CN103232714A - High-softening-point SBS (styrene-butadiene-styrene) modified asphalt and preparation method thereof - Google Patents

High-softening-point SBS (styrene-butadiene-styrene) modified asphalt and preparation method thereof Download PDF

Info

Publication number
CN103232714A
CN103232714A CN2013101593669A CN201310159366A CN103232714A CN 103232714 A CN103232714 A CN 103232714A CN 2013101593669 A CN2013101593669 A CN 2013101593669A CN 201310159366 A CN201310159366 A CN 201310159366A CN 103232714 A CN103232714 A CN 103232714A
Authority
CN
China
Prior art keywords
sbs
asphalt
oil
point
modifying asphalt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101593669A
Other languages
Chinese (zh)
Other versions
CN103232714B (en
Inventor
姚秀杰
张田英
齐邦峰
卢德庆
韩凌
李福起
车金良
权栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC Oil and Petrochemicals Co Ltd
CNOOC Research Institute of Refining and Petrochemicals Beijing Co Ltd
CNOOC Qingdao Heavy Oil Processing Engineering Technology Research Center Co Ltd
Original Assignee
CNOOC Qingdao Heavy Oil Processing Engineering Technology Research Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNOOC Qingdao Heavy Oil Processing Engineering Technology Research Center Co Ltd filed Critical CNOOC Qingdao Heavy Oil Processing Engineering Technology Research Center Co Ltd
Priority to CN201310159366.9A priority Critical patent/CN103232714B/en
Publication of CN103232714A publication Critical patent/CN103232714A/en
Application granted granted Critical
Publication of CN103232714B publication Critical patent/CN103232714B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Compositions Of Macromolecular Compounds (AREA)
  • Working-Up Tar And Pitch (AREA)

Abstract

The invention provides a high-softening-point SBS (styrene-butadiene-styrene) modified asphalt and a preparation method thereof, belonging to the technical field of construction materials. The modified asphalt is prepared from substrate asphalt as the raw material, and the substrate asphalt is compounded from oil sand and CNOOC crude oil. The preparation method comprises the following steps: heating the substrate asphalt to a certain temperature until the substrate asphalt can completely flow; adding a linear SBS modifier into the substrate asphalt to carry out swelling and shearing; and adding a stabilizer into the mixture of the substrate asphalt and SBS modifier, and stirring. The oil sand is used as the raw material, thereby fully utilizing the oil sand resource and obviously enhancing the softening point of the asphalt (the softening point can be higher than 85 DEG C); by adopting the CNOOC crude oil and linear SBS modifier, the prepared product has high stability, and the low-temperature, 135 DEG C viscosity and other indexes satisfy the national modified asphalt standard for roads; and the technique is simple and easy to implement, convenient to operate and convenient for industrial production.

Description

High softening-point SBS modifying asphalt and preparation method thereof
Technical field
The present invention relates to a kind of pitch for highway and preparation method thereof, belong to building material technical field, be specifically related to a kind ofly mix the high softening-point SBS modifying asphalt that refining gained matrix pitch prepares with oil-sand and CNOOC's crude oil.
Background technology
Adopting polymkeric substance that road bitumen is carried out modification is important measures that improve and improve the asphalt pavement performance, by being mixed, polymkeric substance improves use properties in the road bitumen, energy significant prolongation pavement life, reduce noise, improve road-ability and security, SBS is a kind of thermoplastic elastomeric block copolymer, and the SBS modifying asphalt becomes the main product in the modifying asphalt owing to have good low temperature flexibility and high temperature snappiness, lower temperature sensitivity.
At present commonly used have linear SBS and a star-shaped sbs.When adopting linear SBS to prepare modifying asphalt, when reaching above than high softening-point (as 70 ℃), generally can need higher volume, could satisfy the requirement of low-temperature ductility simultaneously, viscosity is excessive and storage stability is bad but can cause 135 ℃.When reducing the SBS volume, softening temperature can reduce, and low-temperature ductility does not reach requirement yet.Reduce the properties-correcting agent consumption, increase sulfur consumption, though can obtain than high softening-point, low-temperature ductility just can not be up to standard, and 135 ℃ of viscosity also can be excessive; When adopting star-shaped sbs to prepare modifying asphalt, because the more linear SBS structure of star-shaped sbs is finer and close, molecular weight is bigger, must increase the difficulty that mixes with matrix pitch, and storage stability is difficult to guarantee, has increased the difficulty of producing.CN200510134354.6 adopts the mother liquor legal system to be equipped with modifying asphalt, and shortcoming is the preparation overlong time of rubber cement mother liquor, needs 4.5~12 hours, and the mother liquor method must be through 2 mixing, and technology is loaded down with trivial details, is unfavorable for the simplification of producing.
Oil-sand is a kind of sand shape mineral reserve that contain crude oil, composition comprises sand, pitch, mineral substance, Tu Heshui, contained viscosity of crude is higher, asphalt content is more, and the reserves of oil-sand are abundant, as an alternative resource, especially a kind of safe alternate resources is most valuable to the whole world, mix refining gained bitumen production modifying asphalt with oil-sand and other oil sources, both taken full advantage of the oil-sand resource, help to improve the high-temperature behavior of modifying asphalt again.
Summary of the invention
In order to solve problems of the prior art, the present invention proposes a kind of high softening-point SBS modifying asphalt and preparation method thereof, it is raw material with the matrix pitch, matrix pitch is that oil-sand and CNOOC's crude oil are mixed the refining gained, add linear SBS properties-correcting agent, stablizer, its softening temperature of SBS modifying asphalt for preparing reaches more than 85 ℃, and every index of SBS modifying asphalt all reaches requirement.
One of task of the present invention is to provide a kind of high softening-point SBS modifying asphalt, and its technical scheme comprises:
A kind of high softening-point SBS modifying asphalt, it is made up of following raw material according to parts by weight:
1000 parts of matrix pitches, 2~5 parts of stablizers;
Above-mentioned matrix pitch is that oil-sand and crude oil are mixed the refining gained, and above-mentioned matrix pitch is properties-correcting agent with SBS, and the consumption of above-mentioned SBS properties-correcting agent is 30~60 parts.
Preferably, above-mentioned crude oil is CNOOC's crude oil.
Above-mentioned oil-sand and its weight ratio of CNOOC's crude oil are 5~20:100.
The softening temperature of above-mentioned SBS modifying asphalt is 85~92 ℃.
Preferably, oil-sand and its weight ratio of CNOOC's crude oil are 15:100.
Its penetration degree of above-mentioned matrix pitch is 60~80/0.1mm in the time of 25 ℃.
Two of task of the present invention is to provide a kind of high softening-point SBS modified asphalt preparation method, and its technical scheme comprises:
At first take by weighing 1000 parts of matrix pitches according to above-mentioned parts by weight, 2~5 parts of stablizers, 30~60 parts of SBS properties-correcting agent, the matrix pitch that takes by weighing is heated to can be mobile fully, and its Heating temperature is 120~200 ℃; SBS properties-correcting agent is joined in the described matrix pitch, and swelling 30~120min uses high-speed shearing machine to shear 10~120min; Add stablizer at last, adopt common stirrer to stir 160~1440min.
Preferably, SBS properties-correcting agent is linear SBS properties-correcting agent.
Above-mentioned high-speed shearing machine rotating speed is 2000~5000rpm, and above-mentioned common stirrer rotating speed is 500~2000rpm.
The useful technique effect that the present invention brings:
The present invention proposes a kind of high softening-point SBS modifying asphalt and preparation method thereof, it is on raw material is chosen, having adopted matrix pitch is raw material, and matrix pitch is that oil-sand and CNOOC's crude oil are mixed the refining gained, because the sulphur content of oil-sand own is higher, therefore be that its softening temperature of pitch of obtaining of feedstock production is higher relatively with the oil-sand, can reach more than 85 ℃, in addition, selecting oil-sand for use is raw material, both take full advantage of the oil-sand resource, significantly improved the softening temperature of pitch again; Select CNOOC's crude oil for use and select linear SBS properties-correcting agent for use, the product stability for preparing is good, and low temperature, 135 ℃ of indexs such as viscosity all satisfy the road modifying asphalt standard of national regulation; It is on the preparation method, at first matrix pitch being heated to certain temperature makes it can be mobile fully, linear SBS properties-correcting agent is joined swelling in the matrix pitch, shearing, adding stablizer then in the mixture of matrix pitch and SBS properties-correcting agent stirs, preparation is finished, and this is simple for process, handled easily, be convenient to suitability for industrialized production.
Embodiment
The present invention proposes a kind of high softening-point SBS modifying asphalt and preparation method thereof, clearer, clear and definite in order to make purpose of the present invention, technical scheme and advantage, below with reference to specific embodiment, the present invention is described in more detail.
The selected raw material of the present invention if no special instructions, all is selected from the raw material in following specification, source:
Matrix pitch: oil-sand and crude oil are mixed the refining gained, and wherein, oil-sand is selected from Canadian oil-sand, and crude oil is selected from CNOOC's crude oil;
Linear SBS properties-correcting agent: Yueyang petrochemical industry 791-H type SBS properties-correcting agent;
Stablizer: the big Science and Technology Ltd. of stone produces.
Embodiment 1:
Take by weighing following raw material according to weight:
Take by weighing the crude oil 1000g of CNOOC, take by weighing oil-sand 50g, the crude oil, the oil-sand that take by weighing are mixed refining obtain matrix pitch fully, standby.
Take by weighing matrix pitch 1000g, linear SBS properties-correcting agent 44g, stablizer 2.9g.
A kind of high softening-point SBS process for preparing modified asphalt may further comprise the steps:
The matrix pitch 1000g that takes by weighing is heated to can be mobile fully, and its Heating temperature is 175 ℃; SBS properties-correcting agent 44g is joined in this matrix pitch, and swelling 90min uses high-speed shearing machine to shear 20min; Adding stablizer at last, is to stir under the 500rpm 480 minutes with common stirrer at rotating speed, prepares high softening-point SBS modifying asphalt, and the performance index of the product for preparing are detected, and the results are shown in Table 1.
Embodiment 2:
Take by weighing following raw material according to weight:
Take by weighing the crude oil 1000g of CNOOC, take by weighing oil-sand 100g, the crude oil, the oil-sand that take by weighing are mixed refining obtain matrix pitch fully, standby.
Take by weighing matrix pitch 1000g, linear SBS properties-correcting agent 46g, stablizer 3.3g.
A kind of high softening-point SBS process for preparing modified asphalt may further comprise the steps:
The matrix pitch 1000g that takes by weighing is heated to can be mobile fully, and its Heating temperature is 180 ℃; SBS properties-correcting agent 46g is joined in this matrix pitch, and swelling 90min uses high-speed shearing machine to shear 30min; Adding stablizer at last, is to stir under the 1000rpm 560 minutes with common stirrer at rotating speed, prepares high softening-point SBS modifying asphalt, and the performance index of the product for preparing are detected, and the results are shown in Table 1.
Embodiment 3:
Take by weighing following raw material according to weight:
Take by weighing the crude oil 1000g of CNOOC, take by weighing oil-sand 180g, the crude oil, the oil-sand that take by weighing are mixed refining obtain matrix pitch fully, standby.
Take by weighing matrix pitch 1000g, linear SBS properties-correcting agent 48g, stablizer 3.5g.
A kind of high softening-point SBS process for preparing modified asphalt may further comprise the steps:
The matrix pitch 1000g that takes by weighing is heated to can be mobile fully, and its Heating temperature is 190 ℃; SBS properties-correcting agent 48g is joined in this matrix pitch, and swelling 90min uses high-speed shearing machine to shear 40min; Adding stablizer at last, is to stir under the 1300rpm 640 minutes with common stirrer at rotating speed, prepares high softening-point SBS modifying asphalt, and the performance index of the product for preparing are detected, and the results are shown in Table 1.
Embodiment 4:
Take by weighing following raw material according to weight:
Take by weighing the crude oil 1000g of CNOOC, take by weighing oil-sand 150g, the crude oil, the oil-sand that take by weighing are mixed refining obtain matrix pitch fully, standby.
Take by weighing matrix pitch 1000g, linear SBS properties-correcting agent 50g, stablizer 3.7g.
A kind of high softening-point SBS process for preparing modified asphalt may further comprise the steps:
The matrix pitch 1000g that takes by weighing is heated to can be mobile fully, and its Heating temperature is 175 ℃; SBS properties-correcting agent 50g is joined in this matrix pitch, and swelling 90min uses high-speed shearing machine to shear 30min; Adding stablizer at last, is to stir under the 1500rpm 720 minutes with common stirrer at rotating speed, prepares high softening-point SBS modifying asphalt, and the performance index of the product for preparing are detected, and the results are shown in Table 1.
Table 1
Figure BDA00003138091800041
Should be understood that; above-mentioned description at preferred embodiment is comparatively detailed; can not therefore think the restriction to scope of patent protection of the present invention; those of ordinary skill in the art is under enlightenment of the present invention; do not breaking away under the scope situation that claim of the present invention protects; can also make various deformation such as replacement, simple combination, the scope of asking for protection of the present invention should be as the criterion with claims.

Claims (9)

1. high softening-point SBS modifying asphalt, it is characterized in that: it is made up of following raw material according to parts by weight:
1000 parts of matrix pitches, 2~5 parts of stablizers;
Described matrix pitch is that oil-sand and crude oil are mixed the refining gained, and described matrix pitch is properties-correcting agent with SBS, and the consumption of described SBS properties-correcting agent is 30~60 parts.
2. a kind of high softening-point SBS modifying asphalt according to claim 1, it is characterized in that: described crude oil is CNOOC's crude oil.
3. a kind of high softening-point SBS modifying asphalt according to claim 2, it is characterized in that: described oil-sand and its weight ratio of CNOOC's crude oil are 5~20:100.
4. a kind of high softening-point SBS modifying asphalt according to claim 3, it is characterized in that: the softening temperature of described SBS modifying asphalt is 85~92 ℃.
5. preparation is characterized in that said method comprising the steps of as the method for a kind of high softening-point SBS modifying asphalt as described in the claim 4: at first be heated to can be mobile fully for the matrix pitch that will take by weighing, and its Heating temperature is 120~200 ℃; SBS properties-correcting agent is joined in the described matrix pitch, and swelling 30~120min uses high-speed shearing machine to shear 10~120min; Add stablizer at last, adopt common stirrer to stir 160~1440min.
6. a kind of high softening-point SBS modifying asphalt according to claim 3, it is characterized in that: described oil-sand and its weight ratio of CNOOC's crude oil are 15:100.
7. according to claim 1 or 2 or 3 described a kind of high softening-point SBS modifying asphalts, it is characterized in that: its penetration degree of described matrix pitch is 60~80/0.1mm in the time of 25 ℃.
8. method according to claim 5, it is characterized in that: described high-speed shearing machine rotating speed is 2000~5000rpm, described common stirrer rotating speed is 500~2000rpm.
9. according to each described a kind of high softening-point SBS modifying asphalt of claim 1~4, it is characterized in that: described SBS properties-correcting agent is linear SBS properties-correcting agent.
CN201310159366.9A 2013-05-03 2013-05-03 High-softening-point SBS (styrene-butadiene-styrene) modified asphalt and preparation method thereof Active CN103232714B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310159366.9A CN103232714B (en) 2013-05-03 2013-05-03 High-softening-point SBS (styrene-butadiene-styrene) modified asphalt and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310159366.9A CN103232714B (en) 2013-05-03 2013-05-03 High-softening-point SBS (styrene-butadiene-styrene) modified asphalt and preparation method thereof

Publications (2)

Publication Number Publication Date
CN103232714A true CN103232714A (en) 2013-08-07
CN103232714B CN103232714B (en) 2015-04-15

Family

ID=48880787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310159366.9A Active CN103232714B (en) 2013-05-03 2013-05-03 High-softening-point SBS (styrene-butadiene-styrene) modified asphalt and preparation method thereof

Country Status (1)

Country Link
CN (1) CN103232714B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112961505A (en) * 2021-02-05 2021-06-15 辽宁省交通科学研究院有限责任公司 Normal-temperature viscous emulsified asphalt cement and preparation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5798595A (en) * 1980-12-10 1982-06-18 Mitsubishi Oil Co Ltd Coal oil mixture
CN1289801A (en) * 1999-09-29 2001-04-04 中国石油化工集团公司 Process for preparing polymer-asphalt composition
CN1765996A (en) * 2004-10-29 2006-05-03 中国石油化工股份有限公司 Polymer modification asphalt cement for open-Graded pavement and its preparation method
CN101125957A (en) * 2007-08-16 2008-02-20 中国海洋石油总公司 Method for preparing polymer modified asphalt

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5798595A (en) * 1980-12-10 1982-06-18 Mitsubishi Oil Co Ltd Coal oil mixture
CN1289801A (en) * 1999-09-29 2001-04-04 中国石油化工集团公司 Process for preparing polymer-asphalt composition
CN1765996A (en) * 2004-10-29 2006-05-03 中国石油化工股份有限公司 Polymer modification asphalt cement for open-Graded pavement and its preparation method
CN101125957A (en) * 2007-08-16 2008-02-20 中国海洋石油总公司 Method for preparing polymer modified asphalt

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
谢远新: ""油砂沥青在道路工程中的应用前景展望"", 《华东公路》, 20 December 2012 (2012-12-20), pages 39 - 41 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112961505A (en) * 2021-02-05 2021-06-15 辽宁省交通科学研究院有限责任公司 Normal-temperature viscous emulsified asphalt cement and preparation method thereof

Also Published As

Publication number Publication date
CN103232714B (en) 2015-04-15

Similar Documents

Publication Publication Date Title
CN105038279B (en) Modified asphalt and preparing method thereof
WO2019129148A1 (en) Modified asphalt and preparation method therefor
CN106800787B (en) A kind of high-temperature storage property high-viscosity high-elasticity modified pitch and preparation method thereof
CN100567399C (en) A kind of rubber powder modified asphalt and working method thereof
CN102977621A (en) SBS (styrene-butadiene-styrene)/scrap rubber powder composite modified asphalt and preparation method thereof
CN104710804A (en) SBS (styrene butadiene styrene) modified asphalt and preparation method thereof
CN104830076B (en) A kind of preparation method of scrap rubber cracking conversion modified pitch
CN102051056A (en) Styrene-butadiene rubber modified asphalt composition and preparation method thereof
CN104497598B (en) A kind of paste rubber and the preparation method of SBS composite modified asphalt
CN104987734A (en) High fracture toughness and elasticity modified asphalt, preparing method and application thereof
CN105482475A (en) Composite modified hard asphalt and preparation method thereof
CN101628989A (en) Sbs modified asphalt stabilizer and preparation method thereof
CN104448457A (en) Rubber-plastic composite asphalt modifier, rubber-plastic composite modified asphalt and preparation method of rubber-plastic composite modified asphalt
CN104650602B (en) A kind of advanced road hard grades of bitumen and preparation method thereof
CN104513488A (en) Road asphalt modifier containing direct coal liquefaction residue, modified road asphalt, and preparation methods of road asphalt modifier and modified road asphalt
CN104212190A (en) Organic montmorillonite modified epoxy asphalt material and preparation method thereof
CN102010603B (en) Rubber powder modified emulsified asphalt and preparation method thereof
CN102504556B (en) High-grade road asphalt prepared from coal tar pitch
CN103305014A (en) SBS (stimulated brillouin scattering) modified asphalt and preparation method thereof
CN106519715B (en) A kind of trench oil base modification biological pitch, biological asphalt mixture and preparation method thereof
CN103044933B (en) Stabilizer composition for polymer modified asphalt
CN103819918A (en) Composite high-viscosity modified asphalt and preparation method thereof
JP2017506280A (en) Plastomer modified asphalt binder that meets the MSCR standard, asphalt pavement with such asphalt binder, and method for making such asphalt binder
CN101348350A (en) Waste rubber powder composite modified asphalt and preparation thereof
CN109593371A (en) Road asphalt modifier and modified pavement asphalt and preparation method thereof and asphalt

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA NATIONAL OFFSHORE OIL AND GAS DEVELOPMENT AN

Effective date: 20140306

Owner name: CHINA MARINE PETROLEUM GENERAL CO.

Free format text: FORMER OWNER: CHINA NATIONAL OFFSHORE CORPORATION (QINGDAO) HEAVY OIL PROCESSING ENGINEERING TECHNOLOGY RESEARCH CETER CO., LTD.

Effective date: 20140306

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 266500 QINGDAO, SHANDONG PROVINCE TO: 100010 DONGCHENG, BEIJING

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20140306

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Applicant after: CHINA NATIONAL OFFSHORE OIL Corp.

Applicant after: CHINA OFFSHORE OIL & GAS DEVELOPMENT & UTILIZATION Co.

Applicant after: CNOOC (QINGDAO) HEAVY OIL PROCESSING ENGINEERING TECHNOLOGY RESEARCH CENTER Co.,Ltd.

Address before: 266500 No. 575 Qianshan North Road, Qingdao economic and Technological Development Zone, Shandong, China

Applicant before: CNOOC (QINGDAO) HEAVY OIL PROCESSING ENGINEERING TECHNOLOGY RESEARCH CENTER Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170301

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Patentee after: CNOOC OIL & PETROCHEMICALS Co.,Ltd.

Patentee after: CNOOC RESEARCH INSTITUTE OF REFINING AND PETROCHEMICALS (BEIJING) Co.,Ltd.

Address before: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Patentee before: CHINA OFFSHORE OIL & GAS DEVELOPMENT & UTILIZATION Co.

Patentee before: CNOOC (QINGDAO) HEAVY OIL PROCESSING ENGINEERING TECHNOLOGY RESEARCH CENTER Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 100010 room 1414, Hai Yuan building, 25 Chaoyangmen North Street, Dongcheng District, Beijing.

Co-patentee after: CNOOC OIL & PETROCHEMICALS Co.,Ltd.

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee after: CNOOC RESEARCH INSTITUTE OF REFINING AND PETROCHEMICALS (BEIJING) Co.,Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: CNOOC OIL & PETROCHEMICALS Co.,Ltd.

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee before: CNOOC RESEARCH INSTITUTE OF REFINING AND PETROCHEMICALS (BEIJING) Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20180428

Address after: 100010 room 1414, Hai Yuan building, 25 Chaoyangmen North Street, Dongcheng District, Beijing.

Co-patentee after: CNOOC OIL & PETROCHEMICALS Co.,Ltd.

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee after: CNOOC RESEARCH INSTITUTE OF REFINING AND PETROCHEMICALS (BEIJING) Co.,Ltd.

Co-patentee after: CNOOC (QINGDAO) HEAVY OIL PROCESSING ENGINEERING TECHNOLOGY RESEARCH CENTER Co.,Ltd.

Address before: 100010 room 1414, Hai Yuan building, 25 Chaoyangmen North Street, Dongcheng District, Beijing.

Co-patentee before: CNOOC OIL & PETROCHEMICALS Co.,Ltd.

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

Co-patentee before: CNOOC RESEARCH INSTITUTE OF REFINING AND PETROCHEMICALS (BEIJING) Co.,Ltd.

TR01 Transfer of patent right