CN103151624A - Connecting clamp of distribution transformer bushing lead screw rod and line wire - Google Patents
Connecting clamp of distribution transformer bushing lead screw rod and line wire Download PDFInfo
- Publication number
- CN103151624A CN103151624A CN2013100728175A CN201310072817A CN103151624A CN 103151624 A CN103151624 A CN 103151624A CN 2013100728175 A CN2013100728175 A CN 2013100728175A CN 201310072817 A CN201310072817 A CN 201310072817A CN 103151624 A CN103151624 A CN 103151624A
- Authority
- CN
- China
- Prior art keywords
- clamping plate
- screw rod
- line conductor
- long
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Housings And Mounting Of Transformers (AREA)
Abstract
Description
技术领域 technical field
本发明涉及一种配电变压器高、低压套管引线螺杆与线路导线连接技术,尤其涉及一种应用于10~35kV配电变压器高、低压套管引线螺杆与线路导线连接新型线夹。 The invention relates to a technology for connecting high-voltage and low-voltage bushing lead screws and line wires of distribution transformers, in particular to a new type of clamp used for connecting high-voltage and low-voltage bushing lead screws and line wires of 10-35kV distribution transformers.
背景技术 Background technique
目前,为了满足工农业生产和广大人民生活用电需求,电力工业在不断建设发展,由于工农业生产和广大人民生活用电需求高,运行的配电变压器经常满载或超载。由于现有的配电变压器高、低压套管引线螺杆与线路导线之间采用接线板连接,连接点是引线螺杆窜入接线板上的孔用螺栓紧固,接线板上的孔小了引线螺杆窜不进去,接线板上的孔大了与引线螺杆接触不紧密,接线板与引线螺杆之间接触面积小,经常流过大电流,变压器高、低压套管引线螺杆与接线板之间发热烧坏,引起变压器事故被迫停电检修,这样设备损坏率高,停电时间长,供电可靠性低。如能全面推广应用新型的10~35kV配电变压器高、低压套管引线螺杆与线路导线连接线夹,就可以避免类式的事故发生,可以确保工农业生产和人民生活用电,大大提高配电网的供电可靠性,增加供电企业及社会效益。 At present, in order to meet the needs of industrial and agricultural production and people's daily life, the electric power industry is constantly building and developing. Due to the high demand for industrial and agricultural production and people's daily life, distribution transformers in operation are often fully loaded or overloaded. Since the existing distribution transformer high and low voltage bushing lead screw rods are connected to the line wires by a terminal board, the connection point is that the lead wire rods enter the holes on the terminal board and are fastened with bolts, and the holes on the terminal board are smaller than the lead screw rods. Can't get in, the hole on the terminal board is too big and the contact with the lead screw is not tight, the contact area between the terminal board and the lead screw is small, and a large current often flows, the heat between the transformer high and low voltage bushing lead screw and the terminal board is hot. If the transformer is damaged, it will cause a transformer accident and be forced to cut off the power for maintenance, so that the equipment damage rate is high, the power outage time is long, and the power supply reliability is low. If the new type of 10~35kV distribution transformer high and low voltage bushing lead screw and line wire connection clamp can be fully promoted and applied, it can avoid the occurrence of accidents, ensure the power consumption of industrial and agricultural production and people's daily life, and greatly improve the power distribution system. The power supply reliability of the power grid increases the power supply enterprises and social benefits.
发明内容 Contents of the invention
本发明的目的是提供一种配电变压器套管引线螺杆与线路导线连接线夹,设计科学合理,使用起来简单方便可靠。 The purpose of the present invention is to provide a distribution transformer bushing lead screw and line wire connecting clamp, which is scientific and reasonable in design and simple, convenient and reliable in use.
本发明采用下述技术方案:一种配电变压器套管引线螺杆与线路导线连接线夹,包括螺杆夹板、长夹板、线路导线压板,所述的螺杆夹板与长夹板上端之间放置引线螺杆,螺杆夹板的两端与长夹板上端通过螺栓固定连接,所述的长夹板下端与线路导线压板之间放置线路导线,长夹板下端与线路导线压板通过螺栓固定连接。 The present invention adopts the following technical scheme: a distribution transformer bushing lead screw and line wire connection clamp, including a screw splint, a long splint, and a line wire pressing plate, and a lead screw is placed between the screw splint and the upper end of the long splint. The two ends of the screw splint are fixedly connected with the upper end of the long splint by bolts, the line wire is placed between the lower end of the long splint and the line wire pressing plate, and the lower end of the long splint is fixedly connected with the line wire pressing plate by bolts.
所述长夹板是一个长方型铜铝过渡板,上端是铜板,下端是铝板,铜板与铝板焊接一起;所述铜板上有上下两行对应的安装孔,每行两个安装孔,两行安装孔之间设置有用于放置引线螺杆的横向的圆弧凹槽,所述铝板上有左右两列对应的安装孔,每列三个安装孔,两列安装孔之间设置有用于放置线路导线的纵向的圆弧凹槽。 The long splint is a rectangular copper-aluminum transition plate, the upper end is a copper plate, the lower end is an aluminum plate, and the copper plate and the aluminum plate are welded together; the copper plate has two rows of corresponding installation holes, each row has two installation holes, and two rows There are horizontal circular arc grooves for placing lead screws between the mounting holes, and there are two rows of corresponding mounting holes on the left and right sides of the aluminum plate, each row has three mounting holes, and there is a gap between the two rows of mounting holes for placing line wires. longitudinal arc grooves.
所述的螺杆夹板是铜板夹板,所述铜板夹板有四个安装孔,此四个安装孔与长夹板的铜板上的四个安装孔相对应,铜板夹板的两行安装孔之间为用于放置引线螺杆的圆弧状;铜板夹板的下端与长夹板之间通过螺栓紧密无间隙连接,铜板夹板的上端与长夹板之间通过螺栓有间隙连接。 The screw splint is a copper plate splint, and the copper plate splint has four mounting holes, which correspond to the four mounting holes on the copper plate of the long splint, and the two rows of mounting holes of the copper plate splint are used for The arc shape of the lead screw is placed; the lower end of the copper plate splint and the long splint are tightly connected by bolts without gaps, and the upper end of the copper plate splint and the long splint are connected by bolts with a gap.
所述的线路导线压板是金属板,所述线路导线压板有三个,每个线路导线压板的两端有安装孔,此安装孔与长夹板的铝板上的安装孔对应,所述线路导线压板的两个安装孔之间为用于放置线路导线的圆弧状,所述线路导线压板和所述长夹板的铝板通过螺栓无间隙连接。 The line wire pressing plate is a metal plate, and there are three line wire pressing plates. There are mounting holes at both ends of each line wire pressing plate. The mounting holes correspond to the mounting holes on the aluminum plate of the long plywood. There is an arc shape between the two installation holes for placing the line wire, and the line wire pressing plate and the aluminum plate of the long splint are connected without gap by bolts.
本发明配电变压器套管引线螺杆与线路导线连接新型线夹,是根据设备现场实际需要开发一种应用于配电变压器与线路导线连接技术,具体的说,该线夹设计合理,理想的实现了配电变压器高、低压套管引线螺杆与线路导线可靠连接,具体优点如下: The present invention is a new type of clip for connecting the distribution transformer bushing lead screw and the line wire, which is to develop a technology for connecting the distribution transformer and the line wire according to the actual needs of the equipment site. Specifically, the design of the wire clip is reasonable and ideally realized. It ensures the reliable connection between the high and low voltage bushing lead screws of the distribution transformer and the line wires. The specific advantages are as follows:
1.该配电变压器高、低压套管引线螺杆与线路导线连接线夹,采用长夹板与引线螺杆夹板立起夹住引线螺杆,所以连接的极为可靠,夹板与引线螺杆增大了接触面,增强了接触压力,提高了接触可靠性; 1. The high and low voltage bushing lead screw of the distribution transformer is connected to the wire clamp of the line wire. The long splint and the lead screw splint are used to clamp the lead screw, so the connection is extremely reliable. The splint and the lead screw increase the contact surface. Enhanced contact pressure and improved contact reliability;
2.该新型线夹的安装应用,可减少变压器的高、低压套管引线螺杆与线夹连接之间发热烧坏,减少对用户停电,提高了供电可靠性,增加企业及社会效益; 2. The installation and application of this new type of clamp can reduce the heat and burnout between the high and low voltage bushing lead screw and the clamp connection of the transformer, reduce power outages for users, improve power supply reliability, and increase corporate and social benefits;
3. 该配电变压器高、低压套管引线螺杆与线路导线连接的新型线夹结构简单,设计科学合理,使用起来简单方便可靠; 3. The new type of clamp for connecting the high and low voltage bushing lead screws and line wires of the distribution transformer has a simple structure, scientific and reasonable design, and is simple, convenient and reliable to use;
附图说明 Description of drawings
图1为本发明的结构示意图; Fig. 1 is a structural representation of the present invention;
图2为本发明中长线夹的右视结构示意图; Fig. 2 is a right view structural representation of the middle and long line clamp of the present invention;
图3为本发明中螺杆线夹的右视结构示意图; Fig. 3 is the right view structural representation of screw clamp in the present invention;
图4为本发明中线路导线压板的右视结构示意图; Fig. 4 is a right view structural representation of the circuit conductor pressing plate in the present invention;
图5为本发明中线路导线压板的俯视结构示意图。 Fig. 5 is a schematic top view structural diagram of the circuit conductor pressing plate in the present invention.
具体实施方式 Detailed ways
如图1所示,本发明一种配电变压器套管引线螺杆与线路导线连接线夹,包括螺杆夹板2、长夹板1、线路导线压板31、32、33,所述的螺杆夹板2与长夹板1上端之间放置引线螺杆4,螺杆夹板2的两端与长夹板1上端通过螺栓61、62固定连接,所述的长夹板1下端与线路导线压板31、32、33之间放置线路导线5,长夹板1下端与线路导线压板31、32、33通过螺栓63、64、65固定连接。
As shown in Figure 1, a distribution transformer bushing lead screw of the present invention is connected to a line wire clamp, including a
如图2所示,所述长夹板1是一个长方型铜铝过渡板,上端是铜板,下端是铝板,铜板与铝板焊接一起,7为焊接线;所述铜板上有上下两行对应的安装孔,每行两个安装孔,两行安装孔之间设置有用于放置引线螺杆4的横向的圆弧凹槽12,所述铝板上有左右两列对应的安装孔,每列三个安装孔,两列安装孔之间设置有用于放置线路导线的纵向的圆弧凹槽13。长夹板上的凹槽12是用来保护引线螺杆4,长夹板上的凹槽13是用来保护线路导线5,防止用螺栓紧固时力大使引线螺杆4、线路导线5变型损坏,同时增大螺杆线夹2与引线螺杆4的接触面积,增大线路导线压板与线路导线5的接触面积,能承载大电流。
As shown in Figure 2, the long splint 1 is a rectangular copper-aluminum transition plate, the upper end is a copper plate, the lower end is an aluminum plate, the copper plate and the aluminum plate are welded together, and 7 is a welding line; Mounting holes, two mounting holes in each row, a
如图3所示,所述的螺杆夹板2是铜板夹板,所述铜板夹板有四个安装孔,此四个安装孔与长夹板的铜板上的四个安装孔相对应,铜板夹板的两行安装孔之间为用于放置引线螺杆的圆弧状;铜板夹板的下端与长夹板之间通过螺栓紧密无间隙连接,铜板夹板的上端与长夹板1之间通过两个螺栓有间隙连接,可以调整螺栓61来加强长夹板和螺杆夹板对引线螺杆4的紧密可靠连接。
As shown in Figure 3, described
如图4、图5所示,所述的线路导线压板31、32、33是金属板,每个线路导线压板的两端有安装孔,此安装孔与长夹板的铝板上的安装孔对应,所述线路导线压板31的安装孔之间为用于放置线路导线的圆弧状8,所述线路导线压板31、32、33和所述长夹板1的铝板分别通过六个螺栓无间隙连接,三个线路导线压板可使线路导线的固定更加紧密稳固。
As shown in Fig. 4 and Fig. 5, the described circuit
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制;尽管参照较佳实施例对本发明进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者对部分技术特征进行等同替换;而不脱离本发明技术方案的精神,其均应涵盖在本发明请求保护的技术方案范围当中。 Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them; although the present invention has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that: the present invention can still be Modifications to the specific implementation of the invention or equivalent replacement of some technical features; without departing from the spirit of the technical solution of the present invention, should be included in the scope of the technical solution claimed in the present invention.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2013100728175A CN103151624A (en) | 2013-03-07 | 2013-03-07 | Connecting clamp of distribution transformer bushing lead screw rod and line wire |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2013100728175A CN103151624A (en) | 2013-03-07 | 2013-03-07 | Connecting clamp of distribution transformer bushing lead screw rod and line wire |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN103151624A true CN103151624A (en) | 2013-06-12 |
Family
ID=48549567
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2013100728175A Pending CN103151624A (en) | 2013-03-07 | 2013-03-07 | Connecting clamp of distribution transformer bushing lead screw rod and line wire |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103151624A (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103840281A (en) * | 2014-02-20 | 2014-06-04 | 江苏省电力公司常州供电公司 | Terminal clamps for preventive testing of main transformers in substations |
| CN105351308A (en) * | 2015-11-26 | 2016-02-24 | 中国航空动力机械研究所 | Pasting and fastening device for high-temperature pipeline strain gauge |
| CN106486283A (en) * | 2015-08-31 | 2017-03-08 | 长春龙源电力设备有限公司 | A kind of yoke of stationary transformer lead |
| CN110752454A (en) * | 2019-10-08 | 2020-02-04 | 陈懿 | Power line connecting device and operation method thereof |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2394359Y (en) * | 1999-11-05 | 2000-08-30 | 郑建巨 | Copper and aluminum wire clamps |
| CN201435295Y (en) * | 2009-05-07 | 2010-03-31 | 刘进生 | Transformer dual-hugging rod thread jointing clamp convenient for installation |
| CN101707295A (en) * | 2009-12-09 | 2010-05-12 | 安徽钛钴新金属有限公司 | Copper-aluminium explosion composite electrical T type copper-aluminium bimetal binding clip and explosion welding method |
| CN101841085A (en) * | 2010-02-02 | 2010-09-22 | 遂昌县明盛电业有限责任公司 | Improvement on copper-aluminum equipment wire clamp assembly and device and method thereof |
| CN201708254U (en) * | 2010-07-12 | 2011-01-12 | 河南省电力公司驻马店供电公司 | Equipment copper and aluminum transition butt welding type wire clamp cracking-prevention support plate |
| CN201812934U (en) * | 2010-05-14 | 2011-04-27 | 安徽钛钴新金属有限公司 | Copper-aluminum transition connecting clamp adopting pressing connection |
| CN203103534U (en) * | 2013-03-07 | 2013-07-31 | 河南省电力公司驻马店供电公司 | Connection wire clamp between casing pipe lead wire screw rod and circuit guide wire of power distribution transformer |
-
2013
- 2013-03-07 CN CN2013100728175A patent/CN103151624A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2394359Y (en) * | 1999-11-05 | 2000-08-30 | 郑建巨 | Copper and aluminum wire clamps |
| CN201435295Y (en) * | 2009-05-07 | 2010-03-31 | 刘进生 | Transformer dual-hugging rod thread jointing clamp convenient for installation |
| CN101707295A (en) * | 2009-12-09 | 2010-05-12 | 安徽钛钴新金属有限公司 | Copper-aluminium explosion composite electrical T type copper-aluminium bimetal binding clip and explosion welding method |
| CN101841085A (en) * | 2010-02-02 | 2010-09-22 | 遂昌县明盛电业有限责任公司 | Improvement on copper-aluminum equipment wire clamp assembly and device and method thereof |
| CN201812934U (en) * | 2010-05-14 | 2011-04-27 | 安徽钛钴新金属有限公司 | Copper-aluminum transition connecting clamp adopting pressing connection |
| CN201708254U (en) * | 2010-07-12 | 2011-01-12 | 河南省电力公司驻马店供电公司 | Equipment copper and aluminum transition butt welding type wire clamp cracking-prevention support plate |
| CN203103534U (en) * | 2013-03-07 | 2013-07-31 | 河南省电力公司驻马店供电公司 | Connection wire clamp between casing pipe lead wire screw rod and circuit guide wire of power distribution transformer |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103840281A (en) * | 2014-02-20 | 2014-06-04 | 江苏省电力公司常州供电公司 | Terminal clamps for preventive testing of main transformers in substations |
| CN103840281B (en) * | 2014-02-20 | 2016-01-20 | 江苏省电力公司常州供电公司 | Terminal clamps for preventive testing of main transformers in substations |
| CN106486283A (en) * | 2015-08-31 | 2017-03-08 | 长春龙源电力设备有限公司 | A kind of yoke of stationary transformer lead |
| CN105351308A (en) * | 2015-11-26 | 2016-02-24 | 中国航空动力机械研究所 | Pasting and fastening device for high-temperature pipeline strain gauge |
| CN110752454A (en) * | 2019-10-08 | 2020-02-04 | 陈懿 | Power line connecting device and operation method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102169859B (en) | Thyristor converter valve tower for high voltage direct current transmission | |
| CN202997413U (en) | Electrified treatment tool for wire clamp heating strip | |
| CN103151624A (en) | Connecting clamp of distribution transformer bushing lead screw rod and line wire | |
| CN203103534U (en) | Connection wire clamp between casing pipe lead wire screw rod and circuit guide wire of power distribution transformer | |
| CN204516914U (en) | Earthing device when distribution line and equipment interruption maintenance | |
| CN202034330U (en) | Bypass fuse | |
| CN103401435B (en) | For the non-cophase counter parallel connection water-cooling aluminum alloy current equalizing bridge arm configuration processed of current transformer | |
| CN202308856U (en) | Charged processing and heating short circuit shunt device for substation current carrier | |
| CN203205770U (en) | V-shaped pull-bar clamp for live replacement of great tensioned strain insulator | |
| CN207504205U (en) | A kind of rapid-assembling/disassembling formula high-voltage earthing clamp | |
| CN202034366U (en) | Thyristor converter valve tower for high-voltage direct-current electricity transmission | |
| CN203850490U (en) | Tension splicing sleeve binding post | |
| CN201708021U (en) | Power distribution transformer outlet connecting clamp | |
| CN202917657U (en) | Wire clamp used for high-voltage equipment | |
| CN208208542U (en) | A kind of transformer | |
| CN201853817U (en) | Wire clamp for power distribution equipment | |
| CN209001849U (en) | A kind of high current rectification circuit using diodes in parallel module | |
| CN107887871B (en) | A bus duct | |
| CN206697759U (en) | A kind of cutting system in parallel of incoming line cabinet | |
| CN202205560U (en) | Connection structure of low-tension side of power transformer | |
| CN203218082U (en) | Transformer conducting rod cable clamp | |
| CN202564063U (en) | High-voltage capacitor electrode extraction structure | |
| CN206721373U (en) | Prebaked Anode In Aluminium Cell electric supply installation | |
| CN203351359U (en) | Wiring clamp | |
| CN205039051U (en) | Electric furnace transformer and low voltage winding structure of working a telephone switchboard thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C12 | Rejection of a patent application after its publication | ||
| RJ01 | Rejection of invention patent application after publication |