CN103159002A - Four-chain balance device for mining chain bucket lifting machine - Google Patents

Four-chain balance device for mining chain bucket lifting machine Download PDF

Info

Publication number
CN103159002A
CN103159002A CN 201110410424 CN201110410424A CN103159002A CN 103159002 A CN103159002 A CN 103159002A CN 201110410424 CN201110410424 CN 201110410424 CN 201110410424 A CN201110410424 A CN 201110410424A CN 103159002 A CN103159002 A CN 103159002A
Authority
CN
China
Prior art keywords
chain
hopper
round
clamping piece
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110410424
Other languages
Chinese (zh)
Inventor
王中来
孙引忠
钱伟平
王巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Zhongkuang Keguang Machine & Electricity Technique Co Ltd
Original Assignee
Xuzhou Zhongkuang Keguang Machine & Electricity Technique Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Zhongkuang Keguang Machine & Electricity Technique Co Ltd filed Critical Xuzhou Zhongkuang Keguang Machine & Electricity Technique Co Ltd
Priority to CN 201110410424 priority Critical patent/CN103159002A/en
Publication of CN103159002A publication Critical patent/CN103159002A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

A four-chain balance device for a mining chain bucket lifting machine comprises four annular chains, a hopper, two clamping plates, a connection plate and a connection fork. The two clamping plates are respectively fixed on two annular chains on one side of the hopper, the two clamping plates are respectively connected with the connection plate through two shafts, the connection plate is connected with the connection fork through a shaft, and the other end of the connection fork is fixed on the hopper. All components of the two annular chains on two sides of the hopper are identical in structures, two chains are arranged into one group to drive the hopper to move synchronously to share the weight of the hopper, and the four annular chains can be in stress balance states. The four-chain balance device for the mining chain bucket lifting device has the advantages of guaranteeing stress balance of the four annular chains when the mining chain bucket lifting machine works and reducing accidents caused by broken annular chains.

Description

A kind of four chain balancing devices of mining chain bucket elevator
Technical field
The present invention relates to a kind of four chain balancing devices, especially a kind of four chain balancing devices of mining chain bucket elevator.
Background technology
At present, mine hoist of the prior art need to arrange large-scale derrick or headframe at well head usually; by motor, steel rope, skip bucket etc. are completed straight up and down Lifting Convey work; need to shut down conversion when replacing due to straight up and down lifting; so work efficiency is low, shaft section is long-pending large in addition, so great in constructing amount; the space that takies is also large; its mechanism's more complicated, Operation and maintenance are cumbersome, and cost is high.Mounting circular ring chain-drive chain bucket elevator, can address the above problem, but will first solve the problem that this mine chain-bucket hoist can not guarantee even number bar round-link chain stress balance, round-link chain is subjected to force unbalance for a long time, the accidents such as chain breakage just easily occur, and affect mine safety production.
Summary of the invention
The deficiency that exists in order to overcome existing mine chain-bucket hoist, the invention provides a kind of four chain balancing devices of mine chain-bucket hoist, this device can guarantee mine chain-bucket hoist four round-link chain stress balance weighing apparatuses when work, reduces the incidence of the accidents such as chain breakage.
The technical solution adopted for the present invention to solve the technical problems is: four chain balancing devices of mining chain bucket elevator comprise four round-link chains, hopper, two clamping pieces, connecting panel and shaft cleviss.Be fixed wtih respectively two clamping pieces on two round-link chains of hopper one side, two clamping pieces are connected with connecting panel by two axles respectively, and connecting panel is connected with shaft clevis by axle, and the other end of shaft clevis is fixed on hopper.The structure of two each parts of round-link chain of hopper both sides is identical, and two one group synchronously drives the hopper motion, shares hopper weight, makes four round-link chains be in the stress balance state.
The invention has the beneficial effects as follows, guarantee mine chain-bucket hoist four round-link chain stress equalizations when work, reduce the accident that the round-link chain fracture causes.
Description of drawings
Fig. 1 is the structural representation of embodiments of the invention.
Fig. 2 is the structural representation of bindiny mechanism of the present invention.
Fig. 3 is the structural representation of clamping piece of the present invention.
Fig. 4 is the structural representation of clamping piece of the present invention.
Fig. 5 is the structural representation of connecting panel of the present invention.
Fig. 6 is the structural representation of shaft clevis of the present invention.
The specific embodiment
Can be found out by Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5 and Fig. 6, the present invention includes four round- link chains 1,2,3,4, hopper 5, clamping piece 6, clamping piece 7, connecting panel 8 and shaft clevis 11.Two round- link chains 1,2 of hopper 5 one sides, be fixed with clamping piece 6 on round-link chain 1, be fixed with clamping piece 7 on round-link chain 2, clamping piece 6 is connected with clamping piece respectively to be connected with axle by axle 9 and is connected with connecting panel 8, connecting panel 8 is connected connection by axle 12 with shaft clevis, the other end of shaft clevis 11 is fixed on hopper 5.Clamping piece 6,7 structures are identical, and clamping piece 6,7 all forms by two of symmetry, and the groove 13 of clamping rings chain 1 and the hole 14 of installation shaft 9 are arranged on clamping piece 6 each piece; The groove 20 of clamping rings chain 2 and the hole 19 of installation shaft 10 are arranged on clamping piece 7 each piece.Connecting panel 8 centres have hole 15, two ends have hole 16 and hole 17, and the hole 14 on hole 17 and clamping piece 6 coordinates installation shaft 9, and the hole 19 on hole 16 and clamping piece 7 coordinates installation shaft 10, and the hole 15 on connecting panel 8 and the hole on shaft clevis 11 18 coordinate installation shaft 12
The round-link chain 1 of hopper 5 one sides, 2 relies on connecting panel 8 to link together, when round-link chain 1 is stressed, connecting panel 8 power that round-link chain 1 is suffered is delivered on round-link chain 2, shaft clevis 11 can rotate by the axle 12 between connecting panel 8 and shaft clevis 11, when between round-link chain 1 and round-link chain 2 during unbalance stress, rely on the rotation of shaft clevis 11 to regulate stressed between round- link chain 1,2, come stressed between balance round- link chain 1,2 with this.Two round-link chains 3 of hopper 5 opposite sides, the structure of 4 each parts and round- link chain 1,2 sides are identical, round- link chain 1,2 and round- link chain 3,4, two one group synchronously drive hopper 5 motions, share hopper 5 weight, make round- link chain 1,2,3,4 be in the stress balance state.

Claims (3)

1. four chain balancing devices of a mining chain bucket elevator, comprise four round-link chains (1) (2) (3) (4), hopper (5), clamping piece (6), clamping piece (7), connecting panel (8) and shaft clevis (11), it is characterized in that: two round-link chains (1) of hopper (5) one sides, (2), be fixed with clamping piece (6) on round-link chain (1), be fixed with clamping piece (7) on round-link chain (2), clamping piece (6) is connected 7 with clamping piece) be connected 10 by axle (9) with axle respectively) be connected with connecting panel (8), connecting panel (8) is connected 11 by axle (12) with shaft clevis) connect, the other end of shaft clevis (11) is fixed on hopper (5), two round-link chains (3) of hopper (5) opposite side, the structure of (4) each parts and round-link chain (1), (2) side are identical, round-link chain (1) (2), round-link chain (3) (4), article two, one group synchronously drives hopper (5) motion, share hopper (5) weight, make round-link chain (1), (2), (3), (4) be in the stress balance state.
2. four chain balancing devices of a kind of mining chain bucket elevator according to claim 1, it is characterized in that: described clamping piece (6), (7) structure are identical, clamping piece (6), (7) all form by two of symmetry, and the groove (13) of clamping rings chain (1) and the hole (14) of installation shaft (9) are arranged on each piece of clamping piece (6); The groove (20) of clamping rings chain (2) and the hole (19) of installation shaft (10) are arranged on each piece of clamping piece (7).
3. four chain balancing devices of a kind of mining chain bucket elevator according to claim 1, it is characterized in that: have hole (15) in the middle of described connecting panel (8), two ends have hole (16) and hole (17), hole (14) on hole (17) and clamping piece (6) coordinates installation shaft (9), hole (19) on hole (16) and clamping piece (7) coordinates installation shaft (10), and the hole (15) on connecting panel (8) and the hole (18) on shaft clevis (11) coordinate installation shaft (12).
CN 201110410424 2011-12-12 2011-12-12 Four-chain balance device for mining chain bucket lifting machine Pending CN103159002A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110410424 CN103159002A (en) 2011-12-12 2011-12-12 Four-chain balance device for mining chain bucket lifting machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110410424 CN103159002A (en) 2011-12-12 2011-12-12 Four-chain balance device for mining chain bucket lifting machine

Publications (1)

Publication Number Publication Date
CN103159002A true CN103159002A (en) 2013-06-19

Family

ID=48582606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110410424 Pending CN103159002A (en) 2011-12-12 2011-12-12 Four-chain balance device for mining chain bucket lifting machine

Country Status (1)

Country Link
CN (1) CN103159002A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104828467A (en) * 2015-04-17 2015-08-12 张家港建辰机械科技有限公司 Chain circulation bearing device
CN104828468A (en) * 2015-04-27 2015-08-12 中煤邯郸设计工程有限责任公司 High-drop break preventing machine for lump coal
CN114713340A (en) * 2022-03-14 2022-07-08 宜春万申制药机械有限公司 Multifunctional intelligent granule finishing equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104828467A (en) * 2015-04-17 2015-08-12 张家港建辰机械科技有限公司 Chain circulation bearing device
CN104828467B (en) * 2015-04-17 2017-01-11 张家港建辰机械科技有限公司 Chain circulation bearing device
CN104828468A (en) * 2015-04-27 2015-08-12 中煤邯郸设计工程有限责任公司 High-drop break preventing machine for lump coal
CN104828468B (en) * 2015-04-27 2016-10-26 中煤邯郸设计工程有限责任公司 The breakage-proof machine of lump coal height drop
CN114713340A (en) * 2022-03-14 2022-07-08 宜春万申制药机械有限公司 Multifunctional intelligent granule finishing equipment
CN114713340B (en) * 2022-03-14 2023-04-18 宜春万申制药机械有限公司 Multi-functional intelligent whole grain equipment

Similar Documents

Publication Publication Date Title
CN204980742U (en) Single balanced elevator of many cars of chain that revolves
CN103159002A (en) Four-chain balance device for mining chain bucket lifting machine
CN201305329Y (en) Gearless signal chain bucket conveyer
CN201334306Y (en) Hoisting machine for upright post member
CN202464650U (en) Four-chain balancing device of mine chain bucket elevator
CN203855312U (en) Novel dual-beam electric hoist
CN102992203A (en) Simple hoisting device for steel structure bridge installation
CN200992463Y (en) Lifting-moving machine of preventing lifted goods swinging
CN202594639U (en) Three-fulcrum lifting mechanism for bridge-type crane
CN202744186U (en) Rotating lifting hook
CN202369237U (en) Four-chain balancing device of mine chain bucket elevator
CN202400744U (en) Double-beam double-suspension-bridge type crane
CN202296765U (en) Balancing device for four chains of mine chain bucket elevator
CN103159121A (en) Four-chain balancing device of mine chain bucket elevator
CN202175507U (en) Electric single-beam crane
CN201746227U (en) Grab bucket lifting and balancing device of continuous wall hydraulic grab bucket
CN202296698U (en) Rotatable flat-tail rope suspending device
CN208361139U (en) A kind of terminal-collecting machine high-level shelf material frame anti-falling structure
CN201626759U (en) Portable lifting appliance
CN201647789U (en) Automatic rope adjustment and replacement device for mine hoisting container
CN204474224U (en) There is the steel rope double end anchor fitting of micro-equilibrium function
CN201864456U (en) Bracket for loading test of crane
CN204508570U (en) Medium-speed pulverizer mill hoisting mechanism
CN204604595U (en) A kind of bucket type mixing plant lifting device
CN202897761U (en) Novel balance tail rope for vertical shaft multi-rope frictional geared winch hoisting system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C05 Deemed withdrawal (patent law before 1993)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130619