CN103199468A - Cabling rack and communication device - Google Patents

Cabling rack and communication device Download PDF

Info

Publication number
CN103199468A
CN103199468A CN2013100735836A CN201310073583A CN103199468A CN 103199468 A CN103199468 A CN 103199468A CN 2013100735836 A CN2013100735836 A CN 2013100735836A CN 201310073583 A CN201310073583 A CN 201310073583A CN 103199468 A CN103199468 A CN 103199468A
Authority
CN
China
Prior art keywords
chute
slide construction
gag lever
lever post
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100735836A
Other languages
Chinese (zh)
Other versions
CN103199468B (en
Inventor
鲁大伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honor Device Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201310073583.6A priority Critical patent/CN103199468B/en
Publication of CN103199468A publication Critical patent/CN103199468A/en
Application granted granted Critical
Publication of CN103199468B publication Critical patent/CN103199468B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a cabling rack which comprises a limit portion, a sliding portion and a containing portion. The limit portion comprises a body and a limit structure. The limit structure extends towards the sliding portion from the inner wall of the body and comprises a first limit rod and a second limit rod opposite to the first limit rod. The sliding portion is connected with the limit portion in a sliding mode and comprises an operation body and a sliding structure. The sliding structure extends towards the limit portion from the lower portion of the operation body and corresponds to the limit structure. The sliding structure comprises a first sliding structure and a second sliding structure opposite to the first sliding structure, the first limit rod can slide relative to the first sliding structure, and the second limit rod can slide relative to the second sliding structure. The containing portion is an enclosed cabling space and used for containing cables. The invention further provides a communication device. According to the cabling rack and the communication device, the containing portion which is the enclosed cabling space is utilized, and therefore the cables are prevented from falling off from the cabling rack.

Description

Chute and communication equipment
Technical field
The present invention relates to the communications field, relate in particular to a kind of chute and communication equipment.
Background technology
Continuous development along with information technology, the interface of the veneer in the communication equipment is more and more, port density is also more and more higher, cause the cabling quantity of whole communication equipment sharply to increase, how to make the cabling space of chute carry more cable, and guarantee the convenient of the safety of cable and operation, all become a key factor that influences communication equipment complete machine performance.Please refer to Figure 14, existing chute generally is provided with an accepting hole 900 of putting into for cable, but accepting hole 900 be open cabling space, and too much when cabling quantity, cable is above the height of accepting hole 900, very easily landing from the chute of cable.
Summary of the invention
Technical problem to be solved by this invention is, is used for solving prior art and exists cable from the problem of chute landing.
To achieve these goals, embodiment of the present invention provides following technical scheme:
On the one hand, a kind of chute is provided, it is installed on the rack of communication equipment, be used for the combing cable, it is characterized in that: described chute comprises limiting section, at least one sliding part and at least one resettlement section, described limiting section comprises body and at least one position limiting structure, described position limiting structure extends towards described sliding part from the inwall of described body, described position limiting structure comprises first gag lever post and second gag lever post relative with first gag lever post, described sliding part and described limiting section are slidingly connected, described sliding part comprises operating body and slide construction, described slide construction extends and corresponding with described position limiting structure from the bottom of described operating body towards described limiting section, described slide construction comprises second slide construction that first slide construction is relative with described first slide construction, described first gag lever post can slide by described relatively first slide construction, described second gag lever post can slide by described relatively second slide construction, and described resettlement section is enclosed cabling space, is used for accommodating cable.
In first kind of possible implementation, described first gag lever post comprises protruding first boss to described second gag lever post, described second gag lever post comprises protruding second boss to described first gag lever post, and the width of the width of described first boss and described second boss equates.
In conjunction with first kind of possible implementation, in second kind of possible implementation, described first slide construction comprises first chute, described second slide construction comprises second chute, the width of the width of described first chute and described second chute equates, described first boss is contained in described first chute, and described second boss is contained in described second chute.
In conjunction with first kind of possible implementation, in the third possible implementation, described first gag lever post comprises location division, first groove and second groove, and described location division is near described body, and described first groove and described second groove are positioned at the two ends of described location division.
In conjunction with the third possible implementation, in the 4th kind of possible implementation, described first slide construction also comprises first projection, described first projection deviates from the end away from described operating body that described second slide construction protrudes and be positioned at described first slide construction from the inwall of described first chute, wherein, when described first projection was contained in described second groove, described chute was in open mode; When described first projection was contained in described first groove, described chute was in closed condition.
In conjunction with the 4th kind of possible implementation, in the 5th kind of possible implementation, described first gag lever post also comprises stop hook, and described stop hook is positioned at the end of described first gag lever post, and the end of described stop hook is provided with barb.
In conjunction with the 5th kind of possible implementation, in the 6th kind of possible implementation, described first slide construction also comprises second projection, described second projection deviates from the middle part that described second slide construction protrudes and be positioned at described first slide construction from the inwall of described first chute, when described chute was in open mode, described barb hooked described second projection.
In conjunction with the 6th kind of possible implementation, in the 7th kind of possible implementation, described first slide construction also comprises a pair of operating portion, and described operating position is used for controlling described second projection in a pair of relative sidewall of described first slide construction and near described second projection.
In conjunction with the 4th kind of possible implementation, in the 8th kind of possible implementation, described first gag lever post also comprises first inclined-plane, described first inclined-plane is positioned at the terminal of described first gag lever post and described second gag lever post dorsad, described sliding part also comprises a pair of first oblique portion, the described first oblique portion extends obliquely from the two opposite side walls of described first slide construction and the intersection of described operating body, and when described chute was in closed condition, described first inclined-plane inserted between the described first oblique portion.
In conjunction with the 4th kind of possible implementation, in the 9th kind of possible implementation, described second gag lever post also comprises second inclined-plane, described second inclined-plane is positioned at the terminal of described second gag lever post and described first gag lever post dorsad, described sliding part also comprises a pair of second oblique portion, the described second oblique portion extends obliquely from the two opposite side walls of described second slide construction and the intersection of described operating body, and when described chute was in closed condition, described second inclined-plane inserted between the described second oblique portion.
In conjunction with the third possible implementation, in the tenth kind of possible implementation, described first gag lever post also comprises the 3rd groove, and described the 3rd groove is located at described location division and between described first groove and described second groove.
In conjunction with the tenth kind of possible implementation, in the 11 kind of possible implementation, described first slide construction also comprises first projection, described first projection deviates from the end away from described operating body that described second slide construction protrudes and be positioned at described first slide construction from the inwall of described first chute, wherein, when described first projection was contained in described second groove, described chute was in open mode; When described first projection was contained in described first groove or the 3rd groove, described chute was in closed condition.
In the 12 kind of possible implementation, described sliding part also comprises the gap, and described gap is between described first slide construction and described second slide construction.
In conjunction with the 12 kind of possible implementation, in the 13 kind of possible implementation, described sliding part also comprises a plurality of reinforcements, and described reinforcement and is cut apart described gap between described first slide construction and described second slide construction.
On the other hand, provide a kind of communication equipment, it comprises that rack and at least one are installed on the above-mentioned chute in the described rack.
Chute provided by the invention and communication equipment, utilizing the resettlement section is enclosed cabling space, thereby prevents cable landing from the chute.
Description of drawings
In order to be illustrated more clearly in the technical scheme in the embodiment of the invention, the accompanying drawing of required use is done to introduce simply in will describing embodiment below, apparently, accompanying drawing in describing below only is some embodiments of the present invention, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the schematic diagram of communication equipment provided by the invention;
Fig. 2 is the decomposing schematic representation of first kind of execution mode of chute provided by the invention;
Fig. 3 is another angle schematic diagram of the chute among Fig. 2;
Fig. 4 is the cross-sectional schematic of the chute among Fig. 2;
Fig. 5 is the open mode schematic diagram of the chute among Fig. 2;
Fig. 6 is the cross-sectional schematic of the chute among Fig. 4;
Fig. 7 is the closed condition schematic diagram of the chute among Fig. 2;
Fig. 8 is the cross-sectional schematic of the chute among Fig. 7;
Fig. 9 is another angle cross-sectional schematic of the chute among Fig. 7
Figure 10 is the cabling schematic diagram in the communication equipment of cable in Fig. 1;
Figure 11 is the cabling schematic diagram of cable in chute;
Figure 12 is the schematic diagram of second kind of execution mode of chute provided by the invention;
Figure 13 is the schematic diagram of the third execution mode of chute provided by the invention;
Figure 14 is the cabling schematic diagram of cable in the communication equipment that prior art provides.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the invention, the technical scheme in the embodiment of the invention is clearly and completely described, obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills belong to the scope of protection of the invention not making the every other embodiment that obtains under the creative work prerequisite.
Please refer to Fig. 1 and Fig. 8, the communication equipment 800 that embodiment of the present invention provides, it comprises rack 700 and a plurality of chute 100.Chute 100 is installed on rack 700, is used for the cable of combing communication equipment 800.
Please also refer to Fig. 2 to Fig. 4, the chute 100 that embodiment of the present invention provides, it comprises limiting section 10, sliding part 30 and resettlement section 50, resettlement section 50 is used for accommodating cable.
Limiting section 10 is installed on rack 700, and comprises body 12, first gag lever post 14 and second gag lever post 16 relative with first gag lever post 14.
In the present embodiment, first gag lever post 14 and second gag lever post 16 are referred to as position limiting structure 15.Position limiting structure 15 extends towards sliding part 30 from the bottom of body 12.
Body 12 comprises first installing hole 120 and second installing hole 124.In the present embodiment, first installing hole 120 is screwed hole, and second installing hole 124 is hardy hole.During installation, by second installing hole 124 chute 100 is hung on 700, one installed parts 90 of rack, as screw, is fixed in first installing hole 120, so that chute 100 is fixed in rack 700.
First gag lever post 14 extends towards sliding part 30 from the madial wall of body 12, and comprises protruding first boss 140 (please refer to Fig. 9) to second gag lever post 16.
First boss 140 comprises location division 141, first groove 142, second groove 144, slope 146, position-arresting part 148 and stop hook 149.Location division 141 is positioned at location division 141 near an end of body 12 near body 12, the first grooves 142, and second groove 144 is positioned at location division 141 near the other end on slope 146, and namely first groove 142 and second groove 144 are positioned at the two ends of location division 141.Slope 146 is used for connecting position-arresting part 148 and location division 141 and between second groove 144 and position-arresting part 148, namely the difference in height between location division 141 and the position-arresting part 148 links to each other by slope 146.
In the present embodiment, first groove 142 and second groove 144 are semicircle.
The height of position-arresting part 148 is less than the height of location division 141, and stop hook 149 is positioned at the end of position-arresting part 148, and namely stop hook 149 is positioned at the end of first gag lever post 14.The height of stop hook 149 equates with the height of location division 141, stop hook 149 is towards second gag lever post 16, stop hook 149 is first vertical plane 1490 towards a side of body 12, and the another side that deviates from body 12 is the inclined-plane, thereby forms barb 1492 at the end of stop hook 149.
First gag lever post 14 comprises that also 147, the first inclined-planes 147, first inclined-plane are positioned at the terminal of first gag lever post 14 and second gag lever post 16 dorsad.First inclined-plane 147 is higher than the other end near an end of body 12.
Second gag lever post 16 extends towards sliding part 30 from the madial wall of body 12, and comprises second boss 160 (please refer to Fig. 9).Second boss 160 is protruding to be equated to the width of first gag lever post, 14, the first boss 140 and the width of second boss 160.
Second gag lever post 16 comprises that also 167, the second inclined-planes 167, second inclined-plane are positioned at the terminal of second gag lever post 16 and first gag lever post 14 dorsad.Second inclined-plane 167 is higher than the other end near an end of body 12.
Sliding part 30 is slidingly connected with limiting section 10, and comprises operating body 31, first slide construction 32 and second slide construction 34 relative with first slide construction 32.Operating body 31 is used for operation sliding part 30, as promoting or pulling sliding part 30.The height of operating body 31 equals the height of body 12.
First slide construction 32 and second slide construction 34 are referred to as slide construction 33, slide construction 33 extends and corresponding with position limiting structure 15 from the bottom of operating body 31 towards limiting section 10, and namely the position on short transverse concerns it is corresponding to position limiting structure 15 with slide construction 33 and operating body 31 in the relation of the position on the short transverse with body 12.
First slide construction 32 comprises that first chute, 320, the second slide constructions 34 comprise second chute 340.The width of the width of first chute 320 and second chute 340 equates, and is slightly larger than the width of first boss 140 and second boss 160.During assembling, first boss 140 of first gag lever post 14 is contained in first chute 320, and second boss 160 of second gag lever post 16 is contained in second chute 340, thereby limiting section 10 and sliding part 30 are assembled into one.At this assembling position, first gag lever post 14 can slide by relative first slide construction 32, and second gag lever post 16 can slide by relative second slide construction 34.
First slide construction 32 also comprises first projection 322, second projection 324 and a pair of operating portion 326, the first protruding 322 semicirculars in shape, and is positioned at the end away from operating body 31 of first slide construction 32.Second projection 324 is positioned at the middle part of first slide construction 32.First projection, 322 and second projection 324 all deviates from second slide construction, 34 protrusions from the inwall of first chute 320.Second projection 324 comprises second vertical plane, 3240, the second vertical planes, 3240 oriented manipulation bodies 31.Described operating portion 326 is positioned at a pair of relative sidewall of first slide construction 32 and near second projection 324, is used for controlling second projection 324.
Sliding part 30 also comprises a pair of first oblique portion 36 and a pair of second oblique portion 38, the described first oblique portion 36 extends obliquely from the two opposite side walls of first slide construction 32 and the intersection of operating body 31, and the height of each first oblique portion, 36 close operating body 31 1 end is greater than the height of the other end.After the installation, close each the low slightly end of the first oblique portion 36 of the end that first inclined-plane 147 is high slightly, and the height of the high slightly end in first inclined-plane 147 is higher than the height of the low slightly end of the first oblique portion 36.
The described second oblique portion 38 extends obliquely from the two opposite side walls of second slide construction 34 and the intersection of operating body 31.The height of each second oblique portion, 38 close operating body 31 1 end is greater than the height of the other end.After the installation, close each the low slightly end of the second oblique portion 38 of the end that second inclined-plane 167 is high slightly, and the height of the high slightly end in second inclined-plane 167 is higher than the height of the low slightly end of the second oblique portion 38.
In the present embodiment, the cross section of the first oblique portion 36 and the second oblique portion 38 is all triangular in shape, and especially, the cross section of the first oblique portion 36 and the second oblique portion 38 is rectangular triangle all.
Sliding part 30 also comprises gap 37 and a plurality of reinforcement 39, gap 37 is between first slide construction 32 and second slide construction 34, be beneficial to first projection, 322 and second protruding 324 strains of first slide construction 32, and then be beneficial to limiting section 10 relative sliding parts 30 slips.
Reinforcement 39 is used for connecting first slide construction 32 and second slide construction 34 between first slide construction 32 and second slide construction 34.
Resettlement section 50 is surrounded by limiting section 10 and sliding part 30, is used for accommodating cable.The resettlement section 50 of single chute 100 is semienclosed cabling space, when being installed in the rack 700 or with another chute 100, chute 100 fits together, resettlement section 50 is closed, and namely resettlement section 50 becomes enclosed cabling space by semienclosed cabling space.In other words, resettlement section 50 is the enclosed cabling space that surrounded jointly by limiting section 10, sliding part 30 and rack 700, or resettlement section 50 is the enclosed cabling space that surrounded jointly by limiting section 10, sliding part 30 and adjacent traces frame 100.
Please also refer to Fig. 5 and Fig. 6, be in the schematic diagram of open mode for chute 100.During assembling, sliding part 30 is inserted position limiting structure 15 and pushes away sliding part 30, make first projection 322 cross stop hook 149, slope 146 is contained in second groove 144 until first projection 322, second projection 324 is crossed stop hook 149 and is made the barb 1492 of stop hook 149 hook second vertical plane 3240 of second projection 324 simultaneously, thereby sliding part 30 is installed on limiting section 10 slidably.In this open mode, second vertical plane 3240 of first vertical plane 1490 of stop hook 149 and second projection 324 forms back-off, is used for preventing that sliding part 30 from skidding off position limiting structure 15.Simultaneously, because first projection 322 is contained in second groove 144, thereby limit slippage portion 30 skids off position limiting structure 15.In other words, in this open mode, sliding part 30 can relative limit structure 15 not slide under the effect that does not have external force.
Please refer to Fig. 7 and Fig. 8, be in the schematic diagram of closed condition for chute 100.Continue to push away sliding part 30 and be contained in first groove 142 until first projection 322, an end of sliding part 30 close first projectioies 322 is against the body 12 of limiting section 10 simultaneously.In this closed condition, because first projection 322 is contained in first groove 142, thereby limit slippage portion 30 skids off position limiting structure 15.
During use, as need cable is put into chute 100, only need coil holder 100 is moved to open mode from closed condition, namely spur sliding part 30, strain takes place and skids off first groove 142 to slip into second groove 144 until first projection 322 in first projection 322, thereby chute 100 just is in open mode.In open mode, can put into chute to cable.After installing cable, only need coil holder 100 is moved to closed condition from open mode, namely promote sliding part 30, the first projectioies 322 and strain takes place and skid off second groove 144 to slip into first groove 142 until first projection 322, thereby chute 100 just is in closed condition.
During dismounting, make chute 100 be in open mode earlier, make second projection 324 produce strain from both sides press operating part 326 again, when second vertical plane 3240 of second projection 324 breaks away from the barb 1492 of stop hook 149, sliding part 30 is extracted out from position limiting structure 15, just finished the dismounting of chute 100.
Please also refer to Figure 10, because cable is positioned in the resettlement section 50, and resettlement section 50 is enclosed cabling space, and when cabling quantity was too much, cable can be from the two side landing yet, and the cables that namely are contained in the resettlement section 50 can landing from resettlement section 50.In other words, cable is fixed in the chute 100, and no matter in use or in transportation, cable can be from landing on the chute 100.
Please also refer to Figure 11, because the two side of first slide construction 32 and first slide construction 32 respectively is being provided with the first oblique portion 36 and the second oblique portion 38 near operating body 31 places.When described chute 100 was in closed condition, first inclined-plane 147 of position limiting structure 15 inserted the first oblique portion, 36 inside, was positioned over the cable of described chute 100 inside by first inclined-plane 147 and the 36 staggered liftings of the first oblique portion, thereby had avoided the risk of clamp.In like manner, second inclined-plane 167 inserts between the second oblique portion 38, is positioned over cable below the chute 100 by the liftings that interlock of second inclined-plane 167 and the second oblique portion 38, thereby has avoided the risk of clamp.
Please refer to Figure 12, the chute 100a that second kind of execution mode of the present invention provides, the structure of the chute 100 (please refer to Fig. 2) that the chute 100a that described second kind of execution mode provides and first kind of execution mode provide is basic identical, the functional similarity of realizing, its difference is, chute 100a comprises limiting section 10a, a plurality of sliding part 30a and a plurality of resettlement section 50a, limiting section 10a comprises body 12a and a plurality of position limiting structure 15a, each position limiting structure 15a, corresponding sliding part 30a and corresponding resettlement section 50a form a cabling unit, thereby realize the use arranged side by side of a plurality of cablings unit.
Please refer to Figure 13, the chute 100b that the third execution mode of the present invention provides, the structure of the chute 100 (please refer to Fig. 2) that the chute 100b that described the third execution mode provides and first kind of execution mode provide is basic identical, the functional similarity of realizing, its difference is, the first gag lever post 14b also comprises the 3rd groove 140b, described the 3rd groove 140b is located at described location division 141b and between the first groove 142b and the second groove 143b, the first protruding 33b can accommodate the first groove 142b respectively, among the second groove 143b and the 3rd groove 140b, thereby can change the size of the cabling space of resettlement section 50b, during use, can select cabling space according to the actual requirements flexibly.Wherein, when the described first protruding 33b was contained in the described second groove 143b, described chute 100b was in open mode; When the described first protruding 33b was contained in the described first groove 142b or the 3rd groove 140b, described chute 100b was in closed condition.
Above-described execution mode does not constitute the restriction to this technical scheme protection range.Any at above-mentioned execution mode spirit and principle within do modification, be equal to and replace and improvement etc., all should be included within the protection range of this technical scheme.

Claims (15)

1. chute, be installed on the rack of communication equipment, be used for the combing cable, it is characterized in that: described chute comprises limiting section, at least one sliding part and at least one resettlement section, described limiting section comprises body and at least one position limiting structure, described position limiting structure extends towards described sliding part from the inwall of described body, described position limiting structure comprises first gag lever post and second gag lever post relative with first gag lever post, described sliding part and described limiting section are slidingly connected, described sliding part comprises operating body and slide construction, described slide construction extends and corresponding with described position limiting structure from the bottom of described operating body towards described limiting section, described slide construction comprises second slide construction that first slide construction is relative with described first slide construction, described first gag lever post can slide by described relatively first slide construction, described second gag lever post can slide by described relatively second slide construction, described resettlement section is enclosed cabling space, is used for accommodating cable.
2. chute as claimed in claim 1, it is characterized in that, described first gag lever post comprises protruding first boss to described second gag lever post, and described second gag lever post comprises protruding second boss to described first gag lever post, and the width of the width of described first boss and described second boss equates.
3. chute as claimed in claim 2, it is characterized in that, described first slide construction comprises first chute, described second slide construction comprises second chute, the width of the width of described first chute and described second chute equates, described first boss is contained in described first chute, and described second boss is contained in described second chute.
4. chute as claimed in claim 2 is characterized in that, described first gag lever post comprises location division, first groove and second groove, and described location division is near described body, and described first groove and described second groove are positioned at the two ends of described location division.
5. chute as claimed in claim 4, it is characterized in that, described first slide construction also comprises first projection, described first projection deviates from the end away from described operating body that described second slide construction protrudes and be positioned at described first slide construction from the inwall of described first chute, wherein, when described first projection was contained in described second groove, described chute was in open mode; When described first projection was contained in described first groove, described chute was in closed condition.
6. chute as claimed in claim 5 is characterized in that, described first gag lever post also comprises stop hook, and described stop hook is positioned at the end of described first gag lever post, and the end of described stop hook is provided with barb.
7. chute as claimed in claim 6, it is characterized in that, described first slide construction also comprises second projection, described second projection deviates from the middle part that described second slide construction protrudes and be positioned at described first slide construction from the inwall of described first chute, when described chute was in open mode, described barb hooked described second projection.
8. chute as claimed in claim 7 is characterized in that, described first slide construction also comprises a pair of operating portion, and described operating position is used for controlling described second projection in a pair of relative sidewall of described first slide construction and near described second projection.
9. chute as claimed in claim 5, it is characterized in that, described first gag lever post also comprises first inclined-plane, described first inclined-plane is positioned at the terminal of described first gag lever post and described second gag lever post dorsad, described sliding part also comprises a pair of first oblique portion, the described first oblique portion extends obliquely from the two opposite side walls of described first slide construction and the intersection of described operating body, and when described chute was in closed condition, described first inclined-plane inserted between the described first oblique portion.
10. chute as claimed in claim 5, it is characterized in that, described second gag lever post also comprises second inclined-plane, described second inclined-plane is positioned at the terminal of described second gag lever post and described first gag lever post dorsad, described sliding part also comprises a pair of second oblique portion, the described second oblique portion extends obliquely from the two opposite side walls of described second slide construction and the intersection of described operating body, and when described chute was in closed condition, described second inclined-plane inserted between the described second oblique portion.
11. chute as claimed in claim 4 is characterized in that, described first gag lever post also comprises the 3rd groove, and described the 3rd groove is located at described location division and between described first groove and described second groove.
12. chute as claimed in claim 11, it is characterized in that, described first slide construction also comprises first projection, described first projection deviates from the end away from described operating body that described second slide construction protrudes and be positioned at described first slide construction from the inwall of described first chute, wherein, when described first projection was contained in described second groove, described chute was in open mode; When described first projection was contained in described first groove or the 3rd groove, described chute was in closed condition.
13. chute as claimed in claim 1 is characterized in that, described sliding part also comprises the gap, and described gap is between described first slide construction and described second slide construction.
14. chute as claimed in claim 13 is characterized in that, described sliding part also comprises a plurality of reinforcements, and described reinforcement and is cut apart described gap between described first slide construction and described second slide construction.
15. a communication equipment comprises rack, it is characterized in that: described communication equipment comprises that also at least one is installed on any described chute of claim 1 to 14 in the described rack.
CN201310073583.6A 2013-03-07 2013-03-07 Chute and communication equipment Active CN103199468B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310073583.6A CN103199468B (en) 2013-03-07 2013-03-07 Chute and communication equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310073583.6A CN103199468B (en) 2013-03-07 2013-03-07 Chute and communication equipment

Publications (2)

Publication Number Publication Date
CN103199468A true CN103199468A (en) 2013-07-10
CN103199468B CN103199468B (en) 2016-03-30

Family

ID=48721872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310073583.6A Active CN103199468B (en) 2013-03-07 2013-03-07 Chute and communication equipment

Country Status (1)

Country Link
CN (1) CN103199468B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105262018A (en) * 2015-11-25 2016-01-20 扬中市扬子铝加工有限公司 Aluminium alloy wiring frame

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050115737A1 (en) * 2003-12-01 2005-06-02 Levesque Stewart A. Cable management system
CN2746720Y (en) * 2004-11-10 2005-12-14 樊邦弘 Fixing fastener
CN1726625A (en) * 2002-12-11 2006-01-25 潘都依特有限公司 Cable support system
CN201066771Y (en) * 2007-08-07 2008-05-28 王卫东 T release-prevention and disassembly glass steel cable supporter
CA2586898A1 (en) * 2007-04-30 2008-10-30 Belden Cdt Canada Inc. Adjustable cable manager
CN201150159Y (en) * 2008-02-02 2008-11-12 杭州华三通信技术有限公司 Wiring frame and electronic apparatus containing the same
CN202488623U (en) * 2012-02-15 2012-10-10 中兴通讯股份有限公司 Cabling rack and communication device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1726625A (en) * 2002-12-11 2006-01-25 潘都依特有限公司 Cable support system
US20050115737A1 (en) * 2003-12-01 2005-06-02 Levesque Stewart A. Cable management system
CN2746720Y (en) * 2004-11-10 2005-12-14 樊邦弘 Fixing fastener
CA2586898A1 (en) * 2007-04-30 2008-10-30 Belden Cdt Canada Inc. Adjustable cable manager
CN201066771Y (en) * 2007-08-07 2008-05-28 王卫东 T release-prevention and disassembly glass steel cable supporter
CN201150159Y (en) * 2008-02-02 2008-11-12 杭州华三通信技术有限公司 Wiring frame and electronic apparatus containing the same
CN202488623U (en) * 2012-02-15 2012-10-10 中兴通讯股份有限公司 Cabling rack and communication device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105262018A (en) * 2015-11-25 2016-01-20 扬中市扬子铝加工有限公司 Aluminium alloy wiring frame

Also Published As

Publication number Publication date
CN103199468B (en) 2016-03-30

Similar Documents

Publication Publication Date Title
CN202977856U (en) Plug connecting module, holding frame of the connecting module and plug connecting device
CN103199468A (en) Cabling rack and communication device
CN204272526U (en) Controller for motor and electronic equipment
CN202772338U (en) Electronic equipment
CN205407156U (en) Wear wall siphunculus
CN204591103U (en) Folding ladder for building
CN204065967U (en) Electronic equipment and fixing module
CN205070083U (en) Concatenation formula computer data line
CN205565084U (en) Electric connector
CN204153320U (en) A kind of cable bearer cover
CN204179249U (en) A kind of cable connector
CN202307739U (en) Circuit breaker assembly
CN107538967A (en) A kind of cap not easy to be lost
CN213863410U (en) Carrying handle
CN204480975U (en) The universal safety baffle plate that a kind of circuit breaker uses
CN103964193B (en) One drags thing formula cradle mechanism
CN203056320U (en) PLC programming cable for teaching experiment
CN207910148U (en) A kind of knockdown winding displacement
CN205248717U (en) Cable bridge
CN201982096U (en) Cable towing switching device for cable towing device of coal mining machine
CN203463782U (en) Valve protection device for use in production of high-density interconnection circuit board
CN204947149U (en) For the AUTOMOTIVE RELAY socket combined
CN208364685U (en) Squelch type drag chain
CN204400559U (en) Multichannel oil pipe transition assembly
CN205846379U (en) A kind of socket of window regulator motor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210425

Address after: Unit 3401, unit a, building 6, Shenye Zhongcheng, No. 8089, Hongli West Road, Donghai community, Xiangmihu street, Futian District, Shenzhen, Guangdong 518040

Patentee after: Honor Device Co.,Ltd.

Address before: 518129 Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen

Patentee before: HUAWEI TECHNOLOGIES Co.,Ltd.