CN103234075A - Trenchless pipeline replace equipment with double-ring cutter and method thereof - Google Patents

Trenchless pipeline replace equipment with double-ring cutter and method thereof Download PDF

Info

Publication number
CN103234075A
CN103234075A CN2013101131087A CN201310113108A CN103234075A CN 103234075 A CN103234075 A CN 103234075A CN 2013101131087 A CN2013101131087 A CN 2013101131087A CN 201310113108 A CN201310113108 A CN 201310113108A CN 103234075 A CN103234075 A CN 103234075A
Authority
CN
China
Prior art keywords
pipeline
machine structure
shield machine
old
cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101131087A
Other languages
Chinese (zh)
Other versions
CN103234075B (en
Inventor
肖剑
费利东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC COMMUNICATION CONSTRUCTION GROUP CO., LTD.
Original Assignee
MCC COMMUNICATION ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC COMMUNICATION ENGINEERING TECHNOLOGY Co Ltd filed Critical MCC COMMUNICATION ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201310113108.7A priority Critical patent/CN103234075B/en
Publication of CN103234075A publication Critical patent/CN103234075A/en
Application granted granted Critical
Publication of CN103234075B publication Critical patent/CN103234075B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides trenchless pipeline replace equipment with a double-ring cutter and a method thereof. The equipment comprises a shield mechanism provided with an outer ring cutter and an inner ring cutter, a slip casting mechanism and a traction mechanism. The using method of the equipment comprises the following steps: rapidly rotating the cutter at the front end of the shield mechanism under the action of a driver, rotary-cutting and expanding the stratum on the periphery of the old pipeline wall by the outer ring cutter, cutting the old pipeline wall forward by the hopper-shaped inner ring cutter, and meanwhile squeezing inwards to enable the pipe wall to be crushed, pulling the shield mechanism forward unceasingly to break down the old pipeline wall by a tractor, and meanwhile laying new pipelines connected with the back part of the shield mechanism forwards, unceasingly injecting circulating mud by the slip casting mechanism, lubricating the cutters, and bringing the scraps produced after cutting the old pipeline wall out the pipelines. The equipment has the advantages that the underground pipeline replacement can be finished under the trenchless condition; the efficiency is high; and the influence on the periphery is small.

Description

A kind of non-excavation pipeline with dicyclo cutter is exchange device and using method thereof more
Technical field
The disclosure relates to a kind of non-excavation pipeline with dicyclo cutter more exchange device and using method thereof, belongs to the trenchless technology field.
Background technique
Along with the continuous quickening of urbanization process, pipeline is increasing in the urban underground space, thereby produces the needs that old pipeline is changed.That these pipelines that need change generally are laid on is populous, commercial bustling urban district, is often filling other some pipelines at tube circumference, also rides pressing building or be in below the road on pipeline.Excavation construction will cause the breaking-up in traffic congestion, greenery patches and gardens, also may cause breaking-up to underground communal facilitys such as some other pipeline, cables.
Along with the continuous development of trenchless technology and perfect, addressing this problem the best way is exactly the non-excavation pipeline replacing technology of giving birth to therefrom.Because having advantages such as the construction site is little, construction is simple, cost is lower, this technology obtained extensive use.The non-excavation of old pipeline is changed to be actually at the original position place of old pipeline and is changed, and is guide with the old pipe that will change namely, and identical or big slightly new pipe is drawn in or pushed up the people and finishes the replacing operation to replace old pipe with diameter in the broken old pipe of special-purpose machines and tools.Main non-excavation replacing technology has the booster method, eats Guan Fa etc.
Wherein, eating the pipe method is to change application and the improvement in field at pipeline in miniature tunnel pipelayer's method.This worker's method adopts the smear metal cutter that old pipeline to be changed is pulverized.The smear metal cutter of particular design can " be eaten " and fall pipeline and soil layer and the interior any obstacle of soil layer.The pipeline chip is discharged to the face of land by the new pipeline that cutting head connects later.The rear portion that new pipeline is connected excavator is brought into.
Fig. 1 is the existing more schematic representation of exchange device of pipe method pipeline of eating.As shown in Figure 1, existingly eat the employed shield machine structure of pipe method and generally comprise a smear metal 91 and shield structure bodies 92.In the smear metal 91 the smear metal tooth is housed, is used for the old pipeline 4 of smear metal.The smear metal head is placed in the edge of shield structure body 92, the soil layer smear metal is arrived new pipeline necessary diameter is installed.Be conical heading end 93 in the smear metal head, be inserted into the old pipeline 4 that to replace during work, can reduce the wearing and tearing of smear metal tooth like this for tension force of pipeline.But, because chip is pushed to outward edge along conical heading end, be unfavorable for the discharge of pipeline chip, cause chip to be blocked in the front end of shield machine structure easily, reduced the efficient of constructing.
Summary of the invention
In view of above-mentioned, of the present inventionly provide a kind of and carry out equipment and the method for construction that non-excavating underground pipe line is changed to eat the pipe method, use is installed in stratum around the old pipeline of outer shroud cutter rotary-cut on the shield machine structure, use is fixed on and is funnelform interior cutting ring tool cutting on the shield machine structure and pushes old pipeline, make its fragmentation, can discharge old pipeline chip better like this.
According to an aspect of the present invention, provide more exchange device of a kind of non-excavation pipeline with dicyclo cutter, comprising:
Haulage gear, shield machine structure and slip casting mechanism, wherein,
Described haulage gear is connected to the front end of described shield machine structure by tow rope, spurs described shield machine structure and travels forward, and described slip casting mechanism is connected to described shield machine structure by the circulation slurry injection pipe from the rear end;
Described shield machine structure comprises the cutting tool that is positioned at front end and the driving mechanism that is positioned at the rear end, and has the tow rope connected element at its front end, has new pipe connecting part in its back-end;
When described shield machine structure travels forward, the broken old pipeline of the cutting tool of front end, the fragment of generation is taken out of by the circulation slurry injection pipe by described slip casting mechanism;
When described shield machine structure travels forward, lay the new pipeline that is connected described shield machine structure rear end simultaneously;
The said equipment is characterised in that,
The cutting tool of described shield machine structure front end comprises outer shroud cutter and interior cutting ring tool, described outer shroud cutter is positioned at shield machine structure front end radial edges, drive rotation by described driving mechanism, be used for the old pipeline of cutting stratum on every side, channel diameter is enlarged to lay new pipeline, the cutting ring tool is funnel-like in described, is positioned at the inboard of described outer shroud cutter and is fixed on the described shield machine structure, is used for cutting and squeezes the tube wall of broken old pipeline.
Described equipment is characterised in that described outer cutting ring external diameter is slightly larger than the new external diameter of pipe that needs laying, the old outer diameter tube that its internal diameter is changed greater than need.
Described equipment is characterised in that, described funnelform interior cutting ring tool, the old outer diameter tube that its external diameter is changed greater than need, the old internal diameter of the pipeline that internal diameter is changed less than need of being.
According to a further aspect in the invention, provide a kind of exercise of power to require 1 described equipment to carry out the method that non-excavation pipeline is changed, comprise the steps:
Prepare before the construction: understand stratum and phreatic situation, and the position of underground existing pipeline and other embedded objects, and solve power supply for construction, water;
Excavation of foundation pit: dig two working pits respectively in the old pipe ends that needs are changed, prepare mud pit simultaneously;
Equipment is installed: after in place as claim 1 described equipment, described haulage gear, described shield machine structure and described slip casting mechanism are installed, and by tow rope described distractor and described shield machine structure are coupled together, and described circulating mud pipe placed in the new pipeline, its grouting port and pulp absorbing hole are respectively installed to the opening of driver tip;
Replace tubes construction: start power supply, described distractor spurs described shield machine structure by tow rope and carries out construction operation forward along old pipeline, broken old pipeline is also laid new pipeline, and mud circulation is done by described slip casting of while mechanism in the hole of new hole enlargement, take away the old pipeline chip that cuts down;
Construction finishes: described equipment is shifted out working pit, new pipeline is handled and the landfill work hole;
Above-mentioned construction sequence is characterised in that, in above-mentioned replace tubes construction sequence:
With advancing of described shield machine structure, be the described interior cutting ring tool cutting of leak shape and inwardly push old tube wall, with old tube wall fragmentation;
The described outer shroud cutter of the driver drives of described shield machine structure fast rotational is carried out the rotary-cut hole enlargement to stratum around the old tube wall.
Adopt above-mentioned Apparatus and method for to carry out non-excavation pipeline and change, can discharge old pipeline fragment better, avoid stopping up, improve efficiency of construction.
Description of drawings
According to following detailed description of carrying out with reference to accompanying drawing, it is more apparent that the features and advantages of the present invention will become.In the accompanying drawings:
Fig. 1 is the existing more schematic representation of exchange device of pipe method pipeline of eating.
Fig. 2 is according to the non-excavation pipeline of the first embodiment of the present invention schematic representation of exchange device more.
Fig. 3 is the structural representation of outer shroud cutter and interior cutting ring tool.
Fig. 4 is to use the non-excavation pipeline replacing method of the second embodiment of the present invention to carry out the schematic representation that pipeline is changed construction.
Embodiment
The present invention is described below with reference to the accompanying drawings.Should be understood that the illustrated invention of this paper can be with varied form specific implementation, and disclosed any concrete structure, function or both only are representational in this article.Based on the explanation of this paper, those skilled in the art should be understood that an aspect disclosed herein can be independent of any other side and realize, and the two or more aspects in these aspects can make up according to variety of way.Simultaneously, the size of each several part and can be because do amplification or dwindle with actual and not quite identical in this paper accompanying drawing for the purpose of convenient and clear.
First embodiment:
Fig. 2 is according to the non-excavation pipeline of the first embodiment of the present invention schematic representation of exchange device more.
As shown in Figure 2, according to the non-excavation pipeline of the first embodiment of the present invention more exchange device comprise: shield machine structure 1, haulage gear 2 and slip casting mechanism 3.
Wherein, shield machine structure 1 comprises outer shroud cutter 11, interior cutting ring tool 12, driver 16 and tow rope connected element 13 and new pipe connecting part 14.Haulage gear 2 comprises distractor 22 and tow rope 21.Slip casting mechanism 3 comprises grouting pump 31 and circulation slurry injection pipe 32.
Outer shroud cutter 11 and interior cutting ring tool 12 drive rotation by driver 16;
Fig. 3 is the structural representation of outer shroud cutter and interior cutting ring tool.As shown in Figure 3, outer shroud cutter 11 is installed in shield machine structure 1 front end radially outer edge, and side is interior cutting ring tool 12 within it, and interior cutting ring tool 12 is funnel-like.
The front end center fixation of shield machine structure 1 has tow rope connected element 13, and the distractor 22 of described haulage gear 2 is connected with it by tow rope 21, travels forward to drag shield machine structure 1;
Shield machine structure 1 connects the new pipeline 5 that will lay by the new pipe connecting part 14 of its rear end;
The circulating mud pipe 32 of slip casting mechanism 3 enters driving mechanism 1 in new pipeline 5, its grouting port and pulp absorbing hole stretch out by the opening of described driver tip, and the grouting pump 31 by described slip casting mechanism 3 can carry out mud circulation.
During work, distractor 22 drags shield machine structure 1 by tow rope 21 and travels forward along the axis of old pipeline 4; In shield machine structure 1 proal process, driver 16 drives outer shroud cutter 11 and interior cutting ring tool 12 fast rotational, the rotary-cut hole enlargement is carried out on the stratum around 11 pairs of old tube walls of cutting ring tool, and the tube wall and the inside extruding that are the old pipeline 4 of funnelform interior cutting ring tool 12 cuttings make the tube wall fragmentation; Along with advancing of shield machine structure 1, the new pipeline 5 that is connected its rear end is also laid forward; Simultaneously, slip casting mechanism 3 uses grouting pump 32 that mud is injected in the hole of new hole enlargement by 31 circulations of circulating mud pipe, lubricates cutter, reduces the frictional force on new pipe 5 and stratum, and the old pipeline of fragmentation is taken out of.
Second embodiment:
According to the described method of construction of present embodiment, do not need pipeline is done the replacing that all fronts excavation can be finished pipeline.
Fig. 4 is to use the non-excavation pipeline replacing method of the second embodiment of the present invention to carry out the schematic representation that pipeline is changed construction.With reference to figure 4, use non-excavation pipeline of the present invention more exchange device carry out pipeline when changing construction, carry out as follows:
At first, do the preceding preparation of construction: understand stratum and phreatic situation, and the position of underground existing pipeline and other embedded objects, and solve power supply for construction, water;
Then, excavation of foundation pit: dig two working pits 61 and 62 respectively in the old pipeline rear and front end that needs are changed, prepare mud pit simultaneously.
Afterwards, erection unit: described pipeline more exchange device in place after, at first shield machine structure 1 is transported in the working pit 62, be arranged in the position coaxial with old pipeline, then distractor (winch) 22 is fixed on working pit 61 edges, and by angle pulley, connect the shield machine structure 1 of distractor 22 and described equipment with tow rope; And the circulating mud pipe 32 of described equipment placed in the new pipeline 5, grouting port and the grout outlet of circulating mud pipe 32 is respectively installed on the driver 16.
Afterwards, begin construction: start power supply, the driver 16 of the shield machine structure 1 of described equipment drives outer shroud cutter 11 and interior cutting ring tool 12 fast rotational, and the rotary-cut hole enlargement is carried out on the stratum around 11 pairs of old tube walls of outer shroud cutter; The distractor 22 of described equipment constantly advances by the described shield machine structure 1 of tow rope 21 pulling, the interior cutting ring tool 12 of described shield machine structure 1 in the tube wall of the old pipeline 4 of cutting with old tube wall attrition crushing; New pipeline 5 is connected the rear end of described shield machine structure 1, and lays new pipeline forward with the motion of shield machine structure 1; Simultaneously, the slip casting mechanism 3 of described equipment uses grouting pump 32 by circulating mud pipe 31 mud constantly to be circulated in the hole of new hole enlargement, to reduce the resistance that new pipeline 5 advances, lubricates cutter, and takes away the chip of the old pipeline 4 that cuts down.
At last, construction finishes: described equipment is shifted out working pit, new pipeline is handled and the landfill work hole.
Though as above describe having carried out according to embodiments of the invention with reference to accompanying drawing, it will be appreciated by those skilled in the art that the embodiment that foregoing invention is proposed, can also make various improvement on the basis that does not break away from content of the present invention.Therefore, protection scope of the present invention should be determined by the content of appending claims.

Claims (4)

1. the non-excavation pipeline with dicyclo cutter exchange device more comprises:
Haulage gear, shield machine structure and slip casting mechanism, wherein,
Described haulage gear is connected to the front end of described shield machine structure by tow rope, spurs described shield machine structure and travels forward, and the rear end of described shield machine structure is connected with new pipeline, and described slip casting mechanism is connected to described shield machine structure by the circulation slurry injection pipe from the rear end;
Described shield machine structure comprises the cutting tool that is positioned at front end and the driving mechanism that is positioned at the rear end, and described driving mechanism drives described cutting tool fast rotational;
When described shield machine structure travels forward, the broken old pipeline of the cutting tool of front end, the fragment of generation is taken out of by the circulation slurry injection pipe by described slip casting mechanism;
When described shield machine structure travels forward, lay the new pipeline that is connected its rear end simultaneously;
The said equipment is characterised in that,
The cutting tool of described shield machine structure front end comprises outer shroud cutter and interior cutting ring tool, described outer shroud cutter is positioned at shield machine structure front end radial edges, be used for the old pipeline of cutting stratum on every side, channel diameter is enlarged to lay new pipeline, the cutting ring tool is funnel-like in described, be positioned at the inboard of described outer shroud cutter, be used for the tube wall of cutting and crowded broken old pipeline.
2. equipment according to claim 1 is characterized in that, described outer cutting ring external diameter is slightly larger than the new external diameter of pipe that needs laying, the old outer diameter tube that its internal diameter is changed greater than need.
3. equipment according to claim 1 is characterized in that, described funnelform interior cutting ring tool, the old outer diameter tube that its external diameter is changed greater than need, the old internal diameter of the pipeline that internal diameter is changed less than need of being.
4. an exercise of power requires 1 described equipment to carry out the method that non-excavation pipeline is changed, and comprises the steps:
Prepare before the construction: understand stratum and phreatic situation, and the position of underground existing pipeline and other embedded objects, and solve power supply for construction, water;
Excavation of foundation pit: dig two working pits respectively in the old pipe ends that needs are changed, prepare mud pit simultaneously;
Equipment is installed: after in place as claim 1 described equipment, described haulage gear, described shield machine structure and described slip casting mechanism are installed, and by tow rope described distractor and described shield machine structure are coupled together, and described circulating mud pipe placed in the new pipeline, its grouting port and pulp absorbing hole are respectively installed to the opening of driver tip;
Replace tubes construction: start power supply, described distractor spurs described shield machine structure by tow rope and carries out construction operation forward along old pipeline, broken old pipeline is also laid new pipeline, and mud circulation is done by described slip casting of while mechanism in the hole of new hole enlargement, take away the old pipeline chip that cuts down;
Construction finishes: described equipment is shifted out working pit, new pipeline is handled and the landfill work hole;
Above-mentioned construction sequence is characterised in that, in above-mentioned replace tubes construction sequence:
With advancing of described shield machine structure, be the described interior cutting ring tool cutting of leak shape and inwardly push old tube wall, with old tube wall fragmentation;
The described outer shroud cutter of the driver drives of described shield machine structure fast rotational is carried out the rotary-cut hole enlargement to stratum around the old tube wall.
CN201310113108.7A 2013-04-02 2013-04-02 Trenchless pipeline replace equipment with double-ring cutter and method thereof Active CN103234075B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310113108.7A CN103234075B (en) 2013-04-02 2013-04-02 Trenchless pipeline replace equipment with double-ring cutter and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310113108.7A CN103234075B (en) 2013-04-02 2013-04-02 Trenchless pipeline replace equipment with double-ring cutter and method thereof

Publications (2)

Publication Number Publication Date
CN103234075A true CN103234075A (en) 2013-08-07
CN103234075B CN103234075B (en) 2014-11-19

Family

ID=48882127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310113108.7A Active CN103234075B (en) 2013-04-02 2013-04-02 Trenchless pipeline replace equipment with double-ring cutter and method thereof

Country Status (1)

Country Link
CN (1) CN103234075B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106764054A (en) * 2017-01-04 2017-05-31 陕西中科非开挖技术股份有限公司 A kind of piping foundation method for non-excavating construction
CN110725387A (en) * 2019-11-26 2020-01-24 中铁十八局集团建筑安装工程有限公司 Aircraft nose suitable for fragmentation method updates reinforced concrete pipeline
CN110919290A (en) * 2019-11-19 2020-03-27 中国地质大学(武汉) Cutting swallowing tube type pipeline updating device
CN112664215A (en) * 2020-12-29 2021-04-16 天津倚通科技发展有限公司 Laying method of trenchless new pipeline
CN113145244A (en) * 2021-04-02 2021-07-23 长江生态环保集团有限公司 Universal crushing head and method for flexible and rigid pipe construction by pipe cracking method
CN114719082A (en) * 2021-01-05 2022-07-08 中国石油天然气集团有限公司 Pipe replacing machine

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1269003A (en) * 1995-04-28 2000-10-04 Tti管线施工技术有限公司 Method and apparatus for cleaning public pipeline and then changed with polyolefin pipeline
LV12649B (en) * 2000-05-17 2001-05-20 Suis-Rīga, Sia Method for trenchless replacement of pipe-line and device for realization thereof
RU2230966C1 (en) * 2002-10-30 2004-06-20 Красноярский государственный технический университет Pipeline trenchless replacement method
JP2005336884A (en) * 2004-05-27 2005-12-08 Hitachi Constr Mach Co Ltd Underground buried pipe conduit renewing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1269003A (en) * 1995-04-28 2000-10-04 Tti管线施工技术有限公司 Method and apparatus for cleaning public pipeline and then changed with polyolefin pipeline
LV12649B (en) * 2000-05-17 2001-05-20 Suis-Rīga, Sia Method for trenchless replacement of pipe-line and device for realization thereof
RU2230966C1 (en) * 2002-10-30 2004-06-20 Красноярский государственный технический университет Pipeline trenchless replacement method
JP2005336884A (en) * 2004-05-27 2005-12-08 Hitachi Constr Mach Co Ltd Underground buried pipe conduit renewing method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106764054A (en) * 2017-01-04 2017-05-31 陕西中科非开挖技术股份有限公司 A kind of piping foundation method for non-excavating construction
CN110919290A (en) * 2019-11-19 2020-03-27 中国地质大学(武汉) Cutting swallowing tube type pipeline updating device
CN110919290B (en) * 2019-11-19 2021-04-16 中国地质大学(武汉) Cutting swallowing tube type pipeline updating device
CN110725387A (en) * 2019-11-26 2020-01-24 中铁十八局集团建筑安装工程有限公司 Aircraft nose suitable for fragmentation method updates reinforced concrete pipeline
CN110725387B (en) * 2019-11-26 2021-02-26 中铁十八局集团有限公司 Aircraft nose suitable for fragmentation method updates reinforced concrete pipeline
CN112664215A (en) * 2020-12-29 2021-04-16 天津倚通科技发展有限公司 Laying method of trenchless new pipeline
CN114719082A (en) * 2021-01-05 2022-07-08 中国石油天然气集团有限公司 Pipe replacing machine
CN113145244A (en) * 2021-04-02 2021-07-23 长江生态环保集团有限公司 Universal crushing head and method for flexible and rigid pipe construction by pipe cracking method
CN113145244B (en) * 2021-04-02 2022-06-03 长江生态环保集团有限公司 Universal crushing head and method for flexible and rigid pipe construction by pipe cracking method

Also Published As

Publication number Publication date
CN103234075B (en) 2014-11-19

Similar Documents

Publication Publication Date Title
CN103234075B (en) Trenchless pipeline replace equipment with double-ring cutter and method thereof
CN103234076B (en) Device for exchanging underground pipelines without trenching and application method thereof
CN103452559A (en) Vertical shaft shield tunneling machine
CN204212700U (en) Drill bit in a kind of conduit jacking
CN207761660U (en) A kind of relaying jacking system of band support adjusted device
CN109339809A (en) A kind of economical rock tunnel(ling) machine being adapted to great burying and its construction method
CN203924301U (en) A kind of propelling with volume rises cooperating type pipeline displacement prosthetic device
CN201771429U (en) Spiral drill bit
CN204164493U (en) A kind of sniffer for jacking construction
CN112483104B (en) Pipe-inserting method pipeline updating heading machine and construction method
CN104532836A (en) Anchor cable construction device combining hole forming, mounting and grouting into one
CN202810846U (en) Excavating equipment
CN209324359U (en) A kind of economical rock tunnel(ling) machine being adapted to great burying
CN110454184A (en) A kind of subway entrance people row short tunnel excavating gear
CN201818311U (en) Tunneling device for multifunctional multi-cutter head rectangular top pull pipe
CN104563886A (en) Segmented bit of long spiral drilling machine
CN205532653U (en) A demolish device for anchor rope
CN107322078A (en) A kind of endless knife cutting pipeline rehabilitation device and pipe repairing method
CN204510210U (en) The anchor cable construction device that a kind of pore-forming, installation, slip casting are three-in-one
CN204941554U (en) A kind of for Double-cutter structure inside and outside underground pipeline excavating gear
CN203476336U (en) Shield tunneling machine for shaft
CN107100634A (en) A kind of weak broken wall rock location TBM constructing devices
CN206647612U (en) Dual-purpose type push pipe head
CN207212370U (en) Antipriming between a kind of large diameter steel pipe pipe curtain spigot-and-socket pipe
CN206328792U (en) The coiling apparatus of pipeline can be laid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 100085, Beijing economic and Technological Development Zone, 1 Kangding street, 2 buildings, six or seven floors

Patentee after: MCC COMMUNICATION CONSTRUCTION GROUP CO., LTD.

Address before: 100028, Beijing, Chaoyang District, No. 28, west of China Metallurgical Building, 18 and 19

Patentee before: MCC Communication Engineering Technology Co., Ltd.