CN103174152A - Cross beam foundation pit supporting structure - Google Patents

Cross beam foundation pit supporting structure Download PDF

Info

Publication number
CN103174152A
CN103174152A CN2013101006195A CN201310100619A CN103174152A CN 103174152 A CN103174152 A CN 103174152A CN 2013101006195 A CN2013101006195 A CN 2013101006195A CN 201310100619 A CN201310100619 A CN 201310100619A CN 103174152 A CN103174152 A CN 103174152A
Authority
CN
China
Prior art keywords
foundation pit
supporting
soldier pile
cross beam
tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101006195A
Other languages
Chinese (zh)
Inventor
钟义敏
钱宵
陈春霞
胡静
郑立宁
陈云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU XINGSHU PROSPECTING FOUNDATION ENGINEERING Co Ltd
Original Assignee
CHENGDU XINGSHU PROSPECTING FOUNDATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU XINGSHU PROSPECTING FOUNDATION ENGINEERING Co Ltd filed Critical CHENGDU XINGSHU PROSPECTING FOUNDATION ENGINEERING Co Ltd
Priority to CN2013101006195A priority Critical patent/CN103174152A/en
Publication of CN103174152A publication Critical patent/CN103174152A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention provides a cross beam foundation pit supporting structure. According to the cross beam foundation pit supporting structure, a plurality of groups of connecting beams arranged horizontally are used for fixedly connecting supporting piles of two sides of the side wall of a foundation pit into a supporting whole, rib columns are arranged behind the connecting beams, the length of each rib column is smaller than that of each supporting pile, and the width of each rib column is smaller than the diameter of each supporting pile. The cross beam foundation pit supporting structure can disperse pushing force applied on the rib columns into the cross beam foundation pit supporting structure formed by the rib columns, the connecting beams and the supporting piles, fully utilizes the supporting piles of the two sides of the side wall of the foundation pit to serve as fixing members, improves supporting effect of the supporting structure, prevents soil bodies of the side wall of the foundation pit from collapsing, ensures safety of the foundation pit, reduces use amount of anchor cables, and saves engineering cost at the same time.

Description

The nine-squares beam foundation pit supporting construction
Technical field
The present invention relates to a kind of building engineering construction field foundation pit supporting construction, is a kind of nine-squares beam foundation pit supporting construction specifically.
Background technology
At present be widely used soldier pile as the supporting and protection structure of foundation ditch in building engineering construction, it mainly is comprised of many soldier piles, and all be reserved with a plurality of anchor cable holes on every soldier pile, be provided with anchor cable in anchor cable hole, and be fixedly connected with steel mesh reinforcement between soldier pile.Soldier pile for boring cast-in-place, in be provided with cage of reinforcement.During use, soldier pile is arranged on design stake position around foundation ditch, be reserved with anchor cable hole on soldier pile, carry out subsequently the soil mass of foundation pit excavation, and carry out steel mesh reinforcement and lay and anchor cable construction in digging process, steel mesh reinforcement carries out the concrete spray operation after laying again, collapses with the soil layer that prevents foundation pit side-wall, anchor cable can strengthen the supporting effect of soldier pile, prevents that soldier pile from toppling because of stressed the generation.Because each soldier pile in this class supporting and protection structure is all stressed separately, therefore in order to promote supporting effect, the pile body of each soldier pile is all longer, and be provided with to organize anchor cables more, the fixed section of soldier pile is also darker, thereby larger on soil body impact under foundation ditch, original geologic structure on destructible stratum, reduce the resistance of the foundation ditch bottom soil body, be unfavorable for foundation ditch safety.And in order to prevent that the soil body between soldier pile from collapsing, the spacing in supporting and protection structure between each soldier pile is generally less, has increased engineering quantity and engineering cost.Because every soldier pile all needs to carry out anchor cable construction, thereby increase the use amount of anchor cable, also extended the engineering construction cycle when increasing construction costs.
Summary of the invention
In order to solve the deficiency of existing foundation pit supporting construction, the invention provides a kind of nine-squares beam foundation pit supporting construction, this nine-squares beam foundation pit supporting construction not only has stronger support action to foundation pit side-wall, and has reduced the impact on foundation ditch bottom solum geologic structure, and has reduced the use amount of anchor cable.
The present invention realizes by following technical proposals: the both sides at foundation pit side-wall are provided with soldier pile, be provided with anchor cable on soldier pile, and be provided with tie-beam between soldier pile, and be provided with the rib post at the rear of tie-beam simultaneously, wherein tie-beam is from top to bottom and is horizontally disposed with, and be fixedly connected with soldier pile, the rib post structure that is square is the square crossing setting with tie-beam, and next-door neighbour's tie-beam, and the length of rib post is less than the supporting pile length, and the width of rib post is less than the diameter of soldier pile.In the present invention, the common groined type supporting and protection structure that forms an integral body of tie-beam, soldier pile and rib post, its middle rib post and tie-beam can be passed to the soil body thrust that is subject on soldier pile, because soldier pile has stronger stability after anchor cable is fixing, thereby can improve the supporting effect of supporting and protection structure.
the invention has the beneficial effects as follows: not only can play effective support action to foundation pit side-wall, and because rib post and continuous beam can take full advantage of the soldier pile of foundation pit side-wall both sides as anchorage element, make tie-beam, the common groined type supporting and protection structure that forms an integral body of soldier pile and rib post, can reduce use amount and the engineering construction amount of anchor cable under the prerequisite that does not reduce foundation ditch integer support effect, thereby saved engineering cost, accelerating construction progress, simultaneously also can shorten the length of rib post fixed section, avoid the soil layer geologic structure generation harmful effect to the foundation ditch bottom, guaranteed engineering safety, the novel construction of this practicality is very easy, and supporting effect is remarkable, be convenient to promote the use of.
Description of drawings
The present invention is further illustrated below in conjunction with accompanying drawing.
Fig. 1 is main TV structure schematic diagram of the present invention.
Fig. 2 is plan structure schematic diagram of the present invention.
Code description in figure: 1,1 '-soldier pile; The 2-tie-beam; 3-rib post; The 4-anchor cable; 5-foundation ditch bottom; The 6-foundation pit side-wall.
The specific embodiment
As shown in Figure 1 and Figure 2, soldier pile (1,1 ') is located at respectively the both sides of foundation pit side-wall, and with many group tie-beams (2), soldier pile is fixedly connected as a supporting integral body, and each tie-beam all is and is horizontally disposed with, and be provided with rib post (3) in foundation pit side-wall (6) soil body of next-door neighbour's tie-beam rear side, rib post and tie-beam are the square crossing setting, and next-door neighbour's tie-beam, and the infall at soldier pile and tie-beam is provided with anchor cable (4) simultaneously.The present invention is when implementing, first soldier pile is arranged on the predetermined position of foundation pit side-wall both sides, be reserved with anchor cable hole on soldier pile, carry out subsequently the excavation of foundation pit operation, and synchronously carry out the rib post and construct in digging process, carry out the tie-beam construction when being excavated to suitable height, the horizontal setting of tie-beam also is fixedly connected with soldier pile, and its middle rib post is arranged in the soil body of tie-beam rear side foundation pit side-wall.Because can effectively utilizing tie-beam and soldier pile to carry out pressure, disperses on middle rib post of the present invention, therefore guaranteeing to shorten respectively the length of rib post and the width of rib post under the constant condition of supporting effect, make the length of rib post less than the supporting pile length, the width of rib post is less than the diameter of soldier pile.because the soldier pile of foundation pit side-wall both sides is fixed by tie-beam and anchor cable, thereby has stronger stability, be positioned at the middle rib post of soldier pile and can take full advantage of the soldier pile of both sides as anchorage element, the thrust that it is suffered is effectively disperseed, thereby can guarantee the rib post in the situation that do not use anchor cable still to have stronger support capacity, simultaneously also can further reduce the length of diameter and the fixed section thereof of rib post, this has just reduced engineering cost to a certain extent, also accelerated construction speed, and the minimizing of rib post fixed section length has also been avoided the geologic structure of foundation ditch bottom (5) is produced harmful effect, guarantee foundation ditch safety.

Claims (3)

1. nine-squares beam foundation pit supporting construction, it is characterized in that: the both sides at foundation pit side-wall are provided with soldier pile, are provided with anchor cable on soldier pile, and are provided with tie-beam between soldier pile, are provided with the rib post at the rear of tie-beam simultaneously.
2. nine-squares beam foundation pit supporting construction according to claim 1 is characterized in that: tie-beam is from top to bottom and is horizontally disposed with, and is fixedly connected with soldier pile.
3. nine-squares beam foundation pit supporting construction according to claim 1 is characterized in that: the rib post structure that is square, be the square crossing setting with tie-beam, and next-door neighbour's tie-beam, and the length of rib post is less than the supporting pile length, and the width of rib post is less than the diameter of soldier pile.
CN2013101006195A 2013-03-27 2013-03-27 Cross beam foundation pit supporting structure Pending CN103174152A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101006195A CN103174152A (en) 2013-03-27 2013-03-27 Cross beam foundation pit supporting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101006195A CN103174152A (en) 2013-03-27 2013-03-27 Cross beam foundation pit supporting structure

Publications (1)

Publication Number Publication Date
CN103174152A true CN103174152A (en) 2013-06-26

Family

ID=48634307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101006195A Pending CN103174152A (en) 2013-03-27 2013-03-27 Cross beam foundation pit supporting structure

Country Status (1)

Country Link
CN (1) CN103174152A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350548A (en) * 2015-11-27 2016-02-24 黄淮学院 Supporting structure of building foundation trench

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1508362A (en) * 2002-12-17 2004-06-30 株式会社德达渡 Supporting article for preventing sand from subsiding
KR100789210B1 (en) * 2007-05-08 2008-01-02 주식회사 드림이엔지 Land-side protection wall using composite pile connected two piles in a body
KR20090078054A (en) * 2008-01-14 2009-07-17 강상욱 Earth-supported structure using pile with screw
CN102828518A (en) * 2012-09-17 2012-12-19 中国建筑第二工程局有限公司 Manual hole digging support pile prestress anchor cable anchoring structure and construction method of anchoring structure
CN203129154U (en) * 2013-03-27 2013-08-14 成都兴蜀勘察基础工程公司 #-shaped-beam foundation pit bracing structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1508362A (en) * 2002-12-17 2004-06-30 株式会社德达渡 Supporting article for preventing sand from subsiding
KR100789210B1 (en) * 2007-05-08 2008-01-02 주식회사 드림이엔지 Land-side protection wall using composite pile connected two piles in a body
KR20090078054A (en) * 2008-01-14 2009-07-17 강상욱 Earth-supported structure using pile with screw
CN102828518A (en) * 2012-09-17 2012-12-19 中国建筑第二工程局有限公司 Manual hole digging support pile prestress anchor cable anchoring structure and construction method of anchoring structure
CN203129154U (en) * 2013-03-27 2013-08-14 成都兴蜀勘察基础工程公司 #-shaped-beam foundation pit bracing structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350548A (en) * 2015-11-27 2016-02-24 黄淮学院 Supporting structure of building foundation trench

Similar Documents

Publication Publication Date Title
CN103437567B (en) Method for supporting existing building underground added storey through original pile foundations
CN204326082U (en) A kind of foundation pit enclosure structure be applicable on soft foundation
CN103526721B (en) A kind of permeable pile foundation groynes
CN203654294U (en) Foundation pit supporting structure used in reverse building method
CN202298650U (en) Arched retaining wall
CN103046561A (en) Anchored row pile and anchorage wall combined retaining structure
CN205975658U (en) Steel platform tower crane foundation
CN205116156U (en) Cement mud agitating pile
CN203129154U (en) #-shaped-beam foundation pit bracing structure
CN104594360A (en) Composite double-row pile foundation pit supporting structure
CN206070542U (en) A kind of new stone blocking net Cable Structure for avalanche preventing and treating
CN102493465A (en) Anchorage type anchor pile retaining structure for soil filling field
CN202730796U (en) Existing retaining wall rib plate type unloading reinforcing structure
CN103174152A (en) Cross beam foundation pit supporting structure
CN203420283U (en) Deep foundation pit in open cut section of tunnel
CN201334668Y (en) Moso bamboo row pile
CN103147446A (en) Visible-beam and hidden-rib lattice anchor cable foundation pit supporting structure
CN203034466U (en) High slope supporting structure closely attached to underground structure external wall
CN203129155U (en) Exposed-beam and hidden-rib lattice anchor cable foundation pit supporting structure
CN211113674U (en) Double-row column supporting structure of foundation pit
CN205276289U (en) Prestressed concrete beam formula double row pile struts system
CN210104765U (en) High and large retaining structure of soft geological side slope
CN203684222U (en) Pile-anchor combined supporting structure with rotary jet enlarging head pre-stressed anchor rods
CN203855959U (en) Circular-section anti-slide pile with bilateral haunched beams
CN202440824U (en) Three-line-pile super-deep foundation-pit support structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130626