CN103231484A - Foamed material pouring device and technology for sandwich polyurethane (PU) building block production line - Google Patents
Foamed material pouring device and technology for sandwich polyurethane (PU) building block production line Download PDFInfo
- Publication number
- CN103231484A CN103231484A CN2013101846376A CN201310184637A CN103231484A CN 103231484 A CN103231484 A CN 103231484A CN 2013101846376 A CN2013101846376 A CN 2013101846376A CN 201310184637 A CN201310184637 A CN 201310184637A CN 103231484 A CN103231484 A CN 103231484A
- Authority
- CN
- China
- Prior art keywords
- foamed material
- pouring
- building block
- conveying mechanism
- section conveying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses a foamed material pouring device and a technology for a sandwich polyurethane (PU) building block production line and belongs to a building block production method and equipment. The device comprises a foaming section conveying mechanism, a stander, a linear guide rail, a pneumatic mechanism, pouring heads, a foamed material metering pump unit, an infrared photoelectric positioning switch and a control cabinet. The technology comprises the following steps of: 1) adjusting the position of the pouring head, namely starting the infrared photoelectric positioning switch, controlling the pneumatic mechanism by the control cabinet, moving the pouring head to a pouring work position when the center lines of the two pouring heads are overlapped with the center lines of two groups of clamped positioning plates; and 2) pouring the building block for many times, namely adjusting the pump rotating speed of the foamed material metering pump unit according to the running speed of a chain plate conveying belt of the foaming section conveying mechanism, so that the foamed material is conveyed at least twice to reach the total amount required by a PU hard foamed sandwich required by the technology. After trial use, the foamed material pouring device and the technology can complete a foaming process in a feasible manner, so that an aerated concrete sandwich PU foamed plastic building block is compounded.
Description
Technical field: the invention belongs to production equipment and the technology of building block, particularly a kind of foamed material apparatus for pouring and technology of sandwich PU building block production line.
Background technology: the polyurethane full name is polyurethanes, English name: polyurethane, and English the abbreviation: PU is the general designation that contains the macromolecular compound of repetition carbamate groups NHCOO on the main chain.It is to be formed by organic diisocyanate or polyisocyanates and dihydroxy or polyol addition polymerization.Hard polyurethane foams is mainly used in heat-insulating material, insulation material.Hard polyurethane foam foam process: polyethers or PEPA are made up material, be commonly called as white material and polyisocyanates, be commonly called as black material one step adding, foam after under high-speed stirred, mixing.
Line procedures in A, the building block: neatly lie against on the roller path the basic building block of finished product concrete and facial ornament building block in twos;
Operation is erect in B, building block upset: the above-mentioned finished product concrete segment that neatly lies against in twos on the roller path, overturn accordingly in twos 90 ° through switching mechanism, and become in twos and relative thirty years of age two line up the product concrete segment;
Spacing is adjusted operation between C, the two row's building blocks: a fixing wherein row is adopted in the spacing adjustment between the above-mentioned relative thirty years of age finished product concrete segment in twos, only adjust relative thirty years of age another and line up the position of product concrete segment, make it along moving perpendicular to the involutory in-plane of blockhouse through the spacing guiding mechanism, make in twos spacing between the relative thirty years of age finished product concrete segment adjust to the distance of technological requirement;
D, leakproof film place mat operation: when the opposed building block in twos of adjusting to technological requirement when spacing continues to run on the chain-plate type belt feeder forward, under unreeling machine cooperates, at chain-plate type belt feeder upper surface place mat plastic sheeting, this area mat plastic sheeting extends to foaming---curing area, and the other end of this area mat plastic sheeting draws rolling by winder then;
E, layering foamed process repeatedly: when the opposed building block in twos of adjusting to technological requirement when spacing continues to run to forward foaming district on the chain-plate type belt feeder, use quantitative pouring apparatus, between relative thirty years of age in twos building block, account for half the first time cast that the polyurethane foam raw material is cast total amount; After cast for the first time, carry out the cast second time, or repeatedly cast;
F, foaming layer curing process: cast finish after, adopt hot blast to solidify to the polyurethane foam layer, make in twos relative thirty years of age two to line up the product concrete segment and be combined into integral body through foaming layer;
G, be separated into the piece operation: use separator allow to be combined into whole two through foaming layer and line up the product concrete segment, be separated into by basic building block and facial ornament building block and between be compounded with the sandwich building block of monolithic of polyurethane foam layer;
H, sandwich building block down line process: adopt to count automatically and pile up bunching device, block-by-block rolls off the production line sandwich building block and piles up stacking behind counting.”
" use quantitative pouring apparatus, between relative thirty years of age in twos building block, account for half the cast first time that the polyurethane foam raw material is cast total amount though relate in the document; After cast for the first time, carry out the cast second time, or repeatedly cast; Yet ", unexposed device and the technology that relates to the foamed material cast.
Need to prove the life idea of pursuing green low-carbon along with people, the heat-insulating construction material of energy savings will substitute existing construction material, the building block of air entrained concrete sandwich polyurethane foam plastics also claims the building block of concrete sandwich hard polyurethane foam to arise at the historic moment.This is the building block that the sandwich polyurethane foam plastics constitutes between a kind of basic building block of finished product concrete of, rectangular shape identical or different by thickness and the facial ornament building block.Because the polyurethane foam plastics laminboard layer has good heat insulation effect, so this is a kind of novel building building block that will substitute existing building block.Its production method also rests on step making by hand the stage at present, prior art document 1 discloses a kind of air entrained concrete sandwich polyurethane foam plastics building block continuous producing method, but implement its method concrete sandwich hard polyurethane foam building block production line relevant device and technology still is not reported or open.This shows, study and design a kind of foamed material apparatus for pouring and technology of concrete sandwich hard polyurethane foam building block production line, the foamed material apparatus for pouring and the technology that are called for short sandwich PU building block production line are necessary.
" PU " in the subject name of the present invention " foamed material apparatus for pouring and the technology of sandwich PU building block production line " refers in particular to polyurethane foam plastics, as shown in Figure 3, " sandwich PU building block " refer in particular to by isometric, wide, the uniform thickness on polyurethane hard bubble sandwiched 01 both sides or not the basic building block 02 of the rectangular shape of uniform thickness and facial ornament building block 03 through polyurethane foam high strength the air entrained concrete sandwich polyurethane foam plastics building block that is combined into.
Summary of the invention: the objective of the invention is to overcome the deficiencies in the prior art, study and design a kind of foamed material apparatus for pouring and technology of sandwich PU building block production line, carry out the foam process link practically, with reach through polyurethane foam high strength be combined into the building block of air entrained concrete sandwich polyurethane foam plastics.
The technical scheme that realizes the object of the invention is: a kind of foamed material apparatus for pouring of sandwich PU building block production line, it is characterized in that designing to have comprising: a foaming section conveying mechanism, be fixed on the foaming section conveying mechanism, have across the frame in foaming section conveying mechanism upper cross-beam, be fixed in the line slideway above the crossbeam of frame, the pneumatic mechanism that can on line slideway, laterally move, be fixed in 2 pouring heads with agitating device on the pneumatic mechanism side by side, be communicated in the foamed material measuring pump group of pouring head through pipeline, the infrared ray photoelectricity position-sensing switch that is used for control pouring head shift position on line slideway is to foaming section conveying mechanism, the agitating device of pouring head, foamed material measuring pump group, the switch board that infrared ray photoelectricity position-sensing switch carries out electrical control.
The effect of foamed material measuring pump group is with polyethers or PEPA combination material, is commonly called as white material and polyisocyanates, is commonly called as the accurate weighing respectively of black material, adds the pouring head with agitating device.Agitating device high-speed stirred in pouring head mixes that injecting under the back foams between 2 groups of basic building blocks that are adjacent to location-plate, involutory setting, the facing building block becomes the polyurethane hard bubble sandwiched of the high strength compound basic building block in ground, facing building block, must finish following preparatory process by technological requirement before pouring into a mould:
1), receive the leakproof film shop:
A, manual plastic film mulch: the initiating terminal of leakproof film walk around transfer the film deflector roll, on put the film deflector roll, flatly along the carrier bar surface between the location-plate that is fixed on the location foaming section conveying mechanism conveyer belt carrier bar, continue to walk around receipts film deflector roll, receive the film deflector roll down, furl the receipts membrane cylinder surface in film gatherer;
B, startup are also adjusted rotating speed: start foaming section conveying mechanism and carry motor and shop receiving apparatus to receive the film motor, adjust both rotating speeds, make the velocity of rotation of foaming section conveying mechanism conveyer belt and the receipts film speed synchronised of film gatherer;
2), preheating building block: reinstate the preceding preheating device of foaming, starting preheating section conveying mechanism, between the interior location-plate on the basic building block of polyurathamc to be cast, the conveyer belt that the facial ornament building block is vertically placed on the preheating section conveying mechanism in twos involutoryly, limit location-plate, front and back are near being arranged in operation forward in left and right two production lines, adjust the speed of service of basic building block, facial ornament building block, the temperature that makes it basic building block, facial ornament building block through hot-air pre-heating runs to the temperature of preheating section conveying mechanism when terminal, reaches the preheat temperature of foam process requirement;
3), the building block after the preheating is served foaming section conveying mechanism: starting foaming section conveying mechanism, building block after the preheating is sent between 2 groups of involutory location-plates of chain plate conveyor belt of foaming section conveying mechanism through the transition cylinder of preheating section conveying mechanism and foaming section conveying mechanism, the speed of service of adjusting foaming section conveying mechanism conveyer belt matches with the speed of service of preheating section conveying mechanism conveyer belt, and the 4 row building blocks front and back between 2 groups of involutory location-plates are moved forward near being arranged in left and right two production lines;
A kind of foamed material pouring technology of sandwich PU building block production line is characterized in that comprising the steps:
1), adjusts the pouring head position: enable infrared ray photoelectricity position-sensing switch, be used for pouring head at the mobile pneumatic mechanism of line slideway through switch board control, the pouring practice position when making pouring head move to the central lines of 2 pouring head center lines and 2 groups of involutory location-plates;
2), carry out the pouring foaming material several times: in the foaming section initial end of conveying mechanism or middle part the foamed material apparatus for pouring is set at least, enable foaming section conveying mechanism, the agitating device of pouring head, foamed material measuring pump group, the switch board that infrared ray photoelectricity position-sensing switch carries out electrical control, the speed of service forward according to detected foaming section conveying mechanism chain plate conveyor belt, adjust the measuring pump rotating speed of foamed material measuring pump group, make the basic building block of foamed material to be cast, foamed material between the facing building block divides the polyurethane hard bubble sandwiched required total amount that reaches technological requirement for 2 times at least; If foamed material divides and pours into a mould for 2 times, carry out being respectively for 2 times the foamed material cast of 45-55% of the polyurethane hard bubble sandwiched required total amount of technological requirement; If foamed material divides and pours into a mould for 3 times, then need foaming section conveying mechanism rise the postmedian increase arrange frame and on the foamed material apparatus for pouring, enable switch board again, adjust the measuring pump rotating speed of foamed material measuring pump group, make the basic building block of foamed material to be cast, the 30-35% that the foamed material between the facing building block reaches the polyurethane hard bubble sandwiched required total amount of technological requirement.Adopt repeatedly the linking that overlaps of layering foaming process, guarantee that polyurethane foam plastics between the concrete segment is full of to tamp, thereby guaranteed the compound sticking quality of self foaming quality and compound sticking concrete segment.
Purpose of the present invention also adopts following further technical measures to realize:
Described foaming section conveying mechanism includes chain plate conveyor belt, is symmetrically fixed on 2 groups of involutory location-plates on the carrier bar.
Be positioned with 2 groups of basic building block, facing building blocks that are adjacent to location-plate, involutory setting between described 2 groups of involutory location-plates.
Carrier bar area mat between described 2 groups of involutory location-plates has the membranaceous high molecular polymer leakproof film that can not see through liquid.The technique effect of this design is: prevent uncured liquid polyethers or PEPA combination material when pouring into a mould first, be commonly called as white material and polyisocyanates, be commonly called as the seepage of black material.
The described frame that is fixed on the foaming section conveying mechanism includes at least 2 frames that are individually fixed in the initial end of foaming section conveying mechanism, middle part.The technique effect of this design is: all be equipped with aforesaid apparatus for pouring at least 2 frames, to carry out at least 2 cast respectively.
Distance between described 2 the pouring head center lines with agitating device that are fixed in side by side on the pneumatic mechanism equals the distance between described 2 groups of involutory location-plate center lines.Described infrared ray photoelectricity position-sensing switch for control pouring head shift position on line slideway, the magnetic valve that is electrically connected in pneumatic mechanism orders about the pouring head that is fixed on the pneumatic mechanism, moves to the position that infrared ray photoelectricity position-sensing switch detects the central lines of 2 pouring head center lines and 2 groups of involutory location-plates at line slideway.The technique effect of these two designs is: guarantee that uncured polyethers or the PEPA of making a bet through pouring head make up material, be commonly called as white material and polyisocyanates, be commonly called as to deceive and expect that 2 groups of accurately injections are adjacent between the basic building block of location-plate, involutory setting, the facing building block; And when casting complete need clean the pouring head with agitating device, through visual interface and the button of switch board, in conjunction with the action of infrared ray photoelectricity position-sensing switch, make pouring head from original pouring practice position travelling backwards to the position of carrying out washing and cleaning operation.
Described switch board is according to the speed of service forward of foaming section conveying mechanism chain plate conveyor belt, adjust the measuring pump rotating speed of foamed material measuring pump group, make the basic building block of foamed material to be cast, the foamed material through the pouring head discharging between the facing building block divide the polyurethane hard bubble sandwiched required total amount that reaches technological requirement for 2 times at least.The technique effect of this design is: according to the specific requirement of foam process, the white material that the speed of service forward of foundation foaming section conveying mechanism chain plate conveyor belt and the measuring pump rotating speed of foamed material measuring pump group determine or black material and other additives are poured into a mould requirements, visual interface on switch board and button, by adjusting test, obtain reasonably to be matched with the measuring pump rotating speed of foamed material measuring pump group of the speed of service forward of conveyer belt, thereby guarantee branch 2 times or repeatedly reach the polyurethane hard bubble sandwiched required total amount of technological requirement.
The foamed material apparatus for pouring of the sandwich PU building block production line that the invention process obtains, according to process of the present invention, finished foam process through foamed material apparatus for pouring of the present invention practically, with reach through rigid poly urethanes foaming process high strength be combined into the building block of air entrained concrete sandwich polyurethane foam plastics.
Description of drawings: Fig. 1 is the schematic diagram that meets thematic structure of the present invention; Fig. 2 is the side schematic view that meets thematic structure of the present invention; Fig. 3 is the structural representation of sandwich PU building block.
The specific embodiment: further specify the present invention below in conjunction with concrete diagram:
As Fig. 1, shown in 2, a kind of foamed material apparatus for pouring of sandwich PU building block production line, it is characterized in that designing to have comprising: a foaming section conveying mechanism 1, be fixed on the foaming section conveying mechanism, have across the frame 2 in foaming section conveying mechanism upper cross-beam, be fixed in the line slideway 3 above the crossbeam of frame, the pneumatic mechanism 4 that can on line slideway, laterally move, be fixed in 2 pouring heads 5 with agitating device on the pneumatic mechanism side by side, be communicated in the foamed material measuring pump group 6 of pouring head through pipeline, the infrared ray photoelectricity position-sensing switch 7 that is used for control pouring head shift position on line slideway is to foaming section conveying mechanism, the agitating device of pouring head, foamed material measuring pump group, infrared ray photoelectricity position-sensing switch carries out the switch board 8 of electrical control.
As shown in Figure 1, described foaming section conveying mechanism 1 includes chain plate conveyor belt 11, is symmetrically fixed on 2 groups of involutory location-plates 12 on the carrier bar.
As shown in Figure 1, be positioned with 2 groups of basic building block 02, facing building blocks 03 that are adjacent to location-plate, involutory setting between described 2 groups of involutory location-plates 12.
As shown in Figure 1, the carrier bar area mat between described 2 groups of involutory location-plates 12 has the membranaceous high molecular polymer leakproof film 10 that can not see through liquid.
As shown in Figure 1, 2, the described frame 2 that is fixed on the foaming section conveying mechanism includes at least 2 frames that are individually fixed in the initial end of foaming section conveying mechanism, middle part.
As shown in Figure 1, the distance between described 2 pouring head 5 center lines with agitating device that are fixed in side by side on the pneumatic mechanism equals the distance between described 2 groups of involutory location-plate 12 center lines.
Shown in Fig. 1,3, described infrared ray photoelectricity position-sensing switch 7 for control pouring head shift position on line slideway, the magnetic valve that is electrically connected in pneumatic mechanism orders about the pouring head 5 that is fixed on the pneumatic mechanism, moves to the position that infrared ray photoelectricity position-sensing switch detects the central lines of 2 pouring head center lines and 2 groups of involutory location-plates 12 at line slideway 4.
As shown in Figure 1, 2, 3, described switch board 8 is according to the speed of service forward of foaming section conveying mechanism chain plate conveyor belt 11, adjust the measuring pump rotating speed of foamed material measuring pump group 6, make the basic building block 02 of foamed material to be cast, the foamed material through pouring head 5 dischargings between the facing building block 03 divide the polyurethane hard bubble sandwiched 01 required total amount that reaches technological requirement for 2 times at least.
Claims (9)
1. the foamed material apparatus for pouring of a sandwich PU building block production line, it is characterized in that designing to have comprising: a foaming section conveying mechanism (1), be fixed on the foaming section conveying mechanism, have across the frame (2) in foaming section conveying mechanism upper cross-beam, be fixed in the line slideway (3) above the crossbeam of frame, the pneumatic mechanism (4) that can on line slideway, laterally move, be fixed in 2 pouring heads (5) with agitating device on the pneumatic mechanism side by side, be communicated in the foamed material measuring pump group (6) of pouring head through pipeline, the infrared ray photoelectricity position-sensing switch (7) that is used for control pouring head shift position on line slideway is to foaming section conveying mechanism, the agitating device of pouring head, foamed material measuring pump group, infrared ray photoelectricity position-sensing switch carries out the switch board (8) of electrical control.
2. foamed material apparatus for pouring according to claim 1 is characterized in that described foaming section conveying mechanism (1) includes chain plate conveyor belt (11), is symmetrically fixed on the 2 groups of involutory location-plates (12) on the carrier bar.
3. foamed material apparatus for pouring according to claim 2 is characterized in that being positioned with between described 2 groups of involutory location-plates (12) 2 groups of basic building block (02), facing building blocks (03) that are adjacent to location-plate, involutory setting.
4. foamed material apparatus for pouring according to claim 3 is characterized in that the carrier bar area mat between described 2 groups of involutory location-plates (12) has the membranaceous high molecular polymer leakproof film (10) that can not see through liquid foamed material.
5. foamed material apparatus for pouring according to claim 1 is characterized in that the described frame (2) that is fixed on the foaming section conveying mechanism includes at least 2 frames that are individually fixed in the initial end of foaming section conveying mechanism, middle part.
6. foamed material apparatus for pouring according to claim 1 is characterized in that described 2 of being fixed in side by side on the pneumatic mechanism have distance between pouring head (5) center line of agitating device and equal distance between described 2 groups of involutory location-plates (12) center line.
7. foamed material apparatus for pouring according to claim 1, it is characterized in that described infrared ray photoelectricity position-sensing switch (7) for control pouring head shift position on line slideway, the magnetic valve that is electrically connected in pneumatic mechanism orders about the pouring head (5) that is fixed on the pneumatic mechanism, moves to the position that infrared ray photoelectricity position-sensing switch detects the central lines of 2 pouring head center lines and 2 groups of involutory location-plates (12) at line slideway (4).
8. foamed material apparatus for pouring according to claim 1, it is characterized in that described switch board (8) is according to the speed of service forward of foaming section conveying mechanism chain plate conveyor belt (11), adjust the measuring pump rotating speed of foamed material measuring pump group (6), make the basic building block (02) of foamed material to be cast, the foamed material through pouring head (5) discharging between the facing building block (03) divide polyurethane hard bubble sandwiched (01) that reaches technological requirement for 2 times required total amount at least.
9. the foamed material pouring technology of a sandwich PU building block production line is characterized in that comprising the steps:
1), adjusts the pouring head position: enable infrared ray photoelectricity position-sensing switch, be used for pouring head at the mobile pneumatic mechanism of line slideway through switch board control, make pouring head when line slideway moves to infrared ray photoelectricity position-sensing switch and detects the central lines of 2 pouring head center lines and 2 groups of involutory location-plates till;
2), carry out the pouring foaming material several times: in the foaming section initial end of conveying mechanism or middle part the foamed material apparatus for pouring is set at least, enable foaming section conveying mechanism, the agitating device of pouring head, foamed material measuring pump group, the switch board that infrared ray photoelectricity position-sensing switch carries out electrical control, the speed of service forward according to detected foaming section conveying mechanism chain plate conveyor belt, adjust the measuring pump rotating speed of foamed material measuring pump group, make the basic building block of foamed material to be cast, foamed material between the facing building block divides the polyurethane hard bubble sandwiched required total amount that reaches technological requirement for 2 times at least; If foamed material divides and pours into a mould for 2 times, carry out being respectively for 2 times the foamed material cast of 45-55% of the polyurethane hard bubble sandwiched required total amount of technological requirement; If foamed material divides and pours into a mould for 3 times, then need play postmedian increase setting at foaming section conveying mechanism wants, frame and on the foamed material apparatus for pouring, enable switch board again, adjust the measuring pump rotating speed of foamed material measuring pump group, make the basic building block of foamed material to be cast, the 30-35% that the foamed material between the facing building block reaches the polyurethane hard bubble sandwiched required total amount of technological requirement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101846376A CN103231484A (en) | 2013-05-15 | 2013-05-15 | Foamed material pouring device and technology for sandwich polyurethane (PU) building block production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101846376A CN103231484A (en) | 2013-05-15 | 2013-05-15 | Foamed material pouring device and technology for sandwich polyurethane (PU) building block production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103231484A true CN103231484A (en) | 2013-08-07 |
Family
ID=48879587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013101846376A Pending CN103231484A (en) | 2013-05-15 | 2013-05-15 | Foamed material pouring device and technology for sandwich polyurethane (PU) building block production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103231484A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104526960A (en) * | 2014-12-10 | 2015-04-22 | 王长河 | Inflating machine for injection molding of building block and inflating method using inflating machine |
CN105128238A (en) * | 2015-08-27 | 2015-12-09 | 于宝国 | Movable casting machine for building insulation decoration anti-flaming composite boards |
CN108773011A (en) * | 2018-06-15 | 2018-11-09 | 无锡市精捷机器人科技有限公司 | A kind of electric bicycle saddle seat automatic production line |
CN110725435A (en) * | 2019-10-23 | 2020-01-24 | 韩少鹏 | Construction method of building heat-insulating wall |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2528545Y (en) * | 2001-10-26 | 2003-01-01 | 叶孙勇 | Mechanical for controlling position of pouring head of polyurethane foaming machine |
CN102628303A (en) * | 2012-05-10 | 2012-08-08 | 镇江奥力聚氨酯机械有限公司 | Continuous production method for aerated concrete sandwiched polyurethane foam building blocks |
CN103088731A (en) * | 2011-11-03 | 2013-05-08 | 拜耳材料科技(中国)有限公司 | Pouring foaming truck |
CN203293457U (en) * | 2013-05-15 | 2013-11-20 | 镇江奥力聚氨酯机械有限公司 | Foaming material pouring device for sandwiched PU (Poly Urethane) building block production line |
-
2013
- 2013-05-15 CN CN2013101846376A patent/CN103231484A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2528545Y (en) * | 2001-10-26 | 2003-01-01 | 叶孙勇 | Mechanical for controlling position of pouring head of polyurethane foaming machine |
CN103088731A (en) * | 2011-11-03 | 2013-05-08 | 拜耳材料科技(中国)有限公司 | Pouring foaming truck |
CN102628303A (en) * | 2012-05-10 | 2012-08-08 | 镇江奥力聚氨酯机械有限公司 | Continuous production method for aerated concrete sandwiched polyurethane foam building blocks |
CN203293457U (en) * | 2013-05-15 | 2013-11-20 | 镇江奥力聚氨酯机械有限公司 | Foaming material pouring device for sandwiched PU (Poly Urethane) building block production line |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104526960A (en) * | 2014-12-10 | 2015-04-22 | 王长河 | Inflating machine for injection molding of building block and inflating method using inflating machine |
CN105128238A (en) * | 2015-08-27 | 2015-12-09 | 于宝国 | Movable casting machine for building insulation decoration anti-flaming composite boards |
CN108773011A (en) * | 2018-06-15 | 2018-11-09 | 无锡市精捷机器人科技有限公司 | A kind of electric bicycle saddle seat automatic production line |
CN110725435A (en) * | 2019-10-23 | 2020-01-24 | 韩少鹏 | Construction method of building heat-insulating wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103231484A (en) | Foamed material pouring device and technology for sandwich polyurethane (PU) building block production line | |
CN101111353B (en) | Continuous forming apparatus for molding three-dimensional foam products | |
CN203293457U (en) | Foaming material pouring device for sandwiched PU (Poly Urethane) building block production line | |
US3528126A (en) | Continuous production apparatus for hard core foam plates having rigid cover layers particularly on a polyurethane base | |
CN106218177B (en) | A kind of production line and its production technology of expansion type core composite metal plate | |
US3487143A (en) | Apparatus and method for the continuous casting of polyurethane flat belting | |
CN205439196U (en) | Output device of plastify production line | |
US3812227A (en) | Method of producing a flat top slab of foamed polyurethane | |
US3809512A (en) | Apparatus for the continuous production of strands of polymeric foam | |
US20100129481A1 (en) | Apparatus for manufacturing floor mat using double conveyor system | |
US3837771A (en) | Apparatus for producing foamed resin-care web-faced laminates in continuous lengths | |
US3076226A (en) | Apparatus for making sheets of foam rubber | |
KR102172142B1 (en) | Apparatus for continuous production of strand foams of polyurethane | |
JP2001505834A (en) | Manufacturing method of multilayer foam products | |
CN203236644U (en) | Foaming and solidifying limit device of sandwiched PU (Poly Urethane) building block production line | |
EP0775564B1 (en) | Method and apparatus for producing blades for electrophotographic devices | |
KR20150013584A (en) | Method and doctor blade device for spreading a resin paste onto a carrier film, and a resin sheet installation for producing resin sheets | |
CN103231442A (en) | Positioning delivery mechanism and technology for sandwich polyurethane (PU) building block production line | |
CN102935688B (en) | Continuous production device for color plastic floor and color plastic floor continuous producing method | |
CN103635312B (en) | A kind of manufacture method of fabric-foam lami nates | |
CN203237773U (en) | Separating and blocking device for sandwich polyurethane (PU) building block production line | |
CN206351488U (en) | Foamed ceramics material distributing machine | |
CN203157012U (en) | Preheating device of sandwich polyurethane (PU) building block production line before foaming | |
CN203236643U (en) | Foaming heating device of sandwiched PU (Poly Urethane) building block production line | |
CN103264894A (en) | Separating blocking device and process of sandwich poly urethane (PU) building block production line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130807 |