CN103208082B - The evaluation of a kind of downtown area road utilization ratio and application process - Google Patents
The evaluation of a kind of downtown area road utilization ratio and application process Download PDFInfo
- Publication number
- CN103208082B CN103208082B CN201310091582.4A CN201310091582A CN103208082B CN 103208082 B CN103208082 B CN 103208082B CN 201310091582 A CN201310091582 A CN 201310091582A CN 103208082 B CN103208082 B CN 103208082B
- Authority
- CN
- China
- Prior art keywords
- road
- center
- utilization ratio
- section
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 27
- 238000011156 evaluation Methods 0.000 title description 5
- 230000000694 effects Effects 0.000 claims description 7
- 238000013507 mapping Methods 0.000 claims description 6
- 238000007689 inspection Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 238000012913 prioritisation Methods 0.000 claims description 3
- 239000013589 supplement Substances 0.000 claims description 3
- 238000012360 testing method Methods 0.000 abstract description 3
- 230000000007 visual effect Effects 0.000 abstract 1
- 230000008901 benefit Effects 0.000 description 11
- 238000013439 planning Methods 0.000 description 4
- 238000011161 development Methods 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000013210 evaluation model Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 239000011159 matrix material Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000000205 computational method Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Landscapes
- Instructional Devices (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of method assessing downtown area road utilization ratio based on road section centerline length and path area, concretely comprise the following steps: first obtain each center, city Vector Topographic Map data, and on the basis of Spot Test, it checked and adjust;Then by AUTOCAD computed in software, each achievement data is obtained;The data input assessment models that will obtain, obtains downtown area road utilization ratio index, on this basis, with AUTOCAD software as work platforms, promotes center road utilization ratio by constantly adjusting to evaluate.The present invention, based on the data accurately, preferably measured, is adjusted by direct visual means, promotes downtown area road utilization ratio.
Description
Technical field
The present invention relates to one and assess downtown area road based on road section centerline length and path area
The method of utilization ratio, belongs to urban planning technical field.
Background technology
1. the most less to the quantitative study of road utilization ratio, and the many fingers of road utilization ratio being commonly referred
Efficiency is passed through in traffic, as follows:
1. German scholar Wemer Brilon is combined in one the operation of traffic flow with the external force acting in physics
Rising, the traffic efficiency proposing certain burst of traffic flow is represented by:
In formula, EiIt it is the traffic efficiency of i-th burst of traffic flow;qiIt it is the average arrival rate of i-th burst of traffic flow;Ti
For analyzing the length of period;vTiI-th strand of traffic flow average running speed.
2. LatoraV etc. are when studying small-world network, it is proposed that a kind of efficiency evaluation method of weighted network,
Its computational methods are as follows:
In formula: dijRepresent the shortest path length of nodes i to node j, if without path between i to j
Connection, then dij=+∞。
3. the method for significance of highway segment, the method during Jenelius E etc. it is also proposed an assessment highway network
It is the connectedness that whether can affect network of the deletion according to section, and uses different computing formula.For one
Individual given network G, for section k ∈ G, this method gives 3 indexs assessing its importance degree: comprehensive
Importance degree I1, importance degree I with demand as weight2, relative not met rate I3, it is respectively calculated as follows
2., beyond traffic efficiency, also research and propose the different understanding to road efficiency:
1. section traffic efficiency: this index is complete within this time period by the vehicle of section in referring to the unit interval
The truck kilometer number become, its service level having considered section and service traffic volume, it is defined as:
Es=qυT
In formula: T is the unit time, generally takes 1h.
2. section transfer efficiency: section transfer efficiency refers to the accumulation on section of the section traffic efficiency, and this refers to
Mark has considered the service level in section and the transport need of service, and it is defined as:
EL=qL υ
Definition n is the section vehicle number at moment t, according to q=kv, n=kl, then has EL=nv2
3. road network operational efficiency: road network operational efficiency refers to form the transfer efficiency sum in each bar section of road network,
This index comprehensive considers the service level of road network and the transport need of service, and it is defined as:
The different understanding of different road utilization ratios, the difference of often corresponding road utilization ratio define and
Measuring method.And in the range of this specific region, center, road efficiency should be directly related with developing land used,
Promote the raising of center whole economic efficiency.
Summary of the invention
For the deficiencies in the prior art, the present invention is directed to downtown area road the most spacious or narrow
Current Situation, it is believed that the road utilization ratio in the range of this specific region, downtown area, should be more
Consider its impact brought by periphery land-use development, to improve its benefit run, increase center advantage
Land area can be managed in position, and then increases center economic benefit, and can form good downtown area
The assessment feedback method of land utilization efficiency.
Owing to the assessment of downtown area road utilization ratio is usually present appraisal procedure complexity, data are difficult to obtain
, and the problem lacking corresponding method of adjustment, it is desirable to provide it is a kind of based on objective rationality data,
The assessment more simplified and hoisting way, and data be more easy to obtain, degree of accuracy is higher, to promote down town
District's land utilization efficiency.
The present invention proposes one and assesses road, downtown area based on road section centerline length and path area
The method of road utilization ratio, first obtains each center, city Vector Topographic Map data, and at Spot Test
On the basis of it is checked and adjusts;Then by AUTOCAD computed in software, each achievement data is obtained;
The data input assessment models that will obtain, obtains downtown area road utilization ratio index, on this basis,
With AUTOCAD software as work platforms, by constantly adjusting-evaluate-lifting center road utilization ratio.
Comprise the following steps:
Step 1: obtain downtown area existing Vector Topographic Map data.Wherein said existing vector landform
Diagram data is by drawing after field survey by the professional and technical personnel of Mapping departments or planning department, generally may be used
Buy through local Surveying And Mapping Institute, or by obtaining with the cooperation of local regional planning agency.
Step 2: center road conditions is carried out on-site inspection and measurement, and Vector Topographic Map is adjusted
And supplement, obtain up-to-date Vector Topographic Map data.
Step 3: by AUTOCAD software, Vector Topographic Map data is carried out vector edition, calculate and obtain each road
Section centerline length and Road width.
Step 4: build center road based on each road section centerline length obtained and Road width and utilize
Efficiency evaluation model, calculates road utilization ratio index.In downtown area, along the land-use development of road
It is more easy to obtain the raising of higher return, beneficially economic benefit, but crosses and can destroy again for road of great width
The contact of both sides, road, reduces economic benefit, and therefore the proportionate relationship between link length and path area can
Determine the business efficiency of the actual utilization of center road.
Road utilization ratio index is determined by following function model:
aiTwo li×di
In formula: P center road utilization ratio index, i i-th section, liI-th section
Centerline length (m), diThe Road width (m) in i-th section, the road axis in L center
Total length (m), aiPath area (the m in i-th section2), the A center internal road gross area (m2).
What road axis reacted is the effective length of road, and the formation of a road can be same in road 2 side
Time formed 2 frontages, therefore using 2 times of length as center road frontage of road-center line length
Degree index.And center road utilization ratio P value is the highest, show that in roadnet, frontage length proportion is more
Greatly, interface benefit is the best, then the probability that business commercial activity occurs is the biggest, and the result of management of road both sides is more
Good.In downtown area, the most along traffic network launch interface, block mean the most service machines
Meeting.When less path area assume responsibility for more critical surface, then represent road high efficiency and utilize centering
The directly contribution of heart district economic benefit is bigger.
Step 5: adjust center link length, width and road structure for work platforms with AUTOCAD software,
And reacquire each section centerline length after Road adjustment and Road width data, after calculating Road adjustment
Center road utilization ratio index.Through repeatedly adjusting, calculating, the road obtaining each method of adjustment utilizes effect
Rate index, and by the comparison of road utilization ratio index, determine that center road utilizes prioritization scheme.
Wherein, described step 2 particularly as follows:
Step 2.1: Survey Research Center's district's road conditions on the spot, and with step 1 obtain Vector Topographic Map carry out right
According to;
Step 2.2: utilize hand-held three-dimensional laser scanner present situation is changed location to carry out field surveys, obtain
By way of variation location, road Vector Topographic Map data;
Step 2.3: by AUTOCAD software, the variation location Vector Topographic Map data obtained with mapping are replaced
Corresponding data in the Vector Topographic Map that step 1 obtains, it is thus achieved that center up-to-date Vector Topographic Map data.
Wherein, described step 3 particularly as follows:
Step 3.1: draw each section centrage with PLINE order in AUTOCAD software;
Step 3.2: obtain center, each section line length drawn with PROPERTIES order in AUTOCAD software
Degrees of data;
Step 3.3: measure the Road width data obtaining each section with DIST order in AUTOCAD software.
Wherein, described step 4 particularly as follows:
Step 4.1: each section centerline length data l that step 3 is recordediAnd each section Road width data
Di is multiplied, and obtains each section area data ai;
Step 4.2: by each section area data aiSum up process, obtain center road gross area A;
Step 4.3: by each section centerline length data liSum up process, obtain the road in center
Centrage total length L;
Step 4.4: the road axis total length L in center and the ratio of center road gross area A,
It is center land utilization efficiency indices P.
Wherein, described step 5 particularly as follows:
Step 5.1: by the drafting of AUTOCAD software, delete, extend isovector edit commands, to center
District's road is adjusted;
Step 5.2:: the road axis after measuring and calculating Road adjustment and path area index again;
Step 5.3: the index input road utilization ratio assessment models that will record, obtains new road and utilizes effect
Rate index;
Step 5.4: repeat step 5.1 to step 5.3, until it reaches optimum center road utilization ratio.
Owing to being at the enterprising Row sum-equal matrix in existing road basis, so the feasibility of adjustment should be taken into full account, some
Section can increase area, some can newly added road sections, finally obtain be one adjust after comprehensive assessment result.
And under the restriction of downtown area tale quale, Road adjustment also has certain restriction, its Adjusted Option
It is limited, therefore by the calculating of the road utilization ratio index of each scheme and compare, it is possible to try to achieve
The maximum of downtown area road utilization ratio index under existence conditions, with this understanding, center road
Utilization ratio is the highest, and this scheme is the optimal case of center Road adjustment.
Beneficial effect: the one that the present invention provides assesses city based on road section centerline length and path area
The method of center road utilization ratio, on the one hand for the downtown area that land values are the highest, proposes road
The assessment of road utilization ratio and method for improving, more realistic meaning and use value;On the other hand simplify
Road utilization ratio evaluation index system, has constructed relatively simple model intuitively, and data are more easy to obtain, the most more
For accurately, and data objectivity is relatively strong, and can be directly used in the adjusting and optimizing of instructing center district road.
Accompanying drawing explanation
Fig. 1 is the method flow diagram of the embodiment of the present invention;
Fig. 2 is road utilization ratio assessment figure in center, Guangzhou Beijing Road in the embodiment of the present invention.
Detailed description of the invention
Below in conjunction with specific embodiment, it is further elucidated with the present invention, it should be understood that these embodiments are merely to illustrate
The present invention rather than restriction the scope of the present invention, after having read the present invention, those skilled in the art couple
The amendment of the various equivalent form of values of the present invention all falls within the application claims limited range.
The technical side of the present invention is explained below with reference to Guangzhou Beijing Road center case and accompanying drawing
Case.
Downtown area road utilization ratio assessment and application process, including 5 steps: first determine center
The evaluation index of district's road utilization ratio, builds the assessment models of center road utilization ratio;Then obtain
Each center, city Vector Topographic Map data, and on the basis of Spot Test, it checked and adjust;
Then by AUTOCAD computed in software, each achievement data is obtained;The data input assessment models that will obtain,
Obtain downtown area road utilization ratio index, on this basis, with AUTOCAD software as work platforms,
By constantly adjusting-assessment-lifting center road utilization ratio.
Idiographic flow as it is shown in figure 1, and be described in detail as follows:
Step 1: obtain downtown area Vector Topographic Map data, can be bought by local Surveying And Mapping Institute, or pass through
Cooperation with local regional planning agency obtains.In the practice of center, Guangzhou Beijing Road, it is by advising with Guangzhou
Draw office's cooperation to obtain.
Step 2: center road conditions is carried out on-site inspection and measurement, and Vector Topographic Map is adjusted
And supplement, obtain up-to-date Vector Topographic Map data.
Step 2.1: Survey Research Center's district's road conditions on the spot, and with step 1 obtain Vector Topographic Map carry out right
According to;
Step 2.2: utilize hand-held three-dimensional laser scanner present situation is changed location to carry out field surveys, obtain
By way of variation location, road Vector Topographic Map data;
Step 2.3: by AUTOCAD software, the variation location Vector Topographic Map data obtained with mapping are replaced
Corresponding data in the Vector Topographic Map that step 1 obtains, it is thus achieved that center up-to-date Vector Topographic Map data.
Step 3: by AUTOCAD software, Vector Topographic Map data is carried out vector edition, calculate and obtain each road
Section centerline length and Road width.
Step 3.1: draw each section centrage with PLINE order in AUTOCAD software;
Step 3.2: obtain center, each section line length drawn with PROPERTIES order in AUTOCAD software
Degrees of data;
Step 3.3: measure the Road width data obtaining each section with DIST order in AUTOCAD software.
As in figure 2 it is shown, in center, Guangzhou Beijing Road, i-th road section length is 133m, Road width
For 30m, calculating this section area on this basis is 3990m2。
Step 4: build center road based on each road section centerline length obtained and Road width and utilize
Efficiency evaluation model, calculates road utilization ratio index.In downtown area, along the land-use development of road
It is more easy to obtain the raising of higher return, beneficially economic benefit, but crosses and can destroy again for road of great width
The contact of both sides, road, reduces economic benefit, and therefore the proportionate relationship between link length and path area can
Determine the business efficiency of the actual utilization of center road.
Road utilization ratio index is determined by following function model:
ai=li×di
In formula: P center road utilization ratio index, i i-th section, liI-th section
Centerline length (m), diThe Road width (m) in i-th section, the road axis in L center
Total length (m), aiPath area (the m in i-th section2), the A center internal road gross area (m2).
What road axis reacted is the effective length of road, and the formation of a road can be same in road 2 side
Time formed 2 frontages, therefore using 2 times of length as center road frontage of road-center line length
Degree index.And center road utilization ratio P value is the highest, show that in roadnet, frontage length proportion is more
Greatly, interface benefit is the best, then the probability that business commercial activity occurs is the biggest, and the result of management of road both sides is more
Good.In downtown area, the most along traffic network launch interface, block mean the most service machines
Meeting.When less path area assume responsibility for more critical surface, then represent road high efficiency and utilize centering
The directly contribution of heart district economic benefit is bigger.
Being calculated by data and calculate, obtaining center, Guangzhou Beijing Road present situation land utilization efficiency index is
158.3。
Step 5: adjust center link length, width and road structure for work platforms with AUTOCAD software,
And reacquire each section centerline length after Road adjustment and Road width data, after calculating Road adjustment
Center road utilization ratio index.Through repeatedly adjusting, calculating, the road obtaining each method of adjustment utilizes effect
Rate index, and by the comparison of road utilization ratio index, determine that center road utilizes prioritization scheme.
Step 5.1: by the drafting of AUTOCAD software, delete, extend isovector edit commands, to center
District's road is adjusted;
Step 5.2:: the road axis after measuring and calculating Road adjustment and path area index again;
Step 5.3: the index input road utilization ratio assessment models that will record, obtains new road and utilizes effect
Rate index;
Step 5.4: repeat step 5.1 to step 5.3, until it reaches optimum center road utilization ratio.
Owing to being at the enterprising Row sum-equal matrix in existing road basis, so the feasibility of adjustment should be taken into full account, some
Section can increase area, some can newly added road sections, finally obtain be one adjust after comprehensive assessment result.
And under the restriction of downtown area tale quale, Road adjustment also has certain restriction, its Adjusted Option
It is limited, therefore by the calculating of the road utilization ratio index of each scheme and compare, it is possible to try to achieve
The maximum of downtown area road utilization ratio index under existence conditions, with this understanding, center road
Utilization ratio is the highest, and this scheme is the optimal case of center Road adjustment.
The above is only the preferred embodiment of the present invention, it should be pointed out that: common for the art
For technical staff, under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications,
These improvements and modifications also should be regarded as protection scope of the present invention.
Claims (4)
1. the method assessing downtown area road utilization ratio based on road section centerline length and path area, it is characterised in that include with
Lower step:
Step 1: obtain downtown area existing Vector Topographic Map data;
Step 2: center road conditions is carried out on-site inspection and measurement, and existing Vector Topographic Map is adjusted and supplements, obtain up-to-date
Vector Topographic Map data;
Step 3: use AUTOCAD software that Vector Topographic Map data carries out vector edition, calculate and obtain each section centerline length and Road width;
Step 4: build center road utilization ratio assessment models based on each road section centerline length obtained and Road width, calculates road profit
With efficiency index,
Road utilization ratio index is determined by following function model:
ai=li×di
In formula: P center road utilization ratio index, i i-th section, liThe centerline length (m) in i-th section, diI-th section
Road width (m), road axis total length (m) in L center, aiPath area (the m in i-th section2), in A center
The road gross area (m2);Step 5: adjust center link length, width and road structure with AUTOCAD software for work platforms, lay equal stress on
Each section centerline length after new acquisition Road adjustment and Road width data, calculate Road adjustment rear center district's road utilization ratio index, obtain
Take the road utilization ratio index after repeatedly adjusting, and by the comparison of road utilization ratio index, determine that center road utilizes prioritization scheme.
The method assessing downtown area road utilization ratio based on road section centerline length and path area the most according to claim 1, its
It is characterised by that step 2 comprises the following steps:
Step 2.1: Survey Research Center's district's road conditions on the spot, and compare with the Vector Topographic Map of step 1 acquisition;
Step 2.2: utilize hand-held three-dimensional laser scanner present situation is changed location to carry out field surveys, obtain road variation location Vector Topographic Map
Data;
Step 2.3: by AUTOCAD software, the Vector Topographic Map that the variation location Vector Topographic Map data replacement step 1 obtained with mapping obtains
In corresponding data, it is thus achieved that center up-to-date Vector Topographic Map data.
The method assessing downtown area road utilization ratio based on road section centerline length and path area the most according to claim 1, its
It is characterised by that step 3 comprises the following steps:
Step 3.1: draw each section centrage with PLINE order in AUTOCAD software;
Step 3.2: obtain each section centerline length data drawn with PROPERTIES order in AUTOCAD software;
Step 3.3: measure the Road width data obtaining each section with DIST order in AUTOCAD software.
The method assessing downtown area road utilization ratio based on road section centerline length and path area the most according to claim 1, its
It is characterised by that step 4 comprises the following steps:
Step 4.1: each section centerline length data l that step 3 is recordediAnd each section Road width data diIt is multiplied, obtains each section area number
According to ai;
Step 4.2: by each section area data aiSum up process, obtain center road gross area A;
Step 4.3: by each section centerline length data liSum up process, obtain the road axis total length L in center;
Step 4.4: the road axis total length L in center is multiplied by the ratio of 2 and center road gross area A, is center road and utilizes
Efficiency index P.5, according to claim 1 assess downtown area road based on road section centerline length and path area and utilize effect
The method of rate, it is characterised in that step 5 comprises the following steps:
Step 5.1: by the drafting of AUTOCAD software, delete, extend vector edition order, center road is adjusted;
Step 5.2: the road axis after measuring and calculating Road adjustment and path area index again;
Step 5.3: the index input road utilization ratio assessment models that will record, obtains new road utilization ratio index;
Step 5.4: repeat step 5.1 to step 5.3, until it reaches optimum center road utilization ratio.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310091582.4A CN103208082B (en) | 2013-03-20 | 2013-03-20 | The evaluation of a kind of downtown area road utilization ratio and application process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310091582.4A CN103208082B (en) | 2013-03-20 | 2013-03-20 | The evaluation of a kind of downtown area road utilization ratio and application process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103208082A CN103208082A (en) | 2013-07-17 |
CN103208082B true CN103208082B (en) | 2016-08-10 |
Family
ID=48755299
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310091582.4A Expired - Fee Related CN103208082B (en) | 2013-03-20 | 2013-03-20 | The evaluation of a kind of downtown area road utilization ratio and application process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103208082B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105677933A (en) * | 2014-11-20 | 2016-06-15 | 镇江金软计算机科技有限责任公司 | Method for optimizing Auto CAD 3D software |
CN105046626A (en) * | 2015-08-11 | 2015-11-11 | 上海市政工程设计研究总院(集团)有限公司 | Data analysis apparatus for land mass |
CN105844031B (en) * | 2016-03-29 | 2019-03-29 | 东南大学 | A kind of urban transportation gallery recognition methods based on mobile phone location data |
CN108645342B (en) * | 2018-04-25 | 2020-07-07 | 国交空间信息技术(北京)有限公司 | Road width extraction method based on road track and high-resolution image |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102609807A (en) * | 2012-01-18 | 2012-07-25 | 东南大学 | Method for determining position and agglomeration intensity of city core area |
CN102855759A (en) * | 2012-07-05 | 2013-01-02 | 中国科学院遥感应用研究所 | Automatic collecting method of high-resolution satellite remote sensing traffic flow information |
-
2013
- 2013-03-20 CN CN201310091582.4A patent/CN103208082B/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102609807A (en) * | 2012-01-18 | 2012-07-25 | 东南大学 | Method for determining position and agglomeration intensity of city core area |
CN102855759A (en) * | 2012-07-05 | 2013-01-02 | 中国科学院遥感应用研究所 | Automatic collecting method of high-resolution satellite remote sensing traffic flow information |
Non-Patent Citations (1)
Title |
---|
中国特大城市CBD交通路网模式量化研究;杨俊宴 等;《规划师》;20101231;第26卷(第1期);59-65 * |
Also Published As
Publication number | Publication date |
---|---|
CN103208082A (en) | 2013-07-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Pagliaro et al. | A roadmap toward the development of Sapienza Smart Campus | |
CN104809112B (en) | A kind of city bus development level integrated evaluating method based on multi-source data | |
CN103440411B (en) | Set up based on exposed population group area the method for traffic noise pollution model of acoustic environment functional areas | |
CN103208082B (en) | The evaluation of a kind of downtown area road utilization ratio and application process | |
CN109409662B (en) | Measuring method for correlation between urban traffic and commercial space based on space syntax | |
CN103823951B (en) | Method for quantifying characteristics of road network and effect of characteristics of road network on land utilization | |
CN109389825A (en) | Fire-fighting and rescue route optimal method based on shortest path | |
Rao et al. | Sustainability assessment of road networks: A new perspective based on service ability and landscape connectivity | |
CN110517491A (en) | A kind of consideration path redundancy and out the significance of highway segment sort method of line efficiency | |
CN112184282A (en) | Cinema site selection model establishing method, cinema site selection method and cinema site selection platform | |
Karimi et al. | Sustainable approach to land development opportunities based on both origin-destination matrix and transportation system constraints, case study: Central business district of Isfahan, Iran | |
CN108921425A (en) | A kind of method, system and the server of asset item classifcation of investment | |
CN117036112A (en) | Geographic information system and method for land planning | |
CN111340285A (en) | Quantification method for urban construction land distribution in homeland space planning | |
Luo et al. | Construct the future wetland ecological security pattern with multi-scenario simulation | |
CN103218768B (en) | Evaluation and the application process of the sensible degree in a kind of downtown area | |
CN113724495A (en) | Traffic prediction method for city sharing trip | |
CN117273538A (en) | Analysis method and system for traffic carbon emission space network association structure | |
CN117273262A (en) | Method for evaluating functional toughness of urban multi-mode traffic network under flood disasters | |
Zeng et al. | Design of data model for urban transport GIS | |
CN115495701A (en) | Method for predicting time-space distribution of charging load of consistent electric automobile | |
CN112464417B (en) | Robustness assessment method for scenic gallery | |
Mane et al. | Effect of land use developments on travel time reliability | |
Peng et al. | A key node optimization scheme for public bicycles based on wavefront theory | |
CN104965940A (en) | Method for building social network model of urban public space |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200813 Address after: 210096 Jiangsu city Nanjing Province four pailou No. 2 Patentee after: ARCHITECTURAL DESIGN AND RESEARCH INSTITUTE OF SOUTHEAST UNIVERSITY Co.,Ltd. Address before: 210096 Jiangsu city Nanjing Province four pailou No. 2 Patentee before: SOUTHEAST University |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160810 |
|
CF01 | Termination of patent right due to non-payment of annual fee |