CN103198438A - 响应计划的可靠性分析方法及装置 - Google Patents
响应计划的可靠性分析方法及装置 Download PDFInfo
- Publication number
- CN103198438A CN103198438A CN2013101426007A CN201310142600A CN103198438A CN 103198438 A CN103198438 A CN 103198438A CN 2013101426007 A CN2013101426007 A CN 2013101426007A CN 201310142600 A CN201310142600 A CN 201310142600A CN 103198438 A CN103198438 A CN 103198438A
- Authority
- CN
- China
- Prior art keywords
- psf
- reliability
- response plan
- node
- incidence relation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (10)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101426007A CN103198438A (zh) | 2013-04-23 | 2013-04-23 | 响应计划的可靠性分析方法及装置 |
PCT/CN2014/075730 WO2014173258A1 (zh) | 2013-04-23 | 2014-04-18 | 响应计划的可靠性分析方法及装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013101426007A CN103198438A (zh) | 2013-04-23 | 2013-04-23 | 响应计划的可靠性分析方法及装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103198438A true CN103198438A (zh) | 2013-07-10 |
Family
ID=48720955
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013101426007A Pending CN103198438A (zh) | 2013-04-23 | 2013-04-23 | 响应计划的可靠性分析方法及装置 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN103198438A (zh) |
WO (1) | WO2014173258A1 (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014173258A1 (zh) * | 2013-04-23 | 2014-10-30 | 湖南工学院 | 响应计划的可靠性分析方法及装置 |
WO2014173257A1 (zh) * | 2013-04-23 | 2014-10-30 | 湖南工学院 | 操作员状态评估的可靠性分析方法及装置 |
CN105989435A (zh) * | 2015-02-06 | 2016-10-05 | 中国石油天然气股份有限公司 | 一种基于rcm理论估算设备维护周期的方法 |
CN109345121A (zh) * | 2018-10-09 | 2019-02-15 | 湖南工学院 | 一种用于核电厂运行事件分析的方法和装置 |
CN109447495A (zh) * | 2018-11-08 | 2019-03-08 | 南华大学 | 核电厂组织行为可靠性评估方法、装置及设备 |
CN109447494A (zh) * | 2018-11-08 | 2019-03-08 | 南华大学 | 核电厂班组情景意识可靠性评估方法、装置、设备及介质 |
CN110188973A (zh) * | 2019-03-26 | 2019-08-30 | 苏州热工研究院有限公司 | 一种核电站火灾安全综合评估方法 |
CN113191084A (zh) * | 2021-05-07 | 2021-07-30 | 哈尔滨工业大学 | 基于贝叶斯网络理论的既有铁路桥梁可靠度综合评估方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060004682A1 (en) * | 2004-06-30 | 2006-01-05 | Mats Danielson | Method for decision and risk analysis in probabilistic and multiple criteria situations |
CN101915234A (zh) * | 2010-07-16 | 2010-12-15 | 西安交通大学 | 一种基于贝叶斯网络的压缩机关联故障诊断方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103218689B (zh) * | 2013-04-23 | 2017-09-22 | 湖南工学院 | 操作员状态评估的可靠性分析方法及装置 |
CN103198438A (zh) * | 2013-04-23 | 2013-07-10 | 湖南工学院 | 响应计划的可靠性分析方法及装置 |
-
2013
- 2013-04-23 CN CN2013101426007A patent/CN103198438A/zh active Pending
-
2014
- 2014-04-18 WO PCT/CN2014/075730 patent/WO2014173258A1/zh active Application Filing
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20060004682A1 (en) * | 2004-06-30 | 2006-01-05 | Mats Danielson | Method for decision and risk analysis in probabilistic and multiple criteria situations |
CN101915234A (zh) * | 2010-07-16 | 2010-12-15 | 西安交通大学 | 一种基于贝叶斯网络的压缩机关联故障诊断方法 |
Non-Patent Citations (1)
Title |
---|
李鹏程: "核电厂数字化控制系统中人因失误与可靠性研究", 《中国博士学位论文全文数据库工程科技Ⅱ辑》, 15 June 2012 (2012-06-15) * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2014173258A1 (zh) * | 2013-04-23 | 2014-10-30 | 湖南工学院 | 响应计划的可靠性分析方法及装置 |
WO2014173257A1 (zh) * | 2013-04-23 | 2014-10-30 | 湖南工学院 | 操作员状态评估的可靠性分析方法及装置 |
CN105989435A (zh) * | 2015-02-06 | 2016-10-05 | 中国石油天然气股份有限公司 | 一种基于rcm理论估算设备维护周期的方法 |
CN109345121A (zh) * | 2018-10-09 | 2019-02-15 | 湖南工学院 | 一种用于核电厂运行事件分析的方法和装置 |
CN109447495A (zh) * | 2018-11-08 | 2019-03-08 | 南华大学 | 核电厂组织行为可靠性评估方法、装置及设备 |
CN109447494A (zh) * | 2018-11-08 | 2019-03-08 | 南华大学 | 核电厂班组情景意识可靠性评估方法、装置、设备及介质 |
CN110188973A (zh) * | 2019-03-26 | 2019-08-30 | 苏州热工研究院有限公司 | 一种核电站火灾安全综合评估方法 |
CN113191084A (zh) * | 2021-05-07 | 2021-07-30 | 哈尔滨工业大学 | 基于贝叶斯网络理论的既有铁路桥梁可靠度综合评估方法 |
CN113191084B (zh) * | 2021-05-07 | 2024-04-19 | 哈尔滨工业大学 | 基于贝叶斯网络理论的既有铁路桥梁可靠度综合评估方法 |
Also Published As
Publication number | Publication date |
---|---|
WO2014173258A1 (zh) | 2014-10-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103198438A (zh) | 响应计划的可靠性分析方法及装置 | |
Groth et al. | A data-informed PIF hierarchy for model-based human reliability analysis | |
CN103218689A (zh) | 操作员状态评估的可靠性分析方法及装置 | |
KR20180108446A (ko) | Ict 인프라 관리 시스템 및 이를 이용한 ict 인프라 관리 방법 | |
Pyy | Human reliability analysis methods for probabilistic safety assessment | |
Rasmusse | Human error mechanisms in complex work environments | |
Li et al. | An assessment method of operator’s situation awareness reliability based on fuzzy logic-AHP | |
CN103235882B (zh) | 核电厂数字化主控室操作员监视行为可靠性判定方法 | |
Cheng et al. | Applications of integrated human error identification techniques on the chemical cylinder change task | |
CN103198232B (zh) | 数字化主控室工作人员人因可靠性的确定方法及装置 | |
Li et al. | A novel reliability estimation method of multi-state system based on structure learning algorithm | |
Nourani et al. | Investigating the importance of first impressions and explainable ai with interactive video analysis | |
Li et al. | Study on operator’s SA reliability in digital NPPs. Part 3: A quantitative assessment method | |
Li et al. | Modeling and simulation of crew to crew response variability due to problem-solving styles | |
CN103268778A (zh) | 核电厂数字化主控室操作员的监视转移可靠性判定方法 | |
Groth et al. | A performance shaping factors causal model for nuclear power plant human reliability analysis | |
Sasangohar et al. | Human-System Interface Complexity and Opacity Part II: Methods and Tools to Assess HSI Complexity | |
Bolt et al. | Techniques for human reliability evaluation | |
Zhang et al. | The simulator experimental study on the operator reliability of Qinshan nuclear power plant | |
Boring et al. | A research roadmap for computation-based human reliability analysis | |
COYNE et al. | Nuclear Plant Control Room Operator Modeling Within the ADS-IDAC, Version 2, Dynamic PRA Environment: Part 1-General Description and Cognitive Foundations. | |
Atashfeshan et al. | A novel dynamic function allocation method in human-machine systems focusing on trigger mechanism and allocation strategy | |
Do Nascimento et al. | Human reliability analysis data obtainment through fuzzy logic in nuclear plants | |
Petkov | Symptom-based approach for dynamic HRA and accident management | |
Kim et al. | A quantitative approach to modeling the information flow of diagnosis tasks in nuclear power plants |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: NANHUA UNIV. CNOC DAYAWAN NUCLEAR POWER RUNNING MA Free format text: FORMER OWNER: NANHUA UNIV. CNOC Effective date: 20140424 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Li Inventor after: Su Desong Inventor after: Li Xiaowei Inventor after: Li Pengcheng Inventor after: Dai Licao Inventor after: Hu Hong Inventor after: Jiang Jianjun Inventor after: Chen Qingqing Inventor after: Huang Weigang Inventor after: Dai Zhonghua Inventor after: Wang Chunhui Inventor before: Zhang Li Inventor before: Li Pengcheng Inventor before: Dai Licao Inventor before: Hu Hong Inventor before: Jiang Jianjun Inventor before: Chen Qingqing Inventor before: Huang Weigang Inventor before: Dai Zhonghua |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: ZHANG LI LI PENGCHENG DAI LICAO HU HONG JIANG JIANJUN CHEN QINGQING HUANG WEIGANG DAI ZHONGHUA TO: ZHANG LI LI PENGCHENG DAI LICAO HU HONG JIANG JIANJUN CHEN QINGQING HUANG WEIGANG DAI ZHONGHUA WANG CHUNHUI SU DESONG LI XIAOWEI |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20140424 Address after: 421002 Hunan city of Hengyang province Zhuhui District Road No. 18 Hua Heng Applicant after: Hunan Institute of Technology Applicant after: University of South China Applicant after: China General Nuclear Nuclear Power Co., Ltd. Applicant after: Dayawan Nuclear Power Running Management Co., Ltd. Address before: 421002 Hunan city of Hengyang province Zhuhui District Road No. 18 Hua Heng Applicant before: Hunan Institute of Technology Applicant before: University of South China Applicant before: China General Nuclear Nuclear Power Co., Ltd. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130710 |