standard current transformer:
设:试品电流互感器的变比为I1n/I2n,则选择标准电流互感器的变比为2I1n/I2n。例如:试品电流互感器的变比为100A/5A,则选择标准电流互感器的变比为200A/5A。 Assume: the transformation ratio of the current transformer under test is I 1n /I 2n , and the transformation ratio of the standard current transformer is 2I 1n /I 2n . For example: if the transformation ratio of the test current transformer is 100A/5A, then the transformation ratio of the standard current transformer is 200A/5A.
(2)按电流互感器磁饱和裕度直接测量方法接线图进行接线,见图2; (2) Perform wiring according to the wiring diagram of the direct measurement method of the magnetic saturation margin of the current transformer, see Figure 2;
将标准电流互感器TAO的二次电流端子K2接互感器校验仪工作电流回路测试端子T0,标准电流互感器TAO的二次电流极性端子K1与电流比例变换器二次电流极性端子K2并联接至互感器校验仪差值电流回路测试端子K,电流比例变换器二次电流极性端子K1接互感器校验仪工作电流回路测试端子TX;标准电流互感器TAO的一次电流极性端子L1与试品电流互感器TAX的一次电流极性端子L1串联,标准电流互感器TAO的一次电流极性端子L2与试品电流互感器TAX的一次电流极性端子L2分别接升流器输出端;电流比例变换器一次电流极性端子L1通过负荷箱Z与试品电流互感器TAX的二次电流极性端子K2相连,电流比例变换器一次电流极性端子L2与试品电流互感器TAX的二次电流极性端子K1相连;互感器校验仪差值电流回路测试端子D接地。 Connect the secondary current terminal K 2 of the standard current transformer TA O to the working current loop test terminal T 0 of the transformer calibrator, and connect the secondary current polarity terminal K 1 of the standard current transformer TA O to the secondary current proportional converter Current polarity terminal K 2 is connected to the differential current loop test terminal K of the transformer calibrator in parallel, and the secondary current polarity terminal K 1 of the current proportional converter is connected to the working current loop test terminal T X of the transformer calibrator; standard current The primary current polarity terminal L 1 of the transformer TA O is connected in series with the primary current polarity terminal L 1 of the test current transformer TA X , and the primary current polarity terminal L 2 of the standard current transformer TA O is connected with the test current transformer The primary current polarity terminal L 2 of TA X is respectively connected to the output terminal of the current booster; the primary current polarity terminal L 1 of the current proportional converter passes through the load box Z and the secondary current polarity terminal K 2 of the test current transformer TA X The primary current polarity terminal L 2 of the current proportional converter is connected with the secondary current polarity terminal K 1 of the current transformer TA X of the test object; the differential current loop test terminal D of the transformer calibrator is grounded.
3、按相关规程的要求进行检测。 3. Conduct testing according to the requirements of relevant regulations.
(1)根据试品电流互感器铭牌参数“额定二次负荷”设置负荷箱; (1) Set the load box according to the parameter "rated secondary load" on the nameplate of the current transformer of the test product;
先对负荷箱阻抗值进行计算: First calculate the impedance value of the load box:
依据电工原理: According to the principle of electrical engineering:
…………⑸ …………⑸
例如:试品电流互感器额定二次负荷:S=20VA;额定二次电流:I=5A,则: For example: rated secondary load of the current transformer under test: S=20VA; rated secondary current: I=5A, then:
(2)根据计算结果设置负荷箱量程; (2) Set the load box range according to the calculation result;
(3)按规程要求将试品电流互感器的一次电流升至额定一次电流的150%,此时,标准电流互感器和电流比例变换器二次电流为额定二次电流的75%。或按南方电网公司要求将试品电流互感器的一次电流升至额定一次电流的200%,此时,标准电流互感器和电流比例变换器二次电流为额定二次电流的100%。 (3) Raise the primary current of the current transformer under test to 150% of the rated primary current according to the requirements of the regulations. At this time, the secondary current of the standard current transformer and current proportional converter is 75% of the rated secondary current. Or increase the primary current of the test current transformer to 200% of the rated primary current according to the requirements of China Southern Power Grid Corporation. At this time, the secondary current of the standard current transformer and current proportional converter is 100% of the rated secondary current.
(4)在互感器校验仪上读取试品电流互感器的误差f和δ。f为比值差,单位:(%);δ相位差,单位:(′)分; (4) Read the errors f and δ of the current transformer of the test product on the transformer calibrator. f is the ratio difference, unit: (%); δ phase difference, unit: (′) points;
(5)将试品电流互感器的一次电流电流降至0; (5) Reduce the primary current of the current transformer under test to 0;
(6)完成该试品电流互感器的磁饱和裕度测量。 (6) Complete the measurement of the magnetic saturation margin of the current transformer of the sample.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310113636.2A CN103235280B (en) | 2013-04-03 | 2013-04-03 | Direct measuring method of magnetic saturation margin of current transformer based on scaling converter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310113636.2A CN103235280B (en) | 2013-04-03 | 2013-04-03 | Direct measuring method of magnetic saturation margin of current transformer based on scaling converter |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103235280A CN103235280A (en) | 2013-08-07 |
CN103235280B true CN103235280B (en) | 2015-06-17 |
Family
ID=48883331
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310113636.2A Active CN103235280B (en) | 2013-04-03 | 2013-04-03 | Direct measuring method of magnetic saturation margin of current transformer based on scaling converter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103235280B (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104251948B (en) * | 2014-10-22 | 2016-09-07 | 华自科技股份有限公司 | A kind of differential protection that is applicable to detects test device saturated for CT and method of testing |
CN105974352A (en) * | 2016-06-20 | 2016-09-28 | 国网天津市电力公司 | Ultra-high voltage current transformer error field test monitoring method |
CN106205988A (en) * | 2016-08-12 | 2016-12-07 | 山东亿玛信诺电气有限公司 | Wide cut metering combination transformer |
CN109655777B (en) * | 2019-01-15 | 2021-10-08 | 昆明理工大学 | A method and device for evaluating the magnetic saturation margin performance of a PT used in a distribution network |
CN111487576B (en) * | 2020-04-30 | 2022-12-30 | 浙江省计量科学研究院 | Miniature current transformer measuring device based on direct measurement method |
CN112068062B (en) * | 2020-09-10 | 2023-01-03 | 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 | Mutual inductor calibration system and calibration method |
CN112858989A (en) * | 2021-03-30 | 2021-05-28 | 云南电网有限责任公司电力科学研究院 | Current transformer calibration system |
CN113447878B (en) * | 2021-06-18 | 2023-12-01 | 中国电力科学研究院有限公司 | Error measurement equipment and method for current transformer |
CN115236579A (en) * | 2022-06-15 | 2022-10-25 | 国网江苏省电力有限公司营销服务中心 | Wide-range current transformer error calibration device and method |
CN115561695B (en) * | 2022-11-18 | 2023-06-09 | 山西互感器电测设备有限公司 | Three-phase current transformer on-site verification device and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2170567Y (en) * | 1993-09-17 | 1994-06-29 | 武汉国测电器公司 | Power current transformer with special coil |
CN101539616A (en) * | 2008-03-20 | 2009-09-23 | 上海市电力公司 | Method for detecting accuracy of optical current transformer for measuring |
CN102096060A (en) * | 2010-11-30 | 2011-06-15 | 国网电力科学研究院 | Circuit for checking on-site accuracy of current transformer under condition of underload operations |
CN102540128A (en) * | 2012-02-13 | 2012-07-04 | 江西省电力科学研究院 | Method for automatically calibrating error of combined three-phase current transformer |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100882310B1 (en) * | 2007-06-29 | 2009-02-10 | 한국표준과학연구원 | Current transformer comparison measuring device |
-
2013
- 2013-04-03 CN CN201310113636.2A patent/CN103235280B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2170567Y (en) * | 1993-09-17 | 1994-06-29 | 武汉国测电器公司 | Power current transformer with special coil |
CN101539616A (en) * | 2008-03-20 | 2009-09-23 | 上海市电力公司 | Method for detecting accuracy of optical current transformer for measuring |
CN102096060A (en) * | 2010-11-30 | 2011-06-15 | 国网电力科学研究院 | Circuit for checking on-site accuracy of current transformer under condition of underload operations |
CN102540128A (en) * | 2012-02-13 | 2012-07-04 | 江西省电力科学研究院 | Method for automatically calibrating error of combined three-phase current transformer |
Non-Patent Citations (2)
Title |
---|
二次电流为0.05A的电流互感器及其检定;赵屹榕;《电测与仪表》;19981231;第35卷(第396期);第25-27、37页 * |
电流互感器级联检定线路;卢欣;《电测与仪表》;20090331;第46卷(第519期);第32-33页第0-2节、第34页第2段和图1 * |
Also Published As
Publication number | Publication date |
---|---|
CN103235280A (en) | 2013-08-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103235280B (en) | Direct measuring method of magnetic saturation margin of current transformer based on scaling converter | |
CN102096060B (en) | Circuit for checking on-site accuracy of current transformer under condition of underload operations | |
CN103207379B (en) | Method and device for measuring direct current magnetic bias error characteristics of current transformer | |
CN102540128B (en) | Method for automatically calibrating error of combined three-phase current transformer | |
CN103823100B (en) | A kind of high accuracy current comparator and self checking method | |
CN102662110B (en) | Method for testing dielectric loss and capacitance of capacitance type voltage transformer | |
CN106291123A (en) | A kind of method of direct measurement magnetic cell winding loss | |
CN104330760A (en) | Precise high-voltage current mutual inductor and error testing system and method thereof | |
CN204154863U (en) | A kind of miniature circuit breaker dropout test macro | |
CN103185833B (en) | Method for measuring peak area ratio of short-time energizing test loop power factor | |
CN105044432B (en) | Current transformer leakage current measuring method | |
CN102520382A (en) | Method for detecting half-wave current transformation error of current transformer | |
CN203287514U (en) | Current transformer DC magnetic bias error characteristic measuring device | |
CN205656294U (en) | Current transformer error measuring apparatu | |
PL399602A1 (en) | Method for assessing the accuracy of the transformation of inductive current transformers for deformed current | |
CN107144729A (en) | The interval integral measuring method of low-voltage electrical apparatus short circuit tolerance strength test power factor | |
CN105629192A (en) | Zero-flux current transformer calibration device and method | |
CN101493509A (en) | Verifying apparatus for measuring extra-high voltage transformer error | |
CN104076226B (en) | Device and method based on voltage difference and current differential measuring transformer efficiency | |
CN103777171B (en) | A kind of method of testing of current transformer exciting characteristic curve | |
CN204203447U (en) | A kind of voltage transformer error of safety and environmental protection measures training set | |
CN205562781U (en) | Zero magnetic flow current transformer calibration equipment based on analog quantity is applyed to secondary side | |
CN104111438B (en) | Primary large-current loop monitoring method in current transformer error test | |
CN205594091U (en) | Error measurement device for current transformer | |
CN201373913Y (en) | Calibration device for error measurement of UHV voltage transformer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |