CN103144866A - Novel coal scuttle - Google Patents

Novel coal scuttle Download PDF

Info

Publication number
CN103144866A
CN103144866A CN2013100948298A CN201310094829A CN103144866A CN 103144866 A CN103144866 A CN 103144866A CN 2013100948298 A CN2013100948298 A CN 2013100948298A CN 201310094829 A CN201310094829 A CN 201310094829A CN 103144866 A CN103144866 A CN 103144866A
Authority
CN
China
Prior art keywords
coal
wall
point
contour line
brachistochrone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100948298A
Other languages
Chinese (zh)
Inventor
杨兴森
郝卫东
胡志宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN2013100948298A priority Critical patent/CN103144866A/en
Publication of CN103144866A publication Critical patent/CN103144866A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a novel coal scuttle, and an inner wall of the coal scuttle is an integral curved surface obtained by rotating a contour line for a circle around a center line. The novel coal scuttle is characterized in that an upper end point of the contour line is a point on the inner edge of an outlet end of a raw coal bunker, a lower end point of the contour line is a point on the inner edge of an inlet end of a coal feeder, and the contour line is brachistochrone which passes between the upper end point and the lower end point. The brachistochrone is adopted as the contour line, so that the movement of coal granules on a wall surface is fastest, the wall friction and extrusion of raw coal and the inner wall of the coal scuttle are reduced, the adhering of the raw coal to the inner wall is reduced, and normal operation of an equipment system is guaranteed.

Description

Novel coal bunker
Technical field
The present invention relates to material storing equipment, relate in particular to a kind of novel coal bunker.
Background technology
In production link in the industries such as electric power, building materials, the energy, chemical industry, the storage that usually relates to material such as grinds at the step.The pulverized coal preparation system in power plant for example, the raw coal that is stored in run coal bin enters feeder through coal bunker, then flows to coal mill by feeder and grind.It is conical that existing coal bunker mostly is, and connects the feeder of top coal bunker and bottom.Raw coal is motion from top to bottom in coal bunker, and due to the variation of coal bunker sectional area, kinematic velocity is progressively accelerated, smoothly by whole coal bunker.But near the raw coal wall is due to effects such as wall friction, extruding, the motion of wall coal grain is slow, even attach or anchor on wall, and the raw coal that affects core flows, even cause the raw coal of whole coal bunker to stop up, form that " chute blockage " with " disconnected coal ", has influence on the normal operation of equipment, even causes safety misadventure when serious.At this moment, must beat by external force, raw coal and wall are broken away from, recover the normal operation of the athleticism restorer system of coal grain.
Summary of the invention
The present invention provides a kind of novel coal bunker in order to solve the prior art above shortcomings; Adopt brachistochrone as the shape line, can make the motion of the coal grain on wall the most fast, reduced wall friction, the extruding of raw coal and coal bunker inwall, reduced raw coal at the attaching of inwall, the normal operation of assurance device systems.
The objective of the invention is to adopt following technical proposals to realize:
A kind of novel coal bunker, the complete curved surface that the inwall of described coal bunker is rotated a circle and obtains around line of centers by an outline line, the upper extreme point of described outline line is the point on the exit end inward flange of run coal bin, the lower extreme point of outline line is the point on feeder arrival end inward flange, and described outline line is by the brachistochrone between upper extreme point and lower extreme point.
Beneficial effect of the present invention:
Adopt brachistochrone as coal bunker shape line, wall friction, the extruding of raw coal and coal bunker inwall have been reduced, reduced raw coal attaching at inwall, can make the coal grain motion on wall the most fast, avoid raw coal to stop up and form chute blockage, disconnected coal, overcome the wall coal grain problem slowly of moving, guarantee the normal operation of device systems.
Description of drawings
Fig. 1 is structural representation of the present invention;
Wherein, 1. line of centers, 2. outline line.
The specific embodiment
The present invention will be further described below in conjunction with drawings and Examples.
A kind of novel coal bunker, the complete curved surface that the inwall of described coal bunker is rotated a circle and obtains around line of centers 1 by an outline line 2, it is characterized in that, the upper extreme point A of described outline line 2 is the point on the exit end inward flange of run coal bin, the lower extreme point B of outline line is the point on feeder arrival end inward flange, and described outline line is by the brachistochrone between upper extreme point A and lower extreme point B.
During use, the exit end of run coal bin is connected with the upper surface of coal bunker, and the lower surface of coal bunker is connected with the arrival end of feeder, and raw coal flows to coal mill and grinds by coal bunker, coal bunker, feeder, enters next procedure.Because the coal bunker inwall is to be rotated a circle around line of centers by brachistochrone to form, brachistochrone is by the fastest route in eminence whereabouts on the coal bunker inner wall surface, so adopt brachistochrone can make the motion of the coal grain on wall the most fast as the shape line, chute blockage and the disconnected coal of farthest avoiding raw coal stop up to form, thus overcome the wall coal grain problem slowly of moving.Reduce wall friction, the extruding of raw coal and coal bunker inwall, reduced raw coal the attaching of inwall, guaranteed the normal operation of device systems.
Although above-mentioned by reference to the accompanying drawings to the invention the specific embodiment be described; but be not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various modifications that creative work can make or distortion still in protection scope of the present invention.

Claims (1)

1. novel coal bunker, the complete curved surface that the inwall of described coal bunker is rotated a circle and obtains around line of centers by an outline line, it is characterized in that, the upper extreme point of described outline line is the point on the exit end inward flange of run coal bin, the lower extreme point of outline line is the point on feeder arrival end inward flange, and described outline line is by the brachistochrone between upper extreme point and lower extreme point.
CN2013100948298A 2013-03-22 2013-03-22 Novel coal scuttle Pending CN103144866A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100948298A CN103144866A (en) 2013-03-22 2013-03-22 Novel coal scuttle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100948298A CN103144866A (en) 2013-03-22 2013-03-22 Novel coal scuttle

Publications (1)

Publication Number Publication Date
CN103144866A true CN103144866A (en) 2013-06-12

Family

ID=48543260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100948298A Pending CN103144866A (en) 2013-03-22 2013-03-22 Novel coal scuttle

Country Status (1)

Country Link
CN (1) CN103144866A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107380885A (en) * 2017-09-13 2017-11-24 魏玉昊 Prompt drop helical structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102628591A (en) * 2012-04-24 2012-08-08 上海艾能电力工程有限公司 Improved structure of raw coal cabin of circulating fluidized bed boiler
CN202429562U (en) * 2011-12-13 2012-09-12 中国轻工业长沙工程有限公司 Non-blockage deformed coal bunker
CN202499426U (en) * 2012-03-16 2012-10-24 煤炭工业郑州设计研究院有限公司 Anti-blocking type coal bunker funnel
CN203111839U (en) * 2013-03-22 2013-08-07 山东电力集团公司电力科学研究院 Novel coal hopper

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202429562U (en) * 2011-12-13 2012-09-12 中国轻工业长沙工程有限公司 Non-blockage deformed coal bunker
CN202499426U (en) * 2012-03-16 2012-10-24 煤炭工业郑州设计研究院有限公司 Anti-blocking type coal bunker funnel
CN102628591A (en) * 2012-04-24 2012-08-08 上海艾能电力工程有限公司 Improved structure of raw coal cabin of circulating fluidized bed boiler
CN203111839U (en) * 2013-03-22 2013-08-07 山东电力集团公司电力科学研究院 Novel coal hopper

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
吴佩萱: ""最速降线"问题-数学史上最激动人心的一次公开挑战", 《数学通报》 *
周嘉炜、曹炳阳、过增元: "具有黏滞阻力时的最速降线", 《力学与实践》 *
尤明庆: "最速降线求解和摩擦力影响的研究", 《河南理工大学学报》 *
张正华、赵祥涛、张明学、辛烁军: "最速降线在粮食仓储物流中的应用", 《工程设计》 *
林鹏;兰云贤;刘秀虎: "理想仓斗曲线的设计探讨", 《四川畜牧兽医学院学报》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107380885A (en) * 2017-09-13 2017-11-24 魏玉昊 Prompt drop helical structure

Similar Documents

Publication Publication Date Title
CN204209540U (en) CIT capsule manufacture polishing machine
CN203111839U (en) Novel coal hopper
CN103144866A (en) Novel coal scuttle
CN205146475U (en) Concentrated swirler of screen cloth formula
CN204297708U (en) Ball buffer unit under lappingout
CN202201370U (en) Powder bin capable of avoiding blockage
CN203255702U (en) Improved discharging device of wet line mill
CN204502695U (en) Water film type high efficiency cyclonic dust collector
CN104258987A (en) Magnetic separator
CN209023512U (en) A kind of large silo feeding buffer device
CN202170174U (en) Novel feeding device
CN204051856U (en) A kind of pulverizer being convenient to discharging
CN204342041U (en) A kind of mixing dosage groove drawing mechanism
CN203990515U (en) particle preparation system
CN202987941U (en) Flow guide device of coal feeder and coal feeder
CN205226722U (en) Elbow
CN203544887U (en) Chute turning plate with novel structure
CN107489767A (en) A kind of anti-impact device of pressure vessel
CN211593856U (en) Discharging chute
CN202670776U (en) Cement kiln clinker silo top clinker discharging device
CN203253515U (en) Power plant desulphurization pulping system feeder
CN204339997U (en) Castable process units
CN203667537U (en) Briquette coal transferring device
CN203345556U (en) Guiding discharging chute
CN203255613U (en) Wear-resisting device with replaceable discharging pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130612