CN103183288A - Configuration scheme for air compressor of multifunctional overhead travelling crane and multifunctional overhead travelling crane - Google Patents
Configuration scheme for air compressor of multifunctional overhead travelling crane and multifunctional overhead travelling crane Download PDFInfo
- Publication number
- CN103183288A CN103183288A CN2011104444243A CN201110444424A CN103183288A CN 103183288 A CN103183288 A CN 103183288A CN 2011104444243 A CN2011104444243 A CN 2011104444243A CN 201110444424 A CN201110444424 A CN 201110444424A CN 103183288 A CN103183288 A CN 103183288A
- Authority
- CN
- China
- Prior art keywords
- air
- air compressor
- compressors
- travelling crane
- overhead travelling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Compressors, Vaccum Pumps And Other Relevant Systems (AREA)
Abstract
The invention discloses a configuration scheme for the air compressor of a multifunctional overhead travelling crane. The scheme is realized by replacing an existing high-displacement air compressor by two low-displacement air compressors, wherein the total displacement of the two low-displacement air compressors is greater than the displacement of the existing high-displacement air compressor. With the adoption of the scheme disclosed by the invention, electricity utilization can be saved by 43%; and the life of the multifunctional overhead travelling crane is far greater than the life of an overhead travelling crane continuously using a 75 KW air compressor; simultaneously, the working rate of the overhead travelling crane is guaranteed and increased due to good maintenance. The two 37 KW air compressors are greater than the 75 KW air compressor in working stability, and superior to the existing configuration in the aspects of power, energy conversion, maintenance, life, stability, service efficiency and the like; therefore, with the adoption of the scheme disclosed by the invention, the use performance and adaptability of the multifunctional overhead travelling crane are remarkably improved.
Description
Technical field
the present invention relates to a kind of Air compressor allocation plan and multifunction crane of multifunction crane, belong to for the Air compressor configuring technical field on the electrolysis multi-function crane of 500KA electrolytic bath and the service of above grooved.
Background technology
electrolysis multi-function crane is the key equipment of large-sized prebaked Aluminium Electrolysis in potroom, be mainly used to prebaked anode Aluminium Electrolysis process crust breaking, feed in raw material, blow ash, go out aluminium and propose the operations such as framework.In these operations, need to use pressurized air to coordinate, so be provided with Air compressor at electrolysis multi-function crane.
have now as generally only being provided with the Air compressor of a 75KW on the electrolysis multi-function crane of 500KA electrolytic bath and above grooved service, its free air capacity is per minute 12m
3
.Usually go out aluminium larger with the gas consumption of proposing the framework operation; And crust breaking, reinforced and to blow the gas consumption of grey operation less.
current this configuration, when being gone out aluminium and proposing the framework operation, slightly feel the tolerance deficiency, but, when carrying out crust breaking, feed in raw material and blowing grey operation, tolerance has more than needed.In general, the multifunction crane of potroom is used for aluminium and only accounts for 15% of the whole service time with the time of proposing the framework operation, therefore has serious unreasonable allocation problem.Owing to only having configured at present an Air compressor, this Air compressor is all used in all operations, is unfavorable for energy-conservationly, also directly affects service life of Air compressor, and fault rate is also higher, needs often to shut down maintenance, and impact is produced.Use alerting ability also poor.Therefore the compressed air source on the reasonable disposition multifunction crane, be to solve above-mentioned in-problem gordian technique.
Summary of the invention
the object of the invention is to, a kind of Air compressor allocation plan and multifunction crane of multifunction crane is provided.The energy consumption existed with the solution prior art is large, the life-span is short, fault rate is high, impact is produced, the deficiency of use very flexible.
technical scheme of the present invention
the Air compressor allocation plan of multifunction crane, this scheme is to substitute an existing large free air capacity Air compressor with two float tolerance Air compressors; The exhaust total amount of two float tolerance Air compressors is greater than the free air capacity of an existing large free air capacity Air compressor.
in aforementioned schemes, the exhaust total amount of described two float tolerance Air compressors is per minute 14m
3
.
in aforementioned schemes, the free air capacity of described large free air capacity Air compressor is per minute 12m
3
.
in aforementioned schemes, the power of described two float tolerance Air compressors is 37KW.
in aforementioned schemes, the power of described large free air capacity Air compressor is 75KW.
in aforementioned schemes, the described two float tolerance Air compressors crust breaking, reinforced and blow grey operation that hockets; Two float tolerance Air compressors are gone out aluminium simultaneously and are proposed the framework operation.
the multifunction crane formed according to aforementioned schemes, this multifunction crane is provided with an Air compressor and No. two Air compressors, Air compressor and No. two Air compressors through tracheae and crust breaking and loading soot blower with go out aluminium and carry frame mounting and be connected.
in aforementioned multifunction crane, a described Air compressor and No. two Air compressors are power 37KW, and free air capacity is per minute 7m
3
air compressor.
compared with prior art, the power that the present invention has removed on existing multifunction crane is 75KW, and free air capacity is per minute 12m
3
air compressor.After removing, its locus can be put down two less Air compressors fully.Two 37KW have been installed in the position of Air compressor being installed originally at multifunction crane, free air capacity is per minute 14 m
3
air compressor, substituted an existing power 75KW, free air capacity per minute 12 m
3
air compressor as the compressed air source on the electrolysis multi-function crane of 500KA electrolytic bath and above grooved service.
after above-mentioned transformation, multifunction crane is used flexibly, can use two 37KW Air compressors to carry out in turn crust-breaking & baiting and blow grey operation; Or use two 37KW Air compressors to be gone out aluminium simultaneously and propose the framework operation, service efficiency, than only high with a 75KW Air compressor, can shorten and the aluminium time.From the energy-conservation aspect of multifunction crane, consider, used for air compressor on multifunction crane, in going out aluminium and 15% of duty press whole service time time of carrying framework, is worked 24 hours by multifunction crane every day, annual operation 365 days, and allowing normal maintenance, operating rate 65% calculates.Use two 37KW Air compressors than using a 75KW Air compressor that 24 * 365 * 65% (75-37 * 85%-(37+37) * 15%)=184770 degree electricity will be saved every year.Brownout 43%.From overhead traveling crane maintenance cost and service life, consider: two 37KW Air compressors are used and optimum maintenance in turn, and its life-span will the far super continuous life-span of using a 75KW Air compressor, simultaneously, because optimum maintenance, also guarantee and improved the operating rate of overhead traveling crane.From Air compressor stability, consider: 37KW Air compressor stability is higher than the Air compressor of 75KW.Although the present invention configures two 37KW Air compressors than using much approximately 30,000 yuan of a 75KW Air compressor expense, but the present invention is in function, energy-conservation, safeguard, life-span, stability, the aspects such as service efficiency all are better than existing configuration, therefore, the present invention has improved multifunction crane in-use performance and comformability significantly.
The accompanying drawing explanation
fig. 1 is structural representation of the present invention.
air compressor of being labeled as in accompanying drawing: 1-, No. bis-Air compressors of 2-, the 3-tracheae, 4-crust breaking and loading soot blower, 5-goes out aluminium and carries frame mounting.
The specific embodiment
below in conjunction with drawings and Examples, the present invention is further illustrated, but not as the foundation to the present invention's restriction.
embodiment.The Air compressor allocation plan of multifunction crane, this scheme is to substitute an existing large free air capacity Air compressor with two float tolerance Air compressors; The exhaust total amount of two float tolerance Air compressors is greater than the free air capacity of an existing large free air capacity Air compressor.The exhaust total amount of described two float tolerance Air compressors is per minute 14m
3
.The free air capacity of described large free air capacity Air compressor is per minute 12m
3
.The power of described two float tolerance Air compressors is 37KW.The power of described large free air capacity Air compressor is 75KW.The described two float tolerance Air compressors crust breaking, reinforced and blow grey operation that hockets; Two float tolerance Air compressors are gone out aluminium simultaneously and are proposed the framework operation.
the multifunction crane formed according to aforementioned schemes, this multifunction crane be provided with an Air compressor 1 and 2, numbers Air compressors 1 of No. two Air compressors and No. two Air compressors 1 through tracheae 3 and crust breaking and loading soot blower 4 with go out aluminium and carry frame mounting 5 and be connected.A described Air compressor 1 and No. two Air compressors 2 are power 37KW, and free air capacity is per minute 7m
3
air compressor.
specific embodiment of the invention process and principle
as shown in Figure 1, the power that the present invention has removed on existing multifunction crane is 75KW, and free air capacity is per minute 12m
3
air compressor.After removing, its locus can be put down two less Air compressors fully.Two 37KW have been installed in the position of Air compressor being installed originally at multifunction crane, free air capacity is per minute 14 m
3
air compressor, substituted an existing power 75KW, free air capacity per minute 12 m
3
air compressor as the compressed air source on the electrolysis multi-function crane of 500KA electrolytic bath and above grooved service.Two 37KW, free air capacity is per minute 14 m
3
air compressor, with electric control circuit, be connected respectively, two Air compressors both can work independently, and also can two work simultaneously.Use very flexible.Two Air compressors through tracheae and crust breaking and loading soot blower 4 with go out aluminium and carry frame mounting 5 and be connected.
Claims (8)
1. the Air compressor allocation plan of a multifunction crane is characterized in that: this scheme is to substitute an existing large free air capacity Air compressor with two float tolerance Air compressors; The exhaust total amount of two float tolerance Air compressors is greater than the free air capacity of an existing large free air capacity Air compressor.
2. the Air compressor allocation plan of multifunction crane according to claim 1, it is characterized in that: the exhaust total amount of described two float tolerance Air compressors is per minute 14m
3.
3. the Air compressor allocation plan of multifunction crane according to claim 2, it is characterized in that: the free air capacity of described large free air capacity Air compressor is per minute 12m
3.
4. the Air compressor allocation plan of multifunction crane according to claim 3, it is characterized in that: the power of described two float tolerance Air compressors is 37KW.
5. the Air compressor allocation plan of multifunction crane according to claim 1, it is characterized in that: the power of described large free air capacity Air compressor is 75KW.
6. the Air compressor allocation plan of multifunction crane according to claim 1 is characterized in that: the described two float tolerance Air compressors crust breaking, reinforced and blow grey operation that hockets; Two float tolerance Air compressors are gone out aluminium simultaneously and are proposed the framework operation.
7. a multifunction crane, it is characterized in that: this multifunction crane is provided with an Air compressor (1) and No. two Air compressors (2), an Air compressor (1) and No. two Air compressors (2) through tracheae (3) and crust breaking and loading soot blower (4) with go out aluminium and carry frame mounting (5) and be connected.
8. multifunction crane according to claim 7, it is characterized in that: a described Air compressor (1) and No. two Air compressors (2) are power 37KW, and free air capacity is per minute 7m
3air compressor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104444243A CN103183288A (en) | 2011-12-27 | 2011-12-27 | Configuration scheme for air compressor of multifunctional overhead travelling crane and multifunctional overhead travelling crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011104444243A CN103183288A (en) | 2011-12-27 | 2011-12-27 | Configuration scheme for air compressor of multifunctional overhead travelling crane and multifunctional overhead travelling crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103183288A true CN103183288A (en) | 2013-07-03 |
Family
ID=48674785
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011104444243A Pending CN103183288A (en) | 2011-12-27 | 2011-12-27 | Configuration scheme for air compressor of multifunctional overhead travelling crane and multifunctional overhead travelling crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103183288A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3901787A (en) * | 1974-03-07 | 1975-08-26 | Nippon Light Metal Co | Alumina feeder for electrolytic cells |
US3977950A (en) * | 1974-02-28 | 1976-08-31 | Aluminum Pechiney | Process and apparatus for collection of gases |
CN1661136A (en) * | 2004-12-22 | 2005-08-31 | 沈阳铝镁设计研究院 | Crust breaking and loading control system for aluminum cell and control method |
CN201288220Y (en) * | 2008-11-13 | 2009-08-12 | 四川启明星铝业有限责任公司 | Aluminum oxide conveying device of upper-feedback tanker vehicle |
CN102177280A (en) * | 2008-10-16 | 2011-09-07 | E·C·L·公司 | Service machine used for intervention on electrolysis cells for producing aluminium by igneous electrolysis |
CN102219151A (en) * | 2010-04-19 | 2011-10-19 | 乔宗华 | Compressed air synchronously-conveying scheme for multifunctional crown-block (traveling crane) power |
CN202449741U (en) * | 2011-12-27 | 2012-09-26 | 贵阳铝镁设计研究院有限公司 | Multifunctional crane for double air compressor |
-
2011
- 2011-12-27 CN CN2011104444243A patent/CN103183288A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3977950A (en) * | 1974-02-28 | 1976-08-31 | Aluminum Pechiney | Process and apparatus for collection of gases |
US3901787A (en) * | 1974-03-07 | 1975-08-26 | Nippon Light Metal Co | Alumina feeder for electrolytic cells |
CN1661136A (en) * | 2004-12-22 | 2005-08-31 | 沈阳铝镁设计研究院 | Crust breaking and loading control system for aluminum cell and control method |
CN102177280A (en) * | 2008-10-16 | 2011-09-07 | E·C·L·公司 | Service machine used for intervention on electrolysis cells for producing aluminium by igneous electrolysis |
CN201288220Y (en) * | 2008-11-13 | 2009-08-12 | 四川启明星铝业有限责任公司 | Aluminum oxide conveying device of upper-feedback tanker vehicle |
CN102219151A (en) * | 2010-04-19 | 2011-10-19 | 乔宗华 | Compressed air synchronously-conveying scheme for multifunctional crown-block (traveling crane) power |
CN202449741U (en) * | 2011-12-27 | 2012-09-26 | 贵阳铝镁设计研究院有限公司 | Multifunctional crane for double air compressor |
Non-Patent Citations (1)
Title |
---|
朱丹青等: "铝电解槽气控管路及车间压缩空气管路设计", 《轻金属》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101265588B (en) | Method for low-temperature electrolysis of aluminum oxide for producing aluminum adopting ion liquid | |
CN2869044Y (en) | Stainless steel cathode material conducting structure for copper, nickel electrolytic refining or electrodeposition | |
CN104213152A (en) | Aluminum electrolysis cell with center joint material blocking partition plate | |
CN202449741U (en) | Multifunctional crane for double air compressor | |
CN103183288A (en) | Configuration scheme for air compressor of multifunctional overhead travelling crane and multifunctional overhead travelling crane | |
CN201367467Y (en) | Energy-saving consumption-reducing electrolysis bath | |
CN103849892A (en) | Novel equipment for cleaning residual anode electrolyte | |
CN203653714U (en) | Multipolar aluminum chloride electrolysis bath | |
CN201169492Y (en) | Anode clamp for electrolyzing multifunctional crane | |
CN102953089B (en) | Power supply structure of incompletely-symmetrical power supply and rectification systems for aluminum electrolysis cell direct-current system | |
CN101597770B (en) | Aluminum electrolytic plant arrangement structure | |
CN101851764B (en) | Method for manufacturing abnormally shaped cathode carbon block of aluminum cell | |
CN100582310C (en) | Pre-baked anode for aluminum electrolysis and its preparation method | |
CN204455308U (en) | A kind of aluminium cell anode | |
CN207259609U (en) | First of potline work area groove is met an urgent need short-circuiting means | |
CN207259608U (en) | Potline work area end platform groove is met an urgent need short-circuiting means | |
CN2931500Y (en) | Magnesium electrolysis bath side cathode configuration structure | |
CN201557016U (en) | Improved motor carbon brush for sintered exhauster | |
CN202430303U (en) | Insulated supporting table-replaceable cathode and anode board composite insulating table | |
CN103014766A (en) | Large aluminum electrolytic bath structure | |
CN201729596U (en) | Tool support of electrolytic multi-function crane | |
CN101275241A (en) | Method of precaution power interruption of copper electrolytic refining | |
CN203345947U (en) | Double-guide slag removing device | |
CN217104100U (en) | Aluminum electrolytic cell with anode heat-insulating structure | |
CN204474776U (en) | Prebaked anode bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130703 |