CN103167545A - Method and device for cutting-over of internet protocol (IP) relevant to base stations - Google Patents

Method and device for cutting-over of internet protocol (IP) relevant to base stations Download PDF

Info

Publication number
CN103167545A
CN103167545A CN2013100548187A CN201310054818A CN103167545A CN 103167545 A CN103167545 A CN 103167545A CN 2013100548187 A CN2013100548187 A CN 2013100548187A CN 201310054818 A CN201310054818 A CN 201310054818A CN 103167545 A CN103167545 A CN 103167545A
Authority
CN
China
Prior art keywords
cutover
target
configuration file
information
relevant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100548187A
Other languages
Chinese (zh)
Other versions
CN103167545B (en
Inventor
赵保卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN201310054818.7A priority Critical patent/CN103167545B/en
Publication of CN103167545A publication Critical patent/CN103167545A/en
Application granted granted Critical
Publication of CN103167545B publication Critical patent/CN103167545B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides a method and a device for cutting-over of an internet protocol (IP) relevant to base stations, wherein the method comprises the steps of generating cutting-over configuration files of a plurality of target base stations in a volume mode, connecting the plurality of target base stations, enabling the cutting-over configuration files to be loaded to the corresponding target base stations, sending reset operational instructs to the target base stations with the cutting-over configuration files successfully loaded, enabling the target base stations receiving the reset operational instructs to carry out reset restart operations, and enabling the cutting-over configuration files to take effects. According to the method and the device for the cutting-over of the IP relevant to the base stations, processing efficiency of the cutting-over of the base stations can be improved.

Description

Method and the device of the relevant IP cutover in a kind of base station
Technical field
The present invention relates to communication technique field, particularly relate to the method for the relevant IP cutover in a kind of base station, and, the device of the relevant IP cutover in a kind of base station.
Background technology
In today of information age development, mechanics of communication has been come into the every aspect of people's lives, people have also produced strong dependence to mechanics of communication in the while easily that the enjoyment mechanics of communication is brought, and this just requires Communications service business and equipment manufacturers that efficient Communications service can be provided.The scale of at present Communications service is in continuous expansion, and this means that also how the maintenance needs of equipment and business and cost also in continuous increase, therefore, are safeguarded equipment and business based on low-cost, high efficiency principle, become a vital problem.
In actual applications, according to the variation of business demand, usually need all or part of base station cutover to the another one or a plurality of base station control station of a base station control station administration administered.Under prior art, in base station cutover, the cutover of usually carrying out base station IP by manual mode link-by-link basis base station is processed, and before cutover is carried out in a base station, need to first connect this base station, then begins to carry out the operation of the cutover of this base station IP.After the IP cutover of a base station is completed, carry out the reset operation of this base station, after this base station resets is restarted, complete the IP cutover of this base station is processed.Then continue to carry out the IP cutover processing of next base station.
Adopt prior art, the modification of base station parameter (IP address, base station and control desk IP address etc.) needs manual operations, and reset after modification and restart the base station and can cause the time of service disconnection longer, process the elongation of inciting somebody to action at double consuming time of whole process in the situation that carry out cutover for a plurality of base stations.
Therefore, those skilled in the art's technical problem to be solved is to provide the mechanism of the relevant IP cutover in a kind of base station, in order to improve the treatment effeciency of base station cutover.
Summary of the invention
Technical problem to be solved by this invention is to provide method and the device of the relevant IP cutover in a kind of base station, in order to improve the treatment effeciency of base station cutover.
In order to address the above problem, the invention discloses the method for the relevant IP cutover in a kind of base station, comprising:
The cutover configuration file of a plurality of target BS of Mass production;
Connect described a plurality of target BS, described cutover configuration file is loaded into corresponding target BS;
Load successful target BS for described cutover configuration file and issue the reset operation instruction, carry out by the target BS that receives described reset operation instruction the reboot operation that resets, make described cutover configuration file come into force.
Preferably, described cutover configuration file comprises cutover configuration file before cutover and the cutover configuration file after cutover, and the step of the cutover configuration file of a plurality of target BS cutovers of described Mass production comprises:
A plurality of base stations that definite needs carry out the base station cutover operation are target BS;
Obtain the front relevant IP information of described a plurality of target BS cutover and the relevant IP information after cutover;
Generate respectively the front cutover configuration file of a plurality of target BS cutovers according to the relevant IP information before described cutover; And,
Relevant IP information after the described cutover of foundation generates respectively the cutover configuration file after a plurality of target BS cutovers.
Preferably, the step of the cutover configuration file of a plurality of target BS cutovers of described Mass production also comprises:
Cutover configuration file before described a plurality of target BS cutovers and the cutover configuration file after cutover are deposited to the control desk store path of appointment.
Preferably, the step of the cutover configuration file of a plurality of target BS cutovers of described Mass production also comprises:
The control desk store path information that cutover configuration file before the described a plurality of target BS cutovers of buffer memory and the cutover configuration file after cutover are deposited.
Preferably, at a plurality of target BS of described connection, before described cutover configuration file being loaded into the step of corresponding target BS, described method also comprises:
Obtain map information before and after the cutover of described a plurality of target BS, before and after described cutover, map information is the information of corresponding relation between relevant IP information before a plurality of target BS cutovers of described description and the relevant IP information after cutover;
Generate cutover configuration chained list according to map information before and after the cutover of described a plurality of target BS;
Described control desk store path information comprises file name information, and described cutover configuration chained list comprises relevant IP information before described a plurality of target BS cutover and the file name information of the cutover configuration file after cutover; A plurality of target BS of described connection, the step that described cutover configuration file is loaded into corresponding target BS comprises:
Travel through described cutover configuration chained list, successively according to the file name information of the relevant IP information before the cutover of described a plurality of target BS and the cutover configuration file after cutover, the cutover configuration file after corresponding control desk store path extracts corresponding cutover;
Foundation is connected with the respective objects base station;
Cutover configuration file after described cutover is sent to described target BS, after execution resets reboot operation, the cutover configuration file after described cutover is carried out the operation that comes into force by described target BS.
Preferably, described cutover configuration chained list also comprises the loading result sign, a plurality of target BS of described connection, and the step that described cutover configuration file is loaded into corresponding target BS also comprises:
When receiving the message of the cutover configuration file success after target BS loads described cutover, the loading result with corresponding target BS in described cutover configuration chained list is labeled as successfully sign;
When receiving the message of the cutover profile down after target BS loads described cutover, the loading result with corresponding target BS in described cutover configuration chained list is labeled as unsuccessfully sign.
Preferably, described method also comprises:
For the target BS in described cutover configuration chained list, generate the cutover destination file under the upper level path of control desk store path that the cutover configuration file of described base station cutover is deposited; Described cutover destination file comprises the relevant IP information before described a plurality of target BS cutover, the file name information of the cutover configuration file before the relevant IP information after cutover, cutover, the file name information of the cutover configuration file after cutover, and, the loading result sign.
Preferably, described method also comprises:
Exist in described cutover configuration chained list when unsuccessfully identifying, carry out for target BS corresponding to described unsuccessfully sign the operation that again described cutover configuration file is loaded into corresponding target BS;
When receiving the message of the cutover configuration file success after target BS reloads described cutover, the loading result with corresponding target BS in described cutover configuration chained list is labeled as successfully sign;
When receiving the message of the cutover profile down after target BS reloads described cutover, the loading result with corresponding target BS in described cutover configuration chained list is labeled as unsuccessfully sign.
Preferably, describedly load successful target BS for the cutover configuration file and issue the reset operation instruction, by the target BS execution that the receives described reset operation instruction reboot operation that resets, make the step that described cutover configuration file comes into force comprise:
Be designated successfully the target BS of sign for loading result, issue the reset operation instruction according to the relevant IP information before described target BS cutover, and make that in cutover configuration file after described cutover, the relevant IP information after cutover comes into force;
Carry out according to described target BS the information that this target BS cutover of Message Record of the reboot operation success that resets is completed.
Preferably, described cutover configuration chained list also comprises relevant IP information after described a plurality of target BS cutover and the file name information of the cutover configuration file before cutover; Described method also comprises:
Be designated for loading result the target BS that successfully identifies and carry out the base station rollback operation, described base station rollback operation comprises:
The file name information of the cutover configuration file before the corresponding cutover of relevant IP information search the target BS cutover that needs the execution rollback operation in described cutover configuration chained list after;
According to the file name information of the cutover configuration file before described cutover, the cutover configuration file extract corresponding cutover under corresponding control desk store path before;
Connect the described target BS that needs to carry out rollback operation;
Cutover configuration file before described cutover is sent to described target BS, after execution resets reboot operation, the front cutover configuration file of described cutover is come into force by described target BS;
When the cutover configuration file before described target BS loads described cutover is successful, issue the reset operation instruction according to the relevant IP information after described target BS cutover;
The target BS that receives described reset operation instruction is carried out the reboot operation that resets, and then, makes that in the cutover configuration file before described cutover, the relevant IP information before cutover comes into force.
The invention also discloses the device of the relevant IP cutover in a kind of base station, comprising:
Configuration file Mass production module is for the cutover configuration file of a plurality of target BS of Mass production;
The configuration file load-on module is used for connecting described a plurality of target BS, and described cutover configuration file is loaded into corresponding target BS;
The reset trigger module is used for loading successful target BS for described cutover configuration file and issues the reset operation instruction, carries out by the target BS that receives described reset operation instruction the reboot operation that resets, and makes described cutover configuration file come into force.
Preferably, described cutover configuration file comprises cutover configuration file before cutover and the cutover configuration file after cutover, and described configuration file Mass production module comprises:
Target BS is determined submodule, and being used for the definite a plurality of base stations that need to carry out the base station cutover operation is target BS;
Acquisition of information submodule before and after cutover is used for obtaining the front relevant IP information of described a plurality of target BS cutover and the relevant IP information after cutover;
Before cutover, configuration file generates submodule, is used for the cutover configuration file before the front relevant IP information of the described cutover of foundation generates respectively a plurality of target BS cutovers; And,
After cutover, configuration file generates submodule, is used for generating respectively cutover configuration file after a plurality of target BS cutovers according to the relevant IP information after described cutover.
Preferably, described configuration file Mass production module also comprises:
Specified path is deposited submodule, is used for cutover configuration file and the cutover configuration file after cutover before described a plurality of target BS cutovers are deposited to the control desk store path of appointment.
Preferably, described configuration file Mass production module also comprises:
Cache sub-module is used for the control desk store path information that the front cutover configuration file of the described a plurality of target BS cutovers of buffer memory and the cutover configuration file after cutover are deposited.
Preferably, described device also comprises:
Be connected to map information acquisition module between described configuration file Mass production module and configuration file load-on module, and, cutover configuration chained list generation module;
Described map information acquisition module is for map information before and after the cutover of obtaining described a plurality of target BS, and before and after described cutover, map information is the information of corresponding relation between the front relevant IP information of a plurality of target BS cutovers of described description and the relevant IP information after cutover;
Described cutover configuration chained list generation module is used for generating cutover configuration chained list according to map information before and after the cutover of described a plurality of target BS;
Described control desk store path information comprises file name information, and described cutover configuration chained list comprises relevant IP information before described a plurality of target BS cutover and the file name information of the cutover configuration file after cutover; Described configuration file load-on module comprises:
The chained list traversal is extracted submodule, be used for traveling through described cutover configuration chained list, successively according to the file name information of the relevant IP information before the cutover of described a plurality of target BS and the cutover configuration file after cutover, the cutover configuration file after corresponding control desk store path extracts corresponding cutover;
Base station connexon module be used for to be set up and being connected of respective objects base station;
File transmits submodule, is used for the cutover configuration file after described cutover is sent to described target BS, after execution resets reboot operation, the cutover configuration file after described cutover is carried out the operation that comes into force by described target BS.
Preferably, described cutover configuration chained list also comprises the loading result sign, and described configuration file load-on module also comprises:
Success identifies the mark submodule, is used for when receiving the message of the cutover configuration file success after target BS loads described cutover, and the loading result with corresponding target BS in described cutover configuration chained list is labeled as successfully sign;
Failure sign mark submodule is used for when receiving the message of the cutover profile down after target BS loads described cutover, and the loading result with corresponding target BS in described cutover configuration chained list is labeled as unsuccessfully sign.
Preferably, described device also comprises:
Cutover destination file generation module is used for the target BS for described cutover configuration chained list, generates the cutover destination file under the upper level path of control desk store path that the cutover configuration file of described base station cutover is deposited; Described cutover destination file comprises the relevant IP information before described a plurality of target BS cutover, the file name information of the cutover configuration file before the relevant IP information after cutover, cutover, the file name information of the cutover configuration file after cutover, and, the loading result sign.
Preferably, described device also comprises:
Reload module, be used for existing when unsuccessfully identifying at described cutover configuration chained list, carry out the operation of the target BS that again described cutover configuration file is loaded into correspondence for target BS corresponding to described unsuccessfully sign;
The first heavy label module is used for when receiving the message of the cutover configuration file success after target BS reloads described cutover, and the loading result with corresponding target BS in described cutover configuration chained list is labeled as successfully sign;
The second heavy label module is used for when receiving the message of the cutover profile down after target BS reloads described cutover, and the loading result with corresponding target BS in described cutover configuration chained list is labeled as unsuccessfully sign.
Preferably, described reset trigger module comprises:
Instruction issues submodule, is designated successfully the target BS of sign for loading result, issues the reset operation instruction according to the relevant IP information before described target BS cutover, and makes that in cutover configuration file after described cutover, the relevant IP information after cutover comes into force;
The information recording/submodule is completed in cutover, is used for the described target BS of foundation and carries out the information that this target BS cutover of Message Record of the reboot operation success that resets is completed.
Preferably, described cutover configuration chained list also comprises relevant IP information after described a plurality of target BS cutover and the file name information of the cutover configuration file before cutover; Described device also comprises:
The rollback operation module is used for being designated for loading result the target BS that successfully identifies and carries out the base station rollback operation, and described base station rollback operation comprises:
The file name information of the cutover configuration file before the corresponding cutover of relevant IP information search the target BS cutover that needs the execution rollback operation in described cutover configuration chained list after;
According to the file name information of the cutover configuration file before described cutover, the cutover configuration file extract corresponding cutover under corresponding control desk store path before;
Connect the described target BS that needs to carry out rollback operation;
Cutover configuration file before described cutover is sent to described target BS, after execution resets reboot operation, the front cutover configuration file of described cutover is come into force by described target BS;
When the cutover configuration file before described target BS loads described cutover is successful, issue the reset operation instruction according to the relevant IP information after described target BS cutover;
The target BS that receives described reset operation instruction is carried out the reboot operation that resets, and makes then that in the cutover configuration file before described cutover, the relevant IP information before cutover comes into force.
Compared with prior art, the present invention has the following advantages:
The present invention need to not process with the cutover that base station IP is carried out in manual pattern link base station one by one, cutover configuration file by a plurality of target BS of Mass production, the cutover configuration file that generates is put into the control desk store path of appointment, carry out the loading of cutover configuration file at described a plurality of target BS, the cutover configuration file is loaded successful target BS carry out the reboot operation that resets, namely realize the mode of base station cutover in batches, thereby greatly promoted the efficient of base station cutover.
Moreover, the present invention is under the configuration status before the user need to get back to cutover the time, can carry out fast the rollback of base station cutover and process operation, thereby shorten to greatest extent the interrupted time of business, save maintenance cost, improve the efficient of cutover and the reliability of operation, reduced simple and repeated labor, improved O﹠M operating efficiency and business supportability.
Description of drawings
Fig. 1 shows the flow chart of steps of the embodiment of the method 1 of the relevant IP cutover in a kind of base station of the present invention;
Fig. 2 shows the exemplary plot of the locking relation of the same RNC in a kind of base station of the present invention, control desk;
Fig. 3 shows the flow chart of steps of the embodiment of the method 2 of the relevant IP cutover in a kind of base station of the present invention;
Fig. 4 shows the structured flowchart of device embodiment 1 of the relevant IP cutover in a kind of base station of the embodiment of the present invention;
Fig. 5 shows the structured flowchart of device embodiment 2 of the relevant IP cutover in a kind of base station of the embodiment of the present invention.
Embodiment
For above-mentioned purpose of the present invention, feature and advantage can be become apparent more, the present invention is further detailed explanation below in conjunction with the drawings and specific embodiments.
One of core idea of the present invention is, cutover configuration file by a plurality of target BS of Mass production, and the cutover configuration file that generates is put into the control desk store path of appointment, carry out the loading of cutover configuration file at described a plurality of target BS, the cutover configuration file is loaded successful target BS carry out the reboot operation that resets, namely realize the mode of base station cutover in batches, thereby greatly promoted the efficient of base station cutover.
With reference to Fig. 1, show the flow chart of steps of the embodiment of the method 1 of the relevant IP cutover in a kind of base station of the present invention, specifically comprise the following steps:
Step 101, the cutover configuration file of a plurality of target BS of Mass production;
In specific implementation, described cutover configuration file can comprise cutover configuration file before cutover and the cutover configuration file after cutover.
In a preferred embodiment of the present invention, described step 101 can comprise following substep:
Substep S11, the definite a plurality of base stations that need to carry out the base station cutover operation are target BS;
Substep S12 obtains the front relevant IP information of described a plurality of target BS cutover and the relevant IP information after cutover;
Substep S13 generates respectively the front cutover configuration file of a plurality of target BS cutovers according to the relevant IP information before described cutover; And,
Substep S14, the relevant IP information after the described cutover of foundation generates respectively the cutover configuration file after a plurality of target BS cutovers.
More specifically, the relevant IP information before described cutover can comprise the IP address of the front base station of cutover, and/or, the IP address of radio network controller (RNC), and/or, the IP address of control desk; Relevant IP information after described cutover can comprise the IP address of base station after cutover, and/or, the IP address of radio network controller (RNC), and/or, the IP address of control desk.
The schematic diagram of a kind of base station that reference is shown in Figure 2 and RNC, control desk annexation.Wherein, base station 1, base station 2, base station 3 all are articulated under RNC1, and base station 4, base station 5, base station 6 all are articulated under RNC2, and base station 7, base station 8,9 of base stations are articulated under RNC3; RNC1, RNC2, RNC3 are articulated in control desk 1 time.
In the concrete a kind of example used of the present invention, can pass through IP address, the front base station of a plurality of target BS cutovers of buffer memory, the IP address of RNC, and/or the IP address of control desk generates respectively the front cutover configuration file of described a plurality of target BS cutover; And, can be by IP address, base station after a plurality of target BS cutovers of buffer memory, the IP address of RNC, and/or the IP address of control desk generates respectively the cutover configuration file after described a plurality of target BS cutover.Be the front cutover configuration file of the corresponding cutover of each target BS and the cutover configuration file after cutover.
In another kind of preferred embodiment of the present invention, described step 101 can comprise following substep:
Substep S21, the definite a plurality of base stations that need to carry out the base station cutover operation are target BS;
Substep S22 obtains the front relevant IP information of described a plurality of target BS cutover and the relevant IP information after cutover;
Substep S23 generates respectively the front cutover configuration file of a plurality of target BS cutovers according to the relevant IP information before described cutover;
Substep S24, the relevant IP information after the described cutover of foundation generates respectively the cutover configuration file after a plurality of target BS cutovers;
Substep S25 deposits the cutover configuration file before described a plurality of target BS cutovers and the cutover configuration file after cutover to the control desk store path of appointment.
In specific implementation, relevant IP information before described a plurality of target BS cutovers and the relevant IP information after cutover can be imported to control desk, relevant IP information before the cutover of each target BS and the relevant IP information after cutover are provided with spacing identification, in order to the sign of cutting apart as information between the differentiation different base station.For example, base station A:172.170.3.102,172.170.3.103,192.172.103.108 newline base station B:172.170.5.102,172.170.3.106,192.172.166.188 above-mentioned newline is relevant IP information before the cutover of two base stations and the spacing identification between the relevant IP information after cutover.
Control desk obtains relevant IP information before the cutover of each target BS and the relevant IP information after cutover according to described spacing identification, and generate respectively the cutover configuration file of corresponding target BS after the described relevant IP information that gets of buffer memory, described cutover configuration file according to cutover before the cutover configuration file, and, cutover configuration file after cutover is distinguished, and stores classifiedly to the control desk store path that sets in advance.Need to prove, described control desk store path is the absolute path of accompanying document, and the absolute path of described accompanying document refers to comprise the file path of cutover configuration filename, and namely the directory root node locating is to final filename.For example: the path that certain file is deposited is: " C: Doc New 2.cfg ", the path " C: Doc New 2.cfg " be exactly the file path that comprises the absolute path of this document, and path " C: Doc " do not arrive final this document name, is the file path of the relative path that comprises this document.Use the embodiment of the present invention, can navigate to fast the file of appointment by the absolute path information of accompanying document, can improve the efficient of searching configuration file.
In another preferred embodiment of the present invention, described step 101 can comprise following substep:
Substep S31, the definite a plurality of base stations that need to carry out the base station cutover operation are target BS;
Substep S32 obtains the front relevant IP information of described a plurality of target BS cutover and the relevant IP information after cutover;
Substep S33 generates respectively the front cutover configuration file of a plurality of target BS cutovers according to the relevant IP information before described cutover;
Substep S34, the relevant IP information after the described cutover of foundation generates respectively the cutover configuration file after a plurality of target BS cutovers;
Substep S35 deposits the cutover configuration file before described a plurality of target BS cutovers and the cutover configuration file after cutover to the control desk store path of appointment;
Substep S36, the control desk store path information that the cutover configuration file before the described a plurality of target BS cutovers of buffer memory and the cutover configuration file after cutover are deposited.
In the present embodiment, the control desk store path information that can further deposit the cutover configuration file is carried out buffer memory, so that the quick calling of subsequent treatment, further improves the treatment effeciency of base station cutover.
Step 102 connects described a plurality of target BS, and described cutover configuration file is loaded into corresponding target BS;
For making those skilled in the art understand better the present invention, below base station cutover is briefly described.
Base station cutover can comprise cutover in RNC and the cutover between RNC.
In RNC, cutover is that in RNC, cutover, also can while cutover signal command board and interface board to different signal command board or interface boards.This cutover mode, only can affect the object of carrying aspect: signaling link, data link, facility information etc., can not affect the object of service layer, not need to reload the version file of base station, only relate to the change of the local configuration of link, facility information etc.In this case, variation has occured in the IP address of RNC, and control desk IP address does not change, if the IUB interface IP address of IP address, base station originally and present RNC is at the same network segment, after cutover, IP address in base station is constant, at this moment, IP address, base station does not all change with control desk IP address before and after cutover, only needs the IP address of renewal base station correspondence RNC; Not at the same network segment, after cutover, IP address in base station changes when the IP address of the IP of original base station and the IUB interface of RNC now, and in this case, the IP address of the corresponding RNC of target BS IP address and target BS all needs to upgrade.
Cutover between described RNC refers to that articulating under corresponding RNC changes.Cutover between RNC is to carry out the switching of base station between RNC, for example, with reference to figure 2, with base station 1 cutover under RNC1 to as shown in Figure 2 other RNC(RNC2 or RNC3) under.Cutover between different RNCs, not only carrying aspect needs to rebuild, the service layer data also will be planned again, and variation has all occured the out of Memory relevant with RNC, and above-mentioned informational needs reconfigures, if two RNC versions of data are inconsistent, also need to reload edition data.In this case, variation has occured in the IP address of RNC, and the IP address of control desk does not change.
If base station 1 is switched under any one RNC under other control desk beyond control desk 1, variation has all occured in the IP address of the IP address of control desk, RNC.If the IUB interface IP address of IP address, base station originally and present RNC is at the same network segment, after cutover, IP address in base station is constant, in this case, only needs to upgrade control desk IP address corresponding to target BS, and the information of the IP address of corresponding RNC; If the IUB interface IP address of IP address, base station originally and present RNC is not at the same network segment, after cutover, IP address in base station changes, at this moment, and target BS IP address, the IP address of the corresponding RNC of target BS, and corresponding control desk IP address all needs to upgrade.In brief, base station cutover namely relates to IP address, above-mentioned base station, the IP address of RNC, and/or, the renewal operation of control desk IP address.
Step 103 loads successful target BS for described cutover configuration file and issues the reset operation instruction, carries out by the target BS that receives described reset operation instruction the reboot operation that resets, and makes described cutover configuration file come into force.
In specific implementation, after the target BS that receives described reset operation instruction resets and restarts, can complete the cutover processing to the current goal base station.
With reference to Fig. 3, show the flow chart of steps of the embodiment of the method 2 of the relevant IP cutover in a kind of base station of the present invention, specifically comprise the following steps:
Step 201, the cutover configuration file of a plurality of target BS of Mass production;
Wherein, described cutover configuration file can comprise cutover configuration file before cutover and the cutover configuration file after cutover, the relevant IP information before cutover can be comprised in cutover configuration file before described cutover, the relevant IP information after cutover can be comprised in the cutover configuration file after described cutover.In specific implementation, the designated store path that the cutover configuration file before described a plurality of target BS cutovers and the cutover configuration file after cutover leave control desk in.
Step 202 is obtained map information before and after the cutover of described a plurality of target BS, and before and after described cutover, map information is the information of corresponding relation between relevant IP information before a plurality of target BS cutovers of described description and the relevant IP information after cutover;
For same base station, the relevant IP information after the relevant IP information before cutover and cutover has corresponding relation, can form map information based on corresponding base station according to the corresponding relation of the relevant IP information after the relevant IP information before base station cutover and cutover.
Step 203 generates cutover configuration chained list according to map information before and after the cutover of described a plurality of target BS;
As the concrete a kind of example used of the present invention, described cutover configuration chained list can comprise: the relevant IP information before cutover, the relevant IP information after cutover, the filename of the cutover configuration file before cutover, the filename of the cutover configuration file after cutover, loading result sign etc.Wherein, the loading result sign can be understood as the mark of sign base station cutover success or not, loading result sign acquiescence can be extended this as " unknown ", again it is designated as occurrence when carrying out the success and failure mark.Certainly, above-mentioned example is only as example, and it is all feasible that those skilled in the art arrange arbitrarily the loading result sign according to actual conditions, and the present invention need not this to be limited.
Step 204 connects described a plurality of target BS, and described cutover configuration file is loaded into corresponding target BS;
In specific implementation, described control desk store path information can comprise file name information, and described cutover configuration chained list can comprise relevant IP information before described a plurality of target BS cutover and the file name information of the cutover configuration file after cutover; In a preferred embodiment of the present invention, described step 204 specifically can comprise following substep:
Substep S41, travel through described cutover configuration chained list, successively according to the file name information of the relevant IP information before the cutover of described a plurality of target BS and the cutover configuration file after cutover, the cutover configuration file after corresponding control desk store path extracts corresponding cutover;
Substep S42, foundation is connected with the respective objects base station;
Substep S43 is sent to described target BS with the cutover configuration file after described cutover, after execution resets reboot operation, the cutover configuration file after described cutover is carried out the operation that comes into force by described target BS.
In specific implementation, can also comprise the loading result sign in described cutover configuration chained list, in another kind of preferred embodiment of the present invention, described step 204 specifically can comprise following substep:
Substep S51, travel through described cutover configuration chained list, successively according to the file name information of the relevant IP information before the cutover of described a plurality of target BS and the cutover configuration file after cutover, the cutover configuration file after corresponding control desk store path extracts corresponding cutover;
As the concrete a kind of example used of the embodiment of the present invention, control desk can be according to described cutover configuration chained list, get successively the front relevant IP information of cutover and the file name information of the cutover configuration file after cutover, navigate to corresponding control desk store path, then obtain corresponding cutover configuration file under this store path.
Substep S52, foundation is connected with the respective objects base station;
Substep S53 is sent to described target BS with the cutover configuration file after described cutover, and the cutover configuration file by described target BS after to described cutover is carried out the operation that comes into force;
Substep S54, when receiving the message of the cutover configuration file success after target BS loads described cutover, the loading result with corresponding target BS in described cutover configuration chained list is labeled as successfully sign;
Substep S55, when receiving the message of the cutover profile down after target BS loads described cutover, the loading result with corresponding target BS in described cutover configuration chained list is labeled as unsuccessfully sign.
It is all feasible that those skilled in the art adopt any sign that the loading result sign is limited according to actual conditions, for example, loading result to the base station of cutover success is labeled as " Y ", loading result to the base station of delivery failure is labeled as " N ", and the embodiment of the present invention need not this to be limited.
In this case, the embodiment of the present invention can also comprise the steps:
For the target BS in described cutover configuration chained list, generate the cutover destination file under the upper level path of control desk store path that the cutover configuration file of described base station cutover is deposited;
Wherein, can comprise the relevant IP information that described a plurality of target BS cutover is front in described cutover destination file, the relevant IP information after cutover, the file name information of the cutover configuration file before cutover, the file name information of the cutover configuration file after cutover, and, the loading result sign.
In specific implementation, described cutover destination file can leave under the upper level path of the stored control desk store path of cutover configuration file, can also further represent the information in described cutover destination file on operation interface.For example, the control desk store path of the cutover configuration file before certain base station cutover be " C: Doc CFG New 2.cfg ", the control desk store path of the cutover configuration file after cutover be " C: Doc CFG OLD 6.cfg ", the cutover destination file of this base station leaves under " C: Doc CFG " path.If the cutover configuration file of all target BS all loads successfully, will generate a plurality of cutover destination files for described a plurality of target BS.
More preferably, the embodiment of the present invention can also comprise the steps:
Exist in described cutover configuration chained list when unsuccessfully identifying, carry out for target BS corresponding to described unsuccessfully sign the operation that again described cutover configuration file is loaded into corresponding target BS;
When receiving the message of the cutover configuration file success after target BS reloads described cutover, the loading result with corresponding target BS in described cutover configuration chained list is labeled as successfully sign;
When receiving the message of the cutover profile down after target BS reloads described cutover, the loading result with corresponding target BS in described cutover configuration chained list is labeled as unsuccessfully sign.
Use the present embodiment, when the loading result that has the base station in described cutover configuration chained list is designated when unsuccessfully identifying, being designated unsuccessfully to loading result, the target BS of sign reloads operation, if this target BS cutover configuration file loads failure again, in order to economize on resources, and avoid waste of time, and can consider to stop the load operation to this target BS cutover configuration file, make current base station end the loading of cutover configuration file.
Step 205 loads successful target BS for described cutover configuration file and issues the reset operation instruction, carries out by the target BS that receives described reset operation instruction the reboot operation that resets, and makes described cutover configuration file come into force.
In a preferred embodiment of the present invention, described step 205 can comprise following substep:
Substep S61 is designated successfully the target BS of sign for loading result, issue the reset operation instruction according to the relevant IP information before described target BS cutover, and makes that in cutover configuration file after described cutover, the relevant IP information after cutover comes into force;
Substep S63 carries out according to described target BS the information that this target BS cutover of Message Record of the reboot operation success that resets is completed.
In specific implementation, control desk can pass through the described cutover configuration of traversal chained list, obtain successively front relevant IP information and the loading result sign of cutover of target BS, being designated successfully to loading result, the target BS of sign issues the base station resets operational order, relevant IP information before cutover in the cutover configuration file of the target BS that receives described reset operation instruction before with cutover replaces with the relevant IP information after cutover in cutover configuration file after cutover, namely makes the relevant IP information after cutover come into force.
In specific implementation, can also comprise relevant IP information after described a plurality of target BS cutover and the file name information of the cutover configuration file before cutover in described cutover configuration chained list; In a preferred embodiment of the present invention, can also comprise the steps:
Be designated for loading result the target BS that successfully identifies and carry out the base station rollback operation, described base station rollback operation can comprise:
The file name information of the cutover configuration file before the corresponding cutover of relevant IP information search the target BS cutover that needs the execution rollback operation in described cutover configuration chained list after;
According to the file name information of the cutover configuration file before described cutover, the cutover configuration file extract corresponding cutover under corresponding control desk store path before;
Connect the described target BS that needs to carry out rollback operation;
Cutover configuration file before described cutover is sent to described target BS, and the cutover configuration file by described target BS before to described cutover loads;
When the cutover configuration file before described target BS loads described cutover is successful, issue the reset operation instruction according to the relevant IP information after described target BS cutover;
The target BS that receives described reset operation instruction is carried out the reboot operation that resets, and then, makes that in the cutover configuration file before described cutover, the relevant IP information before cutover comes into force.
Particularly, processing for the rollback of base station cutover, is the reverse operating of base station cutover in principle, is consistent with the handling process of the absolutely large section of above-mentioned base station cutover, just in the loading of cutover configuration file with carry out in the base station resets operation and there are differences.For example, to obtain successively relevant IP information before the cutover of target BS and the filename of the cutover configuration file after cutover in base station cutover, cutover configuration file from the control desk store path of correspondence after the extraction cutover loads, and be to obtain successively relevant IP information after the cutover of target BS and the file of the cutover configuration file before cutover in the base station cutover rollback, extract the cutover configuration file before cutover and carry out rollback and process from the control desk store path of correspondence.Use the embodiment of the present invention, under the application scenarios of the configuration before occurring to return to cutover, can carry out fast the cutover rollback, reduced configuration file and loaded the probability of makeing mistakes.
Need to prove, for embodiment of the method, for simple description, therefore it all is expressed as a series of combination of actions, but those skilled in the art should know, the present invention is not subjected to the restriction of described sequence of movement, because according to the present invention, some step can adopt other orders or carry out simultaneously.Secondly, those skilled in the art also should know, the embodiment described in specification all belongs to preferred embodiment, and related action and module might not be that the present invention is necessary.
With reference to Fig. 4, show the structured flowchart of device embodiment 1 of the relevant IP cutover in a kind of base station of the embodiment of the present invention, specifically can comprise with lower module:
Configuration file Mass production module 401 is for the cutover configuration file of a plurality of target BS of Mass production;
Configuration file load-on module 402 is used for connecting described a plurality of target BS, and described cutover configuration file is loaded into corresponding target BS;
Reset trigger module 403 is used for loading successful target BS for described cutover configuration file and issues the reset operation instruction, carries out by the target BS that receives described reset operation instruction the reboot operation that resets, and makes described cutover configuration file come into force.
In a preferred embodiment of the present invention, described cutover configuration file can comprise cutover configuration file before cutover and the cutover configuration file after cutover, and described configuration file Mass production module 401 can comprise following submodule:
Target BS is determined submodule, and being used for the definite a plurality of base stations that need to carry out the base station cutover operation is target BS;
Acquisition of information submodule before and after cutover is used for obtaining the front relevant IP information of described a plurality of target BS cutover and the relevant IP information after cutover;
Before cutover, configuration file generates submodule, is used for the cutover configuration file before the front relevant IP information of the described cutover of foundation generates respectively a plurality of target BS cutovers; And,
After cutover, configuration file generates submodule, is used for generating respectively cutover configuration file after a plurality of target BS cutovers according to the relevant IP information after described cutover.
More preferably, described configuration file Mass production module can also comprise following submodule:
Specified path is deposited submodule, is used for cutover configuration file and the cutover configuration file after cutover before described a plurality of target BS cutovers are deposited to the control desk store path of appointment.
More preferably, described configuration file Mass production module can also comprise following submodule:
Cache sub-module is used for the control desk store path information that the front cutover configuration file of the described a plurality of target BS cutovers of buffer memory and the cutover configuration file after cutover are deposited.
With reference to Fig. 5, show the structured flowchart of device embodiment 2 of the relevant IP cutover in a kind of base station of the embodiment of the present invention, specifically can comprise with lower module:
Configuration file Mass production module 501 is for the cutover configuration file of a plurality of target BS of Mass production;
Map information acquisition module 502, for map information before and after the cutover of obtaining described a plurality of target BS, before and after described cutover, map information is the information of corresponding relation between the front relevant IP information of a plurality of target BS cutovers of described description and the relevant IP information after cutover;
Cutover configuration chained list generation module 503 is used for generating cutover configuration chained list according to map information before and after the cutover of described a plurality of target BS;
Configuration file load-on module 504 is used for connecting described a plurality of target BS, and described cutover configuration file is loaded into corresponding target BS;
Reset trigger module 505 is used for loading successful target BS for described cutover configuration file and issues the reset operation instruction, carries out by the target BS that receives described reset operation instruction the reboot operation that resets, and makes described cutover configuration file come into force.
In specific implementation, can comprise file name information in described control desk store path information, can comprise relevant IP information before described a plurality of target BS cutover and the file name information of the cutover configuration file after cutover in described cutover configuration chained list; In this case, described configuration file load-on module 504 can comprise following submodule:
The chained list traversal is extracted submodule, be used for traveling through described cutover configuration chained list, successively according to the file name information of the relevant IP information before the cutover of described a plurality of target BS and the cutover configuration file after cutover, the cutover configuration file after corresponding control desk store path extracts corresponding cutover;
Base station connexon module be used for to be set up and being connected of respective objects base station;
File transmits submodule, is used for the cutover configuration file after described cutover is sent to described target BS, after execution resets reboot operation, the cutover configuration file after described cutover is carried out the operation that comes into force by described target BS.
In specific implementation, described cutover configuration chained list can also comprise the loading result sign, and described configuration file load-on module 504 can also comprise following submodule:
Success identifies the mark submodule, is used for when receiving the message of the cutover configuration file success after target BS loads described cutover, and the loading result with corresponding target BS in described cutover configuration chained list is labeled as successfully sign;
Failure sign mark submodule is used for when receiving the message of the cutover profile down after target BS loads described cutover, and the loading result with corresponding target BS in described cutover configuration chained list is labeled as unsuccessfully sign.
In a preferred embodiment of the present invention, described device can also comprise as lower module:
Cutover destination file generation module is used for the target BS for described cutover configuration chained list, generates the cutover destination file under the upper level path of control desk store path that the cutover configuration file of described base station cutover is deposited;
Wherein, can comprise the relevant IP information that described a plurality of target BS cutover is front in described cutover destination file, the relevant IP information after cutover, the file name information of the cutover configuration file before cutover, the file name information of the cutover configuration file after cutover, and, the loading result sign.
More preferably, described device embodiment can also comprise as lower module:
Reload module, be used for existing when unsuccessfully identifying at described cutover configuration chained list, carry out the operation of the target BS that again described cutover configuration file is loaded into correspondence for target BS corresponding to described unsuccessfully sign;
The first heavy label module is used for when receiving the message of the cutover configuration file success after target BS reloads described cutover, and the loading result with corresponding target BS in described cutover configuration chained list is labeled as successfully sign;
The second heavy label module, be used for when receiving the message of the cutover profile down after target BS reloads described cutover, loading result with corresponding target BS in described cutover configuration chained list is labeled as unsuccessfully sign, and adds the termination mark.
As the concrete a kind of example used of the present invention, described reset trigger module 505 can comprise following submodule:
Instruction issues submodule, is designated successfully the target BS of sign for loading result, issues the reset operation instruction according to the relevant IP information before described target BS cutover, and makes that in cutover configuration file after described cutover, the relevant IP information after cutover comes into force;
The information recording/submodule is completed in cutover, is used for the described target BS of foundation and carries out the information that this target BS cutover of Message Record of the reboot operation success that resets is completed.
In specific implementation, described cutover configuration chained list can also comprise relevant IP information after described a plurality of target BS cutover and the file name information of the cutover configuration file before cutover; In this case, described device embodiment can also comprise as lower module:
The rollback operation module is used for being designated for loading result the target BS that successfully identifies and carries out the base station rollback operation, and described base station rollback operation comprises:
The file name information of the cutover configuration file before the corresponding cutover of relevant IP information search the target BS cutover that needs the execution rollback operation in described cutover configuration chained list after;
According to the file name information of the cutover configuration file before described cutover, the cutover configuration file extract corresponding cutover under corresponding control desk store path before;
Connect the described target BS that needs to carry out rollback operation;
Cutover configuration file before described cutover is sent to described target BS, after execution resets reboot operation, the front cutover configuration file of described cutover is come into force by described target BS;
When the cutover configuration file before described target BS loads described cutover is successful, issue the reset operation instruction according to the relevant IP information after described target BS cutover;
The target BS that receives described reset operation instruction is carried out the reboot operation that resets, and makes then that in the cutover configuration file before described cutover, the relevant IP information before cutover comes into force.
Due to device embodiment of the present invention substantially corresponding to aforesaid embodiment of the method, therefore not detailed part in the description of the present embodiment, can be referring to the related description in previous embodiment, just do not given unnecessary details at this.
Those skilled in the art should understand, embodiments of the invention can be provided as method, system or computer program.Therefore, the present invention can adopt complete hardware implementation example, implement software example or in conjunction with the form of the embodiment of software and hardware aspect fully.And the present invention can adopt the form that wherein includes the upper computer program of implementing of computer-usable storage medium (including but not limited to magnetic disc store, CD-ROM, optical memory etc.) of computer usable program code one or more.
The present invention is that reference is described according to flow chart and/or the block diagram of method, equipment (system) and the computer program of the embodiment of the present invention.Should understand can be by the flow process in each flow process in computer program instructions realization flow figure and/or block diagram and/or square frame and flow chart and/or block diagram and/or the combination of square frame.Can provide these computer program instructions to the processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing device to produce a machine, make the instruction of carrying out by the processor of computer or other programmable data processing device produce to be used for the device of realizing in the function of flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame appointments.
These computer program instructions also can be stored in energy vectoring computer or the computer-readable memory of other programmable data processing device with ad hoc fashion work, make the instruction that is stored in this computer-readable memory produce the manufacture that comprises command device, this command device is realized the function of appointment in flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame.
These computer program instructions also can be loaded on computer or other programmable data processing device, make on computer or other programmable devices and to carry out the sequence of operations step producing computer implemented processing, thereby be provided for realizing the step of the function of appointment in flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame in the instruction of carrying out on computer or other programmable devices.
Although described the preferred embodiments of the present invention, in a single day those skilled in the art get the basic creative concept of cicada, can make other change and modification to these embodiment.So claims are intended to all changes and the modification that are interpreted as comprising preferred embodiment and fall into the scope of the invention.
At last, also need to prove, in this article, relational terms such as the first and second grades only is used for an entity or operation are separated with another entity or operating space, and not necessarily requires or hint and have the relation of any this reality or sequentially between these entities or operation.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thereby make the process, method, article or the equipment that comprise a series of key elements not only comprise those key elements, but also comprise other key elements of clearly not listing, or also be included as the intrinsic key element of this process, method, article or equipment.In the situation that not more restrictions, the key element that is limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment that comprises described key element and also have other identical element.
Above method and device to the relevant IP cutover in a kind of base station provided by the present invention is described in detail, used specific case herein principle of the present invention and execution mode are set forth, the explanation of above embodiment just is used for helping to understand method of the present invention and core concept thereof; Simultaneously, for one of ordinary skill in the art, according to thought of the present invention, all will change in specific embodiments and applications, in sum, this description should not be construed as limitation of the present invention.

Claims (20)

1. the method for the relevant IP cutover in base station, is characterized in that, comprising:
The cutover configuration file of a plurality of target BS of Mass production;
Connect described a plurality of target BS, described cutover configuration file is loaded into corresponding target BS;
Load successful target BS for described cutover configuration file and issue the reset operation instruction, carry out by the target BS that receives described reset operation instruction the reboot operation that resets, make described cutover configuration file come into force.
2. the method for claim 1, is characterized in that, described cutover configuration file comprises cutover configuration file before cutover and the cutover configuration file after cutover, and the step of the cutover configuration file of a plurality of target BS cutovers of described Mass production comprises:
A plurality of base stations that definite needs carry out the base station cutover operation are target BS;
Obtain the front relevant IP information of described a plurality of target BS cutover and the relevant IP information after cutover;
Generate respectively the front cutover configuration file of a plurality of target BS cutovers according to the relevant IP information before described cutover; And,
Relevant IP information after the described cutover of foundation generates respectively the cutover configuration file after a plurality of target BS cutovers.
3. method as claimed in claim 2, is characterized in that, the step of the cutover configuration file of a plurality of target BS cutovers of described Mass production also comprises:
Cutover configuration file before described a plurality of target BS cutovers and the cutover configuration file after cutover are deposited to the control desk store path of appointment.
4. method as claimed in claim 3, is characterized in that, the step of the cutover configuration file of a plurality of target BS cutovers of described Mass production also comprises:
The control desk store path information that cutover configuration file before the described a plurality of target BS cutovers of buffer memory and the cutover configuration file after cutover are deposited.
5. method as described in claim 3 or 4, is characterized in that, at a plurality of target BS of described connection, before described cutover configuration file being loaded into the step of corresponding target BS, described method also comprises:
Obtain map information before and after the cutover of described a plurality of target BS, before and after described cutover, map information is the information of corresponding relation between relevant IP information before a plurality of target BS cutovers of described description and the relevant IP information after cutover;
Generate cutover configuration chained list according to map information before and after the cutover of described a plurality of target BS;
Described control desk store path information comprises file name information, and described cutover configuration chained list comprises relevant IP information before described a plurality of target BS cutover and the file name information of the cutover configuration file after cutover; A plurality of target BS of described connection, the step that described cutover configuration file is loaded into corresponding target BS comprises:
Travel through described cutover configuration chained list, successively according to the file name information of the relevant IP information before the cutover of described a plurality of target BS and the cutover configuration file after cutover, the cutover configuration file after corresponding control desk store path extracts corresponding cutover;
Foundation is connected with the respective objects base station;
Cutover configuration file after described cutover is sent to described target BS, after execution resets reboot operation, the cutover configuration file after described cutover is carried out the operation that comes into force by described target BS.
6. method as claimed in claim 5, is characterized in that, described cutover configuration chained list also comprises the loading result sign, a plurality of target BS of described connection, and the step that described cutover configuration file is loaded into corresponding target BS also comprises:
When receiving the message of the cutover configuration file success after target BS loads described cutover, the loading result with corresponding target BS in described cutover configuration chained list is labeled as successfully sign;
When receiving the message of the cutover profile down after target BS loads described cutover, the loading result with corresponding target BS in described cutover configuration chained list is labeled as unsuccessfully sign.
7. method as claimed in claim 6, is characterized in that, also comprises:
For the target BS in described cutover configuration chained list, generate the cutover destination file under the upper level path of control desk store path that the cutover configuration file of described base station cutover is deposited; Described cutover destination file comprises the relevant IP information before described a plurality of target BS cutover, the file name information of the cutover configuration file before the relevant IP information after cutover, cutover, the file name information of the cutover configuration file after cutover, and, the loading result sign.
8. method as claimed in claim 7, is characterized in that, also comprises:
Exist in described cutover configuration chained list when unsuccessfully identifying, carry out for target BS corresponding to described unsuccessfully sign the operation that again described cutover configuration file is loaded into corresponding target BS;
When receiving the message of the cutover configuration file success after target BS reloads described cutover, the loading result with corresponding target BS in described cutover configuration chained list is labeled as successfully sign;
When receiving the message of the cutover profile down after target BS reloads described cutover, the loading result with corresponding target BS in described cutover configuration chained list is labeled as unsuccessfully sign.
9. as claim 5 or 6 or 7 or 8 described methods, it is characterized in that, describedly load successful target BS for the cutover configuration file and issue the reset operation instruction, carry out by the target BS that receives described reset operation instruction the reboot operation that resets, make the step that described cutover configuration file comes into force comprise:
Be designated successfully the target BS of sign for loading result, issue the reset operation instruction according to the relevant IP information before described target BS cutover, and make that in cutover configuration file after described cutover, the relevant IP information after cutover comes into force;
Carry out according to described target BS the information that this target BS cutover of Message Record of the reboot operation success that resets is completed.
10. method as claimed in claim 3, is characterized in that, described cutover configuration chained list also comprises relevant IP information after described a plurality of target BS cutover and the file name information of the cutover configuration file before cutover; Described method also comprises:
Be designated for loading result the target BS that successfully identifies and carry out the base station rollback operation, described base station rollback operation comprises:
The file name information of the cutover configuration file before the corresponding cutover of relevant IP information search the target BS cutover that needs the execution rollback operation in described cutover configuration chained list after;
According to the file name information of the cutover configuration file before described cutover, the cutover configuration file extract corresponding cutover under corresponding control desk store path before;
Connect the described target BS that needs to carry out rollback operation;
Cutover configuration file before described cutover is sent to described target BS, after execution resets reboot operation, the front cutover configuration file of described cutover is come into force by described target BS;
When the cutover configuration file before described target BS loads described cutover is successful, issue the reset operation instruction according to the relevant IP information after described target BS cutover;
The target BS that receives described reset operation instruction is carried out the reboot operation that resets, and then, makes that in the cutover configuration file before described cutover, the relevant IP information before cutover comes into force.
11. the device of the relevant IP cutover in base station is characterized in that, comprising:
Configuration file Mass production module is for the cutover configuration file of a plurality of target BS of Mass production;
The configuration file load-on module is used for connecting described a plurality of target BS, and described cutover configuration file is loaded into corresponding target BS;
The reset trigger module is used for loading successful target BS for described cutover configuration file and issues the reset operation instruction, carries out by the target BS that receives described reset operation instruction the reboot operation that resets, and makes described cutover configuration file come into force.
12. device as claimed in claim 11 is characterized in that, described cutover configuration file comprises cutover configuration file before cutover and the cutover configuration file after cutover, and described configuration file Mass production module comprises:
Target BS is determined submodule, and being used for the definite a plurality of base stations that need to carry out the base station cutover operation is target BS;
Acquisition of information submodule before and after cutover is used for obtaining the front relevant IP information of described a plurality of target BS cutover and the relevant IP information after cutover;
Before cutover, configuration file generates submodule, is used for the cutover configuration file before the front relevant IP information of the described cutover of foundation generates respectively a plurality of target BS cutovers; And,
After cutover, configuration file generates submodule, is used for generating respectively cutover configuration file after a plurality of target BS cutovers according to the relevant IP information after described cutover.
13. device as claimed in claim 12 is characterized in that, described configuration file Mass production module also comprises:
Specified path is deposited submodule, is used for cutover configuration file and the cutover configuration file after cutover before described a plurality of target BS cutovers are deposited to the control desk store path of appointment.
14. device as claimed in claim 13 is characterized in that, described configuration file Mass production module also comprises:
Cache sub-module is used for the control desk store path information that the front cutover configuration file of the described a plurality of target BS cutovers of buffer memory and the cutover configuration file after cutover are deposited.
15. as claim 11 or 12 or 13 or 14 described devices, it is characterized in that, also comprise:
Be connected to map information acquisition module between described configuration file Mass production module and configuration file load-on module, and, cutover configuration chained list generation module;
Described map information acquisition module is for map information before and after the cutover of obtaining described a plurality of target BS, and before and after described cutover, map information is the information of corresponding relation between the front relevant IP information of a plurality of target BS cutovers of described description and the relevant IP information after cutover;
Described cutover configuration chained list generation module is used for generating cutover configuration chained list according to map information before and after the cutover of described a plurality of target BS;
Described control desk store path information comprises file name information, and described cutover configuration chained list comprises relevant IP information before described a plurality of target BS cutover and the file name information of the cutover configuration file after cutover; Described configuration file load-on module comprises:
The chained list traversal is extracted submodule, be used for traveling through described cutover configuration chained list, successively according to the file name information of the relevant IP information before the cutover of described a plurality of target BS and the cutover configuration file after cutover, the cutover configuration file after corresponding control desk store path extracts corresponding cutover;
Base station connexon module be used for to be set up and being connected of respective objects base station;
File transmits submodule, is used for the cutover configuration file after described cutover is sent to described target BS, after execution resets reboot operation, the cutover configuration file after described cutover is carried out the operation that comes into force by described target BS.
16. device as claimed in claim 15 is characterized in that, described cutover configuration chained list also comprises the loading result sign, and described configuration file load-on module also comprises:
Success identifies the mark submodule, is used for when receiving the message of the cutover configuration file success after target BS loads described cutover, and the loading result with corresponding target BS in described cutover configuration chained list is labeled as successfully sign;
Failure sign mark submodule is used for when receiving the message of the cutover profile down after target BS loads described cutover, and the loading result with corresponding target BS in described cutover configuration chained list is labeled as unsuccessfully sign.
17. device as claimed in claim 16 is characterized in that, also comprises:
Cutover destination file generation module is used for the target BS for described cutover configuration chained list, generates the cutover destination file under the upper level path of control desk store path that the cutover configuration file of described base station cutover is deposited; Described cutover destination file comprises the relevant IP information before described a plurality of target BS cutover, the file name information of the cutover configuration file before the relevant IP information after cutover, cutover, the file name information of the cutover configuration file after cutover, and, the loading result sign.
18. device as claimed in claim 17 is characterized in that, also comprises:
Reload module, be used for existing when unsuccessfully identifying at described cutover configuration chained list, carry out the operation of the target BS that again described cutover configuration file is loaded into correspondence for target BS corresponding to described unsuccessfully sign;
The first heavy label module is used for when receiving the message of the cutover configuration file success after target BS reloads described cutover, and the loading result with corresponding target BS in described cutover configuration chained list is labeled as successfully sign;
The second heavy label module is used for when receiving the message of the cutover profile down after target BS reloads described cutover, and the loading result with corresponding target BS in described cutover configuration chained list is labeled as unsuccessfully sign.
19. as claim 15 or 16 or 17 or 18 described devices, it is characterized in that, described reset trigger module comprises:
Instruction issues submodule, is designated successfully the target BS of sign for loading result, issues the reset operation instruction according to the relevant IP information before described target BS cutover, and makes that in cutover configuration file after described cutover, the relevant IP information after cutover comes into force;
The information recording/submodule is completed in cutover, is used for the described target BS of foundation and carries out the information that this target BS cutover of Message Record of the reboot operation success that resets is completed.
20. device as claimed in claim 13 is characterized in that, described cutover configuration chained list also comprises relevant IP information after described a plurality of target BS cutover and the file name information of the cutover configuration file before cutover; Described device also comprises:
The rollback operation module is used for being designated for loading result the target BS that successfully identifies and carries out the base station rollback operation, and described base station rollback operation comprises:
The file name information of the cutover configuration file before the corresponding cutover of relevant IP information search the target BS cutover that needs the execution rollback operation in described cutover configuration chained list after;
According to the file name information of the cutover configuration file before described cutover, the cutover configuration file extract corresponding cutover under corresponding control desk store path before;
Connect the described target BS that needs to carry out rollback operation;
Cutover configuration file before described cutover is sent to described target BS, after execution resets reboot operation, the front cutover configuration file of described cutover is come into force by described target BS;
When the cutover configuration file before described target BS loads described cutover is successful, issue the reset operation instruction according to the relevant IP information after described target BS cutover;
The target BS that receives described reset operation instruction is carried out the reboot operation that resets, and makes then that in the cutover configuration file before described cutover, the relevant IP information before cutover comes into force.
CN201310054818.7A 2013-02-20 2013-02-20 Be correlated with the method for IP cutover and device in a kind of base station Active CN103167545B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310054818.7A CN103167545B (en) 2013-02-20 2013-02-20 Be correlated with the method for IP cutover and device in a kind of base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310054818.7A CN103167545B (en) 2013-02-20 2013-02-20 Be correlated with the method for IP cutover and device in a kind of base station

Publications (2)

Publication Number Publication Date
CN103167545A true CN103167545A (en) 2013-06-19
CN103167545B CN103167545B (en) 2015-08-19

Family

ID=48590200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310054818.7A Active CN103167545B (en) 2013-02-20 2013-02-20 Be correlated with the method for IP cutover and device in a kind of base station

Country Status (1)

Country Link
CN (1) CN103167545B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104753659A (en) * 2013-12-25 2015-07-01 中国移动通信集团内蒙古有限公司 Method, device and system for multiple network element data synchronized load
CN105792266A (en) * 2014-12-25 2016-07-20 北京神州泰岳软件股份有限公司 Base station automatic cutting-connecting method and device
CN112350843A (en) * 2019-08-09 2021-02-09 烽火通信科技股份有限公司 Scene type cutting and connecting method and system based on virtual component

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101179762A (en) * 2007-11-29 2008-05-14 上海华为技术有限公司 Method and device for inter-base station controller to implement relocation of base station
CN101426220A (en) * 2008-12-18 2009-05-06 中兴通讯股份有限公司 Method, apparatus and system for base station cutover
CN101594706A (en) * 2008-05-26 2009-12-02 中兴通讯股份有限公司 A kind of method of base station cutover and device
CN101867941A (en) * 2010-06-10 2010-10-20 华为技术有限公司 Data processing method and network management equipment
CN102075994A (en) * 2011-02-14 2011-05-25 华为技术有限公司 Method and device for moving base station
CN102238593A (en) * 2010-04-23 2011-11-09 中兴通讯股份有限公司 Data cut-over method and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101179762A (en) * 2007-11-29 2008-05-14 上海华为技术有限公司 Method and device for inter-base station controller to implement relocation of base station
CN101594706A (en) * 2008-05-26 2009-12-02 中兴通讯股份有限公司 A kind of method of base station cutover and device
CN101426220A (en) * 2008-12-18 2009-05-06 中兴通讯股份有限公司 Method, apparatus and system for base station cutover
CN102238593A (en) * 2010-04-23 2011-11-09 中兴通讯股份有限公司 Data cut-over method and device
CN101867941A (en) * 2010-06-10 2010-10-20 华为技术有限公司 Data processing method and network management equipment
CN102075994A (en) * 2011-02-14 2011-05-25 华为技术有限公司 Method and device for moving base station

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
HUAWEI: "IRPAN割接介绍", 《HTTP://WENKU.BAIDU.COM/VIEW/45DBF00BF78A6529647D5325.HTML》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104753659A (en) * 2013-12-25 2015-07-01 中国移动通信集团内蒙古有限公司 Method, device and system for multiple network element data synchronized load
CN104753659B (en) * 2013-12-25 2019-06-07 中国移动通信集团内蒙古有限公司 A kind of method, apparatus and system of more network element data synchronization loads
CN105792266A (en) * 2014-12-25 2016-07-20 北京神州泰岳软件股份有限公司 Base station automatic cutting-connecting method and device
CN112350843A (en) * 2019-08-09 2021-02-09 烽火通信科技股份有限公司 Scene type cutting and connecting method and system based on virtual component

Also Published As

Publication number Publication date
CN103167545B (en) 2015-08-19

Similar Documents

Publication Publication Date Title
CN102591909B (en) Systems and methods for providing increased scalability in deduplication storage systems
CN103946844A (en) Synchronizing updates across cluster filesystems
CN103248711A (en) File uploading method and server
CN103634346A (en) Data distribution method and system for network data center
CN104488248A (en) File synchronization method, server and terminal
CN110096306A (en) Application version switching method and device, electronic equipment, storage medium
CN102752294A (en) Method and system for synchronizing data of multiple terminals on basis of equipment capacity
CN104881454A (en) Updating method and system of parameter
CN103167545A (en) Method and device for cutting-over of internet protocol (IP) relevant to base stations
CN104954482A (en) Configuration management system and method
CN102291453A (en) Data synchronization method and device
CN114443294B (en) Big data service component deployment method, system, terminal and storage medium
CN103491137A (en) Data synchronizing system and data synchronizing method
CN105511273A (en) Client operation management method and client
CN105007310A (en) Information synchronization method, device and system
CN102148714A (en) Method and device for upgrading software
CN105227337A (en) A kind of multimode network management configuration model upgrade method and device
CN105183797A (en) Substation file management and control method based on IEC61850 file service
CN112131177A (en) Data migration method and device, storage medium and electronic equipment
CN115129574A (en) Code testing method and device
CN105068828A (en) Navigation data upgrading method and apparatus
CN107291579A (en) A kind of metadata cluster File Snapshot method based on static subtree subregion
CN111782618A (en) Data synchronization system
CN109614442B (en) Data table maintenance method and device for data synchronization, storage medium and electronic equipment
CN103338227A (en) Synchronization method and system of inventory information of electric power asset equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant