A kind of panel connected system based on sandwich structure
Technical field
What the present invention relates to is a kind of Sandwich structure connected system that can realize firm connection.
Background technology
Along with the development of material science research and deeply, the fast development in every field of new material and new technology, as the important component part of building and naval technology research, the exploitation of material behavior and high performance material and scientific research will become the focal issue in very long one period from now on.In numerous new materials, Sandwich Plates is a kind of form of structure of more common practicality, and it is not only superior than single isotropic material aspect intensity, vibration damping, noise reduction and the mechanical characteristic such as uprising, can also play light-weighted effect.
Modern industry is not only pursued quality, is also more next higher to the requirement of programming.Especially some construction factory buildings, emergent room and Antiseismic house etc., setting up fast, stably is the most important thing.Must find a kind of suitable, durable connected system so functional very strong sandwich structure will be applied to these fields, guarantee the long-term safety sample of structure.
For light-weighted sandwich material, in the middle of application process with other member between the place of link often repeat dismounting, also easily destroy, utilize prestressing force assembly connection and peripheral protector to make the application of sandwich structure simpler based on this present invention.This panel connected system based on sandwich can make sandwich and horizontal floor and firm being connected of vertical wallboard.Have the system architecture form simple, loading and unloading are rapid, the advantages such as strong adaptability.
Summary of the invention
The object of the present invention is to provide a kind of panel connected system for connecting fast, stably sandwich structure.
The object of the present invention is achieved like this:
The present invention includes two panels, fixed bearing and fuses, panel is with the L-type dop, one side of dop is perpendicular to panel, another side has prominent tooth and links together with panel, fill fuse in the middle of two panels, the two ends of J type groove are embedded in respectively in the space of two L-type dops and panel, and fixed bearing is arranged on the seam crossing of connector, and the groove that matches with the L-type dop is arranged in fixed bearing.
Prominent tooth is in dop differing heights place.
There is the triangle flap in the fixed bearing outside.
Fixed bearing is fixed on connector by screw.
J type groove two ends height all should be higher than prominent tooth height, and the distance of the higher end of J type groove and dop bottom should meet tongue and groove criterion.
The mode that fuse is taken out notes by thermoplastic or vacuum is filled.
Beneficial effect of the present invention is:
System architecture form of the present invention is simple, and dop and groove link together by the pressure of sandwich to structure, adopt this type of attachment, is easy to loading and unloading; Can adapt to duroplasts, aluminium alloys, the plate structure of the materials such as steel, range of application is wider; The therebetween sandwich layer makes structure bearing load ability not reduce quality and has but realized lightweight; The triangle flap of bearing both sides can be protected connecting portion, improves simultaneously the bending resistance of structure.
Description of drawings
Fig. 1 is the panel connected system schematic diagram of sandwich;
Fig. 2 is the schematic diagram of dop and J type groove.
The specific embodiment
For example the present invention is done more detailed description below in conjunction with accompanying drawing:
In conjunction with Fig. 1 the present invention mainly by with two 1 of the panels of L-type dop, J type groove 2, cuboid fuse 3 one (can fill, thermoplastic and vacuum are taken out notes) and forming with 5 members such as fixed bearing 5 of screw 4.The panel connected system connects and can effectively sandwiched plate be fixed on the floor by dop.Then fixed bearing is fixed on vertical wallboard, also can be stably fixed at above it by this member sandwiched plate.
At first, the screw group that chassis side 4 row interval is 10 centimetres can be guaranteed base and the firm connection that is connected ground or wallboard, and can according to the needs adjustment screw of engineering how much.Secondly, at two slot inwalls of base, two grooves are arranged, its size is consistent with the prominent tooth of dop, will tightly bite after dop slips into, and makes it very firm.At last, the triangle flap of both sides all is 45° angle with ground and sandwiched plate, and flap thickness is that the dop member gets 2~4 times, and lateral support is provided effectively, be connect more firm.
Fig. 2 is respectively with the panel of snap fit and J type groove, fits together the dop that has just formed the panel connected system, as shown in the figure.What need here to describe in detail is that the snap fit length of upper and lower panel is different, and difference is that 1 panel is thick.
Concrete manufacturing process:
1, two steel (aluminium alloys or its plastics etc.) panel is hot-forming for the panel of L-type dop, the dop length of upper and lower panel is different, and difference is that 1 panel is thick, so that the press fit of sandwiched plate.Then adopt filling, thermoplastic and vacuum to take out the modes such as notes and insert foam or other fuses.
2, make J type groove, J type groove two ends height all should be higher than the snap fit height, and the distance of the higher end of J type groove and dop bottom should meet tongue and groove assembles criterion.
3, the compacting firm banking, dig two grooves at two slot inwalls of base, and its size is consistent with the prominent tooth of dop, will tightly bite after dop slips into.Make a call to the screw group at 4 row 10 centimetres, intervals in chassis outer side, can guarantee base and the firm connection that is connected ground or wallboard.At last, the triangle flap of both sides should have rigidity preferably according to top explanation setting, can effectively provide lateral support, makes connection more firm.
During 4, with the dop inserted base, the platform of base can push panel that lower snap fit makes homonymy to interior curve, and the groove of fastening base makes stabilized structure connect.After being assembled, each parts are connected to floor/ceiling with screw again or load bearing wall gets final product.