CN103195058B - 便于溶洞发育地区桥桩采用多护筒施工的方法 - Google Patents
便于溶洞发育地区桥桩采用多护筒施工的方法 Download PDFInfo
- Publication number
- CN103195058B CN103195058B CN201310114213.2A CN201310114213A CN103195058B CN 103195058 B CN103195058 B CN 103195058B CN 201310114213 A CN201310114213 A CN 201310114213A CN 103195058 B CN103195058 B CN 103195058B
- Authority
- CN
- China
- Prior art keywords
- casing
- pile casting
- steel pile
- steel
- bridge pier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
便于溶洞发育地区桥桩采用多护筒施工的方法,其特征在于:选用12-20mm厚度的钢板制作钢护筒,钢护筒分内护筒、外一护筒、外二护筒三种型号;内护筒由多组钢护筒拼接而成,内护筒的长度为该桥桩桩基的设计深度;从地平线到地下溶洞或暗河分布处的中层深度,为外一护筒的长度;从地平线到地下容易发生坍塌的土层、岩层、砂砾石的浅层深度,为外二护筒的长度;由吊车转运护筒到孔口位置→安装护筒→安装振动锤→振动护筒下沉到位→移开振动锤→再次进行冲孔作业后→换吊索吊装另一组护筒→孔口焊接→振动护筒下沉到位;能彻底解决在溶洞特别发育地区桥桩施工混凝土严重超量的问题,实现保障工程质量和施工安全的前提下,有效控制工程成本的优点。
Description
技术领域
本发明涉及桥梁桩基施工技术,确切地说是一种便于溶洞发育地区桥桩采用多护筒施工的方法。
背景技术
近年来随着交通基础设施建设的不断发展,在南方溶洞发育地区的江河湖畔上修建大桥的机会越来越多,当桥桩选址位置的地质结构表层为土层、岩层、砂砾石,而地下地质却发现众多溶洞和地下暗河的情况下,按照传统施工工艺对桥墩桩基施工时,冲击出来的桩孔经常就会出现孔口坍塌、钻机倾斜,甚至出现锤头掩埋、人机被埋等重大安全事故;在进行桥墩下桩基钢筋混凝土浇筑时,一旦遇上地下暗河或地下溶洞,混凝土的用量就无法计算,桥墩的建设成本会成倍增涨,在这种环境下施工,工程质量、安全、工期、成本都无法得到保障,将会给施工企业造成巨大损失,也会影响到整个工程的全面完工。
发明内容
本发明的目的在于:提供一种跟进溶洞地区桥梁桩基施工的新技术,确切说是一种便于溶洞发育地区桥桩采用多护筒施工的方法。能彻底解决在溶洞特别发育地区桥桩施工,因扩孔而产生的混凝土严重超量的问题。达到保障工程质量和施工安全的前提下,科学地加快施工速度,有效控制工程成本的目的。
本发明的目的是通过实施下述技术方案来实现的:
便于溶洞发育地区桥桩采用多护筒施工的方法,其特征在于:
一、护筒加工
钢护筒钢板厚度:需要根据卷筒成型和施加震动结合地下水位情况而确定,当地下溶洞顶板击穿、泥浆漏完时,桩孔四周对钢护筒的压力差最大,以此最不利工况来计算钢护筒钢板厚度,根据不同桩孔的工况采用12-20mm厚度的钢板卷筒成型;
钢护筒长度:根据所需钢板厚度,再选择1.8m宽的A3标准钢板卷制焊接成一段钢护筒,由5-8段钢护筒拼接成一组钢护筒,钢护筒分为:内护筒、外一护筒、外二护筒三种型号;内护筒由多组钢护筒拼接而成,内护筒的长度为该桥桩桩基的设计深度,在内护筒下端7-8m处设置有漏浆孔;外一护筒由多组钢护筒拼接而成,根据桥桩地下地质结构,地平线到地下溶洞或地下暗河分布处的深度,为外一护筒的长度;外二护筒由多组钢护筒拼接而成,根据桥桩地下地质结构,地平线到地下容易发生坍塌的土层、岩层、砂砾石的深度,为外二护筒的长度;
钢护筒直径:双护筒施工时,内护筒的内径应等于设计桥桩桩径;外一护筒直径需大于设计桥桩桩径25-35cm;多护筒施工时,需要在外一护筒外增加外二护筒,外二护筒直径需大于外一护筒外径20-30cm;
钢护筒加工要求:钢板放置要和卷板机保持垂直,否则钢护筒拼接不垂直,下沉钢护筒困难,钢板两个侧面焊接以形成卷筒,卷筒中轴线方向的焊缝厚度不小于6mm,上下钢护筒因卷筒精度不是很高,拼接钢护筒应做到上下接缝一致,保证钢护筒顺利下孔;上下钢护筒之间的第一段环形焊缝长度为2m,以此为基准,每增加一段钢护筒增加4cm长焊缝,沿上下钢护筒交接处的焊缝四周均匀分布,避免偏心受力;拼接必须满足《公路桥涵施工技术规范》JTG/TF50-20118.4.1规定的要求;
二、工艺原理
采用具有自动化控制的CZ-60型冲击钻机冲孔到砂砾覆盖层底部,保证离第一个溶洞顶板被击穿自身厚度1米以上,将焊接好的外护筒组在孔口拼接、及时下沉到当前成孔位置底部;适当改小冲锤,冲孔到设计标高,将焊接好的内护筒段在孔口拼接、下沉到桩基底部;再按水下混凝土浇筑施工工艺进行清孔、下钢筋笼、导管、浇筑水下混凝土;
三、下沉工序
由25吨吊车转运各组护筒到孔口位置→60吨主吊车安装第一组内护筒下沉→采用钢棒临时支吊钢护筒→换吊索→吊装第二组内护筒→孔口焊接一二组内护筒→轻轻吊起钢护筒→拆掉钢棒、钢护筒下沉;
如此循环,钢护筒就位,一般情况下,只要每天循浆不断,下钢护筒前用焊接了钢环的冲锤上下检孔,钢护筒就位不难;对个别地质情况中有细砂层、孔底沉碴较多引起钢护筒下降较困难的,只需用震动锤稍为震动即可解决。
本发明的优点是:便于溶洞发育地区桥桩采用多护筒施工的方法,能彻底解决在溶洞特别发育地区桥桩施工,因扩孔而产生的混凝土严重超量的问题。实现保证工程质量和施工安全的前提下,科学地加快施工速度,有效控制工程成本的优点。
附图说明
图1为本发明多护筒剖面结构视图;
图中标记:1为内护筒,2为外一护筒,3为外二护筒,4为土层地质结构,5为砂砾石地质结构,6为岩层地质结构,7为地下暗河,8为地下溶洞,9为内护筒下端7-8m处设置的漏浆孔。
具体实施方式
实施例1:便于溶洞发育地区桥桩采用多护筒施工的方法
其特征在于:
一、护筒加工
钢护筒钢板厚度:需要根据卷筒成型和施加震动结合地下水位情况而确定,当地下溶洞顶板击穿、泥浆漏完时,桩孔四周对钢护筒的压力差最大,以此最不利工况来计算钢护筒钢板厚度;根据不同桩孔的工况采用12-20mm厚度的钢板卷筒成型;
钢护筒长度:根据所需钢板厚度,再选择1.8m宽的A3标准钢板卷制焊接成一段钢护筒,由5-8段钢护筒拼接成一组钢护筒,钢护筒分为:内护筒1、外一护筒2、外二护筒3三种型号;内护筒1由多组钢护筒拼接而成,内护筒1的长度为该桥桩桩基的设计深度,在内护筒1下端7-8m处设置有漏浆孔9;外一护筒2由多组钢护筒拼接而成,根据桥桩地下地质结构,地平线到地下溶洞8或地下暗河7分布处的深度,为外一护筒2的长度;外二护筒3由多组钢护筒拼接而成,根据桥桩地下地质结构,地平线到地下容易发生坍塌的土层4、岩层6、砂砾石5的深度,为外二护筒的长度;
钢护筒直径:双护筒施工时,内护筒1的内径应等于设计桥桩桩径;外一护筒2直径需大于设计桥桩桩径25-35cm;多护筒施工时,需要在外一护筒2外增加外二护筒3,外二护筒3直径需大于外一护筒2外径20-30cm;
钢护筒加工要求:钢板放置要和卷板机保持垂直,否则钢护筒拼接不垂直,下沉钢护筒困难,钢板两个侧面焊接以形成卷筒,卷筒中轴线方向的焊缝厚度不小于6mm,上下钢护筒因卷筒精度不是很高,拼接钢护筒应做到上下接缝一致,保证钢护筒顺利下孔;上下钢护筒之间的第一段环形焊缝长度为2m,以此为基准,每增加一段钢护筒增加4cm长焊缝,沿上下钢护筒交接处的焊缝四周均匀分布,避免偏心受力;拼接必须满足《公路桥涵施工技术规范》JTG/TF50-20118.4.1规定的要求;
二、工艺原理
采用具有自动化控制的CZ-60型冲击钻机冲孔到砂砾覆盖层底部,保证离第一个溶洞顶板被击穿自身厚度1米以上,将焊接好的外护筒组在孔口拼接、及时下沉到当前成孔位置底部;适当改小冲锤,冲孔到设计标高,将焊接好的内护筒段在孔口拼接、下沉到桩基底部;再按水下混凝土浇筑施工工艺进行清孔、下钢筋笼、导管、浇筑水下混凝土;
三、下沉工序
由25吨吊车转运各组护筒到孔口位置→60吨主吊车安装第一组内护筒下沉→采用钢棒临时支吊钢护筒→换吊索→吊装第二组内护筒→孔口焊接一二组内护筒→轻轻吊起钢护筒→拆掉钢棒、钢护筒下沉;
如此循环,钢护筒就位,一般情况下,只要每天循浆不断,下钢护筒前用焊接了钢环的冲锤上下检孔,钢护筒就位不难;对个别地质情况中有细砂层、孔底沉碴较多引起钢护筒下降较困难的,只需用震动锤稍为震动即可解决;
四、施工要点
1)、掌握详尽的地质资料,护筒层数的选择由地质报告中显示桩基穿越大溶洞的个数来确定,以反复回填方案工程量的增加和增设钢护筒方案工程量的增加进行经济比较;为此地勘资料的准确性尤为重要,以此来确定开孔直径、每层护筒的下沉深度、位置;
2)、筒下到岩面以后,即开始对覆盖层和顶板进行冲钻,其钻孔方法与传统的冲击钻孔方法相同,但成孔的桩径比设计桩径大10cm,以便内护筒顺利就位;
3)、当钢护筒打入第一层岩面时,为使开孔坚实、坚直、圆顺和对继续钻孔起导向,应在钻孔前抛0.5-1.0m3的小片石和适量粘土,借钻头冲击力把泥浆、石块挤向孔壁,以加固护筒刃脚;
4)、双护筒冲击钻孔采用吸泥法清孔,为使钻孔桩砼与孔底岩体粘良好,灌注水下砼之前需用高压水冲射排除残碴;
5)、做好临时吊点和工作平台的设计和力学计算,用I45c和I50α焊接一个临时换吊平台,焊接控制在一个平面上,并保证焊缝高度;
6)、枕木支垫要在一个平面上,且基地沉降不能过大并保持一致,满足承载力要求;
7)、内、外护筒的下沉主要依靠护筒自身重量下沉,另辅以120kw震动锤弱震下沉;这就要求成孔质量要高,孔径顺直;钢护筒的下沉要做到及时,避免因时间过长,泥浆沉淀,护筒下沉不到位的现象发生;
8)、为达到崁岩桩的设计意图,在崁岩区深度的内护筒下端7-8m处设置有漏浆孔,即在内护筒四周每间隔1-1.5m开一个15-25cm大的圆孔,沿高度方向间隔为0.8-1.4m,成梅花桩布置;由于清孔标准是以清水桩为标准进行的清孔,确容易达到此标准,浇筑的混凝土能和岩体形成一个很好的整体;
9)、施工中严格控制钢护筒制作精度、焊接竖直度、焊缝质量;控制成孔竖直度,护筒下沉要及时;做好不利地质条件下钢护筒的技术、物资设备及人员的准备。
Claims (1)
1.便于溶洞发育地区桥桩采用多护筒施工的方法,其特征在于:
一、护筒加工
钢护筒钢板厚度:需要根据卷筒成型和施加震动结合地下水位情况而确定,当地下溶洞顶板击穿、泥浆漏完时,桩孔四周对钢护筒的压力差最大,以此最不利工况来计算钢护筒钢板厚度;根据不同桩孔的工况采用12-20mm厚度的钢板卷筒成型;
钢护筒长度:根据所需钢板厚度,再选择1.8m宽的A3标准钢板卷制焊接成一段钢护筒,由5-8段钢护筒拼接成一组钢护筒,钢护筒分为:内护筒(1)、外一护筒(2)、外二护筒(3)三种型号;内护筒(1)由多组钢护筒拼接而成,内护筒(1)的长度为该桥桩桩基的设计深度,在内护筒(1)下端7-8m处设置有漏浆孔(9);外一护筒(2)由多组钢护筒拼接而成,根据桥桩地下地质结构,地平线到地下溶洞(8)或地下暗河(7)分布处的深度,为外一护筒(2)的长度;外二护筒(3)由多组钢护筒拼接而成,根据桥桩地下地质结构,地平线到地下容易发生坍塌的土层(4)、岩层(6)、砂砾石(5)的深度,为外二护筒的长度;
钢护筒直径:双护筒施工时,内护筒(1)的内径应等于设计桥桩桩径;外一护筒(2)直径需大于设计桥桩桩径25-35cm;多护筒施工时,需要在外一护筒(2)外增加外二护筒(3),外二护筒(3)直径需大于外一护筒(2)外径20-30cm;
钢护筒加工要求:钢板放置要和卷板机保持垂直,否则钢护筒拼接不垂直,下沉钢护筒困难,钢板两个侧面焊接以形成卷筒,卷筒中轴线方向的焊缝厚度不小于6mm,上下钢护筒因卷筒精度不是很高,拼接钢护筒应做到上下接缝一致,保证钢护筒顺利下孔;上下钢护筒之间的第一段环形焊缝长度为2m,以此为基准,每增加一段钢护筒增加4cm长焊缝,沿上下钢护筒交接处的焊缝四周均匀分布,避免偏心受力;拼接必须满足«公路桥涵施工技术规范»JTG/TF50-2011 8.4.1规定的要求;
二、工艺原理
采用具有自动化控制的CZ-60型冲击钻机冲孔到砂砾覆盖层底部,保证离第一个溶洞顶板被击穿自身厚度1米以上,将焊接好的外护筒组在孔口拼接、及时下沉到当前成孔位置底部;适当改小冲锤,冲孔到设计标高,将焊接好的内护筒段在孔口拼接、下沉到桩基底部;再按水下混凝土浇筑施工工艺进行清孔、下钢筋笼、导管、浇筑水下混凝土;
三、下沉工序
由25吨吊车转运各组护筒到孔口位置→60吨主吊车安装第一组内护筒下沉→采用钢棒临时支吊钢护筒→换吊索→吊装第二组内护筒→孔口焊接一二组内护筒→轻轻吊起钢护筒→拆掉钢棒、钢护筒下沉;
如此循环,钢护筒就位,一般情况下,只要每天循浆不断,下钢护筒前用焊接了钢环的冲锤上下检孔,钢护筒就位不难;对个别地质情况中有细砂层、孔底沉碴较多引起钢护筒下降较困难的,只需用震动锤稍为震动即可解决。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310114213.2A CN103195058B (zh) | 2013-04-03 | 2013-04-03 | 便于溶洞发育地区桥桩采用多护筒施工的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310114213.2A CN103195058B (zh) | 2013-04-03 | 2013-04-03 | 便于溶洞发育地区桥桩采用多护筒施工的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103195058A CN103195058A (zh) | 2013-07-10 |
CN103195058B true CN103195058B (zh) | 2015-08-19 |
Family
ID=48717861
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310114213.2A Expired - Fee Related CN103195058B (zh) | 2013-04-03 | 2013-04-03 | 便于溶洞发育地区桥桩采用多护筒施工的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103195058B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989033A (zh) * | 2017-11-23 | 2018-05-04 | 中交路桥华南工程有限公司 | 大型基桩的导向式施工方法 |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104110030B (zh) * | 2014-07-18 | 2016-08-24 | 中建港务建设有限公司 | 钢护筒引孔栽桩施工工艺 |
CN104674796B (zh) * | 2015-03-06 | 2017-06-13 | 中国建筑第二工程局有限公司 | 一种地下防空洞灌注桩的模板系统及其施工方法 |
CN106381869A (zh) * | 2016-01-27 | 2017-02-08 | 浙江省东阳第三建筑工程有限公司 | 一种淤泥夹块石土层双护筒冲击成桩方法 |
CN108570983B (zh) * | 2018-04-20 | 2021-02-09 | 桂林电子科技大学 | 无填充物大型溶洞的桩基施工方法及其护筒 |
CN108589711A (zh) * | 2018-06-06 | 2018-09-28 | 中铁建大桥工程局集团第四工程有限公司 | 一种串珠式溶洞发育区围护桩的施工方法 |
CN110067203B (zh) * | 2019-04-19 | 2021-01-26 | 中交二航局第二工程有限公司 | 一种应用于强涌浪低墩区的墩身盖梁悬挂支架 |
CN111305209A (zh) * | 2020-02-25 | 2020-06-19 | 深圳市工勘岩土集团有限公司 | 一种大直径超深灌注桩超长钢护筒沉入方法 |
WO2021211065A1 (en) * | 2020-04-13 | 2021-10-21 | Seafco Public Company Limited | Pile installation system and method |
CN112144515A (zh) * | 2020-09-30 | 2020-12-29 | 河北昊锐基础工程有限公司 | 一种旋挖桩防塌孔施工方法 |
CN112459055B (zh) * | 2020-12-16 | 2022-02-08 | 绍兴文理学院 | 一种防止护筒下沉以及不均匀沉降的方法 |
CN114319337B (zh) * | 2021-12-15 | 2023-10-13 | 中铁二局第四工程有限公司 | 一种钻孔桩施工用的堵漏装置及钻孔桩施工方法 |
CN114250771A (zh) * | 2022-01-04 | 2022-03-29 | 李亮 | 一种岩质地层钢护筒插打方法 |
CN114808957A (zh) * | 2022-05-31 | 2022-07-29 | 中国十九冶集团有限公司 | 用于岩溶地区桥梁桩基成孔的施工方法 |
CN116005664A (zh) * | 2022-12-23 | 2023-04-25 | 中铁二院工程集团有限责任公司 | 用于钻孔桩基础的施工方法、组合钢护筒及钻孔桩基础 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4165198A (en) * | 1976-09-07 | 1979-08-21 | Farmer Foundation Company | Method for forming pier foundation columns |
CN1490467A (zh) * | 2003-08-05 | 2004-04-21 | 胡柏英 | 一种复合摩擦桩的结构及其施工方法 |
CN102071687A (zh) * | 2011-01-19 | 2011-05-25 | 龙建路桥股份有限公司 | 新型钻孔桩护筒及制作方法 |
CN102912789A (zh) * | 2012-10-24 | 2013-02-06 | 中色十二冶金建设有限公司 | 喀斯特地貌下机械成孔技术 |
-
2013
- 2013-04-03 CN CN201310114213.2A patent/CN103195058B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4165198A (en) * | 1976-09-07 | 1979-08-21 | Farmer Foundation Company | Method for forming pier foundation columns |
CN1490467A (zh) * | 2003-08-05 | 2004-04-21 | 胡柏英 | 一种复合摩擦桩的结构及其施工方法 |
CN102071687A (zh) * | 2011-01-19 | 2011-05-25 | 龙建路桥股份有限公司 | 新型钻孔桩护筒及制作方法 |
CN102912789A (zh) * | 2012-10-24 | 2013-02-06 | 中色十二冶金建设有限公司 | 喀斯特地貌下机械成孔技术 |
Non-Patent Citations (1)
Title |
---|
《双护筒钻进技术在岩溶区桩基施工的应用》;于国功;《桥梁隧道》;20101231(第9期);247-248 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989033A (zh) * | 2017-11-23 | 2018-05-04 | 中交路桥华南工程有限公司 | 大型基桩的导向式施工方法 |
CN107989033B (zh) * | 2017-11-23 | 2020-11-20 | 中交路桥华南工程有限公司 | 大型基桩的导向式施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103195058A (zh) | 2013-07-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103195058B (zh) | 便于溶洞发育地区桥桩采用多护筒施工的方法 | |
CN104153352B (zh) | 一种岩溶地质旋挖灌注桩成孔工艺 | |
CN107938676A (zh) | 一种穿越全填充型溶洞的桩基施工方法 | |
CN107938656A (zh) | 复杂复建基坑工程桩基施工方法 | |
CN104747088B (zh) | 一种钻孔灌注桩单腰多叶筒式钻头及成孔施工方法 | |
CN105275381B (zh) | 富水卵石地层中冲击钻成孔施工方法 | |
CN106245626A (zh) | 一种硬岩层旋挖钻进方法 | |
CN203846485U (zh) | 长桩冲击钻成孔施工装置 | |
CN107524142A (zh) | 一种泥浆护壁钻孔灌注桩施工方法 | |
CN105951747B (zh) | 一种逆作法预埋格构柱的施工方法 | |
CN107130592B (zh) | 长螺旋钻和冲击钻双机复合成孔灌注桩施工工法 | |
CN109555116A (zh) | 一种高密度岩溶强烈发育地区全套管灌注桩施工方法 | |
CN108149678A (zh) | 一种黄土护壁干作业成孔灌注桩的施工方法 | |
CN106836206A (zh) | 护筒旋挖成桩施工方法 | |
CN105155516B (zh) | 在全面清理地下障碍物前施工钻孔灌注桩的方法 | |
CN106013092A (zh) | 一种钻孔灌注桩施工方法 | |
CN111395330B (zh) | 穿越地下廊道的砼钻孔灌注桩成套钢护筒施工方法 | |
CN105672314A (zh) | 一种半逆作法钢管立柱桩施工方法 | |
CN106930276A (zh) | 旋挖灌注桩深孔爆破与导管旋挖清除障碍的施工方法 | |
CN104264663A (zh) | 咬合桩硬切削施工工艺 | |
CN110158579A (zh) | 一种钻孔灌注桩施工方法 | |
CN107653878A (zh) | 钻孔灌注桩可重复使用纵向分离式钢护筒施工工法 | |
CN105064381A (zh) | 一种高低刃脚双壁钢围堰钢筋混凝土一次封底施工方法 | |
CN104121895A (zh) | 软土地区平面高程测量控制点及其埋设方法 | |
CN112281880A (zh) | 一种复杂地层长螺旋引孔插打锁口钢管桩围堰的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150819 Termination date: 20180403 |
|