CN103208196B - Lane adjusting method for urban artery turning traffic - Google Patents
Lane adjusting method for urban artery turning traffic Download PDFInfo
- Publication number
- CN103208196B CN103208196B CN201310140217.8A CN201310140217A CN103208196B CN 103208196 B CN103208196 B CN 103208196B CN 201310140217 A CN201310140217 A CN 201310140217A CN 103208196 B CN103208196 B CN 103208196B
- Authority
- CN
- China
- Prior art keywords
- traffic
- track
- lane
- centerdot
- hand rotation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 36
- 210000001367 artery Anatomy 0.000 title abstract 4
- 230000008859 change Effects 0.000 claims description 11
- 238000013461 design Methods 0.000 claims description 11
- 230000008676 import Effects 0.000 claims description 5
- 230000008569 process Effects 0.000 claims description 5
- 238000012913 prioritisation Methods 0.000 claims description 4
- 238000004364 calculation method Methods 0.000 claims description 3
- 238000005457 optimization Methods 0.000 claims description 3
- 238000012545 processing Methods 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 6
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 239000004615 ingredient Substances 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Landscapes
- Traffic Control Systems (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a lane adjusting method for urban artery turning traffic. The method is used for relieving tidal flow in urban roads and mainly comprises the number of variable lanes in need of direction changing and a lane turning function determining method after lane adjustment. The method comprises that variable-direction traffic setting conditions of urban arteries are given, the number of variable lanes and the lane turning functions after lane adjustment are determined by combining control of tidal intersection signals, and intersection delay values are calculated and compared to obtain the lane adjusting method for urban artery turning traffic. According to the lane adjusting method, the intersection signal control and the variable-direction traffic technology are combined, so that the tidal traffic jam is relieved, the delay is reduced, and the utilization rate of existing road resources is improved effectively.
Description
Technical field
The invention belongs to road traffic control field, be specifically related to the defining method of a kind of changeable driveway quantity towards arterial street break-in traffic and adjustment rear each track, track turning function.
Background technology
In recent years, along with the space in China city adjusts with function, multicenter, new city, Metropolitan Area (circle) etc. become the new model of spatial spread, increasing household resident is in Xincheng District, be operated in downtown area, go off daily relies on car, and " duty lives to be separated " phenomenon is quite general.Thereupon, traffic flow on the contact channel of new city and center presents obvious tidal regime: early (evening) peak often occurs into (going out) direction, city because path resource wretched insufficiency causes the often property sent out to be blocked up, and the phenomenon that is underutilized of rightabout path resource simultaneously.According to domestic and international years'experiences, the one alleviating this phenomenon effectively and feasible measure apply break-in traffic technique exactly.Integrative design intersection combines with break-in traffic technique and alleviates the research that tide flow blocks up by current shortage, also not when the theoretical method of turning function aspect, each track after the adjustment of two-way lane quantity.
Summary of the invention
The object of the invention is to propose a kind of track method of adjustment towards arterial street break-in traffic.Comprise defining method two parts needing to change nyctitropic changeable driveway quantity and adjustment rear each track, track turning function, integrative design intersection is combined with break-in traffic technique and alleviates tide flow and block up, reduce to incur loss through delay, effectively improve the utilization factor of existing road resource.
The technical solution used in the present invention is: towards the track method of adjustment of arterial street break-in traffic, comprise the following steps:
A. volume of traffic direction nonuniformity coefficient K is calculated
d:
Volume of traffic direction nonuniformity coefficient computing formula is:
In formula:
Q
1---the heavy traffic flow path direction magnitude of traffic flow (pcu/h);
Q
2---the light traffic flow path direction magnitude of traffic flow (pcu/h).
B. judge whether to meet break-in traffic setting model:
The setting model of break-in traffic comprises following six aspects:
Condition one: on road, motor vehicle number of track-lines is more than two-way 3 tracks, and number of track-lines is generally more than 6 in the city thoroughfare that the volume of traffic is larger, is at least 5;
Condition two: when track, crossing is not suitable for enlarging or widens;
Condition three: section will have significantly " tidal phenomena ", such as very large at a certain specific time period vehicle flowrate, cause and block up, and other times vehicle flowrate is all normal, now just has the necessity implementing break-in traffic;
Condition four: there is the section of tide flow to implement break-in traffic, need meet a standard, in peak period, one, this section direction vehicle flowrate exceeds 40% than opposite direction wagon flow, namely the minimum need of volume of traffic directional spreding coefficient reach 2/3, as far as possible more than 3/4;
Condition five: subtend track is being used in heavy traffic direction, after namely number of track-lines is reduced in light traffic direction, should ensure that the traffic capacity of the two-way lane after adjusting meets respective demand;
Condition six: the terminal arranging break-in traffic route by sufficient traffic processing power, should can not be formed new traffic bottlenecks, and facilitate vehicles while passing track.
If meet break-in traffic setting model, calculate further and determine changeable driveway quantity and adjustment rear each track, track turning function; If do not meet, then select tide flow integrative design intersection prioritization scheme.
C. changeable driveway quantity and adjustment rear each track, track turning function is determined:
Step one: the traffic capacity calculating present situation two-way road:
In formula:
C
a, C
a' be respectively the traffic capacity of present situation two-way road, pcu/h;
T
m---the signal period duration of crossing M, s;
T
n---the signal period duration of crossing N, s;
S
l, S
t, S
rbe respectively the saturation volume of a left-hand rotation, craspedodrome, right-turn lane, 1550pcu/h, 1650pcu/h, 1550pcu/h can be got respectively;
N
l, n
t, n
rbe respectively the left-hand rotation in a direction, section, craspedodrome, right-turn lane quantity;
G
nL, g
nT, g
nRbe respectively the Effective Green Time duration that N place, crossing a direction entrance driveway respectively turns to phase place, s;
N
l', n
t', n
r' be respectively the left-hand rotation in a ' direction, section, craspedodrome, right-turn lane quantity;
G
mL, g
mT, g
mRbe respectively the Effective Green Time duration that a ' direction, M place, crossing entrance driveway respectively turns to phase place, s.
Step 2: when supposing changeable driveway quantity Δ n=1, calculate q respectively
liand q
ti.Wherein, q
lito attach most importance to the left-hand rotation bicycle road flow in traffic flow direction; q
tito attach most importance to the craspedodrome bicycle road flow in traffic flow direction.
If q
libe greater than q
ti, this changeable driveway is set to left-hand rotation dedicated Lanes, and the left turn traffic for heavy traffic flow path direction passes through, and the function in other three tracks is constant; If q
libe less than q
ti, using the left-hand rotation dedicated Lanes of changeable driveway as heavy traffic flow path direction, the most fast lane before the adjustment of track becomes craspedodrome from original left-hand rotation.
In like manner can determine each lane function of light traffic flow path direction: work as q
libe greater than q
titime, turn left track quantity of the party reduces, and the left turning vehicle lane change originally travelled on changeable driveway travels to adjacent outside left turn lane; Work as q
libe less than q
titime, the Through Lane quantity in this direction reduces, and left turning vehicle moves laterally, and the Through Lane lane change of inner side travelled to adjacent outside Through Lane originally.
Step 3: after two-way lane quantity and function change, reselect tide integrative design intersection scheme, and calculate signal timing dial, in table 1.
Table 1
Step 4: combine with tide flow intersection signal phase optimization scheme, calculate traffic capacity C and C ' that track adjusts latter two direction, computing method are identical with present situation.
Step 5: judge whether to meet number of track-lines and the traffic capacity two constraint conditions.
Condition one: number of track-lines condition
Wherein:
n
a=n
L+n
T+n
R
n′
a=n′
L+n′
T+n′
R
Condition two: traffic capacity condition
In formula, q
l, q
t, q
rbe respectively the left-hand rotation in its excess-three of M place, crossing entrance driveway remittance a direction, section, craspedodrome and right-hand rotation flow, pcu/h; q
l', q
t', q
r' be respectively its excess-three of N place, crossing entrance driveway to import the left-hand rotation in a ' direction, section, craspedodrome and right-hand rotation flow, pcu/h.
If meet above two constraint conditions, then carry out the calculating of step 6; Otherwise, enter step 7.
Step 6: calculate the intersection delay value after the adjustment of track.
Step 7: make changeable driveway quantity increase by 1, i.e. Δ n=2,3 ..., n
atime, repeat step 2 to the computation process of step 6, obtain each intersection delay.
Step 8: if when changeable driveway quantity is i, can not meet number of track-lines and Capacity Constraints condition, then compare Δ n=1,2,3 ..., intersection delay value during i-1, Δ n when this value is minimum is changeable driveway quantity.
So far, complete the determination of the turning function in changeable driveway quantity and the rear each track of track quantity adjustment, obtain the track method of adjustment towards arterial street break-in traffic.
Beneficial effect: the object of the track method of adjustment towards arterial street break-in traffic that the present invention proposes is to alleviate the tide flow phenomenon that urban road exists, feature maximum is compared with the conventional method: 1. block up for tide flow and usually can alleviate with adjusting by being optimized signal timing plan in crossing, and break-in traffic technique improves its utilization factor also often used by adjusting existing road resource flexibly, break-in traffic technique combines with integrative design intersection by the present invention, thus obtain the track method of adjustment of arterial street break-in traffic, 2. the present invention proposes the lane function combined with integrative design intersection and repartition scheme, thus the code reassignment completed existing road resource, after the quantity determining changeable driveway, heavy traffic flow path direction obtains more multilane, light traffic flow path direction is then corresponding decreases track, it is different before traffic supply and demand ratio now adjusts from track, in current break-in traffic lane adjustment, when needs change after nyctitropic track quantity determines, usually no left turn strategy is adopted in minimizing direction, track, this needs left turn traffic separately to find a way out, add the operating range of left turning vehicle, method in the present invention can ensure that each turns to wagon flow normal pass, and do not need part to turn to wagon flow another pathfinding wire-wound capable.
Accompanying drawing explanation
Fig. 1 is urban road intersection list import clearance scheme schematic diagram in prior art.
Fig. 2 is the mixing clearance scheme that in prior art, urban road intersection symmetry combines with single import.
Fig. 3 is that in prior art, urban road intersection symmetry mixes " opening the early disconnected late " scheme of letting pass with single import.
Fig. 4 is that before the adjustment of changeable driveway quantity, the traffic capacity calculates schematic diagram.
Fig. 5 be left-hand rotation bicycle road flow large time heavy traffic flow path direction each track turning function splitting scheme schematic diagram.
Fig. 6 be craspedodrome bicycle road flow large time heavy traffic flow path direction each track turning function splitting scheme schematic diagram.
Fig. 7 is towards the track method of adjustment process flow diagram of arterial street break-in traffic.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention will be further described.
To the arterial street that there is tide flow, first calculate volume of traffic direction nonuniformity coefficient K
d; Then judging whether to meet break-in traffic setting model: if meet break-in traffic setting model, determining changeable driveway quantity by calculating, otherwise, select tide flow integrative design intersection prioritization scheme, in table 1,
Table 1
Each signal phase scheme in table is shown in Fig. 1, Fig. 2, Fig. 3 respectively.
For two-way six-lane, the defining method of changeable driveway quantity and adjustment rear each track, track turning function is:
Step one: the traffic capacity calculating present situation two-way road, as shown in Figure 4.
Step 2: when supposing changeable driveway quantity Δ n=1, calculate q respectively
liand q
ti, wherein, q
lito attach most importance to the left-hand rotation bicycle road flow in traffic flow direction; q
tito attach most importance to the craspedodrome bicycle road flow in traffic flow direction.
If q
libe greater than q
ti, this changeable driveway is set to left-hand rotation dedicated Lanes, and the left turn traffic for heavy traffic flow path direction passes through, and the function in other three tracks is constant, sees Fig. 5; If q
libe less than q
ti, using the left-hand rotation dedicated Lanes of changeable driveway as heavy traffic flow path direction, the most fast lane before the adjustment of track becomes craspedodrome from original left-hand rotation, sees Fig. 6.
In like manner, each lane function defining method of light traffic flow path direction is: work as q
libe greater than q
titime, turn left track quantity of the party reduces, and the left turning vehicle lane change originally travelled on changeable driveway travels to adjacent outside left turn lane; Work as q
libe less than q
titime, the Through Lane quantity in this direction reduces, and left turning vehicle moves laterally, and the Through Lane lane change of inner side travelled to adjacent outside Through Lane originally.
Step 3: after two-way lane quantity and function change, reselect tide integrative design intersection scheme, equally in table 1, and calculate signal timing dial.
Step 4: combine with tide flow intersection signal phase optimization scheme, calculate traffic capacity C and C ' that track adjusts latter two direction, computing method are identical with step one.
Step 5: judge whether to meet number of track-lines and the traffic capacity two constraint conditions, if meet above two constraint conditions, then carries out the calculating of step 6; Otherwise, enter step 7.
Step 6: calculate the intersection delay value after the adjustment of track.
Step 7: make changeable driveway quantity increase by 1, i.e. Δ n=2,3 ..., n
atime, repeat step 2 to the computation process of step 6, obtain each intersection delay.
Step 8: if when changeable driveway quantity is i, can not meet number of track-lines and Capacity Constraints condition, then compare Δ n=1,2,3 ..., intersection delay value during i-1, Δ n when this value is minimum is changeable driveway quantity.
Through above step, the turning function in changeable driveway quantity and the rear each track of track quantity adjustment can be determined, thus obtain the track method of adjustment process flow diagram towards arterial street break-in traffic, see Fig. 7.
It should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.The all available prior art of each ingredient not clear and definite in the present embodiment is realized.
Claims (3)
1., towards the track method of adjustment of arterial street break-in traffic, it is characterized in that: comprise the following steps:
1) volume of traffic direction nonuniformity coefficient K is calculated
d;
In formula:
Q
1---the heavy traffic flow path direction magnitude of traffic flow (pcu/h);
Q
2---the light traffic flow path direction magnitude of traffic flow (pcu/h);
2) judging whether to meet break-in traffic setting model: if meet break-in traffic setting model, determining changeable driveway quantity and adjustment rear each track, track turning function by calculating; Otherwise, select tide flow integrative design intersection prioritization scheme;
3) defining method of changeable driveway quantity and adjustment rear each track, track turning function is:
Step one: the traffic capacity calculating present situation two-way road;
Wherein C
a, C
a' be respectively the traffic capacity of present situation two-way road, pcu/h; T
mfor the signal period duration of crossing M, s; T
nfor the signal period duration of crossing N, s; S
l, S
t, S
rbe respectively the saturation volume of a left-hand rotation, craspedodrome, right-turn lane, 1550pcu/h, 1650pcu/h, 1550pcu/h can be got respectively; n
l, n
t, n
rbe respectively the left-hand rotation in a direction, section, craspedodrome, right-turn lane quantity; g
nL, g
nT, g
nRbe respectively the Effective Green Time duration that N place, crossing a direction entrance driveway respectively turns to phase place, s; n
l', n
t', n
r' be respectively the left-hand rotation in a ' direction, section, craspedodrome, right-turn lane quantity; g
mL, g
mT, g
mRbe respectively the Effective Green Time duration that a ' direction, M place, crossing entrance driveway respectively turns to phase place, s;
Step 2: when supposing changeable driveway quantity Δ n=1, calculate q respectively
liand q
ti, wherein, q
lito attach most importance to the left-hand rotation bicycle road flow in traffic flow direction; q
tito attach most importance to the craspedodrome bicycle road flow in traffic flow direction;
If q
libe greater than q
ti, this changeable driveway is set to left-hand rotation dedicated Lanes, and the left turn traffic for heavy traffic flow path direction passes through, and the function in other three tracks is constant; If q
libe less than q
ti, using the left-hand rotation dedicated Lanes of changeable driveway as heavy traffic flow path direction, the most fast lane before the adjustment of track becomes craspedodrome from original left-hand rotation;
In like manner, each lane function defining method of light traffic flow path direction is: work as q
libe greater than q
titime, turn left track quantity of the party reduces, and the left turning vehicle lane change originally travelled on changeable driveway travels to adjacent outside left turn lane; Work as q
libe less than q
titime, the Through Lane quantity in this direction reduces, and left turning vehicle moves laterally, and Through Lane lane change to the adjacent outside Through Lane of inner side travelled originally;
Step 3: after two-way lane quantity and function change, reselect tide integrative design intersection scheme, and calculate signal timing dial;
Step 4: combine with tide flow intersection signal phase optimization scheme, calculate traffic capacity C and C ' that track adjusts latter two direction, computing method are identical with step one;
Step 5: judge whether to meet number of track-lines and the traffic capacity two constraint conditions;
Condition one: number of track-lines condition
Wherein:
n
a=n
L+n
T+n
R
n
a′=n
L′+n
T′+n
R′
Condition two: traffic capacity condition
In formula, q
l, q
t, q
rbe respectively the left-hand rotation in its excess-three of M place, crossing entrance driveway remittance a direction, section, craspedodrome and right-hand rotation flow, pcu/h; q
l', q
t', q
r' be respectively its excess-three of N place, crossing entrance driveway to import the left-hand rotation in a ' direction, section, craspedodrome and right-hand rotation flow, pcu/h;
If meet above two constraint conditions, then carry out the calculating of step 6; Otherwise, enter step 7;
Step 6: calculate the intersection delay value after the adjustment of track;
Step 7: make changeable driveway quantity increase by 1, i.e. Δ n=2,3 ..., n
atime, repeat the computation process of above step 2 to step 6, obtain each intersection delay;
Step 8: if when changeable driveway quantity is i, can not meet number of track-lines and Capacity Constraints condition, then compare Δ n=1,2,3 ..., intersection delay value during i-1, Δ n when this value is minimum is changeable driveway quantity.
2. the track method of adjustment towards arterial street break-in traffic according to claim 1, is characterized in that: described tide flow integrative design intersection prioritization scheme system of selection sees the following form.
3. the track method of adjustment towards arterial street break-in traffic according to claim 1, is characterized in that: the setting model of described break-in traffic comprises following six aspects:
Condition one: on road, motor vehicle number of track-lines is more than two-way 3 tracks, and number of track-lines is more than 5 in the city thoroughfare that the volume of traffic is larger;
Condition two: when track, crossing is not suitable for enlarging or widens;
Condition three: section will have significantly " tidal phenomena ";
Condition four: the section that there is tide flow, to implement break-in traffic, need meet a standard, in peak period, one, this section direction vehicle flowrate exceeds 40% than opposite direction wagon flow, and namely the minimum need of volume of traffic directional spreding coefficient reach 2/3;
Condition five: subtend track is being used in heavy traffic direction, after namely number of track-lines is reduced in light traffic direction, should ensure that the traffic capacity of the two-way lane after adjusting meets respective demand;
Condition six: the terminal arranging break-in traffic route by sufficient traffic processing power, should can not be formed new traffic bottlenecks, and facilitate vehicles while passing track.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310140217.8A CN103208196B (en) | 2013-04-22 | 2013-04-22 | Lane adjusting method for urban artery turning traffic |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310140217.8A CN103208196B (en) | 2013-04-22 | 2013-04-22 | Lane adjusting method for urban artery turning traffic |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103208196A CN103208196A (en) | 2013-07-17 |
CN103208196B true CN103208196B (en) | 2015-01-28 |
Family
ID=48755409
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310140217.8A Expired - Fee Related CN103208196B (en) | 2013-04-22 | 2013-04-22 | Lane adjusting method for urban artery turning traffic |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103208196B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108755309A (en) * | 2018-06-01 | 2018-11-06 | 郑州大学 | Urban road based on function creates the design method of road network |
Families Citing this family (40)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103426312B (en) * | 2013-09-02 | 2015-12-02 | 银江股份有限公司 | A kind of automatic abductive approach based on vehicle flow detection and system |
CN104732775B (en) * | 2013-12-19 | 2019-04-26 | 深圳市腾讯计算机系统有限公司 | A kind of lane control method, apparatus, processing server and system |
CN104036645B (en) * | 2014-06-03 | 2015-11-18 | 东南大学 | Based on the intersection signal control method of changeable driveway |
CN104504899A (en) * | 2014-12-22 | 2015-04-08 | 武汉邮电科学研究院 | Intelligent traffic management system and implementation method thereof |
CN104933882A (en) | 2015-05-20 | 2015-09-23 | 浙江吉利汽车研究院有限公司 | Traffic intersection driving assistance method and system |
CN105070068A (en) * | 2015-08-20 | 2015-11-18 | 山东交通学院 | Device for marking tidal lane lines and working method of device |
CN106910353A (en) * | 2015-12-23 | 2017-06-30 | 上海宝康电子控制工程有限公司 | Intelligent tidal lane control system and method |
CN105719494A (en) * | 2015-12-23 | 2016-06-29 | 青岛理工大学 | Traffic green wave coordination control technology for cooperative optimization of tidal lane and turning lane |
CN105489009B (en) * | 2015-12-28 | 2017-12-29 | 中兴软创科技股份有限公司 | A kind of tide lane recognition method and system |
US20190009819A1 (en) * | 2016-03-15 | 2019-01-10 | Honda Motor Co., Ltd. | Vehicle control system, vehicle control method and vehicle control program |
CN106257554B (en) * | 2016-04-21 | 2019-03-29 | 长沙理工大学 | A kind of city thoroughfare taboo is left and turns left to protect phase setting method |
CN107705586B (en) * | 2016-08-08 | 2022-05-10 | 阿里巴巴集团控股有限公司 | Traffic flow control method and device for road intersection |
CN106320116A (en) * | 2016-08-25 | 2017-01-11 | 东南大学 | Optimization design method of exit ramp of pedestrian-bicycle shared road at the crossings in cities |
CN106548633A (en) * | 2016-10-20 | 2017-03-29 | 中国科学院深圳先进技术研究院 | A kind of variable guided vehicle road control method of road network tide flow stream |
CN106297326A (en) * | 2016-10-27 | 2017-01-04 | 深圳榕亨实业集团有限公司 | Based on holographic road network tide flow stream Lane use control method |
CN106384518A (en) * | 2016-10-31 | 2017-02-08 | 江苏金米智能科技有限责任公司 | Reversible lane control system |
CN106781562B (en) * | 2016-12-23 | 2022-11-01 | 鲁东大学 | Signal control system and method for single-lane bidirectional passing workshop intersection |
CN106710249A (en) * | 2016-12-25 | 2017-05-24 | 华北理工大学 | Tide type variable lane and control method thereof |
CN107016860A (en) * | 2017-05-18 | 2017-08-04 | 武汉理工大学 | A kind of signal-control crossing dynamic space-time optimization method under car networking technology |
CN107067726B (en) * | 2017-05-28 | 2019-11-08 | 浙江大学 | A method of identification crossing inlet can be changed guided vehicle road and suitability be arranged |
CN107038864B (en) * | 2017-05-28 | 2019-10-15 | 浙江大学 | A kind of crossing inlet guided vehicle road setting reasonability sentences method for distinguishing |
EP3455841A4 (en) * | 2017-06-12 | 2019-07-17 | Beijing Didi Infinity Technology And Development Co., Ltd. | Systems and methods for analyzing and adjusting road conditions |
CN108242158B (en) * | 2018-02-28 | 2021-06-01 | 青岛理工大学 | Intersection signal control method |
CN108447278B (en) * | 2018-05-11 | 2020-09-01 | 银江股份有限公司 | Tidal traffic oriented intersection space-time optimization method and system |
CN109448371A (en) * | 2018-11-05 | 2019-03-08 | 王晨 | A kind of real-time variable lane control method and control system |
CN109523808B (en) * | 2018-12-27 | 2021-07-27 | 长安大学 | Channelized optimization method for left-turn displacement intersection |
CN109859501B (en) * | 2019-03-08 | 2021-05-07 | 鲁东大学 | Intelligent control method for driving direction conversion of variable guide lane at signalized intersection |
CN109949098B (en) * | 2019-03-22 | 2020-12-08 | 山西省交通规划勘察设计院有限公司 | Method for calculating number of lanes of highway toll station |
CN110097752B (en) * | 2019-03-27 | 2021-04-27 | 杭州远眺科技有限公司 | Intelligent variable guide lane calculation method |
CN110400470A (en) * | 2019-06-14 | 2019-11-01 | 中国地质大学(武汉) | Intelligent traffic control system and method based on sensor network and elevating guardrail |
CN111369816A (en) * | 2019-11-29 | 2020-07-03 | 杭州海康威视系统技术有限公司 | Variable guide lane passing direction control method and device, electronic equipment and system |
CN111179612B (en) * | 2019-12-27 | 2021-09-07 | 讯飞智元信息科技有限公司 | Method, device and equipment for generating intersection lane function |
CN111260938B (en) * | 2019-12-30 | 2021-03-16 | 浙江浙大中控信息技术有限公司 | Variable lane self-adaptive control method based on traffic demand |
CN113112842B (en) * | 2020-01-13 | 2022-07-22 | 北京地平线机器人技术研发有限公司 | Lane driving direction updating method and device, storage medium and electronic equipment |
CN111540197B (en) * | 2020-04-17 | 2022-03-18 | 浙江大华技术股份有限公司 | Lane function division method and device, electronic equipment and storage medium |
CN112216103B (en) * | 2020-09-11 | 2021-09-24 | 深圳市朗尼科智能股份有限公司 | Urban traffic optimization method and system |
CN112767699B (en) * | 2020-10-28 | 2022-03-04 | 吉林大学 | Method for judging setting conditions of fixed straight-running CAV (computer aided design) special entrance lane at signalized intersection |
CN113077632A (en) * | 2021-06-07 | 2021-07-06 | 四川紫荆花开智能网联汽车科技有限公司 | V2X intelligent network connection side system and realizing method |
CN113257013B (en) * | 2021-07-16 | 2021-09-21 | 深圳市安达信通讯设备有限公司 | Traffic control system for ramp |
CN114999159B (en) * | 2022-06-23 | 2024-07-30 | 浙江大华技术股份有限公司 | Tidal lane determining method and device, storage medium and electronic device |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101901547A (en) * | 2010-07-21 | 2010-12-01 | 浙江工业大学 | Adaptive control method for variable lane |
CN102074116B (en) * | 2011-03-11 | 2013-04-24 | 上海千年城市规划工程设计股份有限公司 | Signal control method for variable lane |
CN102867412B (en) * | 2012-09-24 | 2014-09-10 | 东南大学 | Setting method for changing urban road into short lane |
-
2013
- 2013-04-22 CN CN201310140217.8A patent/CN103208196B/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108755309A (en) * | 2018-06-01 | 2018-11-06 | 郑州大学 | Urban road based on function creates the design method of road network |
CN108755309B (en) * | 2018-06-01 | 2020-03-20 | 郑州大学 | Function-based design method for newly-built urban road network |
Also Published As
Publication number | Publication date |
---|---|
CN103208196A (en) | 2013-07-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103208196B (en) | Lane adjusting method for urban artery turning traffic | |
CN106023608B (en) | A kind of method of the real-time dynamic timing of crossroad access signal lamp | |
CN102867412B (en) | Setting method for changing urban road into short lane | |
CN104157153B (en) | The intersection channelization of the design of a kind of separate type left turn lane and related intersection, signal phase and timing method to set up | |
CN102074116B (en) | Signal control method for variable lane | |
CN100418117C (en) | Automatic control method for green wave of pedestrian crossing street signal lamp | |
CN101325008A (en) | Dynamic bidirectional green wave band intelligent coordination control method for urban traffic trunk line | |
CN102842238A (en) | Dynamic coordination and control method of traffic signals of urban main road | |
CN103700273A (en) | Signal timing optimization method based on variable guide lane | |
CN107958598B (en) | Ground traffic organization optimization method suitable for separated three-layer three-dimensional intersection | |
CN103871256A (en) | Intersection passage control method achieving left turning through exit lanes | |
CN104074112A (en) | Tidal lane of upstream and downstream intersection of urban road and design method of tidal lane | |
CN110060488B (en) | Conflict-free traffic organization system for two-phase intersection and signal timing method | |
CN105279981A (en) | Tidal lane driving direction dynamic control method | |
CN105185128A (en) | Pedestrian crossing signal control method based on dedicated left turning phase of intersection | |
CN104318787A (en) | Method for improving use efficiency of space resources at intersection with overlapping phases | |
CN105206071A (en) | Intersection timing method based on mixed traffic flow delay model | |
CN103208197A (en) | Traffic signal timing method | |
CN102268852A (en) | Two-phase implementation method of urban road transport system | |
CN110164148B (en) | Intelligent timing control method and system for traffic lights at urban intersections | |
CN202694578U (en) | Left turning vehicle traffic control system | |
CN103572677A (en) | Left-turn-free flyover | |
CN104867336A (en) | Intersection two-phase signal control and canalization method | |
CN103696336A (en) | Stacked soft flyover system of crossroad and three-way intersection | |
Li et al. | Dynamic lane-use assignment model at signalized intersections under tidal flow |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 221700 Room 408, Fengxian County Quality Supervision Bureau, west side of Dongcheng Road, Fengxian County Economic Development Zone, Jiangsu, Xuzhou Applicant after: SOUTHEAST University Address before: 211189 Jiangsu Road, Jiangning District, Southeast University, No. 2, No. Applicant before: Southeast University |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150128 |
|
CF01 | Termination of patent right due to non-payment of annual fee |